327364   |
20100312 2054  |
20100312 2054  |
20100312 2100  |
20100318 2400  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
BT8480_CB  |
CALAVERAS  |
  |
Close  |
138  |
to remain in compliance with OP E-20  |
327363   |
20100312 2053  |
20100312 2053  |
20100312 2100  |
20100318 2400  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
BT8470_CB  |
CALAVERAS  |
  |
Close  |
138  |
to remain in compliance with OP E-20  |
327362   |
20100312 2037  |
20100312 2043  |
20100312 2045  |
20101231 2345  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
2630  |
PEACOCK  |
  |
Open  |
69  |
Circuit opened for post contingency overload protection.  |
326734   |
20100310 0151  |
20100312 1343  |
20100310 0200  |
20100312 1345  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
BT8470_CB  |
CALAVERAS  |
  |
Close  |
138  |
to remain in compliance with OP E-20 due to OWS#1 coming off line  |
326714   |
20100310 0151  |
20100312 1343  |
20100310 0200  |
20100312 1345  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
BT8480_CB  |
CALAVERAS  |
  |
Close  |
138  |
to remain in compliance with OP E-20 due to OWS#1 coming off line  |
326677   |
20100309 1352  |
20100309 1352  |
20100312 1615  |
20100405 1700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
U680  |
RTW  |
  |
Close  |
345  |
Substation energized. Submitted NOMCR for status chg open to close  |
326676   |
20100309 1351  |
20100309 1351  |
20100312 1615  |
20100405 1700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
U670  |
RTW  |
  |
Close  |
345  |
Substation energized. Submitted NOMCR for status chg open to close  |
326668   |
20100309 1346  |
20100309 1347  |
20100312 0800  |
20100312 1600  |
  |
  |
Daily  |
Cancelled  |
Equipment Status Change  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
U680  |
RTW  |
  |
Open  |
345  |
INSTALL NEW CONTROL CABLE  |
325982   |
20100303 1318  |
20100309 1345  |
20100303 1330  |
20100312 0745  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
U680  |
RTW  |
  |
Close  |
345  |
Substation energized. Submitted NOMCR for status chg open to close  |
325981   |
20100303 1318  |
20100309 1345  |
20100303 1330  |
20100312 0745  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
U670  |
RTW  |
  |
Close  |
345  |
Substation energized. Submitted NOMCR for status chg open to close  |
326615   |
20100309 1052  |
20100309 1053  |
20100309 1100  |
20100331 1700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
GEUS (TDSP)  |
  |
DSC  |
69UD4  |
STEAM  |
  |
Open  |
69  |
New switch installed and this will be open until the new Engine plant is in service.  |
326217   |
20100305 0814  |
20100305 0814  |
20100305 0815  |
20100317 1700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
RBT22T5_CB  |
HILL COUNTRY  |
  |
Close  |
345  |
This ezuipment status change will be in effect until the EROCT data base load on the March 16 when breaker 19T4 will become the normal open and breaker 22T4 will be the normal close.  |
326216   |
20100305 0813  |
20100305 0813  |
20100305 0815  |
20100317 1700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
BT19T4_CB  |
HILL COUNTRY  |
  |
Open  |
138  |
This ezuipment status change will be in effect until the EROCT data base load on the March 16 when breaker 19T4 will become the normal open and breaker 22T4 will be the normal close.  |
326164   |
20100304 1517  |
20100304 1517  |
20100313 0815  |
20100316 0800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-5  |
PONY  |
| BLUFF CREEK | | HORSE HOLLOW 3 |   |
Close  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326163   |
20100304 1516  |
20100304 1516  |
20100313 0815  |
20100316 0800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-2  |
PONY  |
| BLUFF CREEK | | HORSE HOLLOW 2 |   |
Close  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326162   |
20100304 1516  |
20100304 1516  |
20100313 1115  |
20100316 1100  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-6  |
PONY  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326161   |
20100304 1514  |
20100304 1514  |
20100313 0815  |
20100316 0800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-U1A  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326160   |
20100304 1514  |
20100304 1514  |
20100313 0815  |
20100316 0800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-U1  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326159   |
20100304 1513  |
20100304 1513  |
20100313 0815  |
20100316 0800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-U2  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326158   |
20100304 1511  |
20100304 1511  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
345B2  |
HHGT  |
  |
Open  |
345  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326157   |
20100304 1510  |
20100304 1510  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
345B1  |
HHGT  |
  |
Open  |
345  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326156   |
20100304 1509  |
20100304 1509  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
035B4  |
HHGT  |
  |
Open  |
34.5  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326155   |
20100304 1509  |
20100304 1509  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
035B5  |
HHGT  |
  |
Open  |
34.5  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326154   |
20100304 1508  |
20100304 1508  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
035B1  |
HHGT  |
  |
Open  |
34.5  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326153   |
20100304 1508  |
20100304 1508  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
035B2  |
HHGT  |
  |
Open  |
34.5  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326152   |
20100304 1507  |
20100304 1507  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
035B3  |
HHGT  |
  |
Open  |
34.5  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326151   |
20100304 1506  |
20100304 1506  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B1  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326150   |
20100304 1506  |
20100304 1506  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B3  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326149   |
20100304 1505  |
20100304 1505  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B2  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326148   |
20100304 1504  |
20100304 1504  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B5  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326147   |
20100304 1503  |
20100304 1503  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B4  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326146   |
20100304 1503  |
20100304 1503  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B7  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326144   |
20100304 1502  |
20100304 1502  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B6  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326143   |
20100304 1501  |
20100304 1501  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B9  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326142   |
20100304 1500  |
20100304 1500  |
20100313 0915  |
20100316 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B8  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
326117   |
20100304 1020  |
20100304 1020  |
20100305 1030  |
20101130 2000  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7510  |
STMBOAT  |
  |
Open  |
69  |
open waiting for station completion  |
325980   |
20100303 1318  |
20100303 1318  |
20100303 1330  |
20100405 1700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
U660  |
RTW  |
  |
Close  |
345  |
Substation energized. Submitted NOMCR for status chg open to close  |
325979   |
20100303 1317  |
20100303 1317  |
20100303 1330  |
20100405 1700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
3748  |
RTW  |
  |
Close  |
345  |
Substation energized. Submitted NOMCR for status chg open to close  |
325977   |
20100303 1317  |
20100303 1317  |
20100303 1330  |
20100405 1700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
3747  |
RTW  |
  |
Close  |
345  |
Substation energized. Submitted NOMCR for status chg open to close  |
325957   |
20100303 1112  |
20100303 1202  |
20100313 0845  |
20100315 1800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
345SL6  |
HHGT  |
  |
Open  |
345  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST NOTE: MORE TIME NEEDED TO COMPLETE WORK DUE TO GROUND CONDITIONS.  |
322678   |
20100201 1323  |
20100301 1359  |
20100201 1330  |
20100312 1800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
8968_CS  |
THOMASTON  |
  |
Open  |
138  |
line name change in ercot data base  |
323520   |
20100209 1515  |
20100228 1617  |
20100209 1530  |
20100430 2300  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
M20CS-3  |
SALT CREEK TMPP  |
  |
Open  |
138  |
Waiting on OXY Plant to complete construction on distribution circuits.  |
325524   |
20100226 1105  |
20100226 1105  |
20100226 1115  |
20100630 1900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_20020  |
DIVIDE SWITCHYARD  |
  |
Open  |
345  |
CB out for Relay and construction work.  |
325523   |
20100226 1104  |
20100226 1104  |
20100226 1115  |
20100630 1900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_20080  |
DIVIDE SWITCHYARD  |
  |
Open  |
345  |
CB out for Relay and construction work.  |
325521   |
20100226 1103  |
20100226 1103  |
20100226 1115  |
20100312 1900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_20070  |
DIVIDE SWITCHYARD  |
  |
Open  |
345  |
CB out for Relay and construction work.  |
324982   |
20100222 1353  |
20100222 1353  |
20100308 1000  |
20100319 1800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
9312  |
NIXON  |
  |
Close  |
69  |
CLOSE DURING LCRA WORK FOR OWERSHIP TRANSFER.  |
322777   |
20100202 1105  |
20100202 1106  |
20100202 1115  |
20101231 2345  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLS_1232  |
KILLEEN FORT HOOD  |
  |
Close  |
138  |
Closed for ERCOT  |
322690   |
20100201 1508  |
20100201 1508  |
20100201 1200  |
20100507 1700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
255T279  |
MEDINA LAKE  |
PIPE CREEK  |
  |
138  |
LINE UPGRADE TO 138 KV TO BE COMPLETED ON MAY 7TH.  |
322689   |
20100201 1507  |
20100201 1507  |
20100201 1200  |
20100507 1700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_21920  |
MEDINA LAKE  |
  |
Open  |
138  |
Circuit breaker will remain open. Line being rebuilt as a 138 kv line. To be completed on May 7th.  |
322656   |
20100201 1457  |
20100201 1457  |
20100201 1500  |
20100331 1900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
1920  |
GONZALES  |
  |
Open  |
69  |
new station open bank sw entere at ercot request  |
322688   |
20100201 1456  |
20100201 1456  |
20100201 1500  |
20100331 1900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
4737  |
GONZALES  |
  |
Open  |
69  |
new station open bank sw entere at ercot request  |
322174   |
20100127 1553  |
20100127 1553  |
20100307 1500  |
20100313 0800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-U1A  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
322173   |
20100127 1547  |
20100127 1547  |
20100307 1500  |
20100313 0800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-U1  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
322172   |
20100127 1546  |
20100127 1546  |
20100307 1500  |
20100313 0800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-U2  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
322171   |
20100127 1545  |
20100127 1545  |
20100307 1500  |
20100313 0800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-5  |
PONY  |
| BLUFF CREEK | | HORSE HOLLOW 3 |   |
Close  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
322170   |
20100127 1544  |
20100127 1544  |
20100307 1500  |
20100313 0800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-2  |
PONY  |
| BLUFF CREEK | | HORSE HOLLOW 2 |   |
Close  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
322169   |
20100127 1543  |
20100127 1544  |
20100307 1500  |
20100313 0800  |
  |
  |
Continuous  |
Cancelled  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-2  |
PONY  |
| BLUFF CREEK | | HORSE HOLLOW 2 |   |
Close  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
322186   |
20100127 1540  |
20100127 1542  |
20100307 1500  |
20100313 0800  |
  |
  |
Continuous  |
Cancelled  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-5  |
PONY  |
| BLUFF CREEK | | HORSE HOLLOW 3 |   |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
322168   |
20100127 1540  |
20100127 1542  |
20100307 1500  |
20100313 0800  |
  |
  |
Continuous  |
Cancelled  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-2  |
PONY  |
| BLUFF CREEK | | HORSE HOLLOW 2 |   |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
322164   |
20100127 1504  |
20100127 1513  |
20100127 1515  |
20100430 1700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_20071  |
DIVIDE SWITCHYARD  |
  |
Open  |
345  |
NORMAL OPEN SWITCH. BREAKER TO BE INSTALLED AT A LATER DATE  |
322163   |
20100127 1504  |
20100127 1504  |
20100127 1515  |
20100430 1700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_20069  |
DIVIDE SWITCHYARD  |
  |
Open  |
345  |
NORMAL OPEN SWITCH. BREAKER TO BE INSTALLED AT A LATER DATE  |
321877   |
20100126 1543  |
20100126 1543  |
20100307 1730  |
20100313 0830  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
345SL6  |
HHGT  |
  |
Open  |
345  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321871   |
20100126 1529  |
20100126 1529  |
20100307 1730  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
345B2  |
HHGT  |
  |
Open  |
345  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321870   |
20100126 1528  |
20100126 1528  |
20100307 1730  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
345B1  |
HHGT  |
  |
Open  |
345  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321869   |
20100126 1506  |
20100126 1527  |
20100307 1730  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
035B5  |
HHGT  |
  |
Open  |
34.5  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321868   |
20100126 1506  |
20100126 1526  |
20100307 1730  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
035B4  |
HHGT  |
  |
Open  |
34.5  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321867   |
20100126 1505  |
20100126 1525  |
20100307 1730  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
035B3  |
HHGT  |
  |
Open  |
34.5  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321866   |
20100126 1505  |
20100126 1523  |
20100307 1730  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
035B2  |
HHGT  |
  |
Open  |
34.5  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321865   |
20100126 1505  |
20100126 1523  |
20100307 1730  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
035B1  |
HHGT  |
  |
Open  |
34.5  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321843   |
20100126 1503  |
20100126 1521  |
20100307 1600  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B2  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321864   |
20100126 1504  |
20100126 1519  |
20100307 1730  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B1  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321842   |
20100126 1503  |
20100126 1516  |
20100307 1600  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B3  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321841   |
20100126 1501  |
20100126 1515  |
20100307 1600  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B4  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321840   |
20100126 1501  |
20100126 1514  |
20100307 1600  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B5  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321839   |
20100126 1500  |
20100126 1512  |
20100307 1600  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B9  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321837   |
20100126 1500  |
20100126 1511  |
20100307 1600  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B7  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321838   |
20100126 1500  |
20100126 1510  |
20100307 1600  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B6  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321836   |
20100126 1459  |
20100126 1509  |
20100307 1600  |
20100313 0900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
138B8  |
HHGT  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321835   |
20100126 1458  |
20100126 1458  |
20100307 1500  |
20100313 1100  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-6  |
PONY  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
321834   |
20100126 1457  |
20100126 1457  |
20100307 1500  |
20100313 1100  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
52-3  |
PONY  |
  |
Open  |
138  |
SWAP HHGT GEN TIE FROM THE SOUTH TO THE WEST  |
320106   |
20100111 1249  |
20100111 1249  |
20100111 1300  |
20101230 2400  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
DSC  |
LN16P4  |
SKYLINE  |
  |
Close  |
345  |
This is modeling error. This is a normal close switch. The changes are being submitted to ERCOT  |
320105   |
20100111 1249  |
20100111 1249  |
20100111 1300  |
20101230 2400  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
DSC  |
LN10N5  |
CALAVERAS  |
  |
Close  |
345  |
This is modeling error. This is a normal close switch. The changes are being submitted to ERCOT  |
319232   |
20091231 2221  |
20091231 2225  |
20100101 0015  |
20101231 2345  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
4130_CB  |
FORT STOCKTON SWITCH  |
  |
Open  |
69  |
open for Ercot contingency due to Wind Farm production  |
318775   |
20091228 0914  |
20091228 0914  |
20091231 1615  |
20101231 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
1513  |
CHRISTOVAL  |
  |
Open  |
69  |
open for congestion  |
318772   |
20091228 0907  |
20091228 0907  |
20091231 2400  |
20101231 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
4183  |
CRANE GULF TAP  |
  |
Close  |
69  |
Unable to re-open sw 4183 Crane Tap 2 after breaker clearance on CB 4315 Crane due to line loading, so left switch 4183 closed and changing status of sw 4183 (to closed) and CB 4315 Crane (to open)  |
318771   |
20091228 0905  |
20091228 0905  |
20091231 2400  |
20101231 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
4315_CB  |
CRANE CSW  |
  |
Open  |
69  |
unable to re-open sw 4183 Crane Tap 2 after breaker clearance on CB 4315 Crane due to line loading, so left switch 4183 closed and changing status of sw 4183 (to closed) and CB 4315 Crane (to open)  |
318269   |
20091222 1224  |
20091222 1224  |
20091231 2400  |
20101231 2345  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
27D5  |
LEON CREEK  |
  |
Close  |
138  |
Per ERCOT Darrell Jenkins to change the stastus of the breaker until the end of the year.  |
318268   |
20091222 1210  |
20091222 1210  |
20091222 1815  |
20101231 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
6287  |
COLRDO RVR MUNICIPL WTR 1  |
  |
Open  |
69  |
open for base case overload  |
318323   |
20091221 1021  |
20091221 1032  |
20091231 2400  |
20101231 2345  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
2240  |
CRANE TU  |
  |
Close  |
69  |
Closed for voltage support in the area.  |
318325   |
20091221 1023  |
20091221 1023  |
20091231 2315  |
20101231 2345  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLS_1258  |
KILLEEN FORT HOOD  |
  |
Open  |
138  |
Changed due to Ercot Request  |
317147   |
20091210 0943  |
20091210 0943  |
20091210 0945  |
20100610 1900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
2838  |
RIO PECOS  |
  |
Close  |
69  |
normal close  |
327392   |
20100313 2213  |
20100314 0020  |
20100313 2130  |
20100314 0015  |
20100313 2130  |
20100314 0020  |
Continuous  |
Approved  |
Forced  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
XF  |
138_69_1  |
LIVE OAK CSW  |
  |
  |
69  |
#1 138/69kv transformer tripped off line cause unknown at this time.  |
327390   |
20100313 2009  |
20100313 2119  |
20100313 1830  |
20100313 2345  |
20100313 1830  |
20100313 2118  |
Daily  |
Approved  |
Forced  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
XF  |
XFMR1  |
SANTA ANNA  |
  |
  |
69  |
Bad Order Transformer arrestor.  |
327373   |
20100313 1931  |
20100313 1931  |
20100313 1700  |
20100319 1800  |
20100313 1700  |
  |
Continuous  |
Approved  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
RA_RTW66  |
RTW  |
RA  |
  |
138  |
Existing outage due to the new 138KV Rothwood(RTH) substation being placed on LN66. Previous outage RA_TB_66 LN in Outage Sch.  |
327341   |
20100312 1403  |
20100313 1727  |
20100311 0800  |
20100312 2300  |
20100311 0800  |
20100312 2125  |
Continuous  |
Approved  |
Forced  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6075_A  |
HEMPHILL  |
ADAMS TERMINATION  |
  |
138  |
This line was taken out of service as part of a switching procedure to remove a bus section from service at Hemphill. In the process a switching device at EPDC failed and caused to line to be unusable.  |
325665   |
20100301 1040  |
20100313 0600  |
20100301 1045  |
20100313 1900  |
20100301 1045  |
20100313 1900  |
Continuous  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
8480  |
LOBO  |
  |
Open  |
138  |
NOT COMPLETE REBUILDING #1 LOBO - LAREDO VFT NORTH LINE TO HIGH CAPACITY.  |
325664   |
20100301 1038  |
20100313 0559  |
20100301 1045  |
20100313 1900  |
20100301 1045  |
20100313 1900  |
Continuous  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5135  |
LAREDO VFT NORTH  |
  |
Open  |
138  |
NOT COMPLETE REBUILDING #1 LOBO - LAREDO VFT NORTH LINE TO HIGH CAPACITY.  |
327353   |
20100312 1553  |
20100312 2038  |
20100312 0900  |
20100312 2100  |
20100312 0900  |
20100312 2036  |
Daily  |
Approved  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
F171  |
POWELL REIT  |
  |
Open  |
138  |
Repair switch  |
327358   |
20100312 1655  |
20100312 2003  |
20100312 1700  |
20100312 2000  |
20100312 1700  |
20100312 1855  |
Daily  |
Approved  |
Forced  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ACME_QUAN1  |
QUANAH  |
ACME BESTWALL  |
  |
69  |
phase down on line. for line repairs.  |
327239   |
20100312 0802  |
20100312 1358  |
20100312 0900  |
20100312 1330  |
20100312 0900  |
20100312 1315  |
Daily  |
Approved  |
Forced  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
GCB_7230_CB  |
FAYETTE PLANT 1  |
  |
Open  |
345  |
reference 345kv ckt 3132 line outage.  |
327238   |
20100312 0801  |
20100312 1357  |
20100312 0900  |
20100312 1330  |
20100312 0900  |
20100312 1314  |
Daily  |
Approved  |
Forced  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
7330_CB  |
FAYETTE PLANT 1  |
  |
Open  |
345  |
reference 345kv ckt 3132 line outage.  |
327237   |
20100312 0800  |
20100312 1355  |
20100312 0900  |
20100312 1330  |
20100312 0900  |
20100312 1313  |
Daily  |
Approved  |
Forced  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
1226  |
LOST PINES AEN  |
  |
Open  |
345  |
reference 345kv ckt 3132 line outage.  |
327236   |
20100312 0758  |
20100312 1354  |
20100312 0900  |
20100312 1330  |
20100312 0900  |
20100312 1314  |
Daily  |
Approved  |
Forced  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
1227  |
LOST PINES AEN  |
  |
Open  |
345  |
reference 345kv ckt 3132 forced line outage.  |
327235   |
20100312 0755  |
20100312 1351  |
20100312 0900  |
20100312 1330  |
20100312 0900  |
20100312 1315  |
Daily  |
Approved  |
Forced  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
LN  |
CKT_3132  |
LOST PINES AEN  |
FAYETTE PLANT 1  |
  |
345  |
Transmission crews have identified a bad jumper on 345kv ckt 3132 LP-FPP that will need immediate attention.  |
327302   |
20100312 1204  |
20100312 1204  |
20100312 1200  |
20100312 1400  |
20100312 1200  |
  |
Daily  |
Approved  |
Forced  |
Rayburn Country Coop, Inc. DBA - Rayburn Electric (TDSP)  |
  |
CB  |
B07833  |
SUNNY POINT RC  |
  |
Open  |
69  |
forced outage test  |
327056   |
20100311 2203  |
20100311 2203  |
20100311 2000  |
20100311 2145  |
20100311 2000  |
  |
Daily  |
Approved  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
Y640  |
SOUTH TEXAS PROJECT  |
  |
Open  |
345  |
opened due to AEP forced outage @ ZWP  |
327055   |
20100311 2201  |
20100311 2201  |
20100310 2400  |
20100311 2145  |
20100310 2400  |
  |
Continuous  |
Approved  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
Y630  |
SOUTH TEXAS PROJECT  |
  |
Open  |
345  |
opened due to AEP forced outage @ZWP  |
327054   |
20100311 2116  |
20100311 2116  |
20100311 2000  |
20100319 1800  |
20100311 2000  |
  |
Continuous  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
XF  |
345A  |
WHITE_PT  |
  |
  |
345  |
Tripped on primary diff. and Gas monitor alarm, techs testing and checking out 345/138 auto.  |
327216   |
20100311 1826  |
20100311 1936  |
20100311 1830  |
20100316 2000  |
20100311 1830  |
  |
Continuous  |
Approved  |
Forced  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
1055  |
RIO PECOS  |
  |
Open  |
69  |
UNIT WAS TRIPPED OFF LINE MANUALLY DUE TO CONTROL PROBLEM.  |
327103   |
20100311 1158  |
20100311 1805  |
20100311 1300  |
20100311 2000  |
20100311 1300  |
20100311 1802  |
Daily  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_RODD_F1  |
BARNEY DAVIS  |
RODD FIELD  |
  |
138  |
Line operated by relay earlier today, patrol discovered ruptured polymer insulator.  |
327102   |
20100311 1122  |
20100311 1730  |
20100311 1130  |
20100311 1600  |
20100311 1130  |
20100311 1630  |
Daily  |
Approved  |
Forced  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ANSN_RADM1  |
ANSON  |
RADIUM  |
  |
69  |
replace crossarm and pick up floating conductor  |
326942   |
20100311 0106  |
20100311 1442  |
20100311 0100  |
20100311 1200  |
20100311 0100  |
20100311 1230  |
Daily  |
Approved  |
Forced  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
120T125  |
LOCKHART  |
DALE  |
  |
69  |
Breaker tripped, reason unknown. This line feeds radial substation Dale and has caused an outage.  |
326868   |
20100310 1438  |
20100311 1351  |
20100310 1445  |
20100311 1600  |
20100310 1445  |
20100311 1350  |
Continuous  |
Approved  |
Forced  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
42U2  |
VH BRAUNIG  |
  |
Open  |
138  |
new peaking unit test and to complete buss work on secondary side  |
326933   |
20100310 1719  |
20100311 1118  |
20100310 1700  |
20100311 1800  |
20100310 1700  |
20100311 1110  |
Continuous  |
Approved  |
Forced  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
MASW_PHMA1  |
MASON SWITCHING STATION  |
MASON PHILLIPS  |
  |
69  |
69Kv line floater  |
326941   |
20100311 0011  |
20100311 0545  |
20100310 2400  |
20100311 0600  |
20100310 2400  |
20100311 0144  |
Continuous  |
Approved  |
Forced  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
7270  |
FAYETTE PLANT 2  |
  |
Open  |
345  |
Need to make repairs to the pop off valve and the governor switch. Pop off valve is stuck open and the compressor motor trips off after over-heating.  |
326934   |
20100310 1726  |
20100311 0152  |
20100310 1630  |
20100311 0800  |
20100310 1630  |
20100311 0138  |
Continuous  |
Approved  |
Forced  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
SAPS_YELWJC1  |
SAN ANGELO POWER STATION  |
YELWJCKT  |
  |
138  |
Line is locked out and crews are patrolling the line to find the problem.  |
320196   |
20100112 1322  |
20100309 1900  |
20100111 2400  |
20100312 1800  |
20100111 2400  |
20100309 1722  |
Continuous  |
Approved  |
Forced  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
HM_900_CB  |
HAMILTON AEN  |
  |
Open  |
138  |
Breaker failure. This cap bank is out of service until further notice. AE is having problems with this particular type of breaker and is currently working on a solution.  |
320221   |
20100112 1313  |
20100309 1859  |
20100111 2400  |
20100312 1600  |
20100111 2400  |
20100309 1859  |
Continuous  |
Approved  |
Forced  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
HA_800  |
HARRIS  |
  |
Open  |
69  |
Breaker failure. This cap bank is out of service until further notice. AE is having problems with this particular type of breaker and is currently working on a solution.  |
326565   |
20100308 1415  |
20100308 1415  |
20100308 0715  |
20100322 1700  |
20100308 0715  |
  |
Continuous  |
Approved  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
F149  |
POWER SYSTEMS-ARCO COGEN  |
  |
Open  |
138  |
Due to scheduled outage work not completed & the unavoidable force extension button would not enable  |
326564   |
20100308 1413  |
20100308 1413  |
20100308 0715  |
20100322 1700  |
20100308 0715  |
  |
Continuous  |
Approved  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
F900  |
POWER SYSTEMS-ARCO COGEN  |
  |
Open  |
138  |
Due to schedule outage work not completed and the unavoidable force extension button would not enable  |
326563   |
20100308 1411  |
20100308 1411  |
20100308 0715  |
20100322 1700  |
20100308 0715  |
  |
Continuous  |
Approved  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
F890  |
POWER SYSTEMS-ARCO COGEN  |
  |
Open  |
138  |
All repairs not completed from schedule outage and unavoidable force extension button would not enable  |
326350   |
20100305 1440  |
20100305 1440  |
20100305 1430  |
20100331 2345  |
20100305 1430  |
  |
Continuous  |
Approved  |
Forced  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
CB  |
138_BKR  |
HACKBERRY DRAW  |
  |
Open  |
138  |
Customer (ENSTOR) opened breaker due to problem. No details provided when contacted by TNP as to duration. Will have to have contractor investigate.  |
325597   |
20100226 1410  |
20100301 1058  |
20100226 1415  |
20100312 1600  |
20100226 1415  |
20100301 1039  |
Continuous  |
Approved  |
Forced  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
DSC  |
BT13J23_DSW  |
CASTLE HILLS  |
  |
Open  |
138  |
To replace break 700 with 11J2. Due to bad weather the job has not been complete.  |
324921   |
20100222 1537  |
20100222 1538  |
20100224 2300  |
20100331 2300  |
20100224 2300  |
  |
Continuous  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
CS_918  |
FALFURRIAS  |
  |
Open  |
138  |
Relays are b/o. Parts ordered  |
324011   |
20100212 1305  |
20100212 1341  |
20100312 1300  |
20100313 0730  |
20100312 1300  |
  |
Continuous  |
Cancelled  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
R750  |
WO  |
  |
Open  |
138  |
Relay issues due to faulty CTs  |
324009   |
20100212 1303  |
20100212 1341  |
20100312 1300  |
20100313 0730  |
20100312 1300  |
  |
Continuous  |
Cancelled  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
XF  |
AT1_H  |
WO  |
  |
  |
138  |
Relay issues due to faulty CTs  |
322971   |
20100203 1344  |
20100203 1344  |
20100203 1345  |
20101231 2345  |
20100203 1345  |
  |
Continuous  |
Approved  |
Forced  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
2170_CB  |
CEDAR HILL CSW  |
  |
Open  |
69  |
controls are not functioning properly  |
320197   |
20100112 1327  |
20100112 1327  |
20100111 2400  |
20100312 1600  |
20100111 2400  |
  |
Continuous  |
Approved  |
Forced  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
CF_900_CB  |
COMMONS FORD  |
  |
Open  |
138  |
Breaker failure. This cap bank is out of service until further notice. AE is having problems with this particular type of breaker and is currently working on a solution.  |
320224   |
20100112 1320  |
20100112 1320  |
20100111 2400  |
20100312 1600  |
20100111 2400  |
  |
Continuous  |
Approved  |
Forced  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
BC_900  |
BEECREEK  |
  |
Open  |
138  |
Breaker failure. This cap bank is out of service until further notice. AE is having problems with this particular type of breaker and is currently working on a solution.  |
320223   |
20100112 1316  |
20100112 1316  |
20100111 2400  |
20100312 1600  |
20100111 2400  |
  |
Continuous  |
Approved  |
Forced  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
PE_904  |
PEDERNALES  |
  |
Open  |
138  |
Breaker failure. This cap bank is out of service until further notice. AE is having problems with this particular type of breaker and is currently working on a solution.  |
327089   |
20100311 1022  |
20100313 1404  |
20100312 1615  |
20100319 1600  |
20100312 2400  |
20100313 0001  |
Continuous  |
Approved  |
Forced Extension  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
DSC  |
SU_602M  |
SUMMIT  |
  |
Open  |
138  |
There are some unresolved relay issues with the new transformer, that would not allow us to confidently re-energize and add load. AE relay personnel are working diligently for a resolution with a possible sudden pressure relay upgrade.  |
327033   |
20100311 0947  |
20100313 1205  |
20100311 1915  |
20100313 1200  |
20100311 1906  |
20100313 1205  |
Continuous  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ANGORA_STER1  |
ANGORA  |
STERLING CITY  |
  |
69  |
equipment trouble drilling in rock  |
327361   |
20100312 2000  |
20100312 2354  |
20100312 1715  |
20100315 1700  |
20100312 1715  |
  |
Continuous  |
Approved  |
Forced Extension  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
10Z0_CB  |
BECK ROAD  |
  |
Open  |
138  |
Unable to finish job due to material failure  |
327360   |
20100312 1958  |
20100312 2353  |
20100312 1715  |
20100315 1700  |
20100312 1715  |
  |
Continuous  |
Approved  |
Forced Extension  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN8490_CB  |
CALAVERAS  |
  |
Open  |
138  |
Unable to finish job due to material failure  |
327352   |
20100312 1548  |
20100312 2038  |
20100312 1715  |
20100312 2100  |
20100312 1700  |
20100312 2036  |
Daily  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BBPPWL79  |
POWELL REIT  |
BIGBAY  |
  |
138  |
Problems with switch.  |
326128   |
20100304 1135  |
20100312 2022  |
20100304 1815  |
20100313 2345  |
20100304 1730  |
20100312 2021  |
Continuous  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ASPM_SWEN1  |
ASPERMONT CSW  |
SWENSON STATION  |
  |
69  |
currently too wet to get to the location to make repairs.  |
327223   |
20100312 0649  |
20100312 1953  |
20100312 1715  |
20100315 1700  |
20100312 1715  |
  |
Continuous  |
Approved  |
Forced Extension  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
N3_Z0  |
CALAVERAS  |
BECK ROAD  |
  |
138  |
Unable to complete the work due to material failure.  |
327220   |
20100312 0645  |
20100312 1952  |
20100312 1715  |
20100315 1700  |
20100312 1715  |
  |
Continuous  |
Approved  |
Forced Extension  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
C4_N3  |
KIRBY CPS  |
CALAVERAS  |
  |
138  |
Unable to complete the work due to material failure.  |
327222   |
20100312 0648  |
20100312 1949  |
20100312 1715  |
20100315 1700  |
20100312 1715  |
  |
Continuous  |
Approved  |
Forced Extension  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN8500_CB  |
CALAVERAS  |
  |
Open  |
138  |
Unable to complete the work due to material failure.  |
327221   |
20100312 0648  |
20100312 1947  |
20100312 1715  |
20100315 1700  |
20100312 1715  |
  |
Continuous  |
Approved  |
Forced Extension  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN15C4_CB  |
KIRBY CPS  |
  |
Open  |
138  |
Unable to complete the work due to material failure.  |
327247   |
20100312 0914  |
20100312 1839  |
20100312 1845  |
20100417 1630  |
20100312 1839  |
  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
9249  |
SANDOW SWITCH  |
  |
Open  |
138  |
adding new bay for new equipment, work not complete  |
327196   |
20100311 1506  |
20100312 1656  |
20100311 1715  |
20100312 1700  |
20100311 1715  |
20100312 1643  |
Continuous  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W780  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
Cust waiting on parts  |
327175   |
20100311 1445  |
20100312 1656  |
20100311 1715  |
20100312 1700  |
20100311 1715  |
20100312 1643  |
Continuous  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W770  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
Cust waiting on parts  |
327177   |
20100311 1445  |
20100312 1655  |
20100311 1715  |
20100312 1700  |
20100311 1715  |
20100312 1643  |
Continuous  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
W759  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
Cust waiting on parts  |
327171   |
20100311 1443  |
20100312 1655  |
20100311 1715  |
20100312 1700  |
20100311 1715  |
20100312 1643  |
Continuous  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W750  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
Cust waiting on parts  |
327168   |
20100311 1442  |
20100312 1655  |
20100311 1715  |
20100312 1700  |
20100311 1715  |
20100312 1643  |
Continuous  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W760  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
Cust waiting on parts  |
325527   |
20100226 1114  |
20100312 1613  |
20100226 1215  |
20100312 1900  |
  |
20100312 1213  |
Continuous  |
Approved  |
Forced Extension  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_20039  |
DIVIDE SWITCHYARD  |
  |
Open  |
345  |
Extended time need to complete work at Divide. Per Contractors and LCRA personnel  |
325526   |
20100226 1107  |
20100312 1613  |
20100226 1215  |
20100312 1900  |
  |
20100312 1213  |
Continuous  |
Approved  |
Forced Extension  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_20031  |
DIVIDE SWITCHYARD  |
  |
Open  |
345  |
Extended time need to complete work at Divide. Per Contractors and LCRA personnel  |
327351   |
20100312 1530  |
20100312 1537  |
20100314 1815  |
20100317 1700  |
  |
  |
Continuous  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P120  |
HR  |
  |
Open  |
138  |
Bad current transformer in breaker.  |
327332   |
20100312 1308  |
20100312 1506  |
20100312 1345  |
20100312 1500  |
20100312 1330  |
20100312 1451  |
Daily  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ABD2_ABD31  |
ABILENE DYESS AFB 2  |
ABILENE DYESS AFB 3  |
  |
69  |
work is not complete.  |
327308   |
20100312 1212  |
20100312 1430  |
20100312 2115  |
20100313 0100  |
  |
  |
Continuous  |
Cancelled  |
Forced Extension  |
Rayburn Country Coop, Inc. DBA - Rayburn Electric (TDSP)  |
  |
CB  |
A66351  |
EMORY_RC  |
  |
Open  |
138  |
delay in mobile transformer deployment  |
327306   |
20100312 1208  |
20100312 1430  |
20100312 1915  |
20100312 2100  |
  |
  |
Daily  |
Cancelled  |
Forced Extension  |
Rayburn Country Coop, Inc. DBA - Rayburn Electric (TDSP)  |
  |
CB  |
A66351  |
EMORY_RC  |
  |
Open  |
138  |
delay in mobile transformer deployment  |
319208   |
20091231 1425  |
20100312 1411  |
20091231 2315  |
20100312 1500  |
20091231 2300  |
20100312 1400  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
6490  |
WESLACO SWITCH  |
  |
Open  |
138  |
5 capacitor can units failed  |
326432   |
20100308 0933  |
20100312 1359  |
20100308 1515  |
20100312 1700  |
  |
20100312 1357  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_050  |
RENNER SWITCH  |
  |
Open  |
138  |
Too wet to add gas right now.  |
327309   |
20100312 1213  |
20100312 1216  |
20100313 0115  |
20100313 0200  |
  |
  |
Daily  |
Approved  |
Forced Extension  |
Rayburn Country Coop, Inc. DBA - Rayburn Electric (TDSP)  |
  |
CB  |
A66351  |
EMORY_RC  |
  |
Open  |
138  |
Actual End Date/Time field not available for entry at testing.  |
327276   |
20100312 1111  |
20100312 1132  |
20100312 1815  |
20100315 1830  |
20100312 1800  |
  |
Continuous  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
CAS_FRDN  |
FREDONIA  |
CASTELL  |
  |
69  |
lcra drilling core samples  |
326927   |
20100310 1644  |
20100311 2355  |
20100311 1015  |
20100311 2000  |
20100311 1015  |
20100311 2030  |
Daily  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5025_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
waiating on parts  |
327217   |
20100311 1919  |
20100311 2214  |
20100311 2015  |
20100312 0200  |
20100311 2000  |
20100311 2211  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5020_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
MV Gen not complete with work.  |
326926   |
20100310 1641  |
20100311 2213  |
20100311 1015  |
20100311 2000  |
20100311 1015  |
20100311 2000  |
Daily  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5020_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
waiting on parts  |
327190   |
20100311 1451  |
20100311 2000  |
20100311 1615  |
20100311 2300  |
20100311 1615  |
20100311 1950  |
Daily  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T3HS  |
FM  |
  |
Open  |
138  |
Sw#6667 @ FM will not close  |
327189   |
20100311 1450  |
20100311 1959  |
20100311 1615  |
20100311 2300  |
20100311 1615  |
20100311 1950  |
Daily  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
6667  |
FM  |
  |
Open  |
138  |
Sw#6667 @ FM will not close  |
327187   |
20100311 1448  |
20100311 1959  |
20100311 1615  |
20100311 2300  |
20100311 1615  |
20100311 1950  |
Daily  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
S666  |
FM  |
  |
Open  |
138  |
Sw#6667 @ FM will not close  |
327184   |
20100311 1447  |
20100311 1958  |
20100311 1615  |
20100311 2300  |
20100311 1615  |
20100311 1950  |
Daily  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BETFM_66  |
FM  |
BET  |
  |
138  |
Sw#6667 @ FM will not close  |
326655   |
20100309 1244  |
20100311 1933  |
20100309 1815  |
20100311 1800  |
20100309 1815  |
20100311 1830  |
Continuous  |
Approved  |
Forced Extension  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
CB  |
OCB_6664_CB  |
OLD OCEAN SUB  |
  |
Open  |
69  |
Weather prevented testing to complete breaker change out.  |
327218   |
20100311 1921  |
20100311 1921  |
20100311 2015  |
20100311 2015  |
  |
  |
Daily  |
Cancelled  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5025_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
  |
326718   |
20100310 0736  |
20100311 1830  |
20100310 1715  |
20100311 1000  |
20100310 1715  |
20100311 1000  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5020_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
equipment problems.  |
326754   |
20100310 0737  |
20100311 1830  |
20100310 1715  |
20100311 1000  |
20100310 1715  |
20100311 1000  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5025_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
equipment problems.  |
326580   |
20100308 1621  |
20100311 1703  |
20100308 1815  |
20100311 1800  |
20100308 1815  |
20100311 1449  |
Continuous  |
Approved  |
Forced Extension  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
3418_CB  |
SAN MIGUEL  |
  |
Open  |
345  |
control issues  |
326885   |
20100310 1521  |
20100311 1531  |
20100310 1515  |
20100311 1600  |
20100310 1515  |
20100311 1526  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2025  |
DILLEY SWITCH CSW  |
  |
Open  |
69  |
CREW NOT COMPLETE WITH WORK  |
326884   |
20100310 1520  |
20100311 1531  |
20100310 1515  |
20100311 1600  |
20100310 1515  |
20100311 1526  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
6125  |
DILLEY SWITCH CSW  |
  |
Open  |
138  |
CREW NOT COMPLETE WITH WORK  |
326883   |
20100310 1519  |
20100311 1531  |
20100310 1515  |
20100311 1600  |
20100310 1515  |
20100311 1526  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2715  |
DILLEY SWITCH CSW  |
  |
Open  |
138  |
CREW NOT COMPLETE WITH WORK  |
326374   |
20100306 1528  |
20100311 1531  |
20100306 1815  |
20100311 1800  |
20100306 1815  |
20100311 1519  |
Continuous  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
G600  |
GREENS BAYOU  |
  |
Open  |
138  |
bad mechanism  |
327198   |
20100311 1514  |
20100311 1514  |
20100312 1715  |
20100312 1715  |
  |
  |
Daily  |
Cancelled  |
Forced Extension  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
N3_Z0  |
CALAVERAS  |
BECK ROAD  |
  |
138  |
  |
327155   |
20100311 1408  |
20100311 1502  |
20100311 1415  |
20100311 1500  |
20100311 1400  |
20100311 1456  |
Daily  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
HAMR_RADM1  |
RADIUM  |
HAMLIN REA  |
  |
69  |
work is not complete.  |
327191   |
20100311 1456  |
20100311 1456  |
20100312 1715  |
20100312 1715  |
  |
  |
Daily  |
Cancelled  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W760  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
  |
327032   |
20100311 0944  |
20100311 0944  |
20100311 1915  |
20100311 1915  |
  |
  |
Daily  |
Cancelled  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ANGORA_STER1  |
ANGORA  |
STERLING CITY  |
  |
69  |
  |
326938   |
20100310 1900  |
20100311 0536  |
20100310 1715  |
20100311 0645  |
20100310 1715  |
20100311 0700  |
Continuous  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
E210  |
SHORE ACRES  |
  |
Open  |
138  |
waiting on parts  |
326538   |
20100308 1816  |
20100310 1500  |
20100308 1915  |
20100312 1900  |
20100308 1905  |
20100310 1355  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_3755  |
SANDOW SWITCH  |
  |
Open  |
345  |
convert 345 kv line to 138 and connect new sandow switch 345 kv auto #1- Work not complete.  |
326800   |
20100310 0930  |
20100310 0930  |
20100311 1015  |
20100311 1015  |
  |
  |
Daily  |
Cancelled  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5020_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
  |
326377   |
20100306 1816  |
20100306 2218  |
20100306 2015  |
20100331 1800  |
20100306 2000  |
  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
93_CS  |
DEL MAR  |
  |
Open  |
138  |
Still waiting on new CS to arrive to replace unit due to catasrophic failure of unit  |
325355   |
20100225 0916  |
20100305 1301  |
20100225 1615  |
20100311 1600  |
20100225 1600  |
20100305 1035  |
Continuous  |
Approved  |
Forced Extension  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M20  |
SINCLAIR  |
  |
Open  |
69  |
New control house and add CS. Mobile Sub will carry Cooke Coop load during this time.  |
325381   |
20100225 1308  |
20100226 1406  |
20100226 1715  |
20100312 1700  |
  |
  |
Continuous  |
Cancelled  |
Forced Extension  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
DSC  |
DSC_965  |
CASTLE HILLS  |
  |
Open  |
138  |
To replace break 700 with 11J2 and up grade the bus. Due to bad weather the job has not been complete.  |
325326   |
20100224 1837  |
20100225 1400  |
20100225 1815  |
20100331 1800  |
20100225 1815  |
  |
Continuous  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
C840  |
CAPITOL COGEN  |
  |
Open  |
138  |
Forced outage continued due to customer not complete with work. Awaiting Parts  |
324754   |
20100219 1202  |
20100219 1651  |
20100219 1715  |
20100319 1700  |
20100219 1651  |
  |
Continuous  |
Approved  |
Forced Extension  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
RBT30T5_CB  |
HILL COUNTRY  |
  |
Open  |
345  |
due to internal fault on new breaker.  |
324776   |
20100219 1321  |
20100219 1428  |
20100219 1815  |
20100319 1900  |
20100219 1800  |
  |
Continuous  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
CRPL_SANA_1A  |
SANTA ANNA  |
SANTA ANNA TAP  |
  |
69  |
weather related delays  |
324724   |
20100219 0921  |
20100219 1428  |
20100219 1815  |
20100319 1900  |
20100219 1800  |
  |
Continuous  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
BRWN_SANA_1A  |
SANTA ANNA  |
BROWNWOOD  |
  |
138  |
weather relateddelays  |
324683   |
20100219 0917  |
20100219 1428  |
20100219 1815  |
20100319 1900  |
20100219 1800  |
  |
Continuous  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
CRPL_SANA_1B  |
SANTA ANNA TAP  |
DRESSEY  |
  |
69  |
weather related delays  |
324682   |
20100219 0916  |
20100219 1427  |
20100219 1815  |
20100319 1900  |
20100219 1800  |
  |
Continuous  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
BANG_SANA_1A  |
SANTA ANNA TAP  |
BANGS  |
  |
69  |
weather related delays  |
324220   |
20100216 0930  |
20100219 0753  |
20100216 1715  |
20100316 1700  |
20100219 0752  |
  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CP_012  |
EAST LEVEE SWITCH  |
  |
Open  |
138  |
bad gaskets on operator.  |
324306   |
20100216 1744  |
20100216 1823  |
20100216 1915  |
20100331 1700  |
20100216 1915  |
  |
Continuous  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T4HS  |
BAYOU COGEN  |
  |
Open  |
138  |
maintenance outage  |
324200   |
20100215 2308  |
20100216 0044  |
20100215 2315  |
20100331 2300  |
20100215 2315  |
  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
3041B  |
SUNCHASE  |
SOUTH PADRE  |
  |
138  |
Parts have not arrived for the switch.  |
322862   |
20100202 1655  |
20100211 2031  |
20100202 1615  |
20100426 1600  |
20100202 1615  |
20100211 1653  |
Continuous  |
Approved  |
Forced Extension  |
BROWNSVILLE PUBLIC UTILITY BOARD (TDSP)  |
  |
DSC  |
A178  |
SILASRAY POWER PLANT  |
  |
Open  |
69  |
Air Blade A177 was damaged and will need to be replaced, Note actual restoration time will be 1440 hours  |
322861   |
20100202 1648  |
20100211 2030  |
20100202 1615  |
20100426 1600  |
20100202 1615  |
20100211 1649  |
Continuous  |
Approved  |
Forced Extension  |
BROWNSVILLE PUBLIC UTILITY BOARD (TDSP)  |
  |
DSC  |
A177  |
SILASRAY POWER PLANT  |
  |
Open  |
69  |
Air Blade A177 was damaged and will need to be replaced, Note actual restoration time will be 1440 hours  |
322860   |
20100202 1642  |
20100211 2030  |
20100202 1615  |
20100426 1600  |
20100202 1615  |
20100211 1655  |
Continuous  |
Approved  |
Forced Extension  |
BROWNSVILLE PUBLIC UTILITY BOARD (TDSP)  |
  |
CB  |
A175  |
SILASRAY POWER PLANT  |
  |
Open  |
69  |
Air blades A177 were damaged and will need to be repaired note actual restoration time will be 1440 hours  |
292663   |
20090424 1056  |
20100204 0822  |
20090424 1715  |
20100430 1600  |
20090424 1715  |
20100204 0822  |
Continuous  |
Approved  |
Forced Extension  |
CITY OF GARLAND (TDSP)  |
  |
LN  |
WJ_MILL  |
WYNN JOYCE  |
MILLER  |
  |
69  |
line and substation are being upgraded to 138 kv  |
319748   |
20100107 1107  |
20100107 1629  |
20100107 1815  |
20130107 1700  |
20100107 1800  |
  |
Continuous  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T3H1  |
MOBIL CHEMICAL  |
  |
Open  |
69  |
per customer TR3 will not return to service  |
319205   |
20091231 1423  |
20091231 1616  |
20091231 2315  |
20101231 2300  |
20091231 2300  |
  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
4010  |
BARNEY DAVIS  |
  |
Open  |
138  |
bad order capacitor, blown cans  |
319206   |
20091231 1423  |
20091231 1441  |
20091231 2315  |
20101231 2300  |
20091231 2315  |
  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
255_CB  |
LAREDO PLANT  |
  |
Open  |
69  |
Capacitor did not test good  |
319150   |
20091231 0623  |
20091231 1308  |
20091231 1215  |
20100330 1600  |
20091231 1207  |
  |
Continuous  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
6455_CB  |
SAN ANGELO RED CREEK  |
  |
Open  |
138  |
Problems with CAP bank. Unable to use.  |
319025   |
20091230 0736  |
20091230 0740  |
20091231 0015  |
20100531 2300  |
  |
  |
Continuous  |
Cancelled  |
Forced Extension  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
XF  |
AT3  |
PIPE CREEK  |
  |
  |
69  |
BAD PUMP  |
318662   |
20091223 1307  |
20091223 1348  |
20091223 1915  |
20100531 1900  |
20091223 1845  |
  |
Continuous  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
FTM_MEN  |
MENARD  |
FORTMA  |
  |
138  |
Line will no longer go to Menard sub. It is rerouted to go from Ft Mason to Yellowjacket  |
327391   |
20100313 2125  |
20100313 2125  |
20100314 1000  |
20100314 1800  |
  |
  |
Daily  |
Approved  |
Maintenance Level 1  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
XF  |
XFMR1  |
SANTA ANNA  |
  |
  |
69  |
Replace a bad order arrestor on the 138/69 transformer.  |
325528   |
20100226 1116  |
20100312 1614  |
20100226 1130  |
20100312 1900  |
  |
20100312 1214  |
Continuous  |
Approved  |
Maintenance Level 1  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_20029  |
DIVIDE SWITCHYARD  |
  |
Open  |
345  |
Extended time need to complete work at Divide. Per Contractors and LCRA personnel. Was no tin portal along with CB 20030.  |
327053   |
20100311 1957  |
20100312 1500  |
20100312 0630  |
20100312 2100  |
20100312 0732  |
20100312 1457  |
Daily  |
Approved  |
Maintenance Level 1  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T530  |
TC  |
  |
Open  |
138  |
Breaker leaking air/oil  |
327052   |
20100311 1955  |
20100312 1500  |
20100312 0630  |
20100312 2100  |
20100312 0732  |
20100312 1457  |
Daily  |
Approved  |
Maintenance Level 1  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T520  |
TC  |
  |
Open  |
138  |
Breaker leaking air/oil  |
327305   |
20100312 1207  |
20100312 1432  |
20100312 1700  |
20100312 1900  |
  |
  |
Daily  |
Cancelled  |
Maintenance Level 1  |
Rayburn Country Coop, Inc. DBA - Rayburn Electric (TDSP)  |
  |
CB  |
A66351  |
EMORY_RC  |
  |
Open  |
138  |
test maintenance level 1  |
327314   |
20100312 1224  |
20100312 1225  |
20100312 1230  |
20100312 1700  |
  |
  |
Daily  |
Approved  |
Maintenance Level 1  |
Rayburn Country Coop, Inc. DBA - Rayburn Electric (TDSP)  |
  |
DSC  |
6888-1  |
WEST MUNSON  |
  |
Open  |
138  |
simple outage on a single piece of equipment.  |
326826   |
20100310 1248  |
20100311 1459  |
20100311 0900  |
20100311 1400  |
20100311 0845  |
20100311 1400  |
Daily  |
Approved  |
Maintenance Level 1  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
HAMR_RADM1  |
RADIUM  |
HAMLIN REA  |
  |
69  |
55ft tangent structure right off of the highway is broken below the ground, temp stabilized with pikes, high winds in the area warrant replacement within 24 hours.  |
326824   |
20100310 1246  |
20100310 1247  |
20100311 0900  |
20100311 1400  |
  |
  |
Daily  |
Cancelled  |
Maintenance Level 1  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ANSN_RADM1  |
RADIUM  |
ANSON  |
  |
69  |
55ft tangent structure right off of the highway is broken below the ground, temp stabilized with pikes, high winds in the area warrant replacement within 24 hours.  |
326126   |
20100304 1111  |
20100305 1253  |
20100305 1100  |
20100313 2345  |
20100305 1118  |
  |
Continuous  |
Approved  |
Maintenance Level 1  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CS_3485  |
CEDAR VALLEY  |
  |
Open  |
138  |
Clear 138/12.5 kv T-2 powerbank for replacement. T2 load will be put over on the T-1 bank. Planned outage starts on Monday.  |
327035   |
20100311 0951  |
20100313 1207  |
20100313 1200  |
20100315 1700  |
20100313 1200  |
  |
Continuous  |
Approved  |
Maintenance Level 2  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ANGORA_PANA1  |
PAN AMERICAN  |
ANGORA  |
  |
69  |
complete work already started at angora tap moving outages due to drilling problems at angora site  |
326856   |
20100310 1332  |
20100312 1505  |
20100312 0900  |
20100312 1330  |
20100312 0910  |
20100312 1330  |
Daily  |
Approved  |
Maintenance Level 2  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ABD2_ABD31  |
ABILENE DYESS AFB 2  |
ABILENE DYESS AFB 3  |
  |
69  |
REPLACE STRUCTURE 2-4 THAT IS LEANING AND ROTTED  |
327317   |
20100312 1228  |
20100312 1255  |
20100313 1230  |
20100313 1600  |
  |
  |
Daily  |
Cancelled  |
Maintenance Level 2  |
Rayburn Country Coop, Inc. DBA - Rayburn Electric (TDSP)  |
  |
CB  |
A93409  |
QUINLAND  |
  |
Open  |
138  |
test Maintenance Level 2 on single piece of equipment  |
326811   |
20100310 0956  |
20100312 1138  |
20100312 0800  |
20100312 1200  |
20100312 0808  |
20100312 1122  |
Daily  |
Approved  |
Maintenance Level 2  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
RINCON_ROCKPO1  |
RINCON  |
ROCKPORT  |
  |
138  |
BROKEN STEEL ARM  |
326609   |
20100309 1035  |
20100311 1431  |
20100311 1300  |
20100311 1800  |
20100311 1400  |
20100311 1430  |
Daily  |
Approved  |
Maintenance Level 2  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
M204  |
LOMA ALTA  |
  |
Open  |
138  |
TO REPLACE BURNED CONTACTS ON SW 7688 AT LOS FRESNOS  |
326607   |
20100309 1033  |
20100311 1429  |
20100311 1400  |
20100311 1800  |
20100311 1400  |
20100311 1429  |
Daily  |
Approved  |
Maintenance Level 2  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
7688  |
LOS FRESNOS  |
  |
Open  |
138  |
BURNED CONTACTS ON RELAY  |
325804   |
20100302 0914  |
20100302 0921  |
20100304 0700  |
20100318 1800  |
  |
  |
Continuous  |
Cancelled  |
Maintenance Level 2  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
1024  |
PH ROBINSON  |
  |
Open  |
138  |
this is a tnp line and they have requested to have it cleared up to make emergency repairs  |
327322   |
20100312 1231  |
20100312 1300  |
20100320 0700  |
20100320 1700  |
  |
  |
Daily  |
Cancelled  |
Maintenance Level 3  |
Rayburn Country Coop, Inc. DBA - Rayburn Electric (TDSP)  |
  |
CB  |
A92360  |
WIELAND  |
  |
Open  |
138  |
test Maintenance Level 3 on a single piece of equipment  |
325689   |
20100301 1314  |
20100313 1957  |
20100310 0700  |
20100313 1800  |
20100310 0713  |
20100313 1830  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
429T429  |
TWIN BUTTE  |
SCHKADE  |
  |
138  |
install dampners on line  |
313316   |
20091104 1542  |
20100313 1935  |
20100306 0600  |
20100313 1800  |
20100306 0546  |
20100313 1700  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
RA_TB_66  |
TB  |
RA  |
  |
138  |
& SECTIONS @ TB & WF - ROTHWOOD CUT-IN Resubmitted due to NOMCR sync -MDH-  |
300755   |
20090708 1445  |
20100313 1921  |
20100306 0600  |
20100313 1800  |
20100306 0726  |
20100313 1500  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W820  |
WF  |
  |
Open  |
138  |
INSTALL PANEL WAVETRAP TUNER CCVT - SEE LN66 TB WF  |
300752   |
20090708 1437  |
20100313 1920  |
20100306 0600  |
20100313 1800  |
20100306 0726  |
20100313 1745  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W790  |
WF  |
  |
Open  |
138  |
INSTALL PANEL WAVETRAP TUNER CCVT - SEE LN66 TB WF  |
326450   |
20100308 0726  |
20100313 1920  |
20100313 1815  |
20100322 1800  |
20100313 1745  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W790  |
WF  |
  |
Open  |
138  |
INSTALL PANEL . EXTENDED TO CUT IN BKR W850  |
300751   |
20090708 1436  |
20100313 1920  |
20100306 0600  |
20100313 1800  |
20100306 0726  |
20100313 1500  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
4665  |
WF  |
  |
Open  |
138  |
INSTALL PANEL WAVETRAP TUNER CCVT - SEE LN66 TB WF  |
300750   |
20090708 1434  |
20100313 1919  |
20100308 0600  |
20100313 1800  |
20100308 0600  |
20100313 1500  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T2HS  |
WF  |
  |
Open  |
138  |
ROTHWOOD CUT-IN  |
304761   |
20090819 1437  |
20100313 1916  |
20100118 0700  |
20100313 1800  |
20100118 0719  |
20100313 1500  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
5665  |
TB  |
  |
Open  |
138  |
CKT 66/81 UPGRADE FOR ROTHWOOD SUB INSTALL PANEL WAVETRAP TUNER CCVT - SEE LN66 TB WF 3/6-13  |
300747   |
20090708 1429  |
20100313 1916  |
20100306 0600  |
20100313 1800  |
20100306 0546  |
20100313 1500  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
N150  |
TB  |
  |
Open  |
138  |
INSTALL PANEL WAVETRAP TUNER CCVT - SEE LN66 TB WF  |
300745   |
20090708 1429  |
20100313 1916  |
20100306 0600  |
20100313 1800  |
20100306 0546  |
20100313 1500  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
N130  |
TB  |
  |
Open  |
138  |
INSTALL PANEL WAVETRAP TUNER CCVT - SEE LN66 TB WF  |
325857   |
20100302 1241  |
20100313 1750  |
20100307 1400  |
20100314 1700  |
20100307 1449  |
20100313 1748  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
7060  |
RICHLAND CHAMBERS  |
  |
Open  |
345  |
Calpine requesting outage on equipment to allow them to work on their switch.  |
325856   |
20100302 1240  |
20100313 1750  |
20100307 1400  |
20100314 1700  |
20100307 1449  |
20100313 1748  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
7055  |
RICHLAND CHAMBERS  |
  |
Open  |
345  |
Calpine requesting outage on equipment to allow them to work on their switch.  |
324796   |
20100219 1344  |
20100313 1734  |
20100315 0830  |
20100319 1600  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
1987  |
SNG  |
  |
Open  |
345  |
ONCOR REPLACING 3-POLE SWITCHES @ XJW  |
321858   |
20100126 1512  |
20100313 1728  |
20100228 2400  |
20100324 2345  |
20100312 2400  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6012_A  |
JACKSBORO SWITCHING  |
BOWMAN SWITCH  |
  |
345  |
Outage to install foundations and erect towers. CREZ Project.  |
318379   |
20091221 1457  |
20100313 1407  |
20100308 0600  |
20100313 1700  |
20100308 0724  |
20100313 1359  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
D170  |
GV  |
  |
Open  |
138  |
REWIRE PANEL AND WAVETRAP  |
318378   |
20091221 1454  |
20100313 1407  |
20100308 0600  |
20100313 1700  |
20100308 0724  |
20100313 1358  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
D160  |
GV  |
  |
Open  |
138  |
REWIRE PANEL AND WAVETRAP  |
318376   |
20091221 1438  |
20100313 1406  |
20100308 0600  |
20100313 1700  |
20100308 0724  |
20100313 1358  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
2925  |
GV  |
  |
Open  |
138  |
REWIRE PANEL AND WAVETRAP  |
327333   |
20100312 1326  |
20100313 1403  |
20100317 0600  |
20100317 2030  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
4136  |
BOWEN  |
  |
Open  |
138  |
Outage for wireless work; antenna changeout. Close switch 4137 at Bowen and 4091 at Davis for alternate source.  |
327331   |
20100312 1304  |
20100313 1403  |
20100317 0600  |
20100317 1400  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1060_B  |
BEAR CREEK  |
KELLER WALL PRICE  |
  |
138  |
Outage for wireless work; trouble ticket.  |
327336   |
20100312 1328  |
20100313 1403  |
20100317 0600  |
20100317 2030  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLS_4085  |
VILLAGE CREEK  |
  |
Open  |
138  |
Outage for wireless work; antenna changeout. Close switch 4137 at Bowen and 4091 at Davis for alternate source.  |
327335   |
20100312 1328  |
20100313 1403  |
20100317 0600  |
20100317 2030  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
4012  |
BOWEN TATE TAP  |
  |
Open  |
138  |
Outage for wireless work; antenna changeout. Close switch 4137 at Bowen and 4091 at Davis for alternate source.  |
327339   |
20100312 1330  |
20100313 1403  |
20100317 0600  |
20100317 2030  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
4137  |
BOWEN  |
  |
Close  |
138  |
Outage for wireless work; antenna changeout. Close switch 4137 at Bowen and 4091 at Davis for alternate source.  |
327344   |
20100312 1416  |
20100313 1403  |
20100317 0600  |
20100317 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLDB6207  |
CENTURY  |
  |
Close  |
345  |
Outage for wireless work; antenna changeout. Close switch 6285 at Kennedale and switch 6207 at Century for alternate source.  |
327345   |
20100312 1417  |
20100313 1403  |
20100317 0600  |
20100317 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_6285  |
KENNEDALE  |
  |
Close  |
345  |
Outage for wireless work; antenna changeout. Close switch 6285 at Kennedale and switch 6207 at Century for alternate source.  |
327343   |
20100312 1416  |
20100313 1403  |
20100317 0600  |
20100317 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
160_A  |
CENTURY  |
KENNEDALE  |
  |
345  |
Outage for wireless work; antenna changeout. Close switch 6285 at Kennedale and switch 6207 at Century for alternate source.  |
327338   |
20100312 1329  |
20100313 1403  |
20100317 0600  |
20100317 2030  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
4091  |
DAVIS  |
  |
Close  |
138  |
Outage for wireless work; antenna changeout. Close switch 4137 at Bowen and 4091 at Davis for alternate source.  |
327346   |
20100312 1447  |
20100313 1403  |
20100317 0700  |
20100317 2100  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T520  |
TC  |
  |
Open  |
138  |
CUST MAINT  |
327357   |
20100312 1632  |
20100313 1403  |
20100317 0800  |
20100317 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
CB  |
CB_202  |
LEWISVILLE HIGHLANDS  |
  |
Open  |
138  |
breaker maint  |
326737   |
20100310 0655  |
20100313 1348  |
20100313 0600  |
20100313 1900  |
20100313 0622  |
20100313 1337  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
3700_E  |
RENNER SWITCH  |
PRESTON NORTH  |
  |
138  |
Chapman to raise conductor for SVC  |
326736   |
20100310 0654  |
20100313 1348  |
20100313 0600  |
20100313 1900  |
20100313 0622  |
20100313 1337  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1500_H  |
RENNER SWITCH  |
PRESTON NORTH  |
  |
138  |
Chapman to raise conductor for SVC  |
325349   |
20100225 0755  |
20100313 1252  |
20100308 0800  |
20100313 1800  |
20100308 0852  |
20100313 1216  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
8132  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325318   |
20100224 1656  |
20100313 1251  |
20100308 0800  |
20100313 1800  |
20100308 0852  |
20100313 1216  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
8141  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325319   |
20100224 1656  |
20100313 1251  |
20100308 0800  |
20100313 1800  |
20100308 0852  |
20100313 1216  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
8151  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325320   |
20100224 1656  |
20100313 1251  |
20100308 0800  |
20100313 1800  |
20100308 0852  |
20100313 1216  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
8161  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325314   |
20100224 1655  |
20100313 1251  |
20100308 0800  |
20100313 1800  |
20100308 0852  |
20100313 1216  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
8111  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325315   |
20100224 1655  |
20100313 1250  |
20100308 0800  |
20100313 1800  |
20100308 0852  |
20100313 1250  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
8121  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325316   |
20100224 1655  |
20100313 1250  |
20100308 0800  |
20100313 1800  |
20100308 0852  |
20100313 1250  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
8122  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325317   |
20100224 1655  |
20100313 1250  |
20100308 0800  |
20100313 1800  |
20100308 0852  |
20100313 1216  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
8131  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
326527   |
20100308 1335  |
20100313 1249  |
20100312 0700  |
20100313 1700  |
20100312 0709  |
20100313 1249  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
E190  |
SHORE ACRES  |
  |
Open  |
138  |
PLANT MAINT ON TR#1  |
325311   |
20100224 1654  |
20100313 1249  |
20100308 0800  |
20100313 1800  |
20100308 0852  |
20100313 1249  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
8042  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325312   |
20100224 1654  |
20100313 1249  |
20100308 0800  |
20100313 1800  |
20100308 0852  |
20100313 1249  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
8041  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325313   |
20100224 1654  |
20100313 1248  |
20100308 0800  |
20100313 1800  |
20100308 0852  |
20100313 1216  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
8022  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325309   |
20100224 1653  |
20100313 1248  |
20100308 0800  |
20100313 1800  |
20100308 0810  |
20100313 1234  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
OCB_8020_CB  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325310   |
20100224 1653  |
20100313 1247  |
20100308 0800  |
20100313 1800  |
20100308 0809  |
20100313 1226  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
OCB_8040_CB  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325306   |
20100224 1652  |
20100313 1245  |
20100308 0800  |
20100313 1800  |
20100308 0809  |
20100313 1235  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
OCB_8140_CB  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325307   |
20100224 1652  |
20100313 1245  |
20100308 0800  |
20100313 1800  |
20100308 0809  |
20100313 1234  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
OCB_8150_CB  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325308   |
20100224 1652  |
20100313 1245  |
20100308 0800  |
20100313 1800  |
20100308 0758  |
20100313 1232  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
8160  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325303   |
20100224 1651  |
20100313 1244  |
20100308 0800  |
20100313 1800  |
20100308 0809  |
20100313 1235  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
OCB_8110_CB  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325304   |
20100224 1651  |
20100313 1244  |
20100308 0800  |
20100313 1800  |
20100308 0809  |
20100313 1244  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
OCB_8120_CB  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325305   |
20100224 1651  |
20100313 1243  |
20100308 0800  |
20100313 1800  |
20100308 0810  |
20100313 1229  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
OCB_8130_CB  |
OLINGER  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325301   |
20100224 1650  |
20100313 1243  |
20100308 0800  |
20100313 1800  |
20100308 0819  |
20100313 1226  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
LN  |
OLI_BEN1  |
OLINGER  |
BEN DAVIS TMPP  |
  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325302   |
20100224 1650  |
20100313 1242  |
20100308 0800  |
20100313 1800  |
20100308 0822  |
20100313 1228  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
LN  |
OLI_ELMG  |
OLINGER  |
ELM GROVE GPL  |
  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325321   |
20100224 1657  |
20100313 1242  |
20100308 0800  |
20100313 1800  |
20100308 0822  |
20100313 1134  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
9704  |
ELM GROVE GPL  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
325322   |
20100224 1657  |
20100313 1241  |
20100308 0800  |
20100313 1800  |
20100308 0819  |
20100313 1159  |
Continuous  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
DISC8037  |
BEN DAVIS TMPP  |
  |
Open  |
138  |
BREAKER REPLACEMENT 8120 AND SWITCHES 8121 AND 8122.  |
326445   |
20100308 1321  |
20100313 1058  |
20100313 0700  |
20100313 1200  |
20100313 0815  |
20100313 1056  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
R083  |
METALS RICHMOND  |
  |
Open  |
138  |
CUST MAINT, PLANT OUTAGE  |
326444   |
20100308 1320  |
20100313 1058  |
20100313 0700  |
20100313 1200  |
20100313 0815  |
20100313 1056  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
R080  |
METALS RICHMOND  |
  |
Open  |
138  |
CUST MAINT, PLANT OUTAGE  |
327349   |
20100312 1452  |
20100313 1013  |
20100316 0800  |
20100316 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
E440  |
FB  |
  |
Open  |
138  |
MAINT  |
326504   |
20100308 1240  |
20100313 0938  |
20100313 0900  |
20100313 1300  |
20100313 0851  |
20100313 0922  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
N040  |
TB  |
  |
Open  |
345  |
TEST BREAKER FAILURE  |
326505   |
20100308 1240  |
20100313 0938  |
20100313 0900  |
20100313 1300  |
20100313 0851  |
20100313 0922  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
N200  |
TB  |
  |
Open  |
138  |
TEST BREAKER FAILURE  |
326503   |
20100308 1239  |
20100313 0937  |
20100313 0900  |
20100313 1300  |
20100313 0851  |
20100313 0922  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
N010  |
TB  |
  |
Open  |
345  |
TEST BREAKER FAILURE  |
326502   |
20100308 1237  |
20100313 0937  |
20100313 0900  |
20100313 1300  |
20100313 0851  |
20100313 0922  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
XF  |
AT2_H  |
TB  |
  |
  |
138  |
TEST BREAKER FAILURE  |
327354   |
20100312 1554  |
20100313 0929  |
20100315 0900  |
20100320 1600  |
  |
  |
Continuous  |
Approved  |
Planned  |
BROWNSVILLE PUBLIC UTILITY BOARD (TDSP)  |
  |
CB  |
D240  |
AIRPORT PUB  |
  |
Open  |
138  |
Clean Lubricate and Test Equiptment  |
327356   |
20100312 1556  |
20100313 0929  |
20100315 0900  |
20100320 1600  |
  |
  |
Continuous  |
Approved  |
Planned  |
BROWNSVILLE PUBLIC UTILITY BOARD (TDSP)  |
  |
CB  |
D120  |
AIRPORT PUB  |
  |
Open  |
69  |
Clean, Lubricate, and Test Equiptment  |
321807   |
20100126 0934  |
20100313 0859  |
20100307 1230  |
20100313 0900  |
20100307 1250  |
20100313 0859  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7130  |
CALLAHAN  |
  |
Close  |
138  |
closed at nextera request  |
321808   |
20100126 0934  |
20100313 0859  |
20100307 1315  |
20100313 0900  |
20100307 1320  |
20100313 0858  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7155  |
HORSE HOLLOW  |
  |
Close  |
138  |
closed at nextera request  |
321809   |
20100126 0934  |
20100313 0858  |
20100307 1415  |
20100313 0900  |
20100307 1420  |
20100313 0858  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
3745  |
HORSE HOLLOW 4  |
  |
Close  |
138  |
closed at nextera request  |
326722   |
20100310 1043  |
20100313 0552  |
20100313 0600  |
20100314 1500  |
20100313 0552  |
  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
333  |
FRONTERA  |
  |
Open  |
138  |
PER RESOURCE REQUEST TO WORK ON STEP UP XFMR  |
321475   |
20100121 1453  |
20100312 2355  |
20100308 0730  |
20100312 1700  |
20100308 0806  |
20100312 1715  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
10Z0_CB  |
BECK ROAD  |
  |
Open  |
138  |
To install new foundation under the line.  |
321473   |
20100121 1452  |
20100312 2354  |
20100308 0730  |
20100312 1700  |
20100308 0806  |
20100312 1715  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN8490_CB  |
CALAVERAS  |
  |
Open  |
138  |
To install new foundation under the line.  |
326239   |
20100305 1044  |
20100312 2117  |
20100312 0700  |
20100312 2100  |
20100312 0857  |
20100312 2051  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
F191  |
POWELL REIT  |
  |
Open  |
138  |
CUST PLANT OUTAGE FOR TR1 MAINT - RESCHEDULED FROM 3/8-9/2010 PER CUST  |
326238   |
20100305 1042  |
20100312 2116  |
20100312 0700  |
20100312 2100  |
20100312 0857  |
20100312 2051  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
F160  |
POWELL REIT  |
  |
Open  |
138  |
CUST PLANT OUTAGE FOR TR1 MAINT - RESCHEDULED FROM 3/8-9/2010 PER CUST  |
326237   |
20100305 1041  |
20100312 2115  |
20100312 0700  |
20100312 2100  |
20100312 0857  |
20100312 2051  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T1HS  |
POWELL REIT  |
  |
Open  |
138  |
CUST PLANT OUTAGE FOR TR1 MAINT - RESCHEDULED FROM 3/8-9/2010 PER CUST  |
289159   |
20090326 1440  |
20100312 2024  |
20100308 0600  |
20100313 1800  |
20100308 0708  |
20100312 1438  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P270  |
HR  |
  |
Open  |
138  |
UPGRADE RELAYS  |
321472   |
20100121 1452  |
20100312 1954  |
20100308 0730  |
20100312 1700  |
20100308 0806  |
20100312 1715  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
N3_Z0  |
CALAVERAS  |
BECK ROAD  |
  |
138  |
To install new foundation under the line.  |
321466   |
20100121 1447  |
20100312 1952  |
20100308 0730  |
20100312 1700  |
20100308 0737  |
20100312 1715  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
C4_N3  |
KIRBY CPS  |
CALAVERAS  |
  |
138  |
To install foundation under the line.  |
321469   |
20100121 1448  |
20100312 1950  |
20100308 0730  |
20100312 1700  |
20100308 0737  |
20100312 1715  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN8500_CB  |
CALAVERAS  |
  |
Open  |
138  |
To install foundation under the line.  |
321468   |
20100121 1447  |
20100312 1948  |
20100308 0730  |
20100312 1700  |
20100308 0737  |
20100312 1715  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN15C4_CB  |
KIRBY CPS  |
  |
Open  |
138  |
To install foundation under the line.  |
326499   |
20100308 1234  |
20100312 1945  |
20100312 0600  |
20100312 2000  |
20100312 0603  |
20100312 1944  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
930_A  |
PARKERVILLE ROAD  |
DESOTO SWITCH  |
  |
138  |
Antenna Change out, Metro PCs site  |
314353   |
20091113 0704  |
20100312 1839  |
20100104 0600  |
20100312 1830  |
20100104 0555  |
20100312 1830  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
9249  |
SANDOW SWITCH  |
  |
Open  |
138  |
adding new bay for new equipment  |
327215   |
20100311 1711  |
20100312 1819  |
20100317 0730  |
20100318 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
RFU_BONN  |
BONNIEVIEW SUB  |
REFUGIO SUB  |
  |
69  |
line clearance to c/o poles  |
327051   |
20100311 1709  |
20100312 1809  |
20100317 0700  |
20100317 1500  |
  |
  |
Daily  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
CNT_BEN  |
BENBOLT  |
CENTRAL SUB  |
  |
69  |
set poles under line  |
327192   |
20100311 1500  |
20100312 1800  |
20100317 0800  |
20100317 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
GEUS (TDSP)  |
  |
CB  |
6921_CB  |
STEAM  |
  |
Open  |
69  |
Clearance is to put new static wire over Steam Plant buss. Note; SP 6913 Bkr is open on another clearance.  |
327259   |
20100312 1014  |
20100312 1800  |
20100317 0800  |
20100317 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
GEUS (TDSP)  |
  |
LN  |
STE_IND  |
INDUSTRIAL PARK GR  |
STEAM  |
  |
69  |
Clearance is to add new static wire for Steam Plant Buss.  |
327166   |
20100311 1442  |
20100312 1751  |
20100317 0830  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_208_CB  |
MCCREE  |
  |
Open  |
69  |
Line maintenance.  |
327167   |
20100311 1442  |
20100312 1751  |
20100317 0830  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
30  |
SOUTHSIDE POI  |
  |
Open  |
69  |
Line maintenance.  |
327153   |
20100311 1407  |
20100312 1742  |
20100317 0800  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
A290  |
WA PARISH  |
  |
Open  |
345  |
MAINT  |
327154   |
20100311 1407  |
20100312 1742  |
20100317 0800  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
A300  |
WA PARISH  |
  |
Open  |
345  |
MAINT  |
327156   |
20100311 1408  |
20100312 1742  |
20100317 0800  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
0505  |
WA PARISH  |
  |
Open  |
345  |
MAINT  |
289143   |
20090326 1441  |
20100312 1628  |
20100308 0600  |
20100312 1600  |
20100308 0708  |
20100312 1627  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T2HS  |
HR  |
  |
Open  |
138  |
UPGRADE RELAYS  |
321451   |
20100121 1529  |
20100312 1617  |
20100312 0700  |
20100312 1700  |
20100312 0712  |
20100312 1606  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
CS_HL_43  |
CS  |
HL  |
  |
69  |
RE-CONDUCTOR LN66 BT-HNY  |
326691   |
20100309 1557  |
20100312 1615  |
20100312 0700  |
20100312 1700  |
20100312 0906  |
20100312 1700  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BBPPWL79  |
POWELL REIT  |
BIGBAY  |
  |
138  |
PT MAINT @ PWL  |
322638   |
20100201 0909  |
20100312 1612  |
20100301 0700  |
20100312 1800  |
20100301 0743  |
20100312 1238  |
Continuous  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_19980  |
DIVIDE SWITCHYARD  |
  |
Open  |
345  |
CLEAR BUS BETWEEN CIRCUIT BREAKERS 19980,20030 FOR BUS RELAY RE-WIRING AND CHECKOUTS FOR T-431  |
322637   |
20100201 0905  |
20100312 1612  |
20100301 0700  |
20100312 1800  |
20100301 0743  |
20100312 1212  |
Continuous  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
431T431  |
DIVIDE SWITCHYARD  |
GASCONADES CREEK  |
  |
345  |
RELAY RE-WIRING AND RELAY CHECKOUT ON LINE T-431  |
322301   |
20100128 1407  |
20100312 1612  |
20100215 0800  |
20100312 1800  |
20100215 0730  |
20100312 1236  |
Continuous  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_20030  |
DIVIDE SWITCHYARD  |
  |
Open  |
345  |
CLEAR 345 BUSWORK BETWEEN SWITCHES 20029,20019,20009,19999 TO ALLOW CONTRACTOR TO PULL IN CONDUCTOR FOR NEW CIRCUIT TO TWIN BUTTES ACROSS BUS. .  |
326678   |
20100309 1352  |
20100312 1610  |
20100312 0800  |
20100312 1600  |
20100312 0908  |
20100312 1608  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
U689  |
RTW  |
  |
Open  |
345  |
INSTALL NEW CONTROL CABLE  |
326670   |
20100309 1347  |
20100312 1610  |
20100312 0800  |
20100312 1600  |
20100312 0908  |
20100312 1608  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
U670  |
RTW  |
  |
Open  |
345  |
INSTALL NEW CONTROL CABLE  |
326672   |
20100309 1348  |
20100312 1609  |
20100312 0800  |
20100312 1600  |
20100312 0908  |
20100312 1608  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
U680  |
RTW  |
  |
Open  |
345  |
INSTALL NEW CONTROL CABLE  |
326469   |
20100308 1017  |
20100312 1606  |
20100315 0800  |
20100318 1800  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
COLETO_KENEDS1  |
COLETO CREEK  |
KENEDSW  |
  |
138  |
LINE OUTAGE TO RAISE STRUCTURES  |
326501   |
20100308 1236  |
20100312 1602  |
20100312 0600  |
20100312 1900  |
20100312 0615  |
20100312 1600  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
3641_C  |
RENNER SWITCH  |
FRANKFORD ROAD  |
  |
138  |
Chapman to raise conductor for SVC  |
326500   |
20100308 1235  |
20100312 1601  |
20100312 0600  |
20100312 1900  |
20100312 0612  |
20100312 1600  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
3280_E  |
RENNER SWITCH  |
FRANKFORD ROAD  |
  |
138  |
Chapman to raise conductor for SVC  |
313322   |
20091104 1519  |
20100312 1558  |
20100308 0600  |
20100312 1500  |
20100308 0618  |
20100312 1438  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BY_HR_95  |
HR  |
BY  |
  |
138  |
UPGRADE RELAYS AND SECTION @ HR Resubmitted due to NOMCR sync -MDH-  |
326509   |
20100308 1242  |
20100312 1557  |
20100312 0600  |
20100312 2100  |
20100312 0638  |
20100312 1550  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
100_A  |
VALLEY RANCH  |
HACKBERRY  |
  |
345  |
PIM TEST, Verizon site # D089  |
326510   |
20100308 1242  |
20100312 1556  |
20100312 0600  |
20100312 2100  |
20100312 0638  |
20100312 1550  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
100_B  |
VALLEY RANCH  |
NORWOOD SWITCH  |
  |
345  |
PIM TEST, Verizon site # D089  |
289157   |
20090326 1438  |
20100312 1530  |
20100308 0600  |
20100312 1500  |
20100308 0708  |
20100312 1438  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
1955  |
HR  |
  |
Open  |
138  |
UPGRADE RELAYS  |
326065   |
20100304 0639  |
20100312 1508  |
20100320 0900  |
20100320 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
278T294  |
MOULTON GVEC  |
HALLETTSVILLE GVEC  |
  |
69  |
Clear Moulton GVEC-GVEC Hallettsville 69 kv line T-294 to remove mobile xfmr from line at Moulton GVEC  |
326687   |
20100309 1543  |
20100312 1507  |
20100320 0600  |
20100320 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
FW_WEB05  |
WEBSTER  |
FW  |
  |
138  |
CLOSE JUMPERS  |
326080   |
20100304 0844  |
20100312 1453  |
20100318 0700  |
20100318 2100  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T530  |
TC  |
  |
Open  |
138  |
CUST MAINT  |
325021   |
20100223 0727  |
20100312 1451  |
20100320 2400  |
20100416 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
8302  |
GRAHAM SES  |
  |
Open  |
345  |
Outage to replace a bad bushing on tertiary and perform tests and repair leaks. This needs to be a continuous outage from 3/1/2010 - 4/16/2010 but has been broken up for study purposes.  |
325030   |
20100223 0727  |
20100312 1451  |
20100320 2400  |
20100416 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_2650  |
GRAHAM SES  |
  |
Open  |
138  |
Outage to replace a bad bushing on tertiary and perform tests and repair leaks. This needs to be a continuous outage from 3/1/2010 - 4/16/2010 but has been broken up for study purposes.  |
325022   |
20100223 0728  |
20100312 1451  |
20100320 2400  |
20100416 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_2690  |
GRAHAM SES  |
  |
Open  |
138  |
Outage to replace a bad bushing on tertiary and perform tests and repair leaks. This needs to be a continuous outage from 3/1/2010 - 4/16/2010 but has been broken up for study purposes.  |
326611   |
20100309 1041  |
20100312 1446  |
20100320 1715  |
20100322 0745  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
MLDB2243  |
KRUGERVILLE  |
  |
Open  |
138  |
Dig pier holes, pour foundations and set structures for line rebuild.  |
326614   |
20100309 1051  |
20100312 1446  |
20100320 1715  |
20100322 0745  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M30  |
NAVO  |
  |
Open  |
138  |
Dig pier holes, pour foundations and set structures for line rebuild.  |
326613   |
20100309 1050  |
20100312 1446  |
20100320 1715  |
20100322 0745  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M70  |
NAVO  |
  |
Open  |
138  |
Dig pier holes, pour foundations and set structures for line rebuild.  |
326681   |
20100309 1414  |
20100312 1431  |
20100316 0600  |
20100316 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLS_104  |
WESTS  |
  |
Close  |
69  |
replace poles and arms close at west line out hillsboro to abbott  |
327231   |
20100312 0718  |
20100312 1431  |
20100316 0600  |
20100316 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6271_B  |
SAGINAW SWITCH  |
FOSSIL CREEK  |
  |
138  |
Outage for wireless work; antenna changeout. Close switch 654 at Fossil Creek for alternate source.  |
327252   |
20100312 0949  |
20100312 1431  |
20100316 0630  |
20100316 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_042  |
RENNER SWITCH  |
  |
Open  |
138  |
The operator needs to have fluid added to it. It is low on fluid and is causing the charging motor to run too long. If this continues, the motor will burn up.  |
326742   |
20100310 0705  |
20100312 1431  |
20100316 0700  |
20100316 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_022  |
WEST LEVEE SWITCH  |
  |
Open  |
138  |
ERCOT Maintenance. Trip testing and calibrating breaker 022 at West Levee.  |
326976   |
20100311 0749  |
20100312 1431  |
20100316 0700  |
20100316 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
176T165  |
WINCHESTER  |
FAYETTEVILLE  |
  |
138  |
OVERHAUL  |
326543   |
20100309 1646  |
20100312 1431  |
20100316 0700  |
20100319 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
WHITT  |
  |
Open  |
69  |
Dig pier holes for new DE tower at Oran.  |
327242   |
20100312 0813  |
20100312 1431  |
20100316 0730  |
20100319 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
DSC  |
218  |
TERRELL HILLS  |
  |
Open  |
138  |
To upgrade the relay panel on 10D2 and to energize the second feed into the new Exeter substation.  |
326802   |
20100310 0934  |
20100312 1431  |
20100316 0800  |
20100319 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
9955  |
ROCKY CREEK  |
  |
Open  |
138  |
Outage to repair oil leak on transformer. New transformer and load has not been applied yet.  |
326803   |
20100310 0935  |
20100312 1431  |
20100316 0800  |
20100319 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
9954  |
ROCKY CREEK  |
  |
Open  |
138  |
Outage to repair oil leak on transformer. New transformer and load has not been applied yet.  |
326842   |
20100310 1325  |
20100312 1431  |
20100316 0800  |
20100316 1500  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
1397  |
SHILOH DGG  |
  |
Open  |
138  |
Check for Nitrogen leak in transformer, then lube and exercise feeder breakers.  |
327165   |
20100311 1440  |
20100312 1431  |
20100316 0800  |
20100316 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
GEUS (TDSP)  |
  |
CB  |
6921_CB  |
STEAM  |
  |
Open  |
69  |
Clearance needed to put new static wire over buss. Note; SP 6913 Bkr. is open on another clearance.  |
327147   |
20100311 1356  |
20100312 1431  |
20100316 0830  |
20100316 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M10  |
RISING STAR TMPP  |
  |
Open  |
69  |
Line maintenance.  |
326698   |
20100309 1641  |
20100312 1431  |
20100316 0700  |
20100319 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_10  |
MORRIS SHEPPARD  |
  |
Open  |
69  |
Dig pier holes for new DE tower at Oran.  |
326699   |
20100309 1645  |
20100312 1431  |
20100316 0700  |
20100319 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_204_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Dig pier holes for new DE tower at Oran.  |
326542   |
20100309 1641  |
20100312 1431  |
20100316 0700  |
20100319 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_202_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Dig pier holes for new DE tower at Oran.  |
327137   |
20100311 1333  |
20100312 1431  |
20100316 0715  |
20100316 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
231T323  |
MARSHALL FORD  |
PALEFACE  |
  |
138  |
T-458 WORK IN CLOSE PROXIMITY TO THIS LINE.  |
326585   |
20100309 0605  |
20100312 1431  |
20100316 0730  |
20100316 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P830  |
MOMENT MONUMENT  |
  |
Open  |
138  |
REPLACE CTs  |
327007   |
20100311 0859  |
20100312 1431  |
20100316 0745  |
20100316 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_3990_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
327017   |
20100311 0905  |
20100312 1431  |
20100316 0745  |
20100316 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3983  |
MARSHALL FORD  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED FOR BYPASSING WHILE NTE #3 138 OP. BUS IS OUT OF SERVICE FOR CLOSE PROXIMITY WORK.  |
327010   |
20100311 0900  |
20100312 1431  |
20100316 0745  |
20100316 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_9180_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
327020   |
20100311 0906  |
20100312 1431  |
20100316 0745  |
20100316 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_9073  |
MARSHALL FORD  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED FOR BYPASSING WHILE NTE #3 138 OP. BUS IS OUT OF SERVICE FOR CLOSE PROXIMITY WORK.  |
327014   |
20100311 0903  |
20100312 1431  |
20100316 0745  |
20100316 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3993  |
MARSHALL FORD  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED FOR BYPASSING WHILE NTE #3 138 OP. BUS IS OUT OF SERVICE FOR CLOSE PROXIMITY WORK.  |
327011   |
20100311 0900  |
20100312 1431  |
20100316 0745  |
20100316 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_9070  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
326600   |
20100309 0856  |
20100312 1431  |
20100316 0800  |
20100316 2100  |
  |
  |
Daily  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
MAT_OLMO  |
OLMOS SUB  |
MATHIS SUB  |
  |
69  |
pole change on line across IH-37  |
327182   |
20100311 1447  |
20100312 1431  |
20100316 0830  |
20100316 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M30  |
PURDON  |
  |
Open  |
69  |
Line maintenance.  |
327183   |
20100311 1447  |
20100312 1431  |
20100316 0830  |
20100316 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M60  |
PURDON  |
  |
Close  |
69  |
Line maintenance.  |
327181   |
20100311 1446  |
20100312 1431  |
20100316 0830  |
20100316 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M70  |
PURDON  |
  |
Open  |
69  |
Line maintenance.  |
326679   |
20100309 1412  |
20100312 1431  |
20100316 0600  |
20100316 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
2170_F  |
HILLSBORO  |
ABBOTT  |
  |
69  |
replace poles and arms  |
326680   |
20100309 1412  |
20100312 1431  |
20100316 0600  |
20100316 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
2180_F  |
HILLSBORO  |
ABBOTT  |
  |
69  |
replace poles and arms  |
327253   |
20100312 0951  |
20100312 1431  |
20100316 0700  |
20100319 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CP_5135  |
IRVING NORWOOD  |
  |
Open  |
138  |
Contractor will be removing station equipment that has been stored inside 138 kV capacitor yard.  |
326530   |
20100308 1331  |
20100312 1431  |
20100316 0700  |
20100316 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
LN  |
CKT_833  |
HOLLY POWER PLANT  |
BRACKENRIDGE  |
  |
69  |
Ckt 833 Daily to transfer down guys & other maintenance  |
326529   |
20100308 1331  |
20100312 1431  |
20100316 0700  |
20100316 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
HP_833_CB  |
HOLLY POWER PLANT  |
  |
Open  |
69  |
Ckt 833 Daily to transfer down guys & other maintenance  |
326990   |
20100311 0842  |
20100312 1431  |
20100316 0745  |
20100316 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_3770_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
327008   |
20100311 0859  |
20100312 1431  |
20100316 0745  |
20100316 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_3980_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
327009   |
20100311 0859  |
20100312 1431  |
20100316 0745  |
20100316 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_8020_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
326812   |
20100310 0958  |
20100312 1431  |
20100316 0800  |
20100316 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
H710  |
KR  |
  |
Open  |
138  |
MAINT  |
327173   |
20100311 1444  |
20100312 1431  |
20100316 0800  |
20100316 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
GEUS (TDSP)  |
  |
LN  |
STE_IND  |
INDUSTRIAL PARK GR  |
STEAM  |
  |
69  |
Clearance needed to put new static wire over buss at Steam Plant.  |
327088   |
20100311 1021  |
20100312 1431  |
20100316 1000  |
20100316 1100  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
HSW_4707  |
FREDERICKSBURG  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO MAINTAIN FEED TO THE T-1 POWERBANK WHILE THE BUS AND BREAKER FAILURE RELAYS ARE BEING TESTED ON THE 138 OP. BUS  |
327083   |
20100311 1016  |
20100312 1431  |
20100316 1000  |
20100316 1100  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_9790_CB  |
FREDERICKSBURG  |
  |
Open  |
138  |
TRIP CHECK 138 KV BUS AND BREAKER FAILUYRE RELAYS. BYPASS SWITCHES 9803,4707 WILL BE CLOSED TO KEEP FEED TO THE T-1 POWERBANK. T-1 IS ALREADY CARRYING T-3 LOAD.  |
327087   |
20100311 1021  |
20100312 1431  |
20100316 1000  |
20100316 1100  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_9803  |
FREDERICKSBURG  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO MAINTAIN FEED TO THE T-1 POWERBANK WHILE THE BUS AND BREAKER FAILURE RELAYS ARE BEING TESTED ON THE 138 OP. BUS  |
327085   |
20100311 1017  |
20100312 1431  |
20100316 1000  |
20100316 1100  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CS4705  |
FREDERICKSBURG  |
  |
Open  |
138  |
TRIP CHECK 138 KV BUS AND BREAKER FAILUYRE RELAYS. BYPASS SWITCHES 9803,4707 WILL BE CLOSED TO KEEP FEED TO THE T-1 POWERBANK. T-1 IS ALREADY CARRYING T-3 LOAD.  |
326813   |
20100310 0959  |
20100312 1431  |
20100316 1200  |
20100316 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
H750  |
KR  |
  |
Open  |
138  |
MAINT  |
327229   |
20100312 0708  |
20100312 1430  |
20100316 0600  |
20100316 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
4456  |
DECORDOVA DAM  |
  |
Open  |
138  |
Outage to adjust travel on FID 2116. Load will be bustied via lowside bustie.  |
327230   |
20100312 0709  |
20100312 1430  |
20100316 0600  |
20100316 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
4457  |
DECORDOVA DAM  |
  |
Open  |
138  |
Outage to adjust travel on FID 2116. Load will be bustied via lowside bustie.  |
327232   |
20100312 0719  |
20100312 1430  |
20100316 0600  |
20100316 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_654  |
FOSSIL CREEK  |
  |
Close  |
138  |
Outage for wireless work; antenna changeout. Close switch 654 at Fossil Creek for alternate source.  |
326825   |
20100310 1246  |
20100312 1430  |
20100316 0700  |
20100316 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
BAT_PEAR  |
BATESVILLE SWITCH  |
PEARSALL SWITCH  |
  |
138  |
Pull conductor over buss  |
326528   |
20100308 1330  |
20100312 1430  |
20100316 0700  |
20100316 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
BR_833_CB  |
BRACKENRIDGE  |
  |
Open  |
69  |
Ckt 833 Daily to transfer down guys & other maintenance  |
326983   |
20100311 0754  |
20100312 1430  |
20100316 0715  |
20100316 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
458T458  |
BEE CREEK  |
PALEFACE  |
  |
138  |
REPLACE INSULATORS AND STATIC DEADEND SHOES ON THREE STRUCTURES  |
326801   |
20100310 0934  |
20100312 1430  |
20100316 0730  |
20100316 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN11W4_CB  |
DE ZAVALA ROAD  |
  |
Open  |
138  |
To regasket UST taps on breaker bushings.  |
327241   |
20100312 0812  |
20100312 1430  |
20100316 0730  |
20100319 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
D2_E2_2  |
AUSTIN ROAD  |
TERRELL HILLS  |
  |
138  |
To upgrade the relay panel on 10D2 and to energize the second feed into the new Exeter substation.  |
327240   |
20100312 0811  |
20100312 1430  |
20100316 0730  |
20100319 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN10D2_CB  |
AUSTIN ROAD  |
  |
Open  |
138  |
To upgrade the relay panel on 10D2 and to energize the second feed into the new Exeter substation.  |
327146   |
20100311 1356  |
20100312 1430  |
20100316 0830  |
20100316 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
CB_545  |
DOWNING  |
  |
Open  |
69  |
Line maintenance.  |
327185   |
20100311 1447  |
20100312 1430  |
20100316 0830  |
20100316 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M20B  |
BARRY TMPP  |
  |
Open  |
69  |
Line maintenance.  |
327186   |
20100311 1447  |
20100312 1430  |
20100316 0830  |
20100316 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
BARRY TMPP  |
  |
Open  |
69  |
Line maintenance.  |
327081   |
20100311 1016  |
20100312 1430  |
20100316 1000  |
20100316 1100  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_9800_CB  |
FREDERICKSBURG  |
  |
Open  |
138  |
TRIP CHECK 138 KV BUS AND BREAKER FAILUYRE RELAYS. BYPASS SWITCHES 9803,4707 WILL BE CLOSED TO KEEP FEED TO THE T-1 POWERBANK. T-1 IS ALREADY CARRYING T-3 LOAD.  |
327084   |
20100311 1016  |
20100312 1430  |
20100316 1000  |
20100316 1100  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_9810_CB  |
FREDERICKSBURG  |
  |
Open  |
138  |
TRIP CHECK 138 KV BUS AND BREAKER FAILUYRE RELAYS. BYPASS SWITCHES 9803,4707 WILL BE CLOSED TO KEEP FEED TO THE T-1 POWERBANK. T-1 IS ALREADY CARRYING T-3 LOAD.  |
326524   |
20100308 1330  |
20100312 1430  |
20100316 0700  |
20100316 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
BR_850_CB  |
BRACKENRIDGE  |
  |
Open  |
69  |
Ckt 833 Daily to transfer down guys & other maintenance  |
322012   |
20100127 0904  |
20100312 1415  |
20100313 0600  |
20100313 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
0050  |
AA  |
  |
Open  |
138  |
CLOSE JUMPERS ON TOWER #08372 @ AA  |
327149   |
20100311 1357  |
20100312 1415  |
20100317 0830  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
CB_545  |
DOWNING  |
  |
Open  |
69  |
Line maintenance.  |
327148   |
20100311 1357  |
20100312 1415  |
20100317 0830  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M10  |
RISING STAR TMPP  |
  |
Open  |
69  |
Line maintenance.  |
323331   |
20100208 1345  |
20100312 1349  |
20100213 0700  |
20100312 1600  |
20100216 0921  |
20100312 1337  |
Continuous  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
DSC  |
SU_602M  |
SUMMIT  |
  |
Open  |
138  |
Clearance to change out SU-789 transformer. SU-101112 transformer should be in service by this time to carry the distribution load.  |
325512   |
20100226 1045  |
20100312 1337  |
20100312 0700  |
20100312 1700  |
20100312 0945  |
20100312 1336  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
55  |
EAST LEVEE SWITCH  |
  |
Open  |
138  |
ERCOT Maintenance. Trip testing on breaker  |
327132   |
20100311 1321  |
20100312 1325  |
20100317 0700  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
TEXAS MUNICIPAL POWER AGENCY  |
  |
DSC  |
DSW_1816  |
PATTERSON STREET  |
  |
Open  |
138  |
Open for Brazos to do line maintenance.  |
327131   |
20100311 1320  |
20100312 1325  |
20100317 0700  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
TEXAS MUNICIPAL POWER AGENCY  |
  |
CB  |
OCB_1815_CB  |
PATTERSON STREET  |
  |
Open  |
138  |
Open for Brazos to do line maintenance.  |
327138   |
20100311 1334  |
20100312 1325  |
20100317 0700  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
LDS_5024  |
SUNSET SWITCH  |
  |
Open  |
138  |
Line maintenance.  |
327326   |
20100312 1241  |
20100312 1256  |
20100317 0700  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1390_G  |
THORNTON EAST TAP  |
THORNTON EAST  |
  |
138  |
Garlands request, replace 138KV line switch 1395 at Oates Dr.  |
327069   |
20100311 1000  |
20100312 1256  |
20100317 0700  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1390_E  |
MESQUITE NORTH TAP  |
THORNTON EAST TAP  |
  |
138  |
Garlands request, replace 138KV line switch 1395 at Oates Dr.  |
327068   |
20100311 0959  |
20100312 1256  |
20100317 0700  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1390_A  |
MESQUITE NORTH TAP  |
MESQUITE NORTH  |
  |
138  |
Garlands request, replace 138KV line switch 1395 at Oates Dr.  |
327044   |
20100311 0958  |
20100312 1256  |
20100317 0700  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1390_F  |
BUCKNER HOME  |
MESQUITE FORNEY ROAD  |
  |
138  |
Garlands request, replace 138KV line switch 1395 at Oates Dr.  |
327043   |
20100311 0958  |
20100312 1256  |
20100317 0700  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1390_C  |
BUCKNER HOME  |
THORNTON EAST TAP  |
  |
138  |
Garlands request, replace 138KV line switch 1395 at Oates Dr.  |
326337   |
20100305 1342  |
20100312 1235  |
20100312 0800  |
20100312 1800  |
20100312 0738  |
20100312 1220  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
XF  |
345_138L  |
LA PALMA  |
  |
  |
138  |
REPLACING ARRESTORS  |
326300   |
20100305 1341  |
20100312 1234  |
20100312 0800  |
20100312 1800  |
20100312 0738  |
20100312 1220  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
XF  |
345_138H  |
LA PALMA  |
  |
  |
345  |
REPLACING ARRESTORS  |
326995   |
20100311 0848  |
20100312 1229  |
20100315 0715  |
20100315 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_3980_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
327001   |
20100311 0850  |
20100312 1229  |
20100315 0715  |
20100315 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_9180_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
327013   |
20100311 0902  |
20100312 1229  |
20100315 0715  |
20100315 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3993  |
MARSHALL FORD  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED FOR BYPASSING WHILE NTE #3 138 OP. BUS IS OUT OF SERVICE FOR CLOSE PROXIMITY WORK.  |
326989   |
20100311 0841  |
20100312 1229  |
20100315 0715  |
20100315 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_3770_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
327019   |
20100311 0906  |
20100312 1229  |
20100315 0715  |
20100315 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_9073  |
MARSHALL FORD  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED FOR BYPASSING WHILE NTE #3 138 OP. BUS IS OUT OF SERVICE FOR CLOSE PROXIMITY WORK.  |
327016   |
20100311 0904  |
20100312 1229  |
20100315 0715  |
20100315 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3983  |
MARSHALL FORD  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED FOR BYPASSING WHILE NTE #3 138 OP. BUS IS OUT OF SERVICE FOR CLOSE PROXIMITY WORK.  |
327004   |
20100311 0852  |
20100312 1229  |
20100315 0715  |
20100315 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_9070  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
326998   |
20100311 0849  |
20100312 1229  |
20100315 0715  |
20100315 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_8020_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
326992   |
20100311 0844  |
20100312 1229  |
20100315 0715  |
20100315 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_3990_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
327136   |
20100311 1332  |
20100312 1229  |
20100315 0900  |
20100315 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
231T323  |
MARSHALL FORD  |
PALEFACE  |
  |
138  |
T-458 WORK IN CLOSE PROXIMITY TO THIS LINE.  |
326982   |
20100311 0753  |
20100312 1229  |
20100315 0900  |
20100315 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
458T458  |
BEE CREEK  |
PALEFACE  |
  |
138  |
REPLACE INSULATORS AND STATIC DEADEND SHOES ON THREE STRUCTURES  |
325579   |
20100226 1314  |
20100312 1209  |
20100311 2300  |
20100312 1100  |
20100311 2245  |
20100312 1130  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5025_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
CB 500, 3710, 2520, 770, 4645, 4345, 5010, 5085, 65, 745, 5015, 5035, 5025 FOR BUS 2 OUTAGE TO REPAIR EXPANSION JOINT ON BUS  |
325578   |
20100226 1314  |
20100312 1208  |
20100311 2300  |
20100312 1100  |
20100311 2245  |
20100312 1130  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5035_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
CB 500, 3710, 2520, 770, 4645, 4345, 5010, 5085, 65, 745, 5015, 5035, 5025 FOR BUS 2 OUTAGE TO REPAIR EXPANSION JOINT ON BUS  |
325577   |
20100226 1313  |
20100312 1208  |
20100311 2300  |
20100312 1100  |
20100311 2246  |
20100312 1130  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5015_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
CB 500, 3710, 2520, 770, 4645, 4345, 5010, 5085, 65, 745, 5015, 5035, 5025 FOR BUS 2 OUTAGE TO REPAIR EXPANSION JOINT ON BUS  |
325576   |
20100226 1313  |
20100312 1208  |
20100311 2300  |
20100312 1100  |
20100311 2258  |
20100312 1130  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
745_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
CB 500, 3710, 2520, 770, 4645, 4345, 5010, 5085, 65, 745, 5015, 5035, 5025 FOR BUS 2 OUTAGE TO REPAIR EXPANSION JOINT ON BUS  |
325246   |
20100224 1215  |
20100312 1207  |
20100310 1815  |
20100415 1800  |
20100312 1815  |
  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
CARANC_PTCOMF1  |
PTCOMFOR  |
CARANCAHUA  |
  |
69  |
AEP RAISING LINE & RECONDUCTORING BETWEEN POINT COMFORT-CARANCAHUA FOR NEW FORMOSA PROJECT.  |
325575   |
20100226 1313  |
20100312 1207  |
20100311 2300  |
20100312 1100  |
20100311 2258  |
20100312 1130  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
65_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
CB 500, 3710, 2520, 770, 4645, 4345, 5010, 5085, 65, 745, 5015, 5035, 5025 FOR BUS 2 OUTAGE TO REPAIR EXPANSION JOINT ON BUS  |
325574   |
20100226 1313  |
20100312 1206  |
20100311 2300  |
20100312 1100  |
20100311 2300  |
20100312 1130  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5085  |
NORTH EDINBURG  |
  |
Open  |
138  |
CB 500, 3710, 2520, 770, 4645, 4345, 5010, 5085, 65, 745, 5015, 5035, 5025 FOR BUS 2 OUTAGE TO REPAIR EXPANSION JOINT ON BUS  |
325573   |
20100226 1313  |
20100312 1206  |
20100311 2300  |
20100312 1100  |
20100311 2256  |
20100312 1130  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5010_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
CB 500, 3710, 2520, 770, 4645, 4345, 5010, 5085, 65, 745, 5015, 5035, 5025 FOR BUS 2 OUTAGE TO REPAIR EXPANSION JOINT ON BUS  |
325572   |
20100226 1312  |
20100312 1206  |
20100311 2300  |
20100312 1100  |
20100311 2253  |
20100312 1130  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
4345_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
CB 500, 3710, 2520, 770, 4645, 4345, 5010, 5085, 65, 745, 5015, 5035, 5025 FOR BUS 2 OUTAGE TO REPAIR EXPANSION JOINT ON BUS  |
325571   |
20100226 1312  |
20100312 1205  |
20100311 2300  |
20100312 1100  |
20100311 2252  |
20100312 1130  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
4645_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
CB 500, 3710, 2520, 770, 4645, 4345, 5010, 5085, 65, 745, 5015, 5035, 5025 FOR BUS 2 OUTAGE TO REPAIR EXPANSION JOINT ON BUS  |
325570   |
20100226 1312  |
20100312 1205  |
20100311 2300  |
20100312 1100  |
20100311 2250  |
20100312 1130  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
770_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
CB 500, 3710, 2520, 770, 4645, 4345, 5010, 5085, 65, 745, 5015, 5035, 5025 FOR BUS 2 OUTAGE TO REPAIR EXPANSION JOINT ON BUS  |
325569   |
20100226 1312  |
20100312 1205  |
20100311 2300  |
20100312 1100  |
20100311 2250  |
20100312 1130  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2520_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
CB 500, 3710, 2520, 770, 4645, 4345, 5010, 5085, 65, 745, 5015, 5035, 5025 FOR BUS 2 OUTAGE TO REPAIR EXPANSION JOINT ON BUS  |
325568   |
20100226 1312  |
20100312 1205  |
20100311 2300  |
20100312 1100  |
20100311 2247  |
20100312 1130  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
3710_CB  |
NORTH EDINBURG  |
  |
Open  |
138  |
CB 500, 3710, 2520, 770, 4645, 4345, 5010, 5085, 65, 745, 5015, 5035, 5025 FOR BUS 2 OUTAGE TO REPAIR EXPANSION JOINT ON BUS  |
325567   |
20100226 1311  |
20100312 1204  |
20100311 2300  |
20100312 1100  |
20100311 2247  |
20100312 1130  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
500  |
NORTH EDINBURG  |
  |
Open  |
138  |
CB 500, 3710, 2520, 770, 4645, 4345, 5010, 5085, 65, 745, 5015, 5035, 5025 FOR BUS 2 OUTAGE TO REPAIR EXPANSION JOINT ON BUS  |
326601   |
20100309 1006  |
20100312 1203  |
20100312 0800  |
20100315 1800  |
20100312 1159  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_60  |
FOX  |
  |
Open  |
69  |
Dig pier holes, pour foundations for new DE tower at Brock Sub.  |
327293   |
20100312 1158  |
20100312 1201  |
20100317 0800  |
20100317 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
Rayburn Country Coop, Inc. DBA - Rayburn Electric (TDSP)  |
  |
CB  |
B07833  |
SUNNY POINT RC  |
  |
Open  |
69  |
test  |
326602   |
20100309 1007  |
20100312 1157  |
20100312 0800  |
20100315 1800  |
20100312 1144  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M50  |
BROCK  |
  |
Open  |
69  |
Dig pier holes, pour foundations for new DE tower at Brock Sub.  |
327280   |
20100312 1129  |
20100312 1154  |
20100324 0800  |
20100324 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
Rayburn Country Coop, Inc. DBA - Rayburn Electric (TDSP)  |
  |
DSC  |
A101  |
NW WYLIE RC  |
  |
Open  |
138  |
Outage Scheduler Test  |
327000   |
20100311 0849  |
20100312 1154  |
20100317 0715  |
20100317 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_8020_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
326997   |
20100311 0848  |
20100312 1154  |
20100317 0715  |
20100317 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_3980_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
327015   |
20100311 0903  |
20100312 1154  |
20100317 0715  |
20100317 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3993  |
MARSHALL FORD  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED FOR BYPASSING WHILE NTE #3 138 OP. BUS IS OUT OF SERVICE FOR CLOSE PROXIMITY WORK.  |
327021   |
20100311 0906  |
20100312 1154  |
20100317 0715  |
20100317 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_9073  |
MARSHALL FORD  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED FOR BYPASSING WHILE NTE #3 138 OP. BUS IS OUT OF SERVICE FOR CLOSE PROXIMITY WORK.  |
326994   |
20100311 0844  |
20100312 1154  |
20100317 0715  |
20100317 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_3990_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
327006   |
20100311 0853  |
20100312 1154  |
20100317 0715  |
20100317 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_9070  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
326991   |
20100311 0842  |
20100312 1154  |
20100317 0715  |
20100317 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_3770_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
327003   |
20100311 0851  |
20100312 1154  |
20100317 0715  |
20100317 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_9180_CB  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR #3 138 KV OPERATING BUS AT MARSYHALL FORD FOR DIGGING OF FOOTINGS IN CLOSE PROXIMITY TO BUS. BYPASSING WILL BE DONE FOR VOLTAGE SUPPORT.  |
327018   |
20100311 0905  |
20100312 1154  |
20100317 0715  |
20100317 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3983  |
MARSHALL FORD  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED FOR BYPASSING WHILE NTE #3 138 OP. BUS IS OUT OF SERVICE FOR CLOSE PROXIMITY WORK.  |
327285   |
20100312 1148  |
20100312 1153  |
20100317 0800  |
20100317 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
Rayburn Country Coop, Inc. DBA - Rayburn Electric (TDSP)  |
  |
DSC  |
A101  |
NW WYLIE RC  |
  |
Open  |
138  |
test  |
325811   |
20100302 0943  |
20100312 1131  |
20100305 1815  |
20100312 1800  |
20100305 1745  |
20100312 1800  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
CAS_FRDN  |
FREDONIA  |
CASTELL  |
  |
69  |
lcra drilling core samples  |
322696   |
20100201 1645  |
20100312 1131  |
20100315 0800  |
20100319 1800  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
OCB7295B  |
SOUTH CARBIDE  |
TITAN  |
  |
138  |
SAFETY CLEARANCE FOR TXDOT HWY PROJECT  |
315160   |
20091120 1330  |
20100312 1126  |
20100319 0800  |
20100319 1800  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
220  |
KOCH UP RIVER  |
  |
Open  |
138  |
workplan maintenance  |
315159   |
20091120 1330  |
20100312 1126  |
20100318 0800  |
20100318 1800  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
410  |
KOCH UP RIVER  |
  |
Open  |
138  |
workplan maintenance  |
315158   |
20091120 1329  |
20100312 1125  |
20100317 0800  |
20100317 1800  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
40_CB  |
KOCH UP RIVER  |
  |
Open  |
69  |
workplan maintenance  |
315156   |
20091120 1328  |
20100312 1125  |
20100315 0800  |
20100315 1800  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
55_CB  |
KOCH UP RIVER  |
  |
Open  |
69  |
workplan maintenance  |
315157   |
20091120 1328  |
20100312 1125  |
20100316 0800  |
20100316 1800  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
20_CB  |
KOCH UP RIVER  |
  |
Open  |
69  |
workplan maintenance  |
314329   |
20091112 1456  |
20100312 1105  |
20100226 1915  |
20100312 1830  |
20100227 0650  |
20100312 0941  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
9240  |
SANDOW SWITCH  |
  |
Open  |
138  |
adding new bay for new equipment  |
325174   |
20100224 0752  |
20100312 1043  |
20100315 0700  |
20100317 1800  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
3418_CB  |
SAN MIGUEL  |
  |
Open  |
345  |
Change out insulators  |
326539   |
20100309 1421  |
20100312 1043  |
20100317 1815  |
20100318 2000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
3418_CB  |
SAN MIGUEL  |
  |
Open  |
345  |
Change out insulators  |
327050   |
20100311 1708  |
20100312 1040  |
20100315 0930  |
20100316 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
COR_DRSC  |
DRISCOLL SUB  |
CORPUS CHRISTI SWITCH  |
  |
69  |
rehab  |
326507   |
20100308 1240  |
20100312 1031  |
20100312 0700  |
20100312 1700  |
20100312 0826  |
20100312 1028  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_025  |
MORRISON LANE SWITCH  |
  |
Open  |
138  |
Work to be performed replace bad coil on operator 028 & repair hot spot on metering capacitors on first stage of Breaker 025 will need a hold on switch 024 not on breaker 025  |
327038   |
20100311 0954  |
20100312 1031  |
20100315 0900  |
20100315 1000  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_2893  |
LOCKHART  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO KEEP FEED TO T-2 WHILE 138 OP. BUS IS OUT OF SERVICE.  |
327039   |
20100311 0954  |
20100312 1031  |
20100315 0900  |
20100315 1000  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_6683  |
LOCKHART  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO KEEP FEED TO T-2 WHILE 138 OP. BUS IS OUT OF SERVICE.  |
327037   |
20100311 0953  |
20100312 1031  |
20100315 0900  |
20100315 1000  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_2873  |
LOCKHART  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO KEEP FEED TO T-2 WHILE 138 OP. BUS IS OUT OF SERVICE.  |
327030   |
20100311 0936  |
20100312 1031  |
20100315 0900  |
20100315 1000  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
GCB_6680  |
LOCKHART  |
  |
Open  |
138  |
CLEAR 138 OP. BUS TO REMOVE BUS JUMPERS FROM CS 3365. TIES HARD AND FAST TO BUS. T-1 LOAD WILL BE PUT OVER ON T-2 PRIOR. BYPASS TO KEEP FEED TO T-2.  |
327031   |
20100311 0939  |
20100312 1031  |
20100315 0900  |
20100318 1730  |
  |
  |
Continuous  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CS3365_CS  |
LOCKHART  |
  |
Open  |
138  |
MAINTENANCE AND TESTING. BUS JUMPERS REMOVED TO CS 3365  |
327026   |
20100311 0935  |
20100312 1029  |
20100315 0900  |
20100315 1000  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_2900_CB  |
LOCKHART  |
  |
Open  |
138  |
CLEAR 138 OP. BUS TO REMOVE BUS JUMPERS FROM CS 3365. TIES HARD AND FAST TO BUS. T-1 LOAD WILL BE PUT OVER ON T-2 PRIOR. BYPASS TO KEEP FEED TO T-2.  |
327027   |
20100311 0936  |
20100312 1029  |
20100315 0900  |
20100315 1000  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CS2875_CS  |
LOCKHART  |
  |
Open  |
138  |
CLEAR 138 OP. BUS TO REMOVE BUS JUMPERS FROM CS 3365. TIES HARD AND FAST TO BUS. T-1 LOAD WILL BE PUT OVER ON T-2 PRIOR. BYPASS TO KEEP FEED TO T-2.  |
327029   |
20100311 0936  |
20100312 1029  |
20100315 0900  |
20100315 1000  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_2890_CB  |
LOCKHART  |
  |
Open  |
138  |
CLEAR 138 OP. BUS TO REMOVE BUS JUMPERS FROM CS 3365. TIES HARD AND FAST TO BUS. T-1 LOAD WILL BE PUT OVER ON T-2 PRIOR. BYPASS TO KEEP FEED TO T-2.  |
327028   |
20100311 0936  |
20100312 1029  |
20100315 0900  |
20100315 1000  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_2880_CB  |
LOCKHART  |
  |
Open  |
138  |
CLEAR 138 OP. BUS TO REMOVE BUS JUMPERS FROM CS 3365. TIES HARD AND FAST TO BUS. T-1 LOAD WILL BE PUT OVER ON T-2 PRIOR. BYPASS TO KEEP FEED TO T-2.  |
326974   |
20100311 0749  |
20100312 1029  |
20100315 0900  |
20100315 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
176T165  |
WINCHESTER  |
FAYETTEVILLE  |
  |
138  |
OVERHAUL  |
327022   |
20100311 0914  |
20100312 1027  |
20100315 0800  |
20100315 1400  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
570  |
PARKDALE SES  |
  |
Open  |
138  |
We will need to take out SVC 2 to replace parts to prevent a automatic shutdown.  |
327023   |
20100311 0915  |
20100312 1027  |
20100315 0800  |
20100315 1400  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
270  |
PARKDALE SES  |
  |
Open  |
138  |
We will need to take out SVC 2 to replace parts to prevent a automatic shutdown.  |
327179   |
20100311 1446  |
20100312 1027  |
20100315 0830  |
20100315 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M30  |
PURDON  |
  |
Open  |
69  |
Line maintenance.  |
327174   |
20100311 1444  |
20100312 1027  |
20100315 0830  |
20100315 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M20B  |
BARRY TMPP  |
  |
Open  |
69  |
Line maintenance.  |
327176   |
20100311 1445  |
20100312 1027  |
20100315 0830  |
20100315 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
BARRY TMPP  |
  |
Open  |
69  |
Line maintenance.  |
327178   |
20100311 1445  |
20100312 1027  |
20100315 0830  |
20100315 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M60  |
PURDON  |
  |
Close  |
69  |
Line maintenance.  |
327180   |
20100311 1446  |
20100312 1027  |
20100315 0830  |
20100315 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M70  |
PURDON  |
  |
Open  |
69  |
Line maintenance.  |
327117   |
20100311 1255  |
20100312 1027  |
20100315 0600  |
20100315 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLS_3392  |
COLLEYVILLE  |
  |
Open  |
138  |
Outage for wireless work; trouble ticket. Close switch 3372 at Colleyville for alternate source.  |
327123   |
20100311 1300  |
20100312 1027  |
20100315 0600  |
20100315 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
6344  |
COLLEYVILLE TAP  |
  |
Open  |
138  |
Outage for wireless work; trouble ticket. Close switch 3372 at Colleyville for alternate source.  |
327120   |
20100311 1258  |
20100312 1027  |
20100315 0600  |
20100315 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1962  |
BEDFORD  |
  |
Open  |
138  |
Outage for wireless work; trouble ticket. Close switch 3372 at Colleyville for alternate source.  |
327118   |
20100311 1256  |
20100312 1027  |
20100315 0600  |
20100315 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
AS_3372  |
COLLEYVILLE  |
  |
Close  |
138  |
Outage for wireless work; trouble ticket. Close switch 3372 at Colleyville for alternate source.  |
326108   |
20100304 0922  |
20100312 0933  |
20100310 0900  |
20100312 1700  |
20100310 1037  |
20100312 0907  |
Continuous  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
CHA_BIGF  |
CHARLOTTE SUB  |
BIG FOOT SUB  |
  |
69  |
rehab  |
325470   |
20100226 0805  |
20100312 0926  |
20100301 0730  |
20100312 1800  |
20100301 0950  |
20100312 0840  |
Continuous  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DE_604BK  |
DESSAU  |
  |
Open  |
138  |
Transformer maintenance on DE-131415  |
326950   |
20100311 0608  |
20100312 0925  |
20100317 0800  |
20100317 1200  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_5601  |
MARION  |
  |
Open  |
138  |
CLEAR 138 KV SWITCH 5601 FOR MAINTENANCE  |
326978   |
20100311 0750  |
20100312 0922  |
20100317 0700  |
20100317 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
176T165  |
WINCHESTER  |
FAYETTEVILLE  |
  |
138  |
OVERHAUL  |
326967   |
20100311 0654  |
20100312 0922  |
20100317 0600  |
20100317 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
CI_GE_21  |
CAMRON  |
GERTIE  |
  |
138  |
Install cell site  |
326872   |
20100310 1451  |
20100312 0920  |
20100317 1000  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CS_5025  |
WHITESTONE  |
  |
Open  |
138  |
CLEAR 138/24.9 KV T-1 POWERBANK TO REPAIR HOT SPOT ON LOWSIDE BUSHING. PEC WILL PUT T-1 LOAD OVER ON T-2 PRIOR.  |
326874   |
20100310 1451  |
20100312 0920  |
20100317 1000  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_5026  |
WHITESTONE  |
  |
Open  |
138  |
CLEAR 138/24.9 KV T-1 POWERBANK TO REPAIR HOT SPOT ON LOWSIDE BUSHING. PEC WILL PUT T-1 LOAD OVER ON T-2 PRIOR.  |
326861   |
20100310 1412  |
20100312 0916  |
20100317 0700  |
20100317 1500  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
7065  |
RICHLAND CHAMBERS  |
  |
Open  |
345  |
REPLACE HYDRAULIC MOTORS  |
326858   |
20100310 1337  |
20100312 0915  |
20100317 0700  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
R790  |
WO  |
  |
Open  |
138  |
rewire panel  |
326860   |
20100310 1339  |
20100312 0915  |
20100317 0700  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T3HS  |
WO  |
  |
Open  |
138  |
rewire panel  |
326844   |
20100310 1338  |
20100312 0915  |
20100317 0700  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
R800  |
WO  |
  |
Open  |
138  |
rewire panel  |
326859   |
20100310 1338  |
20100312 0915  |
20100317 0700  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
7215  |
WO  |
  |
Open  |
138  |
rewire panel  |
325779   |
20100302 0744  |
20100312 0805  |
20100323 0730  |
20100323 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
10Z0_CB  |
BECK ROAD  |
  |
Open  |
138  |
To move tower 19 and 24 onto the new foundations.  |
325780   |
20100302 0744  |
20100312 0805  |
20100324 0730  |
20100324 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
10Z0_CB  |
BECK ROAD  |
  |
Open  |
138  |
To move tower 19 and 24 onto the new foundations.  |
325767   |
20100302 0737  |
20100312 0805  |
20100324 0730  |
20100324 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
N3_Z0  |
CALAVERAS  |
BECK ROAD  |
  |
138  |
To move tower 19 and 24 onto the new foundations.  |
325768   |
20100302 0737  |
20100312 0805  |
20100325 0730  |
20100325 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
N3_Z0  |
CALAVERAS  |
BECK ROAD  |
  |
138  |
To move tower 19 and 24 onto the new foundations.  |
325769   |
20100302 0737  |
20100312 0805  |
20100326 0730  |
20100326 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
N3_Z0  |
CALAVERAS  |
BECK ROAD  |
  |
138  |
To move tower 19 and 24 onto the new foundations.  |
325766   |
20100302 0737  |
20100312 0805  |
20100323 0730  |
20100323 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
N3_Z0  |
CALAVERAS  |
BECK ROAD  |
  |
138  |
To move tower 19 and 24 onto the new foundations.  |
325782   |
20100302 0744  |
20100312 0805  |
20100326 0730  |
20100326 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
10Z0_CB  |
BECK ROAD  |
  |
Open  |
138  |
To move tower 19 and 24 onto the new foundations.  |
325781   |
20100302 0744  |
20100312 0805  |
20100325 0730  |
20100325 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
10Z0_CB  |
BECK ROAD  |
  |
Open  |
138  |
To move tower 19 and 24 onto the new foundations.  |
325777   |
20100302 0743  |
20100312 0805  |
20100326 0730  |
20100326 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN8490_CB  |
CALAVERAS  |
  |
Open  |
138  |
To move tower 19 and 24 onto the new foundations.  |
325776   |
20100302 0743  |
20100312 0805  |
20100325 0730  |
20100325 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN8490_CB  |
CALAVERAS  |
  |
Open  |
138  |
To move tower 19 and 24 onto the new foundations.  |
325775   |
20100302 0743  |
20100312 0805  |
20100324 0730  |
20100324 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN8490_CB  |
CALAVERAS  |
  |
Open  |
138  |
To move tower 19 and 24 onto the new foundations.  |
325774   |
20100302 0743  |
20100312 0804  |
20100323 0730  |
20100323 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN8490_CB  |
CALAVERAS  |
  |
Open  |
138  |
To move tower 19 and 24 onto the new foundations.  |
325815   |
20100302 0948  |
20100312 0803  |
20100312 0830  |
20100312 1430  |
  |
  |
Daily  |
Cancelled  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7090  |
RIO PECOS  |
  |
Open  |
138  |
operator maintenance  |
324827   |
20100219 1639  |
20100311 2208  |
20100308 0800  |
20100312 1800  |
20100308 0735  |
20100311 2145  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
3930_CB  |
WHITE_PT  |
  |
Open  |
345  |
SEVERAL CREWS REPLACING INSULATORS  |
324814   |
20100219 1639  |
20100311 2207  |
20100308 0800  |
20100312 1800  |
20100308 0735  |
20100311 2145  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
3920_CB  |
WHITE_PT  |
  |
Open  |
345  |
SEVERAL CREWS REPLACING INSULATORS  |
325116   |
20100223 1548  |
20100311 2152  |
20100308 0800  |
20100312 1800  |
20100308 0735  |
20100311 2145  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
9757  |
LON HILL  |
  |
Open  |
345  |
SEVERAL CREWS REPLACING INSULATORS  |
326475   |
20100308 1034  |
20100311 1942  |
20100311 0700  |
20100311 1900  |
20100311 0846  |
20100311 1649  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_1610  |
WICHITA FALLS  |
  |
Open  |
69  |
Outage on bus to replace switch 1379 and clean several hot spots on switches. Bus at Holliday will be split and served from remote ends for contingency. CB4870 at Electra and CB 1090 at Seymour closed for alternate sources.  |
323477   |
20100209 1107  |
20100311 1935  |
20100308 0900  |
20100402 1700  |
20100308 1032  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_6259  |
COURTLAND  |
  |
Close  |
345  |
Outage on transformer 1 to regasket,re-process and test. Load will be tied via lowside bustie.  |
326465   |
20100308 0943  |
20100311 1934  |
20100311 0600  |
20100311 2000  |
20100311 0609  |
20100311 1738  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6020_D  |
EVERMAN SWITCH  |
COURTLAND  |
  |
345  |
Outage for wireless work; setting new equipment shelter. Close switch 6259 at Courtland for alternate source.  |
325919   |
20100303 0932  |
20100311 1906  |
20100309 0800  |
20100311 1900  |
20100309 0806  |
20100311 1906  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ANGORA_STER1  |
ANGORA  |
STERLING CITY  |
  |
69  |
open jumpers in line to install switches  |
320903   |
20100117 1837  |
20100311 1827  |
20100311 0800  |
20100312 1600  |
20100311 0830  |
20100311 1826  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
8718  |
BIG FOOT  |
  |
Open  |
138  |
CAPACITOR CS MAINTENANCE  |
324800   |
20100219 1356  |
20100311 1810  |
20100307 0700  |
20100311 1815  |
20100307 0754  |
20100311 1808  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T2HS  |
QNT  |
  |
Open  |
69  |
CUST TESTING AND MAINT  |
325874   |
20100302 1450  |
20100311 1757  |
20100311 0700  |
20100311 1700  |
20100311 0700  |
20100311 1725  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
E210  |
SHORE ACRES  |
  |
Open  |
138  |
PLANT MAINT ON TR#2  |
326443   |
20100308 1052  |
20100311 1720  |
20100311 0700  |
20100311 1900  |
20100311 0820  |
20100311 1611  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
DSC_2998  |
TEXAS JUNCTION TAP  |
  |
Open  |
138  |
Outage to set poles (distribution) under line. Note:Odessa Texas Instuments load is being fed from Midland Airport while transformer is being replaced.  |
326442   |
20100308 1051  |
20100311 1720  |
20100311 0700  |
20100311 1900  |
20100311 0820  |
20100311 1611  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
DSC_2997  |
TEXAS JUNCTION TAP  |
  |
Open  |
138  |
Outage to set poles (distribution) under line. Note:Odessa Texas Instuments load is being fed from Midland Airport while transformer is being replaced.  |
326477   |
20100308 1050  |
20100311 1719  |
20100311 0700  |
20100311 1900  |
20100311 0812  |
20100311 1554  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_3080  |
MIDESSA SWITCH  |
  |
Open  |
138  |
Outage to set poles (distribution) under line. Note:Odessa Texas Instuments load is being fed from Midland Airport while transformer is being replaced.  |
320730   |
20100114 1435  |
20100311 1718  |
20100308 0700  |
20100311 1700  |
20100309 0801  |
20100311 1642  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
SIEWAP02  |
WA PARISH  |
SIENNA  |
  |
138  |
REHAB WORK  |
326438   |
20100308 1031  |
20100311 1709  |
20100311 0700  |
20100311 1900  |
20100311 0832  |
20100311 1649  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
XF  |
AXFMR1  |
LAKE WICHITA SWITCH  |
  |
  |
138  |
Outage on bus to replace switch 1379 and clean several hot spots on switches. Bus at Holliday will be split and served from remote ends for contingency. CB4870 at Electra and CB 1090 at Seymour closed for alternate sources.  |
326472   |
20100308 1032  |
20100311 1709  |
20100311 0700  |
20100311 1900  |
20100311 0832  |
20100311 1649  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_1380  |
LAKE WICHITA SWITCH  |
  |
Open  |
69  |
Outage on bus to replace switch 1379 and clean several hot spots on switches. Bus at Holliday will be split and served from remote ends for contingency. CB4870 at Electra and CB 1090 at Seymour closed for alternate sources.  |
326439   |
20100308 1032  |
20100311 1708  |
20100311 0700  |
20100311 1900  |
20100311 0831  |
20100311 1649  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_1370  |
LAKE WICHITA SWITCH  |
  |
Open  |
69  |
Outage on bus to replace switch 1379 and clean several hot spots on switches. Bus at Holliday will be split and served from remote ends for contingency. CB4870 at Electra and CB 1090 at Seymour closed for alternate sources.  |
326476   |
20100308 1035  |
20100311 1703  |
20100311 0700  |
20100311 1900  |
20100311 0810  |
20100311 1649  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_1090  |
SEYMOUR TU  |
  |
Close  |
69  |
Outage on bus to replace switch 1379 and clean several hot spots on switches. Bus at Holliday will be split and served from remote ends for contingency. CB4870 at Electra and CB 1090 at Seymour closed for alternate sources.  |
326473   |
20100308 1033  |
20100311 1703  |
20100311 0700  |
20100311 1900  |
20100311 0833  |
20100311 1451  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_1620  |
HOLLIDAY  |
  |
Open  |
69  |
Outage on bus to replace switch 1379 and clean several hot spots on switches. Bus at Holliday will be split and served from remote ends for contingency. CB4870 at Electra and CB 1090 at Seymour closed for alternate sources.  |
326474   |
20100308 1033  |
20100311 1702  |
20100311 0700  |
20100311 1900  |
20100311 0838  |
20100311 1649  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_1630  |
HOLLIDAY  |
| BLACKWELL WICHITA FALLS TAP |   |
Open  |
69  |
Outage on bus to replace switch 1379 and clean several hot spots on switches. Bus at Holliday will be split and served from remote ends for contingency. CB4870 at Electra and CB 1090 at Seymour closed for alternate sources.  |
326145   |
20100304 1502  |
20100311 1702  |
20100308 0900  |
20100311 1700  |
20100308 1003  |
20100311 1142  |
Continuous  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
COR_DRSC  |
DRISCOLL SUB  |
CORPUS CHRISTI SWITCH  |
  |
69  |
rehab  |
326440   |
20100308 1033  |
20100311 1702  |
20100311 0700  |
20100311 1900  |
20100311 0943  |
20100311 1649  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_1660  |
HOLLIDAY  |
  |
Open  |
69  |
Outage on bus to replace switch 1379 and clean several hot spots on switches. Bus at Holliday will be split and served from remote ends for contingency. CB4870 at Electra and CB 1090 at Seymour closed for alternate sources.  |
325716   |
20100301 1500  |
20100311 1702  |
20100304 0800  |
20100311 1800  |
20100304 0809  |
20100311 1641  |
Continuous  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
3051  |
MVEC (HEIDELBURG)  |
MVEC (WESLACO)  |
  |
138  |
replace rotten poles  |
326441   |
20100308 1034  |
20100311 1701  |
20100311 0700  |
20100311 1900  |
20100311 0809  |
20100311 1649  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_4870  |
ELECTRA  |
  |
Close  |
69  |
Outage on bus to replace switch 1379 and clean several hot spots on switches. Bus at Holliday will be split and served from remote ends for contingency. CB4870 at Electra and CB 1090 at Seymour closed for alternate sources.  |
326827   |
20100310 1305  |
20100311 1701  |
20100317 0800  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
LN  |
1390_D  |
OATES TMPP  |
MESQUITE NORTH TAP  |
  |
138  |
Replace air switch 1395.  |
326849   |
20100310 1310  |
20100311 1701  |
20100317 0800  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
DISC8361  |
OATES TMPP  |
  |
Open  |
138  |
Replace air switch 1395.  |
326839   |
20100310 1311  |
20100311 1701  |
20100317 0800  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
CB_8350  |
OATES TMPP  |
  |
Open  |
138  |
Replace air switch 1395.  |
326857   |
20100310 1332  |
20100311 1701  |
20100317 0800  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
DISC1395  |
OATES TMPP  |
  |
Open  |
138  |
Replace air switch 1395.  |
326850   |
20100310 1311  |
20100311 1701  |
20100317 0800  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
CB_8360  |
OATES TMPP  |
  |
Open  |
138  |
Replace air switch 1395.  |
326848   |
20100310 1309  |
20100311 1701  |
20100317 0800  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
DISC8351  |
OATES TMPP  |
  |
Open  |
138  |
Replace air switch 1395.  |
326822   |
20100310 1222  |
20100311 1646  |
20100317 0830  |
20100317 1530  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
XF  |
AT1_H  |
ADDICKS  |
  |
  |
138  |
MAINT  |
318425   |
20091222 0844  |
20100311 1643  |
20100308 0700  |
20100311 1700  |
20100308 0642  |
20100311 1636  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T6HS  |
GN  |
  |
Open  |
138  |
REPLACE TR4 RELAY PANEL  |
326808   |
20100310 0952  |
20100311 1643  |
20100317 0800  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
H080  |
H O CLARKE  |
  |
Open  |
138  |
MAINT  |
326810   |
20100310 0953  |
20100311 1643  |
20100317 0800  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
H083  |
H O CLARKE  |
  |
Close  |
138  |
MAINT BYPASS H080  |
326809   |
20100310 0953  |
20100311 1643  |
20100317 0800  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T130  |
H O CLARKE  |
  |
Close  |
138  |
MAINT BYPASS H080  |
318424   |
20091222 0844  |
20100311 1642  |
20100308 0700  |
20100311 1700  |
20100308 0810  |
20100311 1531  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T4HS  |
GN  |
  |
Open  |
138  |
REPLACE TR4 RELAY PANEL  |
318423   |
20091222 0842  |
20100311 1642  |
20100308 0700  |
20100311 1700  |
20100308 0914  |
20100311 1230  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
L840  |
GN  |
  |
Open  |
138  |
REPLACE TR4 RELAY PANEL  |
318422   |
20091222 0840  |
20100311 1641  |
20100308 0700  |
20100311 1700  |
20100308 0914  |
20100311 1230  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
L830  |
GN  |
  |
Open  |
138  |
REPLACE TR4 RELAY PANEL  |
326452   |
20100308 0839  |
20100311 1632  |
20100316 1000  |
20100317 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
M20CS-1  |
CANYON TMPP  |
  |
Open  |
138  |
CoServ working on distribution circuits.  |
326430   |
20100308 0839  |
20100311 1632  |
20100316 1000  |
20100317 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M20-1  |
CANYON TMPP  |
  |
Open  |
138  |
CoServ working on distribution circuits.  |
326659   |
20100309 1333  |
20100311 1631  |
20100317 1000  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_2993  |
LEANDER  |
  |
Close  |
138  |
SWITYCH IS BEING CLOSED TO BYPASS CB 2990 WHILE BEING USED FOR PEC SWITCH TRAINING.  |
326658   |
20100309 1332  |
20100311 1631  |
20100317 1000  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_2990_CB  |
LEANDER  |
  |
Open  |
138  |
Breaker is being used for Pedernales Electric Cooperative switch training. Breaker will be bypassed.  |
326660   |
20100309 1333  |
20100311 1631  |
20100317 1000  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_2983  |
LEANDER  |
  |
Close  |
138  |
SWITYCH IS BEING CLOSED TO BYPASS CB 2990 WHILE BEING USED FOR PEC SWITCH TRAINING.  |
326099   |
20100304 0910  |
20100311 1627  |
20100317 0600  |
20100318 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_5056  |
TEMPLE SWITCH  |
  |
Open  |
345  |
to install new tuners and tuning packs on the line wave traps for the Temple-Sandow 345kv line in conjunction with the Temple-Killeen cut-in to the new Salado Switchyard.  |
326100   |
20100304 0910  |
20100311 1627  |
20100317 0600  |
20100318 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_5060  |
TEMPLE SWITCH  |
  |
Open  |
345  |
to install new tuners and tuning packs on the line wave traps for the Temple-Sandow 345kv line in conjunction with the Temple-Killeen cut-in to the new Salado Switchyard.  |
326098   |
20100304 0909  |
20100311 1627  |
20100317 0600  |
20100318 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
430_A  |
SANDOW SWITCH  |
TEMPLE SWITCH  |
  |
345  |
to install new tuners and tuning packs on the line wave traps for the Temple-Sandow 345kv line in conjunction with the Temple-Killeen cut-in to the new Salado Switchyard.  |
325887   |
20100302 1645  |
20100311 1601  |
20100317 0700  |
20100318 0815  |
  |
  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
9615_CB  |
FORMOSA  |
  |
Open  |
138  |
BUS OUTAGE TO INSTALL FOUNDATIONS FOR METER CT UPGRADE FOR FORMOSA PROJECT. FORMOSA PLANT ADVISED OF WORK.  |
325886   |
20100302 1645  |
20100311 1601  |
20100317 0700  |
20100318 0815  |
  |
  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
595_CB  |
FORMOSA  |
  |
Open  |
138  |
BUS OUTAGE TO INSTALL FOUNDATIONS FOR METER CT UPGRADE FOR FORMOSA PROJECT. FORMOSA PLANT ADVISED OF WORK.  |
327108   |
20100311 1245  |
20100311 1555  |
20100429 0600  |
20100501 1800  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
H970  |
PH ROBINSON  |
  |
Open  |
138  |
REWIRE BUS DIFF RELAY PNL  |
327107   |
20100311 1244  |
20100311 1554  |
20100429 0600  |
20100501 1800  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
H480  |
PH ROBINSON  |
  |
Open  |
138  |
REWIRE BUS DIFF RELAY PNL  |
325827   |
20100302 1013  |
20100311 1553  |
20100317 0700  |
20100331 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
BGLK_MCAN  |
BIG LAKE  |
MCCAMEY NORTH SW  |
  |
138  |
cut in new phase shifter  |
327106   |
20100311 1244  |
20100311 1553  |
20100429 0600  |
20100501 1800  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
H470  |
PH ROBINSON  |
  |
Open  |
138  |
REWIRE BUS DIFF RELAY PNL  |
327105   |
20100311 1243  |
20100311 1553  |
20100429 0600  |
20100501 1800  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
H460  |
PH ROBINSON  |
  |
Open  |
138  |
REWIRE BUS DIFF RELAY PNL  |
325555   |
20100226 1300  |
20100311 1544  |
20100317 0600  |
20100319 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLDB5872  |
RICHARDSON COLLINS  |
  |
Open  |
138  |
CUSTOMER WILL BE FED FROM GENERATOR SOURCE. OUR LOAD WILL BE PLACED ONTO MOBILE TRANSFORMER. WE WILL BE INSTALLING NEW BUS AND SWITCHES TO LINE SIDE OF TRANSFORMERS  |
325560   |
20100226 1301  |
20100311 1544  |
20100317 0600  |
20100319 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLS_AB  |
RICHARDSON COLLINS  |
  |
Open  |
138  |
CUSTOMER WILL BE FED FROM GENERATOR SOURCE. OUR LOAD WILL BE PLACED ONTO MOBILE TRANSFORMER. WE WILL BE INSTALLING NEW BUS AND SWITCHES TO LINE SIDE OF TRANSFORMERS  |
325557   |
20100226 1300  |
20100311 1544  |
20100317 0600  |
20100319 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLDB5874  |
RICHARDSON COLLINS  |
  |
Open  |
138  |
CUSTOMER WILL BE FED FROM GENERATOR SOURCE. OUR LOAD WILL BE PLACED ONTO MOBILE TRANSFORMER. WE WILL BE INSTALLING NEW BUS AND SWITCHES TO LINE SIDE OF TRANSFORMERS  |
325556   |
20100226 1300  |
20100311 1544  |
20100317 0600  |
20100319 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLDB5873  |
RICHARDSON COLLINS  |
  |
Open  |
138  |
CUSTOMER WILL BE FED FROM GENERATOR SOURCE. OUR LOAD WILL BE PLACED ONTO MOBILE TRANSFORMER. WE WILL BE INSTALLING NEW BUS AND SWITCHES TO LINE SIDE OF TRANSFORMERS  |
325559   |
20100226 1301  |
20100311 1544  |
20100317 0600  |
20100319 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLS_AA  |
RICHARDSON COLLINS  |
  |
Open  |
138  |
CUSTOMER WILL BE FED FROM GENERATOR SOURCE. OUR LOAD WILL BE PLACED ONTO MOBILE TRANSFORMER. WE WILL BE INSTALLING NEW BUS AND SWITCHES TO LINE SIDE OF TRANSFORMERS  |
325558   |
20100226 1301  |
20100311 1544  |
20100317 0600  |
20100319 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLDB5877  |
RICHARDSON COLLINS  |
  |
Open  |
138  |
CUSTOMER WILL BE FED FROM GENERATOR SOURCE. OUR LOAD WILL BE PLACED ONTO MOBILE TRANSFORMER. WE WILL BE INSTALLING NEW BUS AND SWITCHES TO LINE SIDE OF TRANSFORMERS  |
326120   |
20100304 1037  |
20100311 1528  |
20100311 0900  |
20100311 1600  |
20100311 0854  |
20100311 1528  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_4090_CB  |
BELLVILLE SOUTH  |
  |
Open  |
138  |
Trip check line relays on the Bellville South to Waller 138 kv line T-213  |
326119   |
20100304 1036  |
20100311 1528  |
20100311 0900  |
20100311 1600  |
20100311 0854  |
20100311 1528  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_11710_CB  |
BELLVILLE SOUTH  |
  |
Open  |
138  |
Trip check line relays on the Bellville South to Waller 138 kv line T-213  |
325931   |
20100303 0951  |
20100311 1526  |
20100311 0700  |
20100311 1600  |
20100311 0922  |
20100311 1615  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T3HS  |
FM  |
  |
Open  |
138  |
LINE OUTAGE AND SECTION AT FM TO REPAIR SWITCH 6667  |
325929   |
20100303 0950  |
20100311 1523  |
20100311 0700  |
20100311 1600  |
20100311 1145  |
20100311 1615  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
6667  |
FM  |
  |
Open  |
138  |
LINE OUTAGE AND SECTION AT FM TO REPAIR SWITCH 6667  |
325930   |
20100303 0950  |
20100311 1522  |
20100311 0700  |
20100311 1600  |
20100311 1147  |
20100311 1615  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
S666  |
FM  |
  |
Open  |
138  |
LINE OUTAGE AND SECTION AT FM TO REPAIR SWITCH 6667  |
325928   |
20100303 0949  |
20100311 1522  |
20100311 0700  |
20100311 1600  |
20100311 0746  |
20100311 1615  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BETFM_66  |
FM  |
BET  |
  |
138  |
LINE OUTAGE AND SECTION AT FM TO REPAIR SWITCH 6667  |
317740   |
20091215 1434  |
20100311 1521  |
20100311 0800  |
20100311 1600  |
20100311 0930  |
20100311 1400  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
XF  |
AT2_H  |
VL  |
  |
  |
69  |
DOBLE RESUBMITTED DUE TO NOMCR SYNC -MDH-  |
326433   |
20100308 0954  |
20100311 1516  |
20100426 0900  |
20100427 1600  |
  |
  |
Continuous  |
Approved  |
Planned  |
BROWNSVILLE PUBLIC UTILITY BOARD (TDSP)  |
  |
CB  |
CB_SM110  |
SOUTHMOS  |
  |
Open  |
138  |
Washing Waterport Substation  |
326434   |
20100308 0956  |
20100311 1516  |
20100426 0900  |
20100427 1600  |
  |
  |
Continuous  |
Approved  |
Planned  |
BROWNSVILLE PUBLIC UTILITY BOARD (TDSP)  |
  |
CB  |
CB_SM140  |
SOUTHMOS  |
  |
Open  |
138  |
Washing Waterport Substation  |
326467   |
20100308 0952  |
20100311 1515  |
20100426 0900  |
20100427 1600  |
  |
  |
Continuous  |
Approved  |
Planned  |
BROWNSVILLE PUBLIC UTILITY BOARD (TDSP)  |
  |
CB  |
E210  |
WATERPORT  |
  |
Open  |
138  |
Washing Waterport Substation  |
324163   |
20100215 1322  |
20100311 1512  |
20100426 0800  |
20100430 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
CB6110  |
LAREDO VFT  |
  |
Open  |
17.5  |
ANNUAL MAINTENANCE ON VFT UNIT. NO POWER TRANSFER AVAILABLE DURING THIS WORK  |
324164   |
20100215 1323  |
20100311 1512  |
20100426 0800  |
20100430 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
CB7470  |
LAREDO VFT  |
  |
Open  |
17.5  |
ANNUAL MAINTENANCE ON VFT UNIT. NO POWER TRANSFER AVAILABLE DURING THIS WORK  |
324165   |
20100215 1324  |
20100311 1512  |
20100426 0800  |
20100430 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
XF  |
VFT  |
LAREDO VFT  |
  |
  |
17.5  |
ANNUAL MAINTENANCE ON VFT UNIT. NO POWER TRANSFER AVAILABLE DURING THIS WORK  |
325489   |
20100226 0716  |
20100311 1503  |
20100308 0730  |
20100311 1700  |
20100308 0741  |
20100311 1715  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
W759  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
CUST BUS MAINT  |
325072   |
20100223 1033  |
20100311 1502  |
20100308 0730  |
20100311 1700  |
20100308 0741  |
20100311 1715  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W770  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
PLANT MAINT  |
325073   |
20100223 1033  |
20100311 1502  |
20100308 0730  |
20100311 1700  |
20100308 0741  |
20100311 1715  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W780  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
PLANT MAINT  |
325071   |
20100223 1032  |
20100311 1502  |
20100308 0730  |
20100311 1700  |
20100308 0741  |
20100311 1715  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W750  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
PLANT MAINT  |
325088   |
20100223 1032  |
20100311 1501  |
20100308 0730  |
20100311 1700  |
20100308 0741  |
20100311 1715  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W760  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
PLANT MAINT  |
325908   |
20100303 0804  |
20100311 1454  |
20100311 1200  |
20100311 1600  |
20100311 1214  |
20100311 1449  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
A040  |
WA PARISH  |
  |
Open  |
138  |
LUBRICATE BREAKER  |
323362   |
20100208 1454  |
20100311 1451  |
20100426 0800  |
20100429 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
XF  |
AT3_H  |
OB  |
  |
  |
345  |
TRANSFORMER ALARM MAINTENANCE - REPAIR AND REPLACE ALARM DEVICES AND CABLES  |
324383   |
20100217 1052  |
20100311 1446  |
20100317 0700  |
20100317 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BI_WAP50  |
BI  |
WA PARISH  |
  |
345  |
PCS WORK  |
325795   |
20100302 0758  |
20100311 1444  |
20100426 0730  |
20100430 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN19S1_CB  |
HOWARD ROAD  |
  |
Open  |
138  |
To modify the transmission line tap that goes to Toyota substation.  |
325789   |
20100302 0754  |
20100311 1444  |
20100426 0730  |
20100430 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
P2_Q1  |
MARBACH ROAD  |
VALLEY ROAD  |
  |
138  |
To modify the transmission line tap that goes to Toyota substation.  |
325794   |
20100302 0757  |
20100311 1444  |
20100426 0730  |
20100430 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
14T3  |
TOYOTA  |
  |
Open  |
138  |
To modify the transmission line tap that goes to Toyota substation.  |
325792   |
20100302 0757  |
20100311 1444  |
20100426 0730  |
20100430 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
T3_S1  |
TOYOTA  |
HOWARD ROAD  |
  |
138  |
To modify the transmission line tap that goes to Toyota substation.  |
325791   |
20100302 0756  |
20100311 1444  |
20100426 0730  |
20100430 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN10Q1_CB  |
VALLEY ROAD  |
  |
Open  |
138  |
To modify the transmission line tap that goes to Toyota substation.  |
325790   |
20100302 0755  |
20100311 1444  |
20100426 0730  |
20100430 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN12P2_CB  |
MARBACH ROAD  |
  |
Open  |
138  |
To modify the transmission line tap that goes to Toyota substation.  |
326122   |
20100304 1042  |
20100311 1442  |
20100311 0830  |
20100311 1730  |
20100311 0855  |
20100311 1442  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
800_CB  |
LULING  |
  |
Open  |
69  |
DIAGNOSTIC TESTING  |
325891   |
20100303 0614  |
20100311 1442  |
20100311 1000  |
20100311 1700  |
20100311 1227  |
20100311 1442  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
10360  |
BERTRAM  |
  |
Close  |
69  |
BREAKER WILL BE USED FOR PEDERNALES ELECTRIC COOPERATIVE SWITCH TRAINING  |
326121   |
20100304 1041  |
20100311 1442  |
20100311 0900  |
20100311 1630  |
20100311 0855  |
20100311 1442  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
PCB_6200_CB  |
AUSTROP  |
  |
Open  |
345  |
OPERATOR MAINTENANCE. SPS WILL BE TURNED OFF ON ONCORs AUSTROP TO SANDOW 345 KV SOUTH CIRCUIT T-229.  |
323737   |
20100211 1330  |
20100311 1441  |
20100426 0700  |
20100521 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
1026  |
WA PARISH  |
  |
Open  |
138  |
SET 16 POLES  |
323391   |
20100208 1530  |
20100311 1440  |
20100426 0700  |
20100426 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BV_FL_09  |
BV  |
FL  |
  |
138  |
REHAB WORK  |
323339   |
20100208 1404  |
20100311 1431  |
20100317 0700  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
6620  |
MT ENTERPRISE  |
  |
Open  |
345  |
REPLACE CCVTS ON BUS LOCATED ON SECTION MT ENTERPRISE TO TENASKA. OUTAGE SCHEDULED WITH TENASKA GATEWAY  |
323340   |
20100208 1405  |
20100311 1431  |
20100317 0700  |
20100317 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
6625  |
MT ENTERPRISE  |
  |
Open  |
345  |
REPLACE CCVTS ON BUS LOCATED ON SECTION MT ENTERPRISE TO TENASKA. OUTAGE SCHEDULED WITH TENASKA GATEWAY  |
326185   |
20100304 1628  |
20100311 1426  |
20100311 0800  |
20100311 1700  |
20100311 0835  |
20100311 1424  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
DOW_MOUN  |
DOWNING  |
MOUNTARY  |
  |
69  |
Line maintenance  |
326275   |
20100305 1100  |
20100311 1420  |
20100311 0800  |
20100312 1700  |
20100311 0808  |
20100311 1149  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
AS_4705  |
HEMPHILL  |
  |
Open  |
138  |
Outage to replace interrupters on FID 4708. Load will be bustied via lowside bustie to transf 1.  |
323208   |
20100205 0951  |
20100311 1420  |
20100426 0600  |
20100501 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
HR_RU_86  |
HR  |
RU  |
  |
138  |
Replace relay panel, wavetrap & lightning arrestors  |
323211   |
20100205 0952  |
20100311 1420  |
20100426 0600  |
20100501 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P480  |
HR  |
  |
Open  |
138  |
Replace relay panel, wavetrap & lightning arrestors  |
323210   |
20100205 0952  |
20100311 1420  |
20100426 0600  |
20100501 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P120  |
HR  |
  |
Open  |
138  |
Replace relay panel, wavetrap & lightning arrestors  |
323209   |
20100205 0951  |
20100311 1420  |
20100426 0600  |
20100501 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
6865  |
HR  |
  |
Open  |
138  |
Replace relay panel, wavetrap & lightning arrestors  |
326276   |
20100305 1100  |
20100311 1420  |
20100311 0800  |
20100312 1700  |
20100311 0752  |
20100311 1149  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_4704  |
HEMPHILL  |
  |
Open  |
138  |
Outage to replace interrupters on FID 4708. Load will be bustied via lowside bustie to transf 1.  |
326195   |
20100304 1656  |
20100311 1416  |
20100308 1215  |
20100311 1700  |
20100309 0655  |
20100311 1416  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN10H1_CB  |
OLMOS  |
  |
Open  |
138  |
To replace the breaker.  |
325748   |
20100302 0709  |
20100311 1412  |
20100309 0730  |
20100312 1700  |
20100309 0732  |
20100311 1412  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
11M1  |
FIVE POINTS  |
  |
Open  |
138  |
Change out leaking SF-6 vessel.  |
325895   |
20100303 0654  |
20100311 1412  |
20100311 0800  |
20100311 1800  |
20100311 0825  |
20100311 1410  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
J250  |
ROANS PRAIRIE REIT  |
  |
Open  |
345  |
REPAIR PILOT VALVES & LUBE MAINT  |
325913   |
20100303 0826  |
20100311 1347  |
20100311 0800  |
20100311 1400  |
20100311 0741  |
20100311 1346  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
6055_CB  |
OKLAUNION  |
  |
Open  |
345  |
CHANGE AIR COMPRESSOR  |
323734   |
20100211 1312  |
20100311 1344  |
20100424 0700  |
20100424 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
L029  |
CENTER  |
  |
Open  |
345  |
- FOR CLEARANCE- MAJOR REPAIR B480 SF6 GAS LEAK - FACTORY ON SITE  |
323730   |
20100211 1310  |
20100311 1344  |
20100424 0700  |
20100424 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
B420  |
CENTER  |
  |
Open  |
345  |
- FOR CLEARANCE- MAJOR REPAIR B480 SF6 GAS LEAK - FACTORY ON SITE  |
323731   |
20100211 1311  |
20100311 1344  |
20100424 0700  |
20100424 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
B450  |
CENTER  |
  |
Open  |
345  |
- FOR CLEARANCE- MAJOR REPAIR B480 SF6 GAS LEAK - FACTORY ON SITE  |
315155   |
20091120 1327  |
20100311 1337  |
20100311 0800  |
20100311 1800  |
20100311 0753  |
20100311 1336  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
6025  |
LON HILL  |
  |
Open  |
138  |
workplan maintenance  |
326396   |
20100307 0633  |
20100311 1337  |
20100310 0800  |
20100311 1700  |
20100310 0854  |
20100311 1332  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
232  |
SPUNKY  |
  |
Open  |
69  |
Reconductor bus between this switch and 484 bsd.  |
326835   |
20100310 1220  |
20100311 1335  |
20100319 0830  |
20100319 1530  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
XF  |
AT2_H  |
WO  |
  |
  |
69  |
MAINT  |
326682   |
20100309 1441  |
20100311 1328  |
20100319 0700  |
20100319 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1230_G  |
GRAPELAND MAGNOLIA TAP  |
PLEASANT SPRINGS TU  |
  |
138  |
line maint close at crockett  |
326683   |
20100309 1443  |
20100311 1328  |
20100319 0700  |
20100319 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_2336  |
CROCKETT TU  |
  |
Close  |
138  |
line maint close at crockett  |
320696   |
20100114 1336  |
20100311 1327  |
20100311 0630  |
20100311 1400  |
20100311 0723  |
20100311 1327  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
CS_HL_43  |
CS  |
HL  |
  |
69  |
RAISING TOWERS AND PULLING NEW CONDUCTORS  |
325820   |
20100302 0952  |
20100311 1325  |
20100319 0830  |
20100319 1400  |
  |
  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7070  |
RIO PECOS  |
  |
Open  |
138  |
operator maintenance  |
326058   |
20100304 0631  |
20100311 1323  |
20100319 0730  |
20100319 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_104L  |
MOULTON GVEC  |
  |
Open  |
69  |
Clear 69 kv buwork between switches 108,106,826,MOS104 at Moulton GVEC to install motor operator on switch 108.  |
326064   |
20100304 0632  |
20100311 1323  |
20100319 0730  |
20100319 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_108  |
MOULTON GVEC  |
  |
Open  |
69  |
Clear 69 kv buwork between switches 108,106,826,MOS104 at Moulton GVEC to install motor operator on switch 108.  |
326061   |
20100304 0631  |
20100311 1323  |
20100319 0730  |
20100319 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
279T294  |
MOULTON GVEC  |
SHINER GVEC  |
  |
69  |
Clear Moulton GVEC-GVEC Shiner 69 kv line T-294 to install motor operator on switch 108 at Moulton GVEC.  |
324385   |
20100217 1052  |
20100311 1322  |
20100319 0700  |
20100319 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BI_WAP50  |
BI  |
WA PARISH  |
  |
345  |
PCS WORK  |
326919   |
20100310 1628  |
20100311 1317  |
20100319 0700  |
20100319 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
6125  |
DILLEY SWITCH CSW  |
  |
Open  |
138  |
BUS OUTAGE TO INSTALL STRING BUS OVER BOTH #1 & #2 BUSES. STEC HAS BEEN ADVISED THAT THEIR 138-69 AUTO WILL BE OUTAGED.  |
326920   |
20100310 1629  |
20100311 1317  |
20100319 0700  |
20100319 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5965_CB  |
DILLEY SWITCH CSW  |
  |
Open  |
138  |
BUS OUTAGE TO INSTALL STRING BUS OVER BOTH #1 & #2 BUSES. STEC HAS BEEN ADVISED THAT THEIR 138-69 AUTO WILL BE OUTAGED.  |
326922   |
20100310 1631  |
20100311 1317  |
20100319 0700  |
20100319 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
60_CB  |
DILLEY SWITCH CSW  |
  |
Open  |
138  |
BUS OUTAGE TO INSTALL STRING BUS OVER BOTH #1 & #2 BUSES. STEC HAS BEEN ADVISED THAT THEIR 138-69 AUTO WILL BE OUTAGED.  |
326925   |
20100310 1635  |
20100311 1317  |
20100319 0700  |
20100319 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2025  |
DILLEY SWITCH CSW  |
  |
Open  |
69  |
138KV BUS OUTAGE @ DILLEY SWITCH TO INSTALL STRING BUS OVER BOTH #1 & #2 BUSES. STEC HAS BEEN ADVISED THEIR 138-69 AUTO WILL BE OUTAGED.  |
326891   |
20100310 1630  |
20100311 1317  |
20100319 0700  |
20100319 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2715  |
DILLEY SWITCH CSW  |
  |
Open  |
138  |
BUS OUTAGE TO INSTALL STRING BUS OVER BOTH #1 & #2 BUSES. STEC HAS BEEN ADVISED THAT THEIR 138-69 AUTO WILL BE OUTAGED.  |
326924   |
20100310 1635  |
20100311 1317  |
20100319 0700  |
20100319 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
BIG_WE_DILLEY1  |
DILLEY SWITCH CSW  |
BIG WELLS  |
  |
138  |
BUS OUTAGE @ DILLEY SWITCH TO INSTALL STRING BUS OVER BOTH #1 & #2 BUSES.  |
326923   |
20100310 1634  |
20100311 1317  |
20100319 0700  |
20100319 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
7825  |
DILLEY SWITCH CSW  |
  |
Open  |
138  |
BUS OUTAGE TO INSTALL STRING BUS OVER BOTH #1 & #2 BUSES. STEC HAS BEEN ADVISED THAT THEIR 138-69 AUTO WILL BE OUTAGED.  |
326921   |
20100310 1629  |
20100311 1317  |
20100319 0700  |
20100319 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
9875  |
DILLEY SWITCH CSW  |
  |
Open  |
138  |
BUS OUTAGE TO INSTALL STRING BUS OVER BOTH #1 & #2 BUSES. STEC HAS BEEN ADVISED THAT THEIR 138-69 AUTO WILL BE OUTAGED.  |
327127   |
20100311 1309  |
20100311 1309  |
20100317 0800  |
20100317 1200  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_5599  |
MARION  |
  |
Open  |
138  |
CLEAR 138 KV SWITCH 5601 FOR MAINTENANCE  |
325814   |
20100302 0947  |
20100311 1302  |
20100311 0830  |
20100311 1430  |
20100311 0803  |
20100311 1253  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7065  |
RIO PECOS  |
  |
Open  |