APPROVED TRANSMISSION OUTAGES Data queried at: 07-SEP-2008 Time: 12:40:43 Comma Delimited Format
Start End Actual
Start
Actual
End
Duration Status Request
Type
Company Multi CB Equipment
Type
Equipment From
Station
To
Station
State Voltage Comment
20080907
0045 
20080907
1000 

 

 
Daily  Approved  Equipment Status Change  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  BT8480_CB  CALAVERAS    Close  138  reamain in compliance with operatin policy E-20 
20080907
0045 
20080907
1000 

 

 
Daily  Approved  Equipment Status Change  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  BT8470_CB  CALAVERAS    Close  138  remain in compliance with operating policy E-20 
20080905
1030 
20080930
2300 

 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M70  RIDGE    Close  138  Ridge Sub not yet in service 
20080905
1030 
20080930
2300 

 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M30  RIDGE    Open  138  Ridge Sub not yet in service 
20080905
1030 
20080930
2300 

 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M10  RIDGE    Open  138  Ridge Sub not yet in service 
20080905
1030 
20080930
2300 

 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M20-2  RIDGE    Open  138  Ridge Sub not yet in service 
20080905
1030 
20080930
2300 

 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M20-1  RIDGE    Open  138  Ridge Sub not yet in service 
20080904
1230 
20080926
1700 

 

 
Continuous  Approved  Equipment Status Change  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_2040_CB  CANYON LCRA    Open  69  BREAKER OUT OF SERVICE. SERVING NO FUNCTION. TO BE REMOVED FROM LCRA SYSTEM AT A LATER DATE. 
20080909
1715 
20081231
1500 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  4130_CB  FORT STOCKTON SWITCH    Open  69  open for post contigency overload // loss of barrilla jct to fort stockton plant 138 
20080829
1815 
20080909
0815 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  4130_CB  FORT STOCKTON SWITCH    Open  69  open for overload due to loss of barrilla jct to fort stockton 138kv line 
20080915
0800 
20080919
1800 

 

 
Continuous  Approved  Equipment Status Change  TEXAS-NEW MEXICO POWER COMPANY    DSC  A6726  PUCKETT TAP    Close  69  Install new concrete three way switch pole. 
20080825
2400 
20080908
0700 

 

 
Continuous  Approved  Equipment Status Change  TEXAS-NEW MEXICO POWER COMPANY    DSC  A6726  PUCKETT TAP    Close  69  Closed to feed customers while 69KV Line (Rio Pecos - White Baker) is being rebuilt. 
20080814
1400 
20080915
1200 

 

 
Continuous  Approved  Equipment Status Change  TXU ELECTRIC COMPANY (TDSP)    DSC  8272  KELLER WALL PRICE    Open  138  SR to follow, change made to seperate Cap Banks. 
20080814
1400 
20080915
1200 

 

 
Continuous  Approved  Equipment Status Change  TXU ELECTRIC COMPANY (TDSP)    DSC  8273  KELLER WALL PRICE    Close  138  SR change to follow, chnage due to allow seperation of cap banks 
20080930
1645 
20091231
1600 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  7215  BLUFF CREEK    Open  138  138kv breaker 7220 Bluff Crk left open due to loading problems if left tied to 138kv bus 
20080930
1645 
20091231
1600 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  7220  BLUFF CREEK    Open  138  138kv breaker 7220 Bluff Crk left open due to loading problems if left tied to 138kv bus 
20080728
1945 
20081231
1600 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  7185  BLUFF CREEK    Open  138  open to balance flow across the bulff creek auto transformers 
20080728
1945 
20081231
1600 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  7200  BLUFF CREEK    Open  138  open to balance flow across the bulff creek auto transformers 
20080728
1945 
20081231
1600 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  7170  BLUFF CREEK    Open  138  open to balance flow across the bulff creek auto transformers 
20080603
1100 
20081103
1000 

 

 
Continuous  Approved  Equipment Status Change  TXU ELECTRIC COMPANY (TDSP)    DSC  MAS_1454  TEMPLE TAYLOR VALLEY    Open  69  to relieve overload condition. 
20080520
1215 
20081231
1600 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  6287  COLRDO RVR MUNICIPL WTR 1    Open  69  normal open point due to customer exposure 
20080519
1430 
20080930
1200 

 

 
Continuous  Approved  Equipment Status Change  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_921  DECKER POWER PLANT 
AUSTROP
 
Close  138  put in for summer loads 
20080519
1430 
20080930
1200 

 

 
Continuous  Approved  Equipment Status Change  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  MC_951_CB  MCNEIL AEN 
KOENIG LANE
 
Close  138  put in for summer load 
20080508
1400 
20081031
1200 

 

 
Continuous  Approved  Equipment Status Change  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  AG_600M_CS  ANGUS VALLEY    Open  138  Out due to xfmr fire..Last year..Equip status changed at ERCOTs request 
20071231
2315 
20080930
1600 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  7215  BLUFF CREEK    Open  138  138kv breaker 7220 Bluff Crk left open due to loading problems if left tied to 138kv bus 
20071231
2315 
20080930
1600 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  7220  BLUFF CREEK    Open  138  138kv breaker 7220 Bluff Crk left open due to loading problems if left tied to 138kv bus 
20070907
0900 
20081231
2300 

 

 
Continuous  Approved  Equipment Status Change  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    DSC  2129  NUECES BAY    Open  69  TO COINSIDE WITH N.O. CB 2140 - PLANT IS REMOVING UNIT - JUMPERS TO BE LIFTED UNTIL FURTHER NOTICE 
20080907
0630 
20080907
0900 
20080907
0630 
20080907
0835 
Daily  Approved  Forced  MAGIC VALLEY ELECTRIC COOP, INC    LN  S105  MVEC (E RIO HONDO)  MVEC (CENTRAL)    138  breaker R120 open, cuase unkown 
20080907
0200 
20080907
2300 
20080907
0200 
20080907
0503 
Daily  Approved  Forced  TEXAS-NEW MEXICO POWER COMPANY    CB  OCB13871_CB  ANGLETON TNP    Open  138  Breaker 138-71 Angleton removed from service by relay will not reclose. 
20080907
0200 
20080907
2300 
20080907
0200 

 
Daily  Approved  Forced  TEXAS-NEW MEXICO POWER COMPANY    LN  G138_17  ANGLETON TNP  BRAZORIA SUB    138  Line 138-17 was removed from service by relay. 
20080906
1545 
20080907
1800 
20080906
1545 
20080906
2309 
Continuous  Approved  Forced  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  2623  GREGORY  RINCON    69  line operated numerous times, cause unknown at this time 
20080905
1515 
20080909
1800 
20080905
1515 

 
Continuous  Approved  Forced  TXU ELECTRIC COMPANY (TDSP)    CB  CB_5680  ALLEN SWITCH    Open  138  East Bus CapBank. CB tripped. Inspect and repair. 
20080905
1815 
20080909
1800 
20080905
1815 

 
Continuous  Approved  Forced  TXU ELECTRIC COMPANY (TDSP)    CP  CAPBANK22  PLANO TENNYSON    Open  138  Repair caps. 
20080905
2215 
20080908
1800 
20080905
2215 

 
Continuous  Approved  Forced  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5525  RIO PECOS    Open  138  CB tripped cannot reclose 
20080905
1815 
20080909
1800 
20080905
1815 

 
Continuous  Approved  Forced  TXU ELECTRIC COMPANY (TDSP)    CP  CAPBANK13  PLANO TENNYSON    Open  138  Repair caps. 
20080819
1400 
20080919
1700 
20080819
1400 
20080905
0850 
Continuous  Approved  Forced  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CS_9395  MILL CREEK    Open  138  CS 9395 WILL CLEAR NEW 138/12.5 KV T-2 POWERBANK. WHEN NEW TRANSFORMER WAS ENERGIZED THERE WAS A NOISE WHEN THE LTC WAS OPERATED. TAKEN OUT OF SERVICE UNTIL A FACTORY REP CAN COME AND INVESTIGATE NOISE. 
20080905
1230 
20080912
1800 
20080905
1230 

 
Continuous  Approved  Forced  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    XF  138_69A1  NORTH EDINBURG      69  Auto trip off line. 
20080904
2330 
20080909
2300 
20080904
2330 
20080905
1207 
Continuous  Approved  Forced  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    XF  138_69A1  BIG FOOT      69  Auto tripped 
20080904
2330 
20080909
2330 
20080904
2330 
20080905
0203 
Continuous  Approved  Forced  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  6045_CB  BIG FOOT    Open  69  69kv Bus tripped 
20080904
2330 
20080909
2300 
20080904
2330 
20080905
0203 
Continuous  Approved  Forced  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  9025_CB  BIG FOOT 
PEARSALL
 
Open  69  69kv Bus tripped 
20080903
1500 
20080908
1700 
20080903
1500 

 
Continuous  Approved  Forced  TXU ELECTRIC COMPANY (TDSP)    CP  CAPBNK2C  ALLEN SWITCH    Open  138  Replacing rubber stops on FID. Will be back in service Monday, 09-08-08. 
20080902
1100 
20081028
1800 
20080902
1100 

 
Continuous  Approved  Forced  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    CB  272_CB  FALCON PLANT    Open  138  oil leaking into river from #2 unit 
20080902
1100 
20081028
1800 
20080902
1100 

 
Continuous  Approved  Forced  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    DSC  DSW_271  FALCON PLANT    Open  138  #2 oil leak 
20080902
1100 
20081028
1800 
20080902
1100 

 
Continuous  Approved  Forced  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    DSC  DSW_273  FALCON PLANT    Open  138  oil leak #2 unit 
20080809
0800 
20081231
2300 
20080809
0800 
20080825
0729 
Continuous  Approved  Forced  CITY OF GARLAND (TDSP)    DSC  SHLB_9009  SHELBY    Open  69  Per ERCOT Supervisor 
20080825
1815 
20081031
1800 
20080825
1815 

 
Continuous  Approved  Forced  TXU ELECTRIC COMPANY (TDSP)    XF  AXFMR1H  STRYKER CREEK SES      345  Replace failed Auto Xfmr. 
20080805
2400 
20081231
2345 
20080805
2400 

 
Continuous  Approved  Forced  RELIANT ENERGY HL&P (TDSP)    CB  PHRR520_CB  PH ROBINSON    Open  345  Breaker tripped off due to air leak. Will leave de-energized. 
20080508
1900 
20081229
2400 
20080508
1900 

 
Continuous  Approved  Forced  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  4170_CB  CITY OF SONORA    Open  69  Controls not working capacitor will not operate 
20080508
0900 
20081231
2300 
20080508
0900 

 
Continuous  Approved  Forced  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    DSC  DSC_254  LAREDO PLANT    Open  69  Capacitor failed waiting to be replaced 
20080508
0900 
20081231
2300 
20080508
0900 

 
Continuous  Approved  Forced  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  295  NORTH PADRE    Open  69  Not ready for service 
20080508
0900 
20081231
2300 
20080508
0900 

 
Continuous  Approved  Forced  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  CS_918  FALFURRIAS    Open  138  capacitor not ready for service 
20080101
0015 
20081201
2345 
20080101
0015 

 
Continuous  Approved  Forced  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  HWY9_NUBAY_2A  HIWAY 9  NUECES BAY    69  SAME LINE THAT HAS BEEN OUT SINCE DEC 2005 DUE TO BAD UNDERGROUND CABLE - NO ESTIMATED TIME OF REPAIR AT THIS TIME. 
20080905
1700 
20080911
2145 
20080905
1700 

 
Continuous  Approved  Forced Extension  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    DSC  3758  RACHAL    Close  138  work not complete. 
20080905
1815 
20080912
1800 
20080905
1815 

 
Continuous  Approved  Forced Extension  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    DSC  6233  RACHAL    Open  138  extended one week 
20080905
1815 
20080912
1800 
20080905
1815 

 
Continuous  Approved  Forced Extension  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    DSC  5617  RACHAL    Open  138  extended one week 
20080905
1815 
20080930
2300 
20080905
1800 

 
Continuous  Approved  Forced Extension  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  6815  FALFURRIAS    Open  69  BUS DISCONNECT 6816 IS OUT OF ADJUSTMENT AND JUMPERS WILL BE LIFTED FROM BUS SIDE FOR REPAIRS ON 9/10/08. IN ADDITION LOW SIDE SWITCH 1963 IS DOWN ON THE GROUND AT THIS TIME. 
20080903
2315 
20080916
2345 
20080903
2316 

 
Continuous  Approved  Forced Extension  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  8450  ZAPATA    Open  138  unit has a bad order UBM card and keeps blowing fuses. have to order repair parts. 
20080825
2400 
20080908
0700 

 

 
Continuous  Approved  Forced Extension  TEXAS-NEW MEXICO POWER COMPANY    LN  RIO_WHTB  RIO PECOS  WHITE BAKER    69  weather delays 
20080829
1815 
20080930
1800 
20080901
0008 

 
Continuous  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CP  CAPBNK23  KILLEEN SWITCH    Open  138  Waiting on parts to make repairs. 
20080829
1815 
20081031
2300 
20080829
1801 

 
Continuous  Approved  Forced Extension  TEXAS-NEW MEXICO POWER COMPANY    CB  OCB_6749_CB  WINK TNP    Open  69  broken disconnect switch 
20080630
1815 
20081231
1800 
20080630
1815 

 
Continuous  Approved  Forced Extension  RELIANT ENERGY HL&P (TDSP)    CB  PHRR540_CB  PH ROBINSON    Open  345  Repair parts have not arrived. 
20080815
2315 
20081031
2400 
20080815
2315 

 
Continuous  Approved  Forced Extension  TEXAS-NEW MEXICO POWER COMPANY    DSC  6608  OLNEY TNP    Open  69  XFMR dissolved gas test shows bad. Further investigation needed, 
20080815
2015 
20080917
2300 
20080815
2000 

 
Continuous  Approved  Forced Extension  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  1050_CB  LAREDO PLANT    Open  69  capacitor 255 catatrophically failed. 
20080630
2400 
20081231
2345 
20080630
2345 

 
Continuous  Approved  Forced Extension  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  2170_CB  CEDAR HILL CSW    Open  69  internal problems 
20080630
1815 
20081231
1800 
20080630
1815 

 
Continuous  Approved  Forced Extension  RELIANT ENERGY HL&P (TDSP)    CB  TRVT160_CB  TRAVIS REIT    Open  138  Breaker blew up. 
20080530
1815 
20081231
2300 
20080530
1824 

 
Continuous  Approved  Forced Extension  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    DSC  454  FORMOSA    Open  138  CUSTOMER TRAN NEEDS REPLACED 
20071231
2315 
20081231
2345 
20071231
2343 

 
Continuous  Approved  Forced Extension  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  210_CB  COLETO CREEK    Open  13.8  will take several months to get parts in to make repairs. 
20080903
1045 
20080924
2300 
20080903
1045 
20080905
1222 
Continuous  Approved  Maintenance Level 1  TXU ELECTRIC COMPANY (TDSP)    CB  CB_1630  CENTERVILLE I45    Open  138  138 Capacitor Cb 1630 has a B/O closing call. Parts are on order. 
20080909
0900 
20080910
1800 

 

 
Continuous  Approved  Maintenance Level 2  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  3985_CB  LA PALMA    Open  138  CB 3875 LEAKING OIL - NEED TO DRAIN TANK AND WELD A NEW DRAIN LINE ON 
20080909
2400 
20080910
1300 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1740_B  SANDOW SWITCH  SALTY    138  foundations for line re-build 
20080909
2400 
20080910
1300 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  M10  SALTY    Close  138  foundations for line re-build 
20080910
0400 
20080910
0800 

 

 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    XF  138_69A1  LA PALMA      69  138/69 AUTO 1 TO REINSTALL 12 KV JUMPERS REMOVED FROM PREVIOUS NIGHTS CLEARANCE 
20080910
0730 
20080910
1530 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  WAPA230_CB  WA PARISH    Open  345  MAINT 
20080910
0800 
20080910
1700 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_4470_CB  FERGUSON    Open  138  doble test 
20080910
0830 
20080910
1700 

 

 
Daily  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  3370_CB  RULE    Open  69  install new control cabe 
20080910
0830 
20080910
1600 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_2230_CB  SIM GIDEON    Open  138  DOBLE TEST 
20080910
0845 
20080910
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  LY_1229_CB  LYTTON SPRINGS    Open  345  BREAKER PROFILE TEST / OPERATOR MAINTENANCE 
20080910
1300 
20080910
1600 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  CB_4980  SANDOW SWITCH    Open  345  Construction due to relay panel replacemment 
20080910
1330 
20080910
1530 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  PHRH920_CB  PH ROBINSON    Open  138  Lube maintenance 
20080910
2300 
20080911
0100 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5285_CB  ALAMITO CREEK    Open  69  replace damaged bus switch 4234// outage pre arranged will all customers 
20080910
2300 
20080911
0100 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  4235_CB  ALAMITO CREEK    Open  69  replace damaged bus switch 4234// outage pre arranged will all customers 
20080910
2300 
20080911
0100 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5280_CB  ALAMITO CREEK    Open  69  replace damaged bus switch 4234// outage pre arranged will all customers 
20080910
2300 
20080911
0100 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  3360_CB  ALAMITO CREEK    Open  69  replace damaged bus switch 4234// outage pre arranged will all customers 
20080910
2300 
20080911
0100 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  4785_CB  ALAMITO CREEK    Open  69  replace damaged bus switch 4234// outage pre arranged will all customers 
20080910
0100 
20080910
0500 

 

 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  1240_CB  FALFURRIAS 
PREMONT
 
Open  69  69kv BUS OUTAGE TO REMOVE JUMPERS OFF SWITCH 6816 (STATCOM) THAT IS BAD ORDER. DISTRIBUTION LOAD FROM #1-69-12 XFMR WILL BE TRANSFERRED TO #2-69-12 XFMR. STATCOM CB 6815 OUT THRU 9-30-08 
20080910
0100 
20080910
0500 

 

 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  6460_CB  FALFURRIAS 
 
Open  69  69kv BUS OUTAGE TO REMOVE JUMPERS OFF SWITCH 6816 (STATCOM) THAT IS BAD ORDER. DISTRIBUTION LOAD FROM #1-69-12 XFMR WILL BE TRANSFERRED TO #2-69-12 XFMR. STATCOM CB 6815 OUT THRU 9-30-08 
20080910
0500 
20080910
1900 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  7090_B  DIALVILLE  REYNOLDS ST    69  replace poles 
20080910
0500 
20080910
1900 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  MAS_2052  REYNOLDS ST    Close  69  replace poles dialville to reynolds 
20080910
0600 
20080911
1700 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6054_A  LNGSW  ODESSA EHV SWITCH    345  Installing lightning arrestors on Longshore Switch bus and need both ends of the line out at the same time.Ref lines 6054_A and 6055_A. E.ON energy is aware of this outage and has agreed to be offline for the duration. 
20080910
0600 
20080910
1600 

 

 
Daily  Approved  Planned  BRYAN TEXAS UTILITIES (TDSP)    LN  TAB_DANS  TABOR  DANSBY    69  Daily outage / Requested for Brazos. 
20080910
0600 
20080911
1700 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6055_A  LNGSW  MORGAN CREEK SES    345  Installing lightning arrestors on Longshore Switch bus and need both ends of the line out at the same time.Ref lines 6054_A and 6055_A. E.ON energy is aware of this outage and has agreed to be offline for the duration. 
20080910
0630 
20080910
1300 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1750_F  WILMER  S.SIDE WASTWTR TREATMNT 2 TAP    138  repair conductor and replace insulators 
20080910
0730 
20080910
1500 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  MUND_SEYM_1B  BOMARTON TU  BAYLOR COUNTY TAP    69  Line outage to connect a mobile sub to the line for bypass at Bomarton. Will close at Seymour 1090. Ref line 6856_B. 
20080910
0730 
20080910
0930 

 

 
Daily  Approved  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  LN1770_CB  WESTSIDE 
FIVE POINTS
 
Open  138  Relay operational testing 
20080910
0730 
20080910
1500 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  CB_1090  SEYMOUR TU    Close  69  Line outage to connect a mobile sub to the line for bypass at Bomarton. Ref Line 6856_A. Arranged with Eddie Riley AEP 
20080910
0730 
20080910
0930 

 

 
Daily  Approved  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  10M1  FIVE POINTS 
WESTSIDE
 
Open  138  Relay operational testing 
20080910
0800 
20080912
2000 

 

 
Continuous  Approved  Planned  GEUS (TDSP)    LN  STE_MAMI  STEAM  MAMIE    69  Work planned is for primary relaying from LTV to Steam Plant. This clr will be in conjunction w/LTV to Mamie clearance requested for same dates. 
20080910
0800 
20080912
2000 

 

 
Continuous  Approved  Planned  GEUS (TDSP)    LN  LTV_MAMI  LTV TMPP  MAMIE    69  Work planned is to replace primary relaying from LTV (6908) to Steam Plant Disc #69LTV-D1. Will OPEN SP 6902 & 6903 momentarily while open disconnect. Also will switch load off Mamie Rd 12kv xfmr. 
20080910
0800 
20080911
1800 

 

 
Continuous  Approved  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  RAY_WES  SAM RAYBURN SWITCHYD  WESER    69  line clearance to c/o poles 
20080910
0830 
20080910
1800 

 

 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  OCB_4320  HARLINGEN SWITCH  RAYMONDVILLE I    69  TO REPLACE WRAPS ON FIBER CABLE 
20080910
0830 
20080910
1400 

 

 
Daily  Approved  Planned  BRYAN TEXAS UTILITIES (TDSP)    LN  NAL_EAST  NALL LANE  EAST    69  install signal lights 
20080910
0830 
20080910
1400 

 

 
Daily  Approved  Planned  BRYAN TEXAS UTILITIES (TDSP)    CB  69221  EAST 
NALL LANE
 
Open  69  maintenance 
20080910
0930 
20080910
1200 

 

 
Daily  Approved  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  LN0020_CB  WESTSIDE 
SOUTHWEST RESEARCH
 
Open  138  Relay operational testing 
20080910
0930 
20080910
1200 

 

 
Daily  Approved  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  10X4  SOUTHWEST RESEARCH 
WESTSIDE
 
Open  138  Relay operational testing 
20080910
1030 
20080910
2000 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  LS_5623  CITY VIEW    Open  138  Line outage to dig pier holes and set foundations for new PPG POI. This outage has been delayed to work inconjunction with outages taken at Pleasant Valley 138,69 Bus and Autotransformer. 
20080910
1030 
20080910
2000 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  CB_5620  WICHITA FALLS PPG 
CITY VIEW
 
Open  138  Line outage to dig pier holes and set foundations for new PPG POI. This outage has been delayed to work inconjunction with outages taken at Pleasant Valley 138,69 Bus and Autotransformer. 
20080910
1100 
20080916
2000 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  MAS_1143  BURKBURNETT    Close  69  The line is out to dig pier holes and set foundations for the new PPG poi at PPG.Work to be done at conclusion of the Pleasant Valley 69 Bus outage. Ref Line 6651_B_E_F. 
20080910
1100 
20080916
2000 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  CB_5140  WICHITA FALLS NORTH TU    Open  69  The line is out to dig pier holes and set foundations for the new PPG poi at PPG.Work to be done at conclusion of the Pleasant Valley 69 Bus outage. Ref Line 6651_B_E_F. 
20080910
1100 
20080916
2000 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  MAS_1145  BURKBURNETT    Open  69  The line is out to dig pier holes and set foundations for the new PPG poi at PPG.Work to be done at conclusion of the Pleasant Valley 69 Bus outage. Ref Line 6651_B_E_F. 
20080906
2200 
20080907
0900 
20080906
2214 
20080907
0905 
Continuous  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  8775  LAREDO VFT NORTH 
LAREDO VFT NORTH
 
Open  138  PER LAREDO EC REQUEST FOR HOLD ORDER 
20080906
2100 
20080907
1400 
20080906
2100 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  BAR_SCHW  BARTLETT SWITCH  SCHWERTNER    69  rebuild line 
20080906
0800 
20080912
1700 
20080906
0828 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    LN  ABSO_BLUF_1A  ABILENE SOUTH  BLUFF CREEK    138  installl new fiber optic cable 
20080905
1915 
20081010
1900 
20080905
1915 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    LN  BAI_CLY  CLYDE  BAIRD    69  line rebuild 
20080909
0400 
20080909
0800 

 

 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    XF  138_69A1  LA PALMA      69  138/69 AUTO 1 FOR INSTALLATION OF NEW PAD MOUNTS NECESSARY FOR PLANT SEPARATION PROJECT 
20080909
0600 
20080909
1300 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1530_B  KIMBERLY CLARK  BROOKSTONE TAP    138  replace bad insulator 
20080909
0900 
20080909
1300 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_1060_CB  LAMPASAS    Open  69  OPERATOR MAINTENANCE 
20080908
2400 
20080909
1300 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1740_B  SANDOW SWITCH  SALTY    138  foundations for line re-build 
20080908
2400 
20080909
1300 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  M10  SALTY    Close  138  foundations for line re-build 
20080909
0830 
20080909
1230 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_11300  RAYMOND BARKER 
LEGION
 
Open  69  OPERATOR MAINTENANCE 
20080908
0600 
20080908
2000 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6557_B  CITY VIEW  WICHITA FALLS PPG    138  The line is out to dig pier holes and set foundations for the new PPG poi. Three new 138 kv switches will be added to the 138 kv line between PPG and City View. 
20080908
0800 
20080908
1600 

 

 
Daily  Approved  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  OVI_VNHU  OLIVIA GOAB SWITCH  VAN HUMBLE SUB    69  line clearance to c/o poles 
20080909
0800 
20080912
1200 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5460_CB  VERNON    Close  69  relay change out 5990 oklaunion close to carry load 
20080909
0730 
20080909
1200 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  _GNL900_CB  GRANT    Open  138  Lube maintenance 
20080909
0800 
20080909
1030 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  PHRH440_CB  PH ROBINSON    Open  138  Lube maintenance 
20080909
1100 
20080909
1330 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  PHRH910_CB  PH ROBINSON    Open  138  Lube maintenance 
20080914
0100 
20080914
1100 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  75_A  ANNA SWITCH  COLLIN 345    345  Contractor to remove spacers for line upgrade 
20080914
0600 
20080914
2000 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6557_B  CITY VIEW  WICHITA FALLS PPG    138  Outage to dig pier holes for foundations for new line PPG POI.Adding three new 138kV switches between PPG and City View. 
20080910
0845 
20080910
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  GCB_3540  RUTHERFORD    Open  138  DOBLE TEST / BREAKER WILL BE BYPASSED 
20080910
0845 
20080910
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_3543  RUTHERFORD    Close  138  SWITCH IS BEING CLOSED TO BYPASS CB 3540 FOR DOBLE TEST 
20080910
0845 
20080910
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_3483  RUTHERFORD    Close  138  SWITCH IS BEING CLOSED TO BYPASS CB 3540 FOR DOBLE TEST 
20080909
0830 
20080909
1800 

 

 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  OCB_4320  HARLINGEN SWITCH  RAYMONDVILLE I    69  TO REPLACE WRAPS ON FIBER CABLE 
20080909
0500 
20080909
1900 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  7090_B  DIALVILLE  REYNOLDS ST    69  replace poles 
20080909
0500 
20080909
1900 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  MAS_2052  REYNOLDS ST    Close  69  replace poles dialville to reynolds 
20080910
0730 
20080910
1500 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  _GLG310_CB  GALVESTON 26TH STREET    Open  138  Doble 
20080910
1200 
20080910
1530 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  WAPH230_CB  WA PARISH    Open  138  MAINT 
20080909
0800 
20080909
1800 

 

 
Daily  Approved  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  EDN_GANA  EDNA SUB  GANADO SWITCH    69  line clearance to c/o poles 
20080912
2400 
20080913
1300 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1740_B  SANDOW SWITCH  SALTY    138  foundations for line re-build 
20080912
2400 
20080913
1300 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  M10  SALTY    Close  138  foundations for line re-build 
20080913
0100 
20080913
1100 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  75_A  ANNA SWITCH  COLLIN 345    345  Contractor to remove spacers for line upgrade 
20080913
0500 
20080913
1900 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  7090_B  DIALVILLE  REYNOLDS ST    69  replace poles 
20080913
0500 
20080913
1900 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  MAS_2052  REYNOLDS ST    Close  69  replace poles dialville to reynolds 
20080913
0600 
20080913
1600 

 

 
Daily  Approved  Planned  BRYAN TEXAS UTILITIES (TDSP)    LN  TAB_DANS  TABOR  DANSBY    69  Daily outage / Requested for Brazos. 
20080913
1200 
20080914
2000 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  HATT1HS  HACHER    Open  138  Customer maint to low side bus. TR#2 already out. Will cause plant outage for overlapping hours. 
20080909
0600 
20080909
1600 

 

 
Daily  Approved  Planned  BRYAN TEXAS UTILITIES (TDSP)    LN  TAB_DANS  TABOR  DANSBY    69  Daily outage / Requested for Brazos. 
20080909
1030 
20080909
2000 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  LS_5623  CITY VIEW    Open  138  Line outage to dig pier holes and set foundations for new PPG POI. This outage has been delayed to work inconjunction with outages taken at Pleasant Valley 138,69 Bus and Autotransformer. 
20080909
1030 
20080909
2000 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  CB_5620  WICHITA FALLS PPG 
CITY VIEW
 
Open  138  Line outage to dig pier holes and set foundations for new PPG POI. This outage has been delayed to work inconjunction with outages taken at Pleasant Valley 138,69 Bus and Autotransformer. 
20080909
0830 
20080911
1900 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  MAS_2167  KEYSTONE TU    Open  69  Crews replacing wood spacers 
20080909
0830 
20080911
1900 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  MAS_2187  KEYSTONE TU    Close  69  Crews replacing wood spacers 
20080909
0830 
20080911
1900 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  MAS_1563  WINK    Open  69  Crews replacing wood spacers. 
20080909
0830 
20080911
1900 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  MAS_1567  WINK BASIN    Close  69  Crews replacing wood spacers 
20080909
0830 
20080911
1900 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  MAS_1564  WINK    Close  69  Crews replacing wood spacers 
20080909
0830 
20080911
1900 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  AS_2178  WINK BASIN    Open  69  Crews replacing wood spacers 
20080909
0800 
20080912
1200 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5990_CB  OKLAUNION 
SOUTHWEST VERNON
 
Open  138  relay change out 
20080909
0845 
20080909
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  GCB_8870_CB  WHITESTONE    Open  138  DOBLE TEST / BREAKER WILL BE BYPASSED 
20080909
0845 
20080909
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_8873  WHITESTONE    Close  138  SWITCH IS BEING CLOSED TO BYPASS CB 8870 FOR DOBLE TEST 
20080909
1300 
20080909
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_3710_CB  LAMPASAS    Open  138  OPERATOR MAINTENANCE 
20080909
0845 
20080909
1600 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_2130_CB  SIM GIDEON    Open  138  DOBLE TEST 
20080909
0930 
20080909
1030 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_8140_CB  DEANVILLE    Open  138  BREAKER IS BEING OPENED TO SINGLE SOURCE FEED DEANVILLE FROM LYONS FOR THE INSTALLATION OF A MOBILE XFMR ON LYONS LINE TO CARRY T-1 POWERBANK LOAD WHILE OUT FOR MAINT. 
20080909
0930 
20080917
1700 

 

 
Continuous  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_8163  DEANVILLE    Close  138  SWITCH IS BEING CLOSED TO ENERGIZE THE BYPASS BUS WHICH HAS A MOBILE XFMR INSTALLED ON IT TO CARRY T-1 POWERBANK LOAD WHILE OUT FOR MAINTENANCE. 
20080909
1030 
20080917
1700 

 

 
Continuous  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CS8145_CS  DEANVILLE    Close  138  CLEAR 138/12.5 KV T-1 POWERBANK FOR LTC MAINTENANCE, AUXILIARY EQUIPMENT MAINTENNANCE,DOBLE TESTING AND CS 8145 MAINTENANCE AND TESTING. T-1 LOAD ON MOBILE XFMR. 
20080909
1330 
20080909
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_13000  INGRAM    Open  138  OPERATOR MAINTENANCE 
20080909
0900 
20080909
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_13300  ZORN    Open  345  BREAKER PROFILE / OPERATOR MAINTENANCE 
20080909
0800 
20080909
1700 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_4720_CB  FERGUSON    Open  138  doble test 
20080909
0800 
20080909
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  GCB_6930_CB  MARION    Open  345  BREAKER PROFILE TEST AND OPERATOR MAINTENANCE 
20080909
0830 
20080909
1700 

 

 
Daily  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    LN  FTS_FTS3  FORT STOCKTON PLANT  FORT STOCKTON SWITCH    69  line maitenance // 4130 fort stockton sw to carry distribution load fort stockton sw 
20080909
0800 
20080909
1600 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  SRBP680_CB  SR BERTRON    Open  138  MAINT 
20080909
1330 
20080909
1530 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  PHRH510_CB  PH ROBINSON    Open  138  Lube maintenance 
20080909
0700 
20080909
1700 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  CBYE520_CB  CEDAR BAYOU PLANT    Open  138  Oil maintenance 
20080909
1200 
20080909
1600 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  _GNL890_CB  GRANT    Open  138  Lube maintenance 
20080909
0730 
20080909
1730 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  EXNE350_CB  EXXON    Open  138  Customer breaker maintenance 
20080909
0730 
20080909
1600 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  _JNJ450_CB  JEANETTA    Open  138  Lube maintenance 
20080909
0730 
20080909
1600 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  _OBF210_CB  OBRIEN    Open  345  maint 
20081013
0600 
20081018
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  ADK_OB39  ADDICKS  OBRIEN    345  LINE 39 ADK-OB & SECTIONS OF BUSS @ ADK BETWEEN 1396-F050-F060 & OB 2396-F270-F280 FOR SOTF & REPLACE BREAKER F050 
20081013
0600 
20081018
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  _OBF280_CB  OBRIEN    Open  345  LINE 39 ADK-OB & SECTIONS OF BUSS @ ADK BETWEEN 1396-F050-F060 & OB 2396-F270-F280 FOR SOTF 
20081013
0600 
20081018
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  ADK1396  ADDICKS    Open  345  LINE 39 ADK-OB & SECTIONS OF BUSS @ ADK BETWEEN 1396-F050-F060 & OB 2396-F270-F280 FOR SOTF & REPLACE BREAKER F050 
20081013
0600 
20081025
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  ADKF050_CB  ADDICKS    Open  345  LINE 39 ADK-OB & SECTIONS OF BUSS @ ADK BETWEEN 1396-F050-F060 & OB 2396-F270-F280 FOR SOTF & REPLACE BREAKER F050 
20081013
0600 
20081018
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  _OB2396  OBRIEN    Open  345  LINE 39 ADK-OB & SECTIONS OF BUSS @ ADK BETWEEN 1396-F050-F060 & OB 2396-F270-F280 FOR SOTF 
20081013
0600 
20081018
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  _OBF270_CB  OBRIEN    Open  345  LINE 39 ADK-OB & SECTIONS OF BUSS @ ADK BETWEEN 1396-F050-F060 & OB 2396-F270-F280 FOR SOTF 
20081013
0600 
20081018
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  ADKF060_CB  ADDICKS    Open  345  LINE 39 ADK-OB & SECTIONS OF BUSS @ ADK BETWEEN 1396-F050-F060 & OB 2396-F270-F280 FOR SOTF & REPLACE BREAKER F050 
20080908
0800 
20080908
1300 

 

 
Daily  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  RBS_RIDG  RIDGE  ROBERTSON    138  relocate wave trap at Robertson 
20080908
0800 
20080908
1300 

 

 
Daily  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  RIDG_WATS  RIDGE  WATSON CHAPEL    138  relocate wave trap at Robertson 
20081013
0600 
20081013
1800 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  _AL_LM53  LA MARQUE  ALTA LOMA    69  Prep Work To Convert Alta Loma To Loop Station Remove Approach Spans To T2HS 
20081012
2400 
20081231
2345 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  HAM_GUST  HAMILTON TMPP  GUSTINE    69  rebuild line 
20081012
0600 
20081013
2000 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  CB_2250  ACKERLY VEALMOOR SWITCH 
ACKERLY
 
Open  69  Open CB 2250 at Ackerly Veelmoor for contingency solve . Ref:line 6095_D 
20081012
0600 
20081013
2000 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  AS_3524  LAMESA    Open  138  Replace Sw 3529 
20081012
0600 
20081013
2000 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6095_D  PAUL DAVIS TAP  LAMESA    138  Replace Sw 3529 
20081012
0600 
20081013
2000 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  MAS_3504  LAMESA    Open  138  Replace Sw 3529; 138/69 Auto out of service. 
20081012
0600 
20081013
2000 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  MAS_3534  LAMESA    Open  138  Replace Sw 3529; Cap bank out of service. 
20081012
0600 
20081013
2000 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  MAS_3506  LAMESA    Open  138  Replace Sw 3529; Transf