20080907 0045  |
20080907 1000  |
  |
  |
Daily  |
Approved  |
Equipment Status Change  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
BT8480_CB  |
CALAVERAS  |
  |
Close  |
138  |
reamain in compliance with operatin policy E-20  |
20080907 0045  |
20080907 1000  |
  |
  |
Daily  |
Approved  |
Equipment Status Change  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
BT8470_CB  |
CALAVERAS  |
  |
Close  |
138  |
remain in compliance with operating policy E-20  |
20080905 1030  |
20080930 2300  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M70  |
RIDGE  |
  |
Close  |
138  |
Ridge Sub not yet in service  |
20080905 1030  |
20080930 2300  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M30  |
RIDGE  |
  |
Open  |
138  |
Ridge Sub not yet in service  |
20080905 1030  |
20080930 2300  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M10  |
RIDGE  |
  |
Open  |
138  |
Ridge Sub not yet in service  |
20080905 1030  |
20080930 2300  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M20-2  |
RIDGE  |
  |
Open  |
138  |
Ridge Sub not yet in service  |
20080905 1030  |
20080930 2300  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M20-1  |
RIDGE  |
  |
Open  |
138  |
Ridge Sub not yet in service  |
20080904 1230  |
20080926 1700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_2040_CB  |
CANYON LCRA  |
  |
Open  |
69  |
BREAKER OUT OF SERVICE. SERVING NO FUNCTION. TO BE REMOVED FROM LCRA SYSTEM AT A LATER DATE.  |
20080909 1715  |
20081231 1500  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
4130_CB  |
FORT STOCKTON SWITCH  |
  |
Open  |
69  |
open for post contigency overload // loss of barrilla jct to fort stockton plant 138  |
20080829 1815  |
20080909 0815  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
4130_CB  |
FORT STOCKTON SWITCH  |
  |
Open  |
69  |
open for overload due to loss of barrilla jct to fort stockton 138kv line  |
20080915 0800  |
20080919 1800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
DSC  |
A6726  |
PUCKETT TAP  |
  |
Close  |
69  |
Install new concrete three way switch pole.  |
20080825 2400  |
20080908 0700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
DSC  |
A6726  |
PUCKETT TAP  |
  |
Close  |
69  |
Closed to feed customers while 69KV Line (Rio Pecos - White Baker) is being rebuilt.  |
20080814 1400  |
20080915 1200  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
8272  |
KELLER WALL PRICE  |
  |
Open  |
138  |
SR to follow, change made to seperate Cap Banks.  |
20080814 1400  |
20080915 1200  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
8273  |
KELLER WALL PRICE  |
  |
Close  |
138  |
SR change to follow, chnage due to allow seperation of cap banks  |
20080930 1645  |
20091231 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7215  |
BLUFF CREEK  |
  |
Open  |
138  |
138kv breaker 7220 Bluff Crk left open due to loading problems if left tied to 138kv bus  |
20080930 1645  |
20091231 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7220  |
BLUFF CREEK  |
  |
Open  |
138  |
138kv breaker 7220 Bluff Crk left open due to loading problems if left tied to 138kv bus  |
20080728 1945  |
20081231 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7185  |
BLUFF CREEK  |
  |
Open  |
138  |
open to balance flow across the bulff creek auto transformers  |
20080728 1945  |
20081231 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7200  |
BLUFF CREEK  |
  |
Open  |
138  |
open to balance flow across the bulff creek auto transformers  |
20080728 1945  |
20081231 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7170  |
BLUFF CREEK  |
  |
Open  |
138  |
open to balance flow across the bulff creek auto transformers  |
20080603 1100  |
20081103 1000  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_1454  |
TEMPLE TAYLOR VALLEY  |
  |
Open  |
69  |
to relieve overload condition.  |
20080520 1215  |
20081231 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
6287  |
COLRDO RVR MUNICIPL WTR 1  |
  |
Open  |
69  |
normal open point due to customer exposure  |
20080519 1430  |
20080930 1200  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_921  |
DECKER POWER PLANT  |
  |
Close  |
138  |
put in for summer loads  |
20080519 1430  |
20080930 1200  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
MC_951_CB  |
MCNEIL AEN  |
  |
Close  |
138  |
put in for summer load  |
20080508 1400  |
20081031 1200  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
AG_600M_CS  |
ANGUS VALLEY  |
  |
Open  |
138  |
Out due to xfmr fire..Last year..Equip status changed at ERCOTs request  |
20071231 2315  |
20080930 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7215  |
BLUFF CREEK  |
  |
Open  |
138  |
138kv breaker 7220 Bluff Crk left open due to loading problems if left tied to 138kv bus  |
20071231 2315  |
20080930 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7220  |
BLUFF CREEK  |
  |
Open  |
138  |
138kv breaker 7220 Bluff Crk left open due to loading problems if left tied to 138kv bus  |
20070907 0900  |
20081231 2300  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
2129  |
NUECES BAY  |
  |
Open  |
69  |
TO COINSIDE WITH N.O. CB 2140 - PLANT IS REMOVING UNIT - JUMPERS TO BE LIFTED UNTIL FURTHER NOTICE  |
20080907 0630  |
20080907 0900  |
20080907 0630  |
20080907 0835  |
Daily  |
Approved  |
Forced  |
MAGIC VALLEY ELECTRIC COOP, INC  |
  |
LN  |
S105  |
MVEC (E RIO HONDO)  |
MVEC (CENTRAL)  |
  |
138  |
breaker R120 open, cuase unkown  |
20080907 0200  |
20080907 2300  |
20080907 0200  |
20080907 0503  |
Daily  |
Approved  |
Forced  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
CB  |
OCB13871_CB  |
ANGLETON TNP  |
  |
Open  |
138  |
Breaker 138-71 Angleton removed from service by relay will not reclose.  |
20080907 0200  |
20080907 2300  |
20080907 0200  |
  |
Daily  |
Approved  |
Forced  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
LN  |
G138_17  |
ANGLETON TNP  |
BRAZORIA SUB  |
  |
138  |
Line 138-17 was removed from service by relay.  |
20080906 1545  |
20080907 1800  |
20080906 1545  |
20080906 2309  |
Continuous  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
2623  |
GREGORY  |
RINCON  |
  |
69  |
line operated numerous times, cause unknown at this time  |
20080905 1515  |
20080909 1800  |
20080905 1515  |
  |
Continuous  |
Approved  |
Forced  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_5680  |
ALLEN SWITCH  |
  |
Open  |
138  |
East Bus CapBank. CB tripped. Inspect and repair.  |
20080905 1815  |
20080909 1800  |
20080905 1815  |
  |
Continuous  |
Approved  |
Forced  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CP  |
CAPBANK22  |
PLANO TENNYSON  |
  |
Open  |
138  |
Repair caps.  |
20080905 2215  |
20080908 1800  |
20080905 2215  |
  |
Continuous  |
Approved  |
Forced  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5525  |
RIO PECOS  |
  |
Open  |
138  |
CB tripped cannot reclose  |
20080905 1815  |
20080909 1800  |
20080905 1815  |
  |
Continuous  |
Approved  |
Forced  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CP  |
CAPBANK13  |
PLANO TENNYSON  |
  |
Open  |
138  |
Repair caps.  |
20080819 1400  |
20080919 1700  |
20080819 1400  |
20080905 0850  |
Continuous  |
Approved  |
Forced  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CS_9395  |
MILL CREEK  |
  |
Open  |
138  |
CS 9395 WILL CLEAR NEW 138/12.5 KV T-2 POWERBANK. WHEN NEW TRANSFORMER WAS ENERGIZED THERE WAS A NOISE WHEN THE LTC WAS OPERATED. TAKEN OUT OF SERVICE UNTIL A FACTORY REP CAN COME AND INVESTIGATE NOISE.  |
20080905 1230  |
20080912 1800  |
20080905 1230  |
  |
Continuous  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
XF  |
138_69A1  |
NORTH EDINBURG  |
  |
  |
69  |
Auto trip off line.  |
20080904 2330  |
20080909 2300  |
20080904 2330  |
20080905 1207  |
Continuous  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
XF  |
138_69A1  |
BIG FOOT  |
  |
  |
69  |
Auto tripped  |
20080904 2330  |
20080909 2330  |
20080904 2330  |
20080905 0203  |
Continuous  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
6045_CB  |
BIG FOOT  |
  |
Open  |
69  |
69kv Bus tripped  |
20080904 2330  |
20080909 2300  |
20080904 2330  |
20080905 0203  |
Continuous  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
9025_CB  |
BIG FOOT  |
  |
Open  |
69  |
69kv Bus tripped  |
20080903 1500  |
20080908 1700  |
20080903 1500  |
  |
Continuous  |
Approved  |
Forced  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CP  |
CAPBNK2C  |
ALLEN SWITCH  |
  |
Open  |
138  |
Replacing rubber stops on FID. Will be back in service Monday, 09-08-08.  |
20080902 1100  |
20081028 1800  |
20080902 1100  |
  |
Continuous  |
Approved  |
Forced  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
272_CB  |
FALCON PLANT  |
  |
Open  |
138  |
oil leaking into river from #2 unit  |
20080902 1100  |
20081028 1800  |
20080902 1100  |
  |
Continuous  |
Approved  |
Forced  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_271  |
FALCON PLANT  |
  |
Open  |
138  |
#2 oil leak  |
20080902 1100  |
20081028 1800  |
20080902 1100  |
  |
Continuous  |
Approved  |
Forced  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_273  |
FALCON PLANT  |
  |
Open  |
138  |
oil leak #2 unit  |
20080809 0800  |
20081231 2300  |
20080809 0800  |
20080825 0729  |
Continuous  |
Approved  |
Forced  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
SHLB_9009  |
SHELBY  |
  |
Open  |
69  |
Per ERCOT Supervisor  |
20080825 1815  |
20081031 1800  |
20080825 1815  |
  |
Continuous  |
Approved  |
Forced  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
XF  |
AXFMR1H  |
STRYKER CREEK SES  |
  |
  |
345  |
Replace failed Auto Xfmr.  |
20080805 2400  |
20081231 2345  |
20080805 2400  |
  |
Continuous  |
Approved  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
PHRR520_CB  |
PH ROBINSON  |
  |
Open  |
345  |
Breaker tripped off due to air leak. Will leave de-energized.  |
20080508 1900  |
20081229 2400  |
20080508 1900  |
  |
Continuous  |
Approved  |
Forced  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
4170_CB  |
CITY OF SONORA  |
  |
Open  |
69  |
Controls not working capacitor will not operate  |
20080508 0900  |
20081231 2300  |
20080508 0900  |
  |
Continuous  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
DSC_254  |
LAREDO PLANT  |
  |
Open  |
69  |
Capacitor failed waiting to be replaced  |
20080508 0900  |
20081231 2300  |
20080508 0900  |
  |
Continuous  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
295  |
NORTH PADRE  |
  |
Open  |
69  |
Not ready for service  |
20080508 0900  |
20081231 2300  |
20080508 0900  |
  |
Continuous  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
CS_918  |
FALFURRIAS  |
  |
Open  |
138  |
capacitor not ready for service  |
20080101 0015  |
20081201 2345  |
20080101 0015  |
  |
Continuous  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
HWY9_NUBAY_2A  |
HIWAY 9  |
NUECES BAY  |
  |
69  |
SAME LINE THAT HAS BEEN OUT SINCE DEC 2005 DUE TO BAD UNDERGROUND CABLE - NO ESTIMATED TIME OF REPAIR AT THIS TIME.  |
20080905 1700  |
20080911 2145  |
20080905 1700  |
  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
3758  |
RACHAL  |
  |
Close  |
138  |
work not complete.  |
20080905 1815  |
20080912 1800  |
20080905 1815  |
  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
6233  |
RACHAL  |
  |
Open  |
138  |
extended one week  |
20080905 1815  |
20080912 1800  |
20080905 1815  |
  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
5617  |
RACHAL  |
  |
Open  |
138  |
extended one week  |
20080905 1815  |
20080930 2300  |
20080905 1800  |
  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
6815  |
FALFURRIAS  |
  |
Open  |
69  |
BUS DISCONNECT 6816 IS OUT OF ADJUSTMENT AND JUMPERS WILL BE LIFTED FROM BUS SIDE FOR REPAIRS ON 9/10/08. IN ADDITION LOW SIDE SWITCH 1963 IS DOWN ON THE GROUND AT THIS TIME.  |
20080903 2315  |
20080916 2345  |
20080903 2316  |
  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
8450  |
ZAPATA  |
  |
Open  |
138  |
unit has a bad order UBM card and keeps blowing fuses. have to order repair parts.  |
20080825 2400  |
20080908 0700  |
  |
  |
Continuous  |
Approved  |
Forced Extension  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
LN  |
RIO_WHTB  |
RIO PECOS  |
WHITE BAKER  |
  |
69  |
weather delays  |
20080829 1815  |
20080930 1800  |
20080901 0008  |
  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CP  |
CAPBNK23  |
KILLEEN SWITCH  |
  |
Open  |
138  |
Waiting on parts to make repairs.  |
20080829 1815  |
20081031 2300  |
20080829 1801  |
  |
Continuous  |
Approved  |
Forced Extension  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
CB  |
OCB_6749_CB  |
WINK TNP  |
  |
Open  |
69  |
broken disconnect switch  |
20080630 1815  |
20081231 1800  |
20080630 1815  |
  |
Continuous  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
PHRR540_CB  |
PH ROBINSON  |
  |
Open  |
345  |
Repair parts have not arrived.  |
20080815 2315  |
20081031 2400  |
20080815 2315  |
  |
Continuous  |
Approved  |
Forced Extension  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
DSC  |
6608  |
OLNEY TNP  |
  |
Open  |
69  |
XFMR dissolved gas test shows bad. Further investigation needed,  |
20080815 2015  |
20080917 2300  |
20080815 2000  |
  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
1050_CB  |
LAREDO PLANT  |
  |
Open  |
69  |
capacitor 255 catatrophically failed.  |
20080630 2400  |
20081231 2345  |
20080630 2345  |
  |
Continuous  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
2170_CB  |
CEDAR HILL CSW  |
  |
Open  |
69  |
internal problems  |
20080630 1815  |
20081231 1800  |
20080630 1815  |
  |
Continuous  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
TRVT160_CB  |
TRAVIS REIT  |
  |
Open  |
138  |
Breaker blew up.  |
20080530 1815  |
20081231 2300  |
20080530 1824  |
  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
454  |
FORMOSA  |
  |
Open  |
138  |
CUSTOMER TRAN NEEDS REPLACED  |
20071231 2315  |
20081231 2345  |
20071231 2343  |
  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
210_CB  |
COLETO CREEK  |
  |
Open  |
13.8  |
will take several months to get parts in to make repairs.  |
20080903 1045  |
20080924 2300  |
20080903 1045  |
20080905 1222  |
Continuous  |
Approved  |
Maintenance Level 1  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_1630  |
CENTERVILLE I45  |
  |
Open  |
138  |
138 Capacitor Cb 1630 has a B/O closing call. Parts are on order.  |
20080909 0900  |
20080910 1800  |
  |
  |
Continuous  |
Approved  |
Maintenance Level 2  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
3985_CB  |
LA PALMA  |
  |
Open  |
138  |
CB 3875 LEAKING OIL - NEED TO DRAIN TANK AND WELD A NEW DRAIN LINE ON  |
20080909 2400  |
20080910 1300  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1740_B  |
SANDOW SWITCH  |
SALTY  |
  |
138  |
foundations for line re-build  |
20080909 2400  |
20080910 1300  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
M10  |
SALTY  |
  |
Close  |
138  |
foundations for line re-build  |
20080910 0400  |
20080910 0800  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
XF  |
138_69A1  |
LA PALMA  |
  |
  |
69  |
138/69 AUTO 1 TO REINSTALL 12 KV JUMPERS REMOVED FROM PREVIOUS NIGHTS CLEARANCE  |
20080910 0730  |
20080910 1530  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
WAPA230_CB  |
WA PARISH  |
  |
Open  |
345  |
MAINT  |
20080910 0800  |
20080910 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_4470_CB  |
FERGUSON  |
  |
Open  |
138  |
doble test  |
20080910 0830  |
20080910 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
3370_CB  |
RULE  |
  |
Open  |
69  |
install new control cabe  |
20080910 0830  |
20080910 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_2230_CB  |
SIM GIDEON  |
  |
Open  |
138  |
DOBLE TEST  |
20080910 0845  |
20080910 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
LY_1229_CB  |
LYTTON SPRINGS  |
  |
Open  |
345  |
BREAKER PROFILE TEST / OPERATOR MAINTENANCE  |
20080910 1300  |
20080910 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_4980  |
SANDOW SWITCH  |
  |
Open  |
345  |
Construction due to relay panel replacemment  |
20080910 1330  |
20080910 1530  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
PHRH920_CB  |
PH ROBINSON  |
  |
Open  |
138  |
Lube maintenance  |
20080910 2300  |
20080911 0100  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5285_CB  |
ALAMITO CREEK  |
  |
Open  |
69  |
replace damaged bus switch 4234// outage pre arranged will all customers  |
20080910 2300  |
20080911 0100  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
4235_CB  |
ALAMITO CREEK  |
  |
Open  |
69  |
replace damaged bus switch 4234// outage pre arranged will all customers  |
20080910 2300  |
20080911 0100  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5280_CB  |
ALAMITO CREEK  |
  |
Open  |
69  |
replace damaged bus switch 4234// outage pre arranged will all customers  |
20080910 2300  |
20080911 0100  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
3360_CB  |
ALAMITO CREEK  |
  |
Open  |
69  |
replace damaged bus switch 4234// outage pre arranged will all customers  |
20080910 2300  |
20080911 0100  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
4785_CB  |
ALAMITO CREEK  |
  |
Open  |
69  |
replace damaged bus switch 4234// outage pre arranged will all customers  |
20080910 0100  |
20080910 0500  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
1240_CB  |
FALFURRIAS  |
  |
Open  |
69  |
69kv BUS OUTAGE TO REMOVE JUMPERS OFF SWITCH 6816 (STATCOM) THAT IS BAD ORDER. DISTRIBUTION LOAD FROM #1-69-12 XFMR WILL BE TRANSFERRED TO #2-69-12 XFMR. STATCOM CB 6815 OUT THRU 9-30-08  |
20080910 0100  |
20080910 0500  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
6460_CB  |
FALFURRIAS  |
  |
Open  |
69  |
69kv BUS OUTAGE TO REMOVE JUMPERS OFF SWITCH 6816 (STATCOM) THAT IS BAD ORDER. DISTRIBUTION LOAD FROM #1-69-12 XFMR WILL BE TRANSFERRED TO #2-69-12 XFMR. STATCOM CB 6815 OUT THRU 9-30-08  |
20080910 0500  |
20080910 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
7090_B  |
DIALVILLE  |
REYNOLDS ST  |
  |
69  |
replace poles  |
20080910 0500  |
20080910 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_2052  |
REYNOLDS ST  |
  |
Close  |
69  |
replace poles dialville to reynolds  |
20080910 0600  |
20080911 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6054_A  |
LNGSW  |
ODESSA EHV SWITCH  |
  |
345  |
Installing lightning arrestors on Longshore Switch bus and need both ends of the line out at the same time.Ref lines 6054_A and 6055_A. E.ON energy is aware of this outage and has agreed to be offline for the duration.  |
20080910 0600  |
20080910 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRYAN TEXAS UTILITIES (TDSP)  |
  |
LN  |
TAB_DANS  |
TABOR  |
DANSBY  |
  |
69  |
Daily outage / Requested for Brazos.  |
20080910 0600  |
20080911 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6055_A  |
LNGSW  |
MORGAN CREEK SES  |
  |
345  |
Installing lightning arrestors on Longshore Switch bus and need both ends of the line out at the same time.Ref lines 6054_A and 6055_A. E.ON energy is aware of this outage and has agreed to be offline for the duration.  |
20080910 0630  |
20080910 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1750_F  |
WILMER  |
S.SIDE WASTWTR TREATMNT 2 TAP  |
  |
138  |
repair conductor and replace insulators  |
20080910 0730  |
20080910 1500  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
MUND_SEYM_1B  |
BOMARTON TU  |
BAYLOR COUNTY TAP  |
  |
69  |
Line outage to connect a mobile sub to the line for bypass at Bomarton. Will close at Seymour 1090. Ref line 6856_B.  |
20080910 0730  |
20080910 0930  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN1770_CB  |
WESTSIDE  |
  |
Open  |
138  |
Relay operational testing  |
20080910 0730  |
20080910 1500  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_1090  |
SEYMOUR TU  |
  |
Close  |
69  |
Line outage to connect a mobile sub to the line for bypass at Bomarton. Ref Line 6856_A. Arranged with Eddie Riley AEP  |
20080910 0730  |
20080910 0930  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
10M1  |
FIVE POINTS  |
  |
Open  |
138  |
Relay operational testing  |
20080910 0800  |
20080912 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
GEUS (TDSP)  |
  |
LN  |
STE_MAMI  |
STEAM  |
MAMIE  |
  |
69  |
Work planned is for primary relaying from LTV to Steam Plant. This clr will be in conjunction w/LTV to Mamie clearance requested for same dates.  |
20080910 0800  |
20080912 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
GEUS (TDSP)  |
  |
LN  |
LTV_MAMI  |
LTV TMPP  |
MAMIE  |
  |
69  |
Work planned is to replace primary relaying from LTV (6908) to Steam Plant Disc #69LTV-D1. Will OPEN SP 6902 & 6903 momentarily while open disconnect. Also will switch load off Mamie Rd 12kv xfmr.  |
20080910 0800  |
20080911 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
RAY_WES  |
SAM RAYBURN SWITCHYD  |
WESER  |
  |
69  |
line clearance to c/o poles  |
20080910 0830  |
20080910 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
OCB_4320  |
HARLINGEN SWITCH  |
RAYMONDVILLE I  |
  |
69  |
TO REPLACE WRAPS ON FIBER CABLE  |
20080910 0830  |
20080910 1400  |
  |
  |
Daily  |
Approved  |
Planned  |
BRYAN TEXAS UTILITIES (TDSP)  |
  |
LN  |
NAL_EAST  |
NALL LANE  |
EAST  |
  |
69  |
install signal lights  |
20080910 0830  |
20080910 1400  |
  |
  |
Daily  |
Approved  |
Planned  |
BRYAN TEXAS UTILITIES (TDSP)  |
  |
CB  |
69221  |
EAST  |
  |
Open  |
69  |
maintenance  |
20080910 0930  |
20080910 1200  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
LN0020_CB  |
WESTSIDE  |
  |
Open  |
138  |
Relay operational testing  |
20080910 0930  |
20080910 1200  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
10X4  |
SOUTHWEST RESEARCH  |
  |
Open  |
138  |
Relay operational testing  |
20080910 1030  |
20080910 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
LS_5623  |
CITY VIEW  |
  |
Open  |
138  |
Line outage to dig pier holes and set foundations for new PPG POI. This outage has been delayed to work inconjunction with outages taken at Pleasant Valley 138,69 Bus and Autotransformer.  |
20080910 1030  |
20080910 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_5620  |
WICHITA FALLS PPG  |
  |
Open  |
138  |
Line outage to dig pier holes and set foundations for new PPG POI. This outage has been delayed to work inconjunction with outages taken at Pleasant Valley 138,69 Bus and Autotransformer.  |
20080910 1100  |
20080916 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_1143  |
BURKBURNETT  |
  |
Close  |
69  |
The line is out to dig pier holes and set foundations for the new PPG poi at PPG.Work to be done at conclusion of the Pleasant Valley 69 Bus outage. Ref Line 6651_B_E_F.  |
20080910 1100  |
20080916 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_5140  |
WICHITA FALLS NORTH TU  |
  |
Open  |
69  |
The line is out to dig pier holes and set foundations for the new PPG poi at PPG.Work to be done at conclusion of the Pleasant Valley 69 Bus outage. Ref Line 6651_B_E_F.  |
20080910 1100  |
20080916 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_1145  |
BURKBURNETT  |
  |
Open  |
69  |
The line is out to dig pier holes and set foundations for the new PPG poi at PPG.Work to be done at conclusion of the Pleasant Valley 69 Bus outage. Ref Line 6651_B_E_F.  |
20080906 2200  |
20080907 0900  |
20080906 2214  |
20080907 0905  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
8775  |
LAREDO VFT NORTH  |
  |
Open  |
138  |
PER LAREDO EC REQUEST FOR HOLD ORDER  |
20080906 2100  |
20080907 1400  |
20080906 2100  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
BAR_SCHW  |
BARTLETT SWITCH  |
SCHWERTNER  |
  |
69  |
rebuild line  |
20080906 0800  |
20080912 1700  |
20080906 0828  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ABSO_BLUF_1A  |
ABILENE SOUTH  |
BLUFF CREEK  |
  |
138  |
installl new fiber optic cable  |
20080905 1915  |
20081010 1900  |
20080905 1915  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
BAI_CLY  |
CLYDE  |
BAIRD  |
  |
69  |
line rebuild  |
20080909 0400  |
20080909 0800  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
XF  |
138_69A1  |
LA PALMA  |
  |
  |
69  |
138/69 AUTO 1 FOR INSTALLATION OF NEW PAD MOUNTS NECESSARY FOR PLANT SEPARATION PROJECT  |
20080909 0600  |
20080909 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1530_B  |
KIMBERLY CLARK  |
BROOKSTONE TAP  |
  |
138  |
replace bad insulator  |
20080909 0900  |
20080909 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_1060_CB  |
LAMPASAS  |
  |
Open  |
69  |
OPERATOR MAINTENANCE  |
20080908 2400  |
20080909 1300  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1740_B  |
SANDOW SWITCH  |
SALTY  |
  |
138  |
foundations for line re-build  |
20080908 2400  |
20080909 1300  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
M10  |
SALTY  |
  |
Close  |
138  |
foundations for line re-build  |
20080909 0830  |
20080909 1230  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_11300  |
RAYMOND BARKER  |
  |
Open  |
69  |
OPERATOR MAINTENANCE  |
20080908 0600  |
20080908 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6557_B  |
CITY VIEW  |
WICHITA FALLS PPG  |
  |
138  |
The line is out to dig pier holes and set foundations for the new PPG poi. Three new 138 kv switches will be added to the 138 kv line between PPG and City View.  |
20080908 0800  |
20080908 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
OVI_VNHU  |
OLIVIA GOAB SWITCH  |
VAN HUMBLE SUB  |
  |
69  |
line clearance to c/o poles  |
20080909 0800  |
20080912 1200  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5460_CB  |
VERNON  |
  |
Close  |
69  |
relay change out 5990 oklaunion close to carry load  |
20080909 0730  |
20080909 1200  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
_GNL900_CB  |
GRANT  |
  |
Open  |
138  |
Lube maintenance  |
20080909 0800  |
20080909 1030  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
PHRH440_CB  |
PH ROBINSON  |
  |
Open  |
138  |
Lube maintenance  |
20080909 1100  |
20080909 1330  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
PHRH910_CB  |
PH ROBINSON  |
  |
Open  |
138  |
Lube maintenance  |
20080914 0100  |
20080914 1100  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
75_A  |
ANNA SWITCH  |
COLLIN 345  |
  |
345  |
Contractor to remove spacers for line upgrade  |
20080914 0600  |
20080914 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6557_B  |
CITY VIEW  |
WICHITA FALLS PPG  |
  |
138  |
Outage to dig pier holes for foundations for new line PPG POI.Adding three new 138kV switches between PPG and City View.  |
20080910 0845  |
20080910 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
GCB_3540  |
RUTHERFORD  |
  |
Open  |
138  |
DOBLE TEST / BREAKER WILL BE BYPASSED  |
20080910 0845  |
20080910 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3543  |
RUTHERFORD  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO BYPASS CB 3540 FOR DOBLE TEST  |
20080910 0845  |
20080910 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3483  |
RUTHERFORD  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO BYPASS CB 3540 FOR DOBLE TEST  |
20080909 0830  |
20080909 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
OCB_4320  |
HARLINGEN SWITCH  |
RAYMONDVILLE I  |
  |
69  |
TO REPLACE WRAPS ON FIBER CABLE  |
20080909 0500  |
20080909 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
7090_B  |
DIALVILLE  |
REYNOLDS ST  |
  |
69  |
replace poles  |
20080909 0500  |
20080909 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_2052  |
REYNOLDS ST  |
  |
Close  |
69  |
replace poles dialville to reynolds  |
20080910 0730  |
20080910 1500  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
_GLG310_CB  |
GALVESTON 26TH STREET  |
  |
Open  |
138  |
Doble  |
20080910 1200  |
20080910 1530  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
WAPH230_CB  |
WA PARISH  |
  |
Open  |
138  |
MAINT  |
20080909 0800  |
20080909 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
EDN_GANA  |
EDNA SUB  |
GANADO SWITCH  |
  |
69  |
line clearance to c/o poles  |
20080912 2400  |
20080913 1300  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1740_B  |
SANDOW SWITCH  |
SALTY  |
  |
138  |
foundations for line re-build  |
20080912 2400  |
20080913 1300  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
M10  |
SALTY  |
  |
Close  |
138  |
foundations for line re-build  |
20080913 0100  |
20080913 1100  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
75_A  |
ANNA SWITCH  |
COLLIN 345  |
  |
345  |
Contractor to remove spacers for line upgrade  |
20080913 0500  |
20080913 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
7090_B  |
DIALVILLE  |
REYNOLDS ST  |
  |
69  |
replace poles  |
20080913 0500  |
20080913 1900  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_2052  |
REYNOLDS ST  |
  |
Close  |
69  |
replace poles dialville to reynolds  |
20080913 0600  |
20080913 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRYAN TEXAS UTILITIES (TDSP)  |
  |
LN  |
TAB_DANS  |
TABOR  |
DANSBY  |
  |
69  |
Daily outage / Requested for Brazos.  |
20080913 1200  |
20080914 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
HATT1HS  |
HACHER  |
  |
Open  |
138  |
Customer maint to low side bus. TR#2 already out. Will cause plant outage for overlapping hours.  |
20080909 0600  |
20080909 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
BRYAN TEXAS UTILITIES (TDSP)  |
  |
LN  |
TAB_DANS  |
TABOR  |
DANSBY  |
  |
69  |
Daily outage / Requested for Brazos.  |
20080909 1030  |
20080909 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
LS_5623  |
CITY VIEW  |
  |
Open  |
138  |
Line outage to dig pier holes and set foundations for new PPG POI. This outage has been delayed to work inconjunction with outages taken at Pleasant Valley 138,69 Bus and Autotransformer.  |
20080909 1030  |
20080909 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_5620  |
WICHITA FALLS PPG  |
  |
Open  |
138  |
Line outage to dig pier holes and set foundations for new PPG POI. This outage has been delayed to work inconjunction with outages taken at Pleasant Valley 138,69 Bus and Autotransformer.  |
20080909 0830  |
20080911 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_2167  |
KEYSTONE TU  |
  |
Open  |
69  |
Crews replacing wood spacers  |
20080909 0830  |
20080911 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_2187  |
KEYSTONE TU  |
  |
Close  |
69  |
Crews replacing wood spacers  |
20080909 0830  |
20080911 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_1563  |
WINK  |
  |
Open  |
69  |
Crews replacing wood spacers.  |
20080909 0830  |
20080911 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_1567  |
WINK BASIN  |
  |
Close  |
69  |
Crews replacing wood spacers  |
20080909 0830  |
20080911 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_1564  |
WINK  |
  |
Close  |
69  |
Crews replacing wood spacers  |
20080909 0830  |
20080911 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
AS_2178  |
WINK BASIN  |
  |
Open  |
69  |
Crews replacing wood spacers  |
20080909 0800  |
20080912 1200  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5990_CB  |
OKLAUNION  |
  |
Open  |
138  |
relay change out  |
20080909 0845  |
20080909 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
GCB_8870_CB  |
WHITESTONE  |
  |
Open  |
138  |
DOBLE TEST / BREAKER WILL BE BYPASSED  |
20080909 0845  |
20080909 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_8873  |
WHITESTONE  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO BYPASS CB 8870 FOR DOBLE TEST  |
20080909 1300  |
20080909 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_3710_CB  |
LAMPASAS  |
  |
Open  |
138  |
OPERATOR MAINTENANCE  |
20080909 0845  |
20080909 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_2130_CB  |
SIM GIDEON  |
  |
Open  |
138  |
DOBLE TEST  |
20080909 0930  |
20080909 1030  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_8140_CB  |
DEANVILLE  |
  |
Open  |
138  |
BREAKER IS BEING OPENED TO SINGLE SOURCE FEED DEANVILLE FROM LYONS FOR THE INSTALLATION OF A MOBILE XFMR ON LYONS LINE TO CARRY T-1 POWERBANK LOAD WHILE OUT FOR MAINT.  |
20080909 0930  |
20080917 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_8163  |
DEANVILLE  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO ENERGIZE THE BYPASS BUS WHICH HAS A MOBILE XFMR INSTALLED ON IT TO CARRY T-1 POWERBANK LOAD WHILE OUT FOR MAINTENANCE.  |
20080909 1030  |
20080917 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CS8145_CS  |
DEANVILLE  |
  |
Close  |
138  |
CLEAR 138/12.5 KV T-1 POWERBANK FOR LTC MAINTENANCE, AUXILIARY EQUIPMENT MAINTENNANCE,DOBLE TESTING AND CS 8145 MAINTENANCE AND TESTING. T-1 LOAD ON MOBILE XFMR.  |
20080909 1330  |
20080909 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_13000  |
INGRAM  |
  |
Open  |
138  |
OPERATOR MAINTENANCE  |
20080909 0900  |
20080909 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_13300  |
ZORN  |
  |
Open  |
345  |
BREAKER PROFILE / OPERATOR MAINTENANCE  |
20080909 0800  |
20080909 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_4720_CB  |
FERGUSON  |
  |
Open  |
138  |
doble test  |
20080909 0800  |
20080909 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
GCB_6930_CB  |
MARION  |
  |
Open  |
345  |
BREAKER PROFILE TEST AND OPERATOR MAINTENANCE  |
20080909 0830  |
20080909 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
FTS_FTS3  |
FORT STOCKTON PLANT  |
FORT STOCKTON SWITCH  |
  |
69  |
line maitenance // 4130 fort stockton sw to carry distribution load fort stockton sw  |
20080909 0800  |
20080909 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
SRBP680_CB  |
SR BERTRON  |
  |
Open  |
138  |
MAINT  |
20080909 1330  |
20080909 1530  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
PHRH510_CB  |
PH ROBINSON  |
  |
Open  |
138  |
Lube maintenance  |
20080909 0700  |
20080909 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
CBYE520_CB  |
CEDAR BAYOU PLANT  |
  |
Open  |
138  |
Oil maintenance  |
20080909 1200  |
20080909 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
_GNL890_CB  |
GRANT  |
  |
Open  |
138  |
Lube maintenance  |
20080909 0730  |
20080909 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
EXNE350_CB  |
EXXON  |
  |
Open  |
138  |
Customer breaker maintenance  |
20080909 0730  |
20080909 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
_JNJ450_CB  |
JEANETTA  |
  |
Open  |
138  |
Lube maintenance  |
20080909 0730  |
20080909 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
_OBF210_CB  |
OBRIEN  |
  |
Open  |
345  |
maint  |
20081013 0600  |
20081018 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
ADK_OB39  |
ADDICKS  |
OBRIEN  |
  |
345  |
LINE 39 ADK-OB & SECTIONS OF BUSS @ ADK BETWEEN 1396-F050-F060 & OB 2396-F270-F280 FOR SOTF & REPLACE BREAKER F050  |
20081013 0600  |
20081018 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
_OBF280_CB  |
OBRIEN  |
  |
Open  |
345  |
LINE 39 ADK-OB & SECTIONS OF BUSS @ ADK BETWEEN 1396-F050-F060 & OB 2396-F270-F280 FOR SOTF  |
20081013 0600  |
20081018 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
ADK1396  |
ADDICKS  |
  |
Open  |
345  |
LINE 39 ADK-OB & SECTIONS OF BUSS @ ADK BETWEEN 1396-F050-F060 & OB 2396-F270-F280 FOR SOTF & REPLACE BREAKER F050  |
20081013 0600  |
20081025 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
ADKF050_CB  |
ADDICKS  |
  |
Open  |
345  |
LINE 39 ADK-OB & SECTIONS OF BUSS @ ADK BETWEEN 1396-F050-F060 & OB 2396-F270-F280 FOR SOTF & REPLACE BREAKER F050  |
20081013 0600  |
20081018 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
_OB2396  |
OBRIEN  |
  |
Open  |
345  |
LINE 39 ADK-OB & SECTIONS OF BUSS @ ADK BETWEEN 1396-F050-F060 & OB 2396-F270-F280 FOR SOTF  |
20081013 0600  |
20081018 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
_OBF270_CB  |
OBRIEN  |
  |
Open  |
345  |
LINE 39 ADK-OB & SECTIONS OF BUSS @ ADK BETWEEN 1396-F050-F060 & OB 2396-F270-F280 FOR SOTF  |
20081013 0600  |
20081018 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
ADKF060_CB  |
ADDICKS  |
  |
Open  |
345  |
LINE 39 ADK-OB & SECTIONS OF BUSS @ ADK BETWEEN 1396-F050-F060 & OB 2396-F270-F280 FOR SOTF & REPLACE BREAKER F050  |
20080908 0800  |
20080908 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
RBS_RIDG  |
RIDGE  |
ROBERTSON  |
  |
138  |
relocate wave trap at Robertson  |
20080908 0800  |
20080908 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
RIDG_WATS  |
RIDGE  |
WATSON CHAPEL  |
  |
138  |
relocate wave trap at Robertson  |
20081013 0600  |
20081013 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
_AL_LM53  |
LA MARQUE  |
ALTA LOMA  |
  |
69  |
Prep Work To Convert Alta Loma To Loop Station Remove Approach Spans To T2HS  |
20081012 2400  |
20081231 2345  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
HAM_GUST  |
HAMILTON TMPP  |
GUSTINE  |
  |
69  |
rebuild line  |
20081012 0600  |
20081013 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_2250  |
ACKERLY VEALMOOR SWITCH  |
  |
Open  |
69  |
Open CB 2250 at Ackerly Veelmoor for contingency solve . Ref:line 6095_D  |
20081012 0600  |
20081013 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
AS_3524  |
LAMESA  |
  |
Open  |
138  |
Replace Sw 3529  |
20081012 0600  |
20081013 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6095_D  |
PAUL DAVIS TAP  |
LAMESA  |
  |
138  |
Replace Sw 3529  |
20081012 0600  |
20081013 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_3504  |
LAMESA  |
  |
Open  |
138  |
Replace Sw 3529; 138/69 Auto out of service.  |
20081012 0600  |
20081013 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_3534  |
LAMESA  |
  |
Open  |
138  |
Replace Sw 3529; Cap bank out of service.  |
20081012 0600  |
20081013 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MAS_3506  |
LAMESA  |
  |
Open  |
138  |
Replace Sw 3529; Transf |