APPROVED TRANSMISSION OUTAGES Data queried at: 02-SEP-2010 Time: 17:10:50 Comma Delimited Format
OutageId Date Posted Last Updated Start End Actual
Start
Actual
End
Duration Status Request
Type
Company Multi CB Equipment
Type
Equipment From
Station
To
Station
State Voltage Comment
348219
 
20100830
1414 
20100830
1414 
20100830
1415 
20101231
2345 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  6287  COLRDO RVR MUNICIPL WTR 1    Open  69  MOS 6287 opened for contingency problems at request of ERCOT 
348147
 
20100830
1124 
20100830
1124 
20100910
0700 
20100910
1800 

 

 
Daily  Approved  Equipment Status Change  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    DSC  9028  THOMASTON    Close  138  CLOSE DURING LINE OUTAGE BETWEEN THOMASTON - CUERO 
347928
 
20100827
1532 
20100827
1532 
20100829
1130 
20100831
0445 

 

 
Continuous  Approved  Equipment Status Change  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    DSC  4247  LAS MILPAS    Close  138  CS 4187 has bad contacts on C Phase and can not be opened. MOAS 4247 is closed to ease the load untill CS 4187 can be fixed. 
318772
 
20091228
0907 
20100827
1351 
20091231
2400 
20101231
1600 

 
20100827
1338 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  4183  CRANE GULF TAP    Close  69  Unable to re-open sw 4183 Crane Tap 2 after breaker clearance on CB 4315 Crane due to line loading, so left switch 4183 closed and changing status of sw 4183 (to closed) and CB 4315 Crane (to open) 
347286
 
20100824
1548 
20100824
1548 
20100824
1600 
20100923
1600 

 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M80-2  HASSE BEC POD    Open  69  Not in service. 
347285
 
20100824
1547 
20100824
1547 
20100824
1600 
20100923
1600 

 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M70-2  HASSE BEC POD    Open  138  Not in service. 
346945
 
20100820
1521 
20100820
1521 
20100823
0900 
20100904
1800 

 

 
Continuous  Approved  Equipment Status Change  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  7350  SAN DIEGO 
SAN DIEGO SUB
 
Close  69  CB 7350 San Diego requested to be closed by ERCOT for a scheduled planned clearance that STEC has between Robstown and Corpus SS 
346903
 
20100820
1131 
20100820
1131 
20100820
1145 
20100905
2300 

 

 
Continuous  Approved  Equipment Status Change  TXU ELECTRIC COMPANY (TDSP)    CB  1090  SEYMOUR TU    Close  69  PCAP - Bepc Olney - Westover 69 kV single circuit. Closed at Ercot request due to Bepc sum of load above 7.5 MVA. 
346786
 
20100819
1055 
20100819
1055 
20100920
0700 
20101003
1600 

 

 
Continuous  Approved  Equipment Status Change  TEXAS-NEW MEXICO POWER COMPANY    DSC  6614  MERIDIAN TAP    Close  69  Requested by Oncor to close loop for outage at Walnut springs 
345994
 
20100813
0840 
20100816
0925 
20100813
0845 
20101015
1600 
20100816
0845 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M70  PETTEWAY    Open  69  Per ERCOT request M70 was open for summer line loading. 
346200
 
20100816
0922 
20100816
0922 
20100816
0930 
20100923
0700 

 

 
Continuous  Approved  Equipment Status Change  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  TR_3435  PHILLIPS JOHNSON CITY    Open  138  COMPLETION OF INSTALLATION AND CHECKOUTS STILL NEED TO BE COMPLETED BEFORE GOING INTO SERVICE. 
346190
 
20100816
0752 
20100816
0752 
20100816
0800 
20101231
2300 

 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M10  FAIRVIEW    Open  138  Switch will need to stay open until the work at Waples is complete. We are adding a cap bank, new CB and new relay panels at Waples. 
346109
 
20100813
1646 
20100813
1646 
20100813
1700 
20100910
1600 

 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  3810  JACK COUNTY 345KV SWITCHYARD    Open  345  CB left open so that Fluor contractor can complete construction. 
345868
 
20100813
1645 
20100813
1645 
20100813
1700 
20100910
1600 

 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  3805  JACK COUNTY 345KV SWITCHYARD    Open  345  CB left open so that Fluor contractor can complete construction. 
344101
 
20100728
1427 
20100728
1427 
20100728
1430 
20100920
0645 

 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M70  DOMINO    Close  138  Switch was closed so that the ERCOT model would be up to date. 
343800
 
20100727
0849 
20100727
0849 
20100727
0900 
20101231
2300 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  1513  CHRISTOVAL    Open  69  Sw opened to solve for contingency overload problem on line 
343159
 
20100720
1150 
20100720
1150 
20100720
1200 
20100831
2300 

 

 
Continuous  Approved  Equipment Status Change  TXU ELECTRIC COMPANY (TDSP)    CB  CB_1540  WINK    Close  69  CB 1540 was closed for precontingency and a NOMCR will be sent to make this this breaker normally close. 
341163
 
20100701
1559 
20100701
1559 
20100702
0100 
20101031
1600 

 

 
Continuous  Approved  Equipment Status Change  DENTON MUNICIPAL ELECTRIC (TDSP)    DSC  JC443  JIM CHRISTAL SUBSTATION    Open  138  Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station. 
341162
 
20100701
1558 
20100701
1558 
20100702
0100 
20101031
1600 

 

 
Continuous  Approved  Equipment Status Change  DENTON MUNICIPAL ELECTRIC (TDSP)    DSC  JC441  JIM CHRISTAL SUBSTATION    Open  138  Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station. 
341161
 
20100701
1557 
20100701
1557 
20100702
0100 
20101031
1600 

 

 
Continuous  Approved  Equipment Status Change  DENTON MUNICIPAL ELECTRIC (TDSP)    DSC  JC433  JIM CHRISTAL SUBSTATION    Open  138  Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station. 
341160
 
20100701
1556 
20100701
1556 
20100702
0100 
20101031
1600 

 

 
Continuous  Approved  Equipment Status Change  DENTON MUNICIPAL ELECTRIC (TDSP)    DSC  JC431  JIM CHRISTAL SUBSTATION    Open  138  Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station. 
341159
 
20100701
1555 
20100701
1555 
20100702
0100 
20101031
1600 

 

 
Continuous  Approved  Equipment Status Change  DENTON MUNICIPAL ELECTRIC (TDSP)    DSC  JC421  JIM CHRISTAL SUBSTATION    Open  138  Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station. 
341158
 
20100701
1553 
20100701
1553 
20100702
0100 
20101031
1600 

 

 
Continuous  Approved  Equipment Status Change  DENTON MUNICIPAL ELECTRIC (TDSP)    DSC  JC411  JIM CHRISTAL SUBSTATION    Open  138  Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station. 
341157
 
20100701
1551 
20100701
1551 
20100702
0100 
20101031
1600 

 

 
Continuous  Approved  Equipment Status Change  DENTON MUNICIPAL ELECTRIC (TDSP)    DSC  JC403  JIM CHRISTAL SUBSTATION    Open  138  Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station. 
341156
 
20100701
1550 
20100701
1550 
20100702
0100 
20101031
1600 

 

 
Continuous  Approved  Equipment Status Change  DENTON MUNICIPAL ELECTRIC (TDSP)    DSC  JC401  JIM CHRISTAL SUBSTATION    Open  138  Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station. 
341154
 
20100701
1545 
20100701
1545 
20100702
0100 
20101031
1600 

 

 
Continuous  Approved  Equipment Status Change  DENTON MUNICIPAL ELECTRIC (TDSP)    CB  JC440  JIM CHRISTAL SUBSTATION    Open  138  Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station. 
341153
 
20100701
1544 
20100701
1544 
20100702
0100 
20101031
1600 

 

 
Continuous  Approved  Equipment Status Change  DENTON MUNICIPAL ELECTRIC (TDSP)    CB  JC430  JIM CHRISTAL SUBSTATION    Open  138  Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station. 
341152
 
20100701
1543 
20100701
1543 
20100702
0100 
20101031
1600 

 

 
Continuous  Approved  Equipment Status Change  DENTON MUNICIPAL ELECTRIC (TDSP)    CB  JC420  JIM CHRISTAL SUBSTATION    Open  138  Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station. 
341151
 
20100701
1541 
20100701
1541 
20100702
0100 
20101031
1600 

 

 
Continuous  Approved  Equipment Status Change  DENTON MUNICIPAL ELECTRIC (TDSP)    CB  JC410  JIM CHRISTAL SUBSTATION    Open  138  Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station. 
341150
 
20100701
1540 
20100701
1540 
20100702
0100 
20101031
1600 

 

 
Continuous  Approved  Equipment Status Change  DENTON MUNICIPAL ELECTRIC (TDSP)    CB  JC400  JIM CHRISTAL SUBSTATION    Open  138  Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station. 
341130
 
20100701
1441 
20100701
1441 
20100701
1500 
20101231
2300 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  2171  ONYX SWITCHING STATION    Open  69  This is a normally open switch. 
339465
 
20100622
1023 
20100624
1453 
20100701
2100 
20101022
1600 

 

 
Continuous  Approved  Equipment Status Change  TEXAS MUNICIPAL POWER AGENCY    DSC  DSW_M8014  JIM CHRISTAL SUBSTATION    Close  138  DME contractor work for Jim Christal rebuild. Jim Christal distribution load will be moved OFF Jim Christal before outage begins. 
339655
 
20100623
1418 
20100623
1418 
20100630
1300 
20101231
2345 

 

 
Continuous  Approved  Equipment Status Change  TXU ELECTRIC COMPANY (TDSP)    DSC  MLS_1232  KILLEEN FORT HOOD    Close  138  Closed for ERCOT 
339654
 
20100623
1414 
20100623
1414 
20100630
1300 
20101025
1900 

 

 
Continuous  Approved  Equipment Status Change  TXU ELECTRIC COMPANY (TDSP)    DSC  MLS_1258  KILLEEN FORT HOOD    Open  138  Changed due to Ercot Request 
338792
 
20100615
1034 
20100615
1034 
20100615
1400 
20100915
1400 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5830_CAP  ALAMITO CREEK    Open  69  CAP BANK 5830 UNAVAILABLE - 
337658
 
20100604
0933 
20100604
0933 
20100617
1615 
20101015
1800 

 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M10  MERIDIAN    Open  69  Open for summer line loading per existing mitigation plan. 
337642
 
20100604
0932 
20100604
0932 
20100617
1615 
20101015
1800 

 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M70  MERIDIAN    Open  69  Open for summer line loading per existing mitigation plan. 
337170
 
20100603
0801 
20100603
0801 
20101025
1915 
20101231
2345 

 

 
Continuous  Approved  Equipment Status Change  TXU ELECTRIC COMPANY (TDSP)    DSC  MLS_1258  KILLEEN FORT HOOD    Open  138  Changed due to Ercot Request 
336057
 
20100521
1427 
20100521
1427 
20100521
1430 
20101015
1800 

 

 
Continuous  Approved  Equipment Status Change  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M30  SUTTON    Open  69  Open for summer line loading per existing mitigation plan. 
330201
 
20100408
1125 
20100408
1125 
20100408
1130 
20101231
1100 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  7335  GONZALES AEP    Close  69  source breaker to nas battery 
319232
 
20091231
2221 
20091231
2225 
20100101
0015 
20101231
2345 

 

 
Continuous  Approved  Equipment Status Change  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  4130_CB  FORT STOCKTON SWITCH    Open  69  open for Ercot contingency due to Wind Farm production 
318269
 
20091222
1224 
20091222
1224 
20091231
2400 
20101231
2345 

 

 
Continuous  Approved  Equipment Status Change  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  27D5  LEON CREEK 
 
Close  138  Per ERCOT Darrell Jenkins to change the stastus of the breaker until the end of the year. 
348763
 
20100901
2040 
20100902
1705 
20100901
1915 
20100902
2000 
20100901
1915 
20100902
1653 
Continuous  Approved  Forced  TXU ELECTRIC COMPANY (TDSP)    LN  6675_A  CHALK  GARDEN CITY    69  Line locked out during a severe thunderstorm. 
348825
 
20100902
1106 
20100902
1408 
20100902
1015 
20100902
1800 
20100902
1015 
20100902
1355 
Daily  Approved  Forced  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  3765_CS  NORTH LAREDO    Open  138  Capacitor will not come online due to unbalance of cap cans, crew taking clearance to test and repair/relpace cans. 
348820
 
20100902
1017 
20100902
1106 
20100902
1000 
20100902
1600 
20100902
1000 
20100902
1048 
Daily  Approved  Forced  RELIANT ENERGY HL&P (TDSP)    CB  H570  TH WHARTON    Open  138  To repair air leak 
348762
 
20100901
1853 
20100902
1017 
20100901
1700 
20100903
2000 
20100901
1700 
20100902
0942 
Continuous  Approved  Forced  TXU ELECTRIC COMPANY (TDSP)    LN  6730_C  WELCH TAP  WELCH    69  5 poles down during a severe thunderstorm. 
348778
 
20100902
0918 
20100902
0919 
20100902
0930 
20100902
2330 
20100902
0930 

 
Daily  Approved  Forced  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  4495  WEIL TRACT    Open  138  Unit has a bad order motor. Crew to repair/replace. 
348769
 
20100901
2356 
20100902
0525 
20100901
2330 
20100902
1200 
20100901
2330 
20100902
0524 
Continuous  Approved  Forced  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_405_CB  SEYMOUR TAP TMPP 
SEYMOUR TAP TU
 
Open  69  Storms in the area. 
348757
 
20100901
1719 
20100901
2216 
20100901
1530 
20100901
2300 
20100901
1530 
20100901
2300 
Daily  Approved  Forced  TXU ELECTRIC COMPANY (TDSP)    LN  6100_A  ANDREWS TAP  AMOCO THREE BAR TAP    138  Line locked out during a severe thunderstorm. 
348253
 
20100831
0048 
20100901
2105 
20100830
1830 
20100901
1830 
20100830
1830 
20100901
1900 
Continuous  Approved  Forced  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    LN  ALMC_PAIS0  PAISANO  ALAMITO CREEK    69  Line operated to lock out by relay sectionalized between Paisano- Alamito crk. crew needs to patrol and make line repairs. 
348758
 
20100901
1719 
20100901
1913 
20100901
1615 
20100901
2100 
20100901
1615 
20100901
1743 
Daily  Approved  Forced  TEXAS-NEW MEXICO POWER COMPANY    CB  OCB_3B32_CB  TNP ONE PLANT    Open  345  UNit 2 tripped by relay 
348660
 
20100901
1717 
20100901
1909 
20100901
1615 
20100901
2100 
20100901
1615 
20100901
1743 
Daily  Approved  Forced  TEXAS-NEW MEXICO POWER COMPANY    CB  OCB_3A28_CB  TNP ONE PLANT    Open  345  Unit 2 tripped by relay 
348547
 
20100901
0932 
20100901
1554 
20100901
0900 
20100901
1700 
20100901
0900 
20100901
1700 
Daily  Approved  Forced  RELIANT ENERGY HL&P (TDSP)    CB  W780  TIDAL ROAD COGEN    Open  138  Repair switch 
348334
 
20100831
1109 
20100901
1554 
20100831
1045 
20100901
1700 
20100831
1045 
20100901
1700 
Continuous  Approved  Forced  RELIANT ENERGY HL&P (TDSP)    CB  W770  TIDAL ROAD COGEN    Open  138  Broken switch 
348615
 
20100901
1440 
20100901
1440 
20100901
1445 
20100901
2300 
20100901
1445 

 
Daily  Approved  Forced  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  6300_CB  LAREDO PLANT    Open  138  STATCOM unit tripped off line by relay. 
348614
 
20100901
1439 
20100901
1439 
20100901
1445 
20100901
2300 
20100901
1445 

 
Daily  Approved  Forced  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  6305_CB  LAREDO PLANT    Open  138  STATCOM unit tripped by relay. 
348438
 
20100831
1624 
20100831
2135 
20100831
1615 
20100831
2300 
20100831
1615 
20100831
2120 
Daily  Approved  Forced  TXU ELECTRIC COMPANY (TDSP)    LN  6651_E  SHEPPARD FIELD TAP 1  BURKBURNETT    69  Line relayed out. 
348437
 
20100831
1621 
20100831
2134 
20100831
1615 
20100831
2300 
20100831
1615 
20100831
2120 
Daily  Approved  Forced  TXU ELECTRIC COMPANY (TDSP)    LN  6651_B  WICHITA FALLS NORTH TU  SHEPPARD FIELD TAP 1    69  Line relayed out. problem unknown at this time. 
348432
 
20100831
1606 
20100831
1918 
20100831
1600 
20100831
1900 
20100831
1600 
20100831
1914 
Daily  Approved  Forced  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    LN  ALPI_MARF1  ALPINE  MARFA    69  line out by relaly 
348269
 
20100830
2145 
20100831
1517 
20100830
2130 
20100831
1800 
20100830
2130 
20100831
1517 
Continuous  Approved  Forced  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  PCB_7460_CB  HAYS ENERGY    Open  345  Issues with gas density monitor causing the breaker to become unreliable. Rotherham 
348208
 
20100830
1712 
20100831
0038 
20100830
1600 
20100831
1200 
20100830
1600 
20100831
0032 
Continuous  Approved  Forced  RELIANT ENERGY HL&P (TDSP)    XF  AT1_H  FORT BEND      69  Line 45 locked out. 
348207
 
20100830
1703 
20100831
0038 
20100830
1600 
20100831
1200 
20100830
1600 
20100831
0032 
Continuous  Approved  Forced  RELIANT ENERGY HL&P (TDSP)    LN  FB_RS_45  FORT BEND  ROSENBERG    69  Line locked out. 
340962
 
20100701
0735 
20100830
1018 
20100701
0700 
20100930
1800 
20100701
0700 

 
Continuous  Approved  Forced  RELIANT ENERGY HL&P (TDSP)    CB  C840  CAPITOL COGEN    Open  138  Customer waiting on parts to repair breaker. This outage is a continuation from 2/06/10. CenterPoint was unable to force extend and was advised to "Force" out per Grady. 
347029
 
20100823
0531 
20100823
0531 
20100823
0600 
20101119
1800 
20100823
0600 

 
Continuous  Approved  Forced  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CS_5475  BUDA    Open  138  CLEAR 138/24.9 KV T-2 POWERBANK FOR LTC REPLACEMENT. T-1 LOAD WILL BE ON MOBILE XFMR INSTALLED ON RUTHERFORS LINE 
344347
 
20100730
0946 
20100812
1143 
20100730
0845 
20100830
1600 
20100730
0845 
20100812
1138 
Continuous  Approved  Forced  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  24D5  LEON CREEK 
J0
 
Open  138  while in process of adding sf6 gas to 24D5 (Leon Creek) B phase bus side bushing faulted. 
345547
 
20100810
1547 
20100810
1547 
20100731
2400 
20101231
2345 
20100731
2400 

 
Continuous  Approved  Forced  TEXAS-NEW MEXICO POWER COMPANY    CP  HEIGH_C1  HEIGHTS SUB    Open  69  Original forced outage expired on 07-31-10 at 2345. CAP Bank is still OOS waiting on parts. ETA unknown at this time. 
336687
 
20100527
1449 
20100527
1551 
20100527
1500 
20101031
1700 
20100527
1500 
20100527
1522 
Continuous  Approved  Forced  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_2612  COMAL    Open  138  Switch got damaged in new ongoing construction. To fix T-1 and T-2 will have to be out of service. Load will not allow putting load on T-3. To repair in fall when another bank goes in. 
335133
 
20100515
2126 
20100515
2126 
20100515
1945 
20101231
2300 
20100515
1945 

 
Continuous  Approved  Forced  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  100_CB  COLETO CREEK    Open  13.8  Reactor blew up due to internal fault. 
348845
 
20100902
1210 
20100902
1615 
20100902
1615 
20100902
1800 
20100902
1545 
20100902
1615 
Daily  Approved  Forced Extension  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  129T145  HARWOOD  LULING    69  Parts late in arriving 
348847
 
20100902
1213 
20100902
1557 
20100902
1615 
20100902
1800 
20100902
1545 

 
Daily  Approved  Forced Extension  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_9456LW  HARWOOD    Open  69  Parts late in arriving 
348846
 
20100902
1210 
20100902
1556 
20100902
1415 
20100902
1700 
20100902
1414 
20100902
1556 
Daily  Approved  Forced Extension  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_9454  HARWOOD    Open  69  Parts late in arriving 
348922
 
20100902
1409 
20100902
1529 
20100902
1515 
20100902
1800 
20100902
1529 
20100902
1529 
Daily  Approved  Forced Extension  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  PK_900_CB  PILOT KNOB    Open  138  New part is needed. 
346938
 
20100820
1449 
20100902
1522 
20100820
2015 
20100903
2000 
20100820
2400 
20100902
1520 
Continuous  Approved  Forced Extension  TEXAS-NEW MEXICO POWER COMPANY    DSC  DSW239-65  GAF SUB    Open  138  Industrial customer requests more time due to addition equipment problems. 
348827
 
20100902
1213 
20100902
1449 
20100902
1415 
20100902
1700 
20100902
1425 
20100902
1449 
Daily  Approved  Forced Extension  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_9458LW  HARWOOD    Open  69  Parts late in arriving 
348557
 
20100901
1046 
20100902
1240 
20100901
1215 
20100902
1200 
20100901
1215 
20100902
1217 
Continuous  Approved  Forced Extension  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  4187_CS  LAS MILPAS    Open  138  problems getting sw 4187 adjusted - outages to reinstall moved to 9/2 
348568
 
20100901
1453 
20100902
1152 
20100901
2015 
20100902
1800 
20100901
1947 
20100902
1139 
Continuous  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  1844  JEWETT    Open  138  Part on order, awaiting part to repair breaker. 
348826
 
20100902
1119 
20100902
1121 
20100902
1615 
20101001
1600 

 

 
Continuous  Approved  Forced Extension  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    DSC  HA_603M  HARRIS    Open  69  The customer (U.T.) engineers are not ready to re-energize their transformer. 
348447
 
20100831
1938 
20100902
0718 
20100831
2315 
20100902
0545 
20100831
2300 
20100902
0615 
Continuous  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  9625  RATTLESNAKE ROAD SWITCH    Open  345  Customer equipment not ready for service 
348446
 
20100831
1937 
20100902
0717 
20100831
2315 
20100902
0545 
20100831
2300 
20100902
0615 
Continuous  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  9615  RATTLESNAKE ROAD SWITCH    Open  345  Customer equipment not ready for service 
348664
 
20100901
1909 
20100902
0406 
20100901
2315 
20100903
2000 
20100901
2315 
20100902
0405 
Continuous  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    LN  6100_A  ANDREWS TAP  AMOCO THREE BAR TAP    138  Line locked out during a severe thunderstorm. 3 poles down. 
348612
 
20100901
1427 
20100901
2037 
20100901
1715 
20100901
2000 
20100901
1705 
20100901
2028 
Daily  Approved  Forced Extension  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  10Q1  Q1 
P2
 
Open  138  needed to complete job 
348611
 
20100901
1426 
20100901
2036 
20100901
1715 
20100901
2000 
20100901
1705 
20100901
2028 
Daily  Approved  Forced Extension  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  12P2  P2 
Q1
 
Open  138  needed to complete job 
348610
 
20100901
1424 
20100901
2036 
20100901
1715 
20100901
2000 
20100901
1705 
20100901
2028 
Daily  Approved  Forced Extension  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    LN  P2_Q1  P2  Q1    138  needed to complete job 
348600
 
20100901
1326 
20100901
1947 
20100901
1045 
20100901
2000 
20100901
1030 
20100901
1947 
Daily  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  1844  JEWETT    Open  138  Awaiting replacement part for breaker operator. 
348752
 
20100901
1552 
20100901
1921 
20100901
1715 
20100901
2000 
20100901
1715 
20100901
1826 
Daily  Approved  Forced Extension  RELIANT ENERGY HL&P (TDSP)    DSC  W759  TIDAL ROAD COGEN    Open  138  SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2 
348750
 
20100901
1551 
20100901
1920 
20100901
1715 
20100901
2000 
20100901
1715 
20100901
1826 
Daily  Approved  Forced Extension  RELIANT ENERGY HL&P (TDSP)    CB  W780  TIDAL ROAD COGEN    Open  138  SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2 
348749
 
20100901
1550 
20100901
1920 
20100901
1715 
20100901
2000 
20100901
1715 
20100901
1825 
Daily  Approved  Forced Extension  RELIANT ENERGY HL&P (TDSP)    CB  W770  TIDAL ROAD COGEN    Open  138  SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2 
348748
 
20100901
1549 
20100901
1920 
20100901
1715 
20100901
2000 
20100901
1715 
20100901
1830 
Daily  Approved  Forced Extension  RELIANT ENERGY HL&P (TDSP)    CB  W750  TIDAL ROAD COGEN    Open  138  SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2 
348657
 
20100901
1548 
20100901
1917 
20100901
1715 
20100901
2000 
20100901
1715 
20100901
1824 
Daily  Approved  Forced Extension  RELIANT ENERGY HL&P (TDSP)    CB  W760  TIDAL ROAD COGEN    Open  138  SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2 
348440
 
20100831
1636 
20100901
1544 
20100831
1715 
20100903
1700 
20100831
1700 
20100901
1542 
Continuous  Approved  Forced Extension  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    DSC  DSW_206  MARKHAM AIR SWITCH    Close  69  temporary repairs still under way 
348534
 
20100901
0710 
20100901
1540 
20100901
0600 
20100901
1030 
20100901
0600 
20100901
1030 
Daily  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  1844  JEWETT    Open  138  Problem with breaker , will not close. 
348439
 
20100831
1634 
20100901
1501 
20100831
1715 
20100903
1700 
20100831
1700 
20100901
1440 
Continuous  Approved  Forced Extension  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    XF  138_69_1  FRANKLINS CAMP      69  pulling vacuume on auto now 
348533
 
20100901
0708 
20100901
0859 
20100901
0600 
20100901
1030 
20100901
0600 
20100901
0837 
Daily  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  1854  JEWETT 
 
Open  138  CB 1854 will not close, problems with breaker. 
348539
 
20100901
0746 
20100901
0810 
20100901
0600 
20100901
0745 
20100901
0530 
20100901
0721 
Daily  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  1860  JEWETT    Open  138  finish work 
348538
 
20100901
0745 
20100901
0809 
20100901
0600 
20100901
0745 
20100901
0530 
20100901
0721 
Daily  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  CB_1814  JEWETT    Open  138  finish work 
348537
 
20100901
0744 
20100901
0808 
20100901
0600 
20100901
0745 
20100901
0530 
20100901
0721 
Daily  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  1834  JEWETT    Open  138  finish work 
348536
 
20100901
0742 
20100901
0808 
20100901
0600 
20100901
0745 
20100901
0530 
20100901
0721 
Daily  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  1804  JEWETT    Open  138  finish work 
348449
 
20100831
2340 
20100831
2341 
20100831
2015 
20100930
2300 

 

 
Continuous  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  025  KIRKLAND PARK    Open  138  Replace operator. New operator coming from Germany. 
347939
 
20100827
1850 
20100831
2033 
20100827
1715 
20100831
2300 
20100828
0001 
20100831
2300 
Continuous  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  9615  RATTLESNAKE ROAD SWITCH    Open  345  Customer equipment not ready 
347938
 
20100827
1848 
20100831
2033 
20100827
1715 
20100831
2300 
20100828
0001 
20100831
2300 
Continuous  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  9625  RATTLESNAKE ROAD SWITCH    Open  345  Customer equipment not ready. 
348445
 
20100831
1933 
20100831
1936 
20100831
2315 
20100902
0545 

 

 
Continuous  Cancelled  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  9615  RATTLESNAKE ROAD SWITCH    Open  345  Customer Equipment is not ready for service. 
347435
 
20100825
1402 
20100831
1704 
20100825
1715 
20100831
1700 
20100825
1715 
20100831
1700 
Continuous  Approved  Forced Extension  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    DSC  DSW_206  MARKHAM AIR SWITCH    Close  69  temporary repairs still under way 
347451
 
20100825
1359 
20100831
1704 
20100825
1715 
20100831
1700 
20100825
1715 
20100831
1700 
Continuous  Approved  Forced Extension  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    XF  138_69_1  FRANKLINS CAMP      69  temporary repairs still under way 
347872
 
20100827
1057 
20100831
1508 
20100827
1215 
20100831
1930 
20100827
1202 
20100831
1508 
Continuous  Approved  Forced Extension  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CP  C2  STEWART ROAD    Open  138  crew waiting on equipment (Can) to repace bad cap can. 
348359
 
20100831
1020 
20100831
1404 
20100831
1015 
20100831
1200 
20100831
1015 
20100831
1230 
Daily  Approved  Forced Extension  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_202_CB  ORAN TMPP 
MORRIS SHEPPARD
 
Open  69  Contractor digger truck layed over on its side will digging piers. Dozer will need to pull truck back over on its side. 
348357
 
20100831
1018 
20100831
1404 
20100831
1015 
20100831
1200 
20100831
1015 
20100831
1230 
Daily  Approved  Forced Extension  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_10  MORRIS SHEPPARD    Open  69  Contractor digger truck layed over on its side will digging piers. Dozer will need to pull truck back over on its side. 
348352
 
20100831
1005 
20100831
1342 
20100831
1215 
20100831
1500 

 
20100831
1345 
Daily  Approved  Forced Extension  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  GCB_5060_CB  GAY HILL    Open  138  EXTENSION IS DUE TO IKSSUES WITH BUCKET TRUCK 
348351
 
20100831
1004 
20100831
1342 
20100831
1215 
20100831
1500 

 
20100831
1345 
Daily  Approved  Forced Extension  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  GCB_5050_CB  GAY HILL    Open  138  EXTENSION IS DUE TO ISSUES WITH BUCKET TRUCK 
348330
 
20100831
1003 
20100831
1342 
20100831
1215 
20100831
1500 

 
20100831
1345 
Daily  Approved  Forced Extension  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  GCB_5070_CB  GAY HILL    Open  138  EXTENSION IS DUE TO ISSUES WITH BUCKET TRUCK 
348331
 
20100831
1018 
20100831
1019 
20100831
1715 
20100930
2300 

 

 
Continuous  Approved  Forced Extension  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CS_1475  ANDICE    Open  138  WORK PROGRESSING SLOWER THAT ORIGINALLY FIGURED. PER PEDERNALES ELECTRIC COOPERATIVE 
348310
 
20100831
0947 
20100831
0947 
20100831
1615 
20101015
1630 

 

 
Continuous  Approved  Forced Extension  CITY OF GARLAND (TDSP)    DSC  7431  WALNUT    Open  138  Supporting outages to pour tower foundations were delayed due to ERCOT summer loading issues. 
348309
 
20100831
0946 
20100831
0947 
20100831
1615 
20101015
1630 

 

 
Continuous  Approved  Forced Extension  CITY OF GARLAND (TDSP)    CB  7430  WALNUT    Open  138  Supporting outages to pour tower foundations were delayed due to ERCOT summer loading issues. 
348124
 
20100830
1136 
20100830
1714 
20100830
1445 
20100906
1430 
20100830
1445 

 
Continuous  Approved  Forced Extension  TEXAS-NEW MEXICO POWER COMPANY    CB  OCB_05_CB  SWEENY COGEN    Open  138  Customer has not completed work 
348123
 
20100830
1133 
20100830
1714 
20100830
1445 
20100906
1430 
20100830
1445 

 
Continuous  Approved  Forced Extension  TEXAS-NEW MEXICO POWER COMPANY    CB  OCB_01_CB  SWEENY COGEN    Open  138  Customer has not competed work 
347936
 
20100827
1700 
20100827
1741 
20100827
2015 
20100831
2000 

 

 
Continuous  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    CB  025  KIRKLAND PARK    Open  138  Bad Operator; parts on order. 
345997
 
20100813
0850 
20100826
1638 
20100814
2400 
20110131
2345 
20100814
2348 
20100826
1623 
Continuous  Approved  Forced Extension  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  CS_918  FALFURRIAS    Open  138  still waiting on parts 
347361
 
20100825
0937 
20100826
1404 
20100825
1615 
20100901
1800 
20100825
2400 
20100826
1404 
Continuous  Approved  Forced Extension  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  5845  WEIL TRACT    Open  138  parts on order for repair 
345786
 
20100811
1525 
20100811
1550 
20100811
1515 
20100831
1800 
20100811
1515 

 
Continuous  Approved  Forced Extension  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  5431  FRIEND RANCH    Open  138  need more time 
345785
 
20100811
1524 
20100811
1550 
20100811
1515 
20100831
1800 
20100811
1515 

 
Continuous  Approved  Forced Extension  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  7093  FRIEND RANCH    Open  138  need more time 
319206
 
20091231
1423 
20100811
1513 
20091231
2315 
20101231
2300 
20091231
2315 
20100811
1511 
Continuous  Approved  Forced Extension  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  255_CB  LAREDO PLANT    Open  69  Capacitor did not test good 
333079
 
20100430
1635 
20100811
1152 
20100430
1815 
20101231
2300 
20100511
0001 

 
Continuous  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    XF  AXFMR1T  SULPHUR SPRINGS SWITCH      13.2  Reactor catastrophically failed. District to replace when new reactor arrives. 
345435
 
20100810
0938 
20100810
1728 
20100810
1715 
20100903
2345 
20100810
1727 

 
Continuous  Approved  Forced Extension  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  2005  NORTH CARBIDE 
SEADRIFT
 
Open  69  this is a new breaker, that will not be put in service at this time because the relay dept still needs to do some relay work 
344291
 
20100729
1457 
20100729
1504 
20100731
2315 
20101231
2300 

 

 
Continuous  Approved  Forced Extension  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CS3525  FREIHEIT    Open  138  T-2 POWERBANK WILL HAVE TO BE REPLACED. NBU IS LOOKING FOR A REPLACEMENT. 
343573
 
20100723
1451 
20100724
0838 
20100723
1515 
20100930
1800 
20100723
2400 

 
Continuous  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    XF  AXFMR4L  TRINIDAD SES      69  This extention reflects a more accurate in service date. 
343572
 
20100723
1447 
20100724
0837 
20100723
1515 
20100930
1800 
20100723
2400 

 
Continuous  Approved  Forced Extension  TXU ELECTRIC COMPANY (TDSP)    XF  AXFMR4H  TRINIDAD SES      138  This extention reflects a more accurate in service date. 
319205
 
20091231
1423 
20100709
1016 
20091231
2315 
20101231
2300 
20091231
2300 

 
Continuous  Approved  Forced Extension  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  4010  BARNEY DAVIS    Open  138  bad order capacitor, blown cans 
338989
 
20100618
0723 
20100618
2248 
20100618
1815 
20100831
2300 
20100618
1800 

 
Continuous  Approved  Forced Extension  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    XF  138_69_1  LIVE OAK CSW      69  Engineering having to redesign LTC and SCADA controls 
336044
 
20100521
1006 
20100521
1710 
20100521
1715 
20101231
2200 
20100521
1715 

 
Continuous  Approved  Forced Extension  CITY OF GARLAND (TDSP)    DSC  102  SPENCER    Open  69  Breaker relay protection and SCADA operation of the breaker are incomplete and not tested at this time. 
336042
 
20100521
0956 
20100521
1710 
20100521
1715 
20101231
2200 
20100521
1715 

 
Continuous  Approved  Forced Extension  CITY OF GARLAND (TDSP)    CB  OCB_G340_CB  SPENCER 
 
Open  69  Breaker relay protection and SCADA operation of the breaker are incomplete and not tested at this time. 
348659
 
20100901
1658 
20100902
1454 
20100902
0830 
20100902
1400 
20100902
0847 
20100902
1427 
Daily  Approved  Maintenance Level 1  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  SDRFT_PORT  PORT OCONNOR SUB  SEADRIFT    69  Seadrift load has been backfed - line clearance to replace wave trap at Pt. OConnor 
348658
 
20100901
1639 
20100902
1245 
20100902
0800 
20100902
1700 
20100902
0857 
20100902
1145 
Daily  Approved  Maintenance Level 1  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  10467  SANTIAGO    Open  138  Switch to be opened at request of Langford WF. WF is scheduled to be offline for planned outage for substation work during this time 
348587
 
20100901
1104 
20100902
1241 
20100902
1030 
20100902
1200 
20100902
1030 
20100902
1217 
Daily  Approved  Maintenance Level 1  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    DSC  4247  LAS MILPAS    Open  138  las milpas - south mcallan to lift jumpers on cs 4187 
348585
 
20100901
1054 
20100902
1241 
20100902
1030 
20100902
1200 
20100902
1001 
20100902
1217 
Daily  Approved  Maintenance Level 1  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  4545_CB  SOUTH MCALLEN 
LAS MILPAS
 
Open  138  las milpas - south mcallan to lift jumpers on cs 4187 
348558
 
20100901
1122 
20100902
1050 
20100902
0800 
20100902
1530 
20100902
0819 
20100902
1010 
Daily  Approved  Maintenance Level 1  TXU ELECTRIC COMPANY (TDSP)    DSC  1032  DENISON DAM TAP    Open  138  This is to replace open jumper at the Tap. This was done due to a emergency outage at Denison Dam. 
348588
 
20100901
1120 
20100902
1050 
20100902
0800 
20100902
1530 
20100902
0819 
20100902
1010 
Daily  Approved  Maintenance Level 1  TXU ELECTRIC COMPANY (TDSP)    DSC  1026  DENISON DAM TAP    Open  138  This is to replace open jumper at the Tap. This was done due to a emergency outage at Denison Dam. 
348584
 
20100901
1052 
20100902
0918 
20100902
0500 
20100902
1000 
20100902
0458 
20100902
0856 
Daily  Approved  Maintenance Level 1  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    DSC  4257  LAS MILPAS    Open  138  las milpas - stewart rd to reinstall jumpers on cs 4187 
348582
 
20100901
1050 
20100902
0917 
20100902
0500 
20100902
1000 
20100902
0437 
20100902
0859 
Daily  Approved  Maintenance Level 1  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    DSC  4907  STEWART ROAD    Open  138  las milpas - stewart rd to reinstall jumpers on cs 4187 
348436
 
20100831
1614 
20100831
1729 
20100831
1630 
20100831
2000 
20100831
1641 
20100831
1726 
Daily  Approved  Maintenance Level 1  TXU ELECTRIC COMPANY (TDSP)    DSC  4824  ELMONT POI    Close  138  GCEC transformer is out of phase Line flow will not be interrupted. 
348223
 
20100830
1443 
20100831
1716 
20100831
0800 
20100831
1100 
20100831
0739 
20100831
1116 
Daily  Approved  Maintenance Level 1  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    LN  ALPR_BARL1  BARRILLA  ALPINE REA    69  Pole top reported broken and pole needs to be changed out 
348329
 
20100831
0955 
20100831
1423 
20100831
1000 
20100831
1500 
20100831
0956 
20100831
1423 
Daily  Approved  Maintenance Level 1  TXU ELECTRIC COMPANY (TDSP)    LN  6850_A  ARCHER CITY  BLACKWELL WICHITA FALLS TAP    69  Line section outaged to repair broken crossarms. 
348171
 
20100830
1236 
20100831
0938 
20100831
0900 
20100904
1600 
20100831
0927 

 
Continuous  Approved  Maintenance Level 1  BROWNSVILLE PUBLIC UTILITY BOARD (TDSP)    LN  LM_UC  UNION CARBIDE  LOMA ALTA    69  Need to change out flashed over buss insulators at Union Carbide Substation. It appears that it is the possible cause for the operations on this transmission line. Distribution Load will be transferred out. 
347990
 
20100829
1455 
20100830
1000 
20100830
0900 
20100830
1200 
20100830
0914 
20100830
0949 
Daily  Approved  Maintenance Level 1  BROWNSVILLE PUBLIC UTILITY BOARD (TDSP)    CB  H220  FILTER PLANT    Open  138  Need outage to recharge H220 Circuit Switcher with SF6. 
347966
 
20100830
0805 
20100902
1608 
20100901
0800 
20100903
1600 
20100901
0937 
20100902
1606 
Continuous  Approved  Maintenance Level 2  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  MV_MV_7  MVEC (LA SARA)  MVEC (RAYMONDVILLE TAP)    138  clearance to replace bad interruptors - this is a radial line - La Sara load to be backfed. 
348109
 
20100830
0848 
20100901
0853 
20100901
0800 
20100901
1700 
20100901
0853 

 
Daily  Approved  Maintenance Level 2  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  10467  SANTIAGO    Open  138  Switch to be opened at request of Langford WF. WF is scheduled to be offline for planned outage for substation work during this time 
347365
 
20100825
0952 
20100902
1654 
20100909
0600 
20100909
1300 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1255_C  NECHES RIVER PUMP  PALESTINE SOUTH    138  line maint 
348931
 
20100902
1439 
20100902
1646 
20100907
0900 
20100907
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Open  69  CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL 
348932
 
20100902
1439 
20100902
1646 
20100907
0900 
20100907
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Open  69  CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL 
348560
 
20100901
1145 
20100902
1646 
20100907
1000 
20100909
1500 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  2881  CITY OF SONORA    Open  69  Switch opened while having the 69 KV bus clearance at Friend Ranch 
348592
 
20100901
1143 
20100902
1646 
20100907
1000 
20100909
1500 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  3965_CB  SONORA    Close  69  Close CB 3965 Sonora while having a 69 KV bus clearance at Friend Ranch to utilize the capacitor at Sonora City 
347916
 
20100827
1356 
20100902
1638 
20100902
2400 
20100903
1200 

 

 
Continuous  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6009_A  WILLOW CREEK SWITCH  PARKER SWITCH    345  Line outage to remove spacers and static wire bonds in preparation for erecting towers for future work. 
348364
 
20100831
1116 
20100902
1638 
20100907
0800 
20101210
1700 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  2140  PUTNAM 69kv    Open  69  NEED SWITCH OPEN TO DE-ENERGIZE LINE TO PUTNAM. BREAKER 2123 @ PUTNAM ALREADY IN OUTAGE SCHEDULER AND APPROVED. 
348535
 
20100901
0725 
20100902
1638 
20100907
0800 
20100915
1700 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  3742  JACK COUNTY 345KV SWITCHYARD    Open  345  Fluor contractor will check out generator protection. 
348335
 
20100831
1113 
20100902
1638 
20100907
0800 
20101210
1700 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  2255  MORAN CSW    Open  69  NEED SWITCH OPEN TO DE-ENERGIZE LINE TO PUTNAM. BREAKER 2122 @ PUTNAM ALREADY IN OUTAGE SCHEDULER AND APPROVED. 
348459
 
20100901
0726 
20100902
1638 
20100907
0800 
20100915
1700 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  3792  JACK COUNTY 345KV SWITCHYARD    Open  345  Fluor contractor will check out generator protection. 
348458
 
20100901
0726 
20100902
1638 
20100907
0800 
20100915
1700 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  3791  JACK COUNTY 345KV SWITCHYARD    Open  345  Fluor contractor will check out generator protection. 
348363
 
20100831
1115 
20100902
1638 
20100907
0800 
20101210
1700 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  5117  BAIRD    Open  69  NEED SWITCH OPEN TO DE-ENERGIZE LINE TO PUTNAM. BREAKER 4575 @ PUTNAM ALREADY IN OUTAGE SCHEDULER AND APPROVED. 
348454
 
20100901
0725 
20100902
1638 
20100907
0800 
20100915
1700 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  3785  JACK COUNTY 345KV SWITCHYARD    Open  345  Fluor contractor will check out generator protection. 
348455
 
20100901
0725 
20100902
1638 
20100907
0800 
20100915
1700 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  3790  JACK COUNTY 345KV SWITCHYARD    Open  345  Fluor contractor will check out generator protection. 
348457
 
20100901
0726 
20100902
1638 
20100907
0800 
20100915
1700 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  3786  JACK COUNTY 345KV SWITCHYARD    Open  345  Fluor contractor will check out generator protection. 
348456
 
20100901
0726 
20100902
1638 
20100907
0800 
20100915
1700 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  3784  JACK COUNTY 345KV SWITCHYARD    Open  345  Fluor contractor will check out generator protection. 
347181
 
20100824
0904 
20100902
1637 
20100909
1200 
20100909
1600 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  5080  CROSBY    Open  138  lube job 
343854
 
20100727
1049 
20100902
1636 
20100909
0800 
20100909
1700 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  X710  BIPORT    Open  138  SECTION OUTAGE TO GO WITH LINE OUTAGE FOR TRIP CHECK 
343857
 
20100727
1051 
20100902
1636 
20100909
0800 
20100909
1700 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  X740  BIPORT    Open  138  SECTION OUTAGE TO GO WITH LINE OUTAGE FOR TRIP CHECK 
343858
 
20100727
1051 
20100902
1636 
20100909
0800 
20100909
1700 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  BFPVL_82  BIPORT  VELASCO    138  LINE OUTAGE FOR TRIP CHECK 
348333
 
20100831
1100 
20100902
1627 
20100909
0700 
20100909
1500 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  BE_950_CB  BERGSTROM    Open  138  Sub station GCB maintenance / testing. 
348180
 
20100830
1354 
20100902
1623 
20100909
0700 
20100909
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
348143
 
20100830
1117 
20100902
1618 
20100909
0700 
20100909
1800 

 

 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  THOMAS_VICTOR1  THOMASTON  VICTORIA    138  LINE OUTAGE BETWEEN THOMASTON - VICTORIA PS TO DIG FOUNDATIONS UNDER LINE 
347631
 
20100826
1035 
20100902
1617 
20100830
0730 
20100902
1600 
20100830
0822 
20100902
1525 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  E990  EXXON    Open  138  section outage at exxon for new construction 
338956
 
20100616
1307 
20100902
1616 
20100830
0730 
20100902
1600 
20100830
0823 
20100902
1525 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  E960  EXXON    Open  138  CUST TO TIE IN NEW X990 
346834
 
20100819
1611 
20100902
1616 
20100902
0900 
20100902
1700 
20100902
0903 
20100902
1609 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  CELANE_KLEBER1  CELANESE BISHOP  KLEBERG CSW    138  replacing b/o ccvt 
338955
 
20100616
1306 
20100902
1615 
20100830
0730 
20100902
1600 
20100830
0823 
20100902
1525 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  E930  EXXON    Open  138  CUST TO TIE IN NEW X990 
338954
 
20100616
1305 
20100902
1615 
20100830
0730 
20100902
1600 
20100830
0824 
20100902
1526 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  E780  EXXON    Open  138  CUST TO TIE IN NEW X990 
338953
 
20100616
1304 
20100902
1614 
20100830
0730 
20100902
1600 
20100830
0824 
20100902
1527 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  E750  EXXON    Open  138  CUST TO TIE IN NEW X990 
338952
 
20100616
1303 
20100902
1613 
20100830
0730 
20100902
1600 
20100830
0824 
20100902
1527 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  E720  EXXON    Open  138  CUST TO TIE IN NEW X990 
338951
 
20100616
1302 
20100902
1612 
20100830
0730 
20100902
1600 
20100830
0824 
20100902
1527 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  E360  EXXON    Open  138  CUST TO TIE IN NEW X990 
347604
 
20100826
0933 
20100902
1610 
20100909
0700 
20100909
1700 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  H810  VELASCO    Open  138  install temp control cables 
345856
 
20100812
1013 
20100902
1609 
20100909
0700 
20100909
1800 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1019  SWEETWATER NO 2    Open  69  Outage to replace the relay panel. 
345922
 
20100812
1014 
20100902
1609 
20100909
0700 
20100909
1800 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1021  SWEETWATER NO 2    Open  69  Outage to replace the relay panel. 
348299
 
20100831
0819 
20100902
1605 
20100909
0630 
20100909
1700 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  7150  WOLF HOLLOW    Open  345  Outage to repair SF-6 pressure gauges. Will be removing SF-6 from the circuit breaker. 
347711
 
20100826
1213 
20100902
1558 
20100902
1400 
20100902
1600 
20100902
1506 
20100902
1558 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  HSW_1291  LULING    Open  69  CLEAR LULING TO HARWOOD 69 KV LINE TO REMOVE PORTABLE FROM LINE AT HARWOOD 
347712
 
20100826
1213 
20100902
1558 
20100902
1400 
20100902
1600 
20100902
1506 
20100902
1558 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  HSW_1289  LULING    Open  69  CLEAR LULING TO HARWOOD 69 KV LINE TO REMOVE PORTABLE FROM LINE AT HARWOOD 
347900
 
20100827
1056 
20100902
1558 
20100830
1130 
20100902
1700 
20100830
1109 
20100902
1555 
Continuous  Approved  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  MCF_RFUG  MCFADDIN SUB  REFUGIO SUB    69  line rehab 
347710
 
20100826
1212 
20100902
1556 
20100902
1400 
20100902
1600 
20100902
1449 
20100902
1556 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_9456LW  HARWOOD    Open  69  CLEAR LULING TO HARWOOD 69 KV LINE TO REMOVE PORTABLE FROM LINE AT HARWOOD 
347709
 
20100826
1212 
20100902
1556 
20100902
1400 
20100902
1600 
20100902
1450 
20100902
1556 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  129T145  HARWOOD  LULING    69  CLEAR LULING TO HARWOOD 69 KV LINE TO REMOVE PORTABLE FROM LINE AT HARWOOD 
347713
 
20100826
1213 
20100902
1556 
20100902
1400 
20100902
1600 
20100902
1505 
20100902
1555 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  1290_CB  LULING    Open  69  CLEAR LULING TO HARWOOD 69 KV LINE TO REMOVE PORTABLE FROM LINE AT HARWOOD 
347477
 
20100825
1459 
20100902
1554 
20100902
1200 
20100902
1600 
20100902
1200 
20100902
1521 
Daily  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    LN  SANTIA_SAPS1  SAN ANGELO POWER STATION  SANTIAGO    138  Replace crossarms 
346809
 
20100819
1445 
20100902
1552 
20101011
0700 
20101016
1700 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  T520  GARDEN VILLAS    Open  69  outage for wave trap maint. 
345457
 
20100810
1106 
20100902
1552 
20101011
0700 
20101014
1700 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  3368  VALLEY SES    Open  345  I will be testing the transformer. 
347269
 
20100824
1337 
20100902
1552 
20101011
0700 
20101011
2000 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  L750  STRANG    Open  138  REPLACE BUSHING 
345459
 
20100810
1107 
20100902
1552 
20101011
0700 
20101014
1700 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  6090  VALLEY SES 
 
Open  138  I will be testing the transformer. 
345456
 
20100810
1105 
20100902
1552 
20101011
0700 
20101014
1700 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    XF  AXFMR1  VALLEY SES      345  I will be testing the transformer. 
345458
 
20100810
1107 
20100902
1552 
20101011
0700 
20101014
1700 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  6089  VALLEY SES    Open  138  I will be testing the transformer. 
343520
 
20100723
0802 
20100902
1552 
20101011
0730 
20101011
1800 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  AI_SRB55  SR BERTRON  ALEXANDER ISLAND    69  OUTAGE TO DISCONNECT TEMP MOBLE TRANSFORMER 
347444
 
20100825
1452 
20100902
1552 
20101011
0800 
20101021
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M50  HOLDER    Open  138  Upgrade relay panels. Total restoration time will be 290 hrs. 
347474
 
20100825
1452 
20100902
1552 
20101011
0800 
20101021
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_395_CB  HOLDER 
BROWNWOOD SWITCH
 
Open  69  Upgrade relay panels. Total restoration time will be 290 hrs. 
347476
 
20100825
1453 
20100902
1552 
20101011
0800 
20101021
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  394  HOLDER    Open  69  Upgrade relay panels. Total restoration time will be 290 hrs. 
347445
 
20100825
1453 
20100902
1552 
20101011
0800 
20101021
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  396  HOLDER    Open  69  Upgrade relay panels. Total restoration time will be 290 hrs. 
347515
 
20100826
0849 
20100902
1552 
20100902
0800 
20100902
1600 
20100902
0853 
20100902
1552 
Daily  Approved  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  COY_KENE  COY CITY SUB  KENEDY    69  Line Maint. 
344743
 
20100803
1412 
20100902
1552 
20100907
0800 
20100907
1700 

 

 
Daily  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  2625  HAWKINS SWITCH 
SALEM TMPP
 
Open  138  Test relays. 
347566
 
20100826
0904 
20100902
1535 
20101011
0600 
20101011
0645 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL NOTE: EARLIER START REQUESTED BY CONTRACTOR 
345076
 
20100805
1349 
20100902
1535 
20101011
0700 
20101015
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_455_CB  LILLIAN 
 
Open  69  New control house and upgrade relay panels. 
345083
 
20100805
1352 
20100902
1535 
20101011
0700 
20101015
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M60  LILLIAN    Open  69  New control house and upgrade relay panels. 
345080
 
20100805
1352 
20100902
1535 
20101011
0700 
20101015
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M20A  LILLIAN    Open  69  New control house and upgrade relay panels. 
345073
 
20100805
1348 
20100902
1535 
20101011
0700 
20101015
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  1885  LILLIAN 
CONLEY
 
Open  138  New control house and upgrade relay panels. 
345075
 
20100805
1349 
20100902
1535 
20101011
0700 
20101015
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_2045  LILLIAN 
JESSICA
 
Open  138  New control house and upgrade relay panels. 
345079
 
20100805
1351 
20100902
1535 
20101011
0700 
20101015
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  M20BCS  LILLIAN    Open  138  New control house and upgrade relay panels. Mobile Sub will carry UCS load during this time. 
345081
 
20100805
1352 
20100902
1535 
20101011
0700 
20101015
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M50  LILLIAN    Open  138  New control house and upgrade relay panels. 
345078
 
20100805
1351 
20100902
1535 
20101011
0700 
20101015
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  M20ACS  LILLIAN    Open  69  New control house and upgrade relay panels. Mobile Sub will carry UCS load during this time. 
345074
 
20100805
1348 
20100902
1535 
20101011
0700 
20101015
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_1875_CB  LILLIAN 
VALLEY BRANCH
 
Open  138  New control house and upgrade relay panels. 
347060
 
20100823
1017 
20100902
1533 
20101011
0600 
20101013
1900 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  290_A  LAKE CREEK SES  TRADINGHOUSE SES    345  install Dynamic Line Rating equipment 
348102
 
20100830
0855 
20100902
1528 
20100902
0700 
20100902
1500 
20100902
0734 
20100902
1528 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  PK_900_CB  PILOT KNOB    Open  138  Sub station GCB maintenance / testing 
348485
 
20100901
0518 
20100902
1520 
20100907
0800 
20100907
1800 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  GCB_8900_CB  BUTTERCUP    Open  138  CLEAR CB 8900 TO TEST LINE PANEL 
348487
 
20100901
0519 
20100902
1520 
20100907
0800 
20100907
1800 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_8899  BUTTERCUP    Open  138  CLEAR CB 8900 TO TEST LINE PANEL 
348488
 
20100901
0519 
20100902
1520 
20100907
0800 
20100907
1800 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_8901  BUTTERCUP    Open  138  CLEAR CB 8900 TO TEST LINE PANEL 
348933
 
20100902
1439 
20100902
1520 
20100907
0900 
20100907
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Open  69  CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL 
348934
 
20100902
1439 
20100902
1520 
20100907
0900 
20100907
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Open  69  CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL 
348482
 
20100901
0516 
20100902
1520 
20100907
0930 
20100907
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  PCB_6220_CB  AUSTROP    Open  345  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348484
 
20100901
0516 
20100902
1520 
20100907
0930 
20100907
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_6219  AUSTROP    Open  345  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348483
 
20100901
0516 
20100902
1520 
20100907
0930 
20100907
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_6221  AUSTROP    Open  345  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
347577
 
20100826
0929 
20100902
1517 
20100909
0800 
20100909
1030 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  4340  HEIGHTS REIT    Open  69  BRKR MAINT - ONE ENDS 34 WO 
347481
 
20100825
1515 
20100902
1517 
20100909
0830 
20100909
1400 

 

 
Daily  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    LN  COCS_FTST1  FORT STOCKTON PLANT  CONOCO COMP STATION    69  Replace crossarms 
347344
 
20100825
0844 
20100902
1514 
20100909
0800 
20100909
1130 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  W540  BELLAIRE    Open  138  LUBE MAINTENANCE 
347349
 
20100825
0751 
20100902
1513 
20100909
0800 
20100909
1130 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  V530  OASIS    Open  345  LUBE MAINTENANCE 
348476
 
20100901
0504 
20100902
1513 
20100907
0800 
20100907
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_6579  ZORN    Open  345  CLEAR CB 6580 FOR OPERATOR MAINTENANCE 
348477
 
20100901
0504 
20100902
1513 
20100907
0800 
20100907
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_6581  ZORN    Open  345  CLEAR CB 6580 FOR OPERATOR MAINTENANCE 
348478
 
20100901
0504 
20100902
1513 
20100907
0800 
20100907
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  PCB_6580_CB  ZORN    Open  345  CLEAR CB 6580 FOR OPERATOR MAINTENANCE 
348475
 
20100901
0501 
20100902
1513 
20100907
0900 
20100907
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  181  LAVERNIA    Open  69  CLEAR CB 180 FOR DIAGNOSTIC TESTING 
348479
 
20100901
0506 
20100902
1513 
20100907
1030 
20100907
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  11480  BITTER CREEK    Open  345  CLEAR CB 11480 FOR OPERATOR INSPECTION 
348480
 
20100901
0506 
20100902
1513 
20100907
1030 
20100907
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  11481  BITTER CREEK    Open  345  CLEAR CB 11480 FOR OPERATOR INSPECTION 
348481
 
20100901
0506 
20100902
1513 
20100907
1030 
20100907
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  11479  BITTER CREEK    Open  345  CLEAR CB 11480 FOR OPERATOR INSPECTION 
347189
 
20100824
0903 
20100902
1509 
20100909
0800 
20100909
1130 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  CB10  CROSBY    Open  138  lube job 
345776
 
20100811
1359 
20100902
1506 
20100830
1300 
20100902
1600 
20100831
0809 
20100902
1115 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_20B  KATZ    Open  69  Replace delivery transformer at Katz substation. 
345775
 
20100811
1359 
20100902
1506 
20100830
1300 
20100902
1600 
20100831
0810 
20100902
1116 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_20A  KATZ    Open  69  Replace delivery transformer at Katz substation. 
345774
 
20100811
1358 
20100902
1506 
20100830
1300 
20100902
1600 
20100831
0808 
20100902
1117 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  X_LD_CB  KATZ    Open  69  Replace delivery transformer at Katz substation. Mobile Sub will carry Tri-County load during this time. 
348407
 
20100901
0454 
20100902
1505 
20100907
0830 
20100907
1130 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_2630_CB  FAYETTEVILLE    Open  138  CLEAR CB 2630 FOR OPERATOR INSPECTION 
348408
 
20100901
0455 
20100902
1505 
20100907
0830 
20100907
1130 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_2631  FAYETTEVILLE    Open  138  CLEAR CB 2630 FOR OPERATOR INSPECTION 
348469
 
20100901
0455 
20100902
1505 
20100907
0830 
20100907
1130 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_2629  FAYETTEVILLE    Open  138  CLEAR CB 2630 FOR OPERATOR INSPECTION 
348473
 
20100901
0500 
20100902
1505 
20100907
0900 
20100907
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  180  LAVERNIA    Open  69  CLEAR CB 180 FOR DIAGNOSTIC TESTING 
348474
 
20100901
0500 
20100902
1505 
20100907
0900 
20100907
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  179  LAVERNIA    Open  69  CLEAR CB 180 FOR DIAGNOSTIC TESTING 
348470
 
20100901
0458 
20100902
1505 
20100907
1230 
20100907
1600 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_2641  FAYETTEVILLE    Open  138  CLEAR CB 2640 FOR OPERATOR INSPECTION 
348472
 
20100901
0459 
20100902
1505 
20100907
1230 
20100907
1600 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_2640_CB  FAYETTEVILLE    Open  138  CLEAR CB 2640 FOR OPERATOR INSPECTION 
348471
 
20100901
0459 
20100902
1505 
20100907
1230 
20100907
1600 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_2639  FAYETTEVILLE    Open  138  CLEAR CB 2640 FOR OPERATOR INSPECTION 
348353
 
20100831
1005 
20100902
1500 
20100909
0100 
20100909
0900 

 

 
Daily  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    CB  D110_CB  PHARR MVEC 
MVEC ALBERTA ROAD TAP
 
Open  138  remove Goliath Mobile from Doedyns line 
348354
 
20100831
1010 
20100902
1500 
20100909
0100 
20100909
0900 

 

 
Daily  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    CB  20620_CB  MVEC (DOEDYNS) 
MVEC ALBERTA ROAD TAP
 
Open  138  remove Goliath Mobile from Doedyns line Doedyns load to be backfed 
348570
 
20100901
0943 
20100902
1458 
20100907
0600 
20100907
1400 

 

 
Daily  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  1607  ROBERTSON    Open  138  Line maintenance. 
348880
 
20100902
1330 
20100902
1458 
20100907
0700 
20100910
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M10  FALLCREEK    Open  138  Reroute line into new Domino Sub and remove existing reroute. 
348909
 
20100902
1329 
20100902
1458 
20100907
0700 
20100910
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M10  DOMINO    Open  138  Reroute line into new Domino Sub and remove existing reroute. 
348906
 
20100902
1328 
20100902
1458 
20100907
0700 
20100910
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  2277  WAPLES    Open  138  Reroute line into new Domino Sub and remove existing reroute. 
348910
 
20100902
1329 
20100902
1458 
20100907
0700 
20100910
1800 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M30  DOMINO    Open  138  Reroute line into new Domino Sub and remove existing reroute. 
348817
 
20100902
0939 
20100902
1458 
20100907
1300 
20100909
1600 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M30  PETTEWAY    Open  69  Repair oil leak on the delivery transformer located on the no load tap were the inspection plates are located. Mobile Sub will carry Navasota Valley Coop load during this time. 
348780
 
20100902
0938 
20100902
1458 
20100907
1300 
20100909
1600 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  M20CS  PETTEWAY    Open  69  Repair oil leak on the delivery transformer located on the no load tap were the inspection plates are located. Mobile Sub will carry Navasota Valley Coop load during this time. 
347708
 
20100826
1209 
20100902
1457 
20100902
0830 
20100902
1730 
20100902
0810 
20100902
1454 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_5290_CB  BERGHEIM    Open  138  CLEAR CB 5290 FOR OPERATOR INSPECTION 
346019
 
20100813
1041 
20100902
1455 
20100909
0700 
20100909
1300 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    LN  CKT_906  DESSAU  SPRINKLE    138  Ckt maintenance 
346021
 
20100813
1046 
20100902
1455 
20100909
0700 
20100909
1300 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DE_906_CB  DESSAU    Open  138  Ckt maintenance 
346020
 
20100813
1042 
20100902
1455 
20100909
0700 
20100909
1300 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DE_951_CB  DESSAU    Open  138  Ckt maintenance 
346022
 
20100813
1046 
20100902
1455 
20100909
0700 
20100909
1300 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  SK_906  SPRINKLE 
DESSAU
 
Open  138  Ckt maintenance 
345220
 
20100806
1511 
20100902
1455 
20100817
0900 
20100902
1700 
20100817
0830 
20100902
1324 
Continuous  Approved  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  RBT9998_CB  SKYLINE    Open  345  To replace breaker. 
347207
 
20100824
1309 
20100902
1446 
20100909
0700 
20100909
1700 

 

 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  5700  BRECKENRIDGE 
 
Open  69  Outage to replace crossarms. Open CB 5700 as part of TOAP. 
347206
 
20100824
1308 
20100902
1446 
20100909
0700 
20100909
1700 

 

 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6180_C  GRAHAM SES  SUN ECU TAP    138  Outage to replace crossarms. Open CB 5700 as part of TOAP. 
348350
 
20100831
1000 
20100902
1442 
20100910
0100 
20100917
1400 

 

 
Continuous  Approved  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    CB  AB112  MVEC ALBERTA ROAD TAP 
MVEC (VAL VERDE RD)
 
Open  138  line clearaqnce to c/o 2 dead end structures 
348349
 
20100831
0959 
20100902
1441 
20100910
0100 
20100917
1400 

 

 
Continuous  Approved  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    CB  V120  MVEC (VAL VERDE RD) 
MVEC ALBERTA ROAD TAP
 
Open  138  line clearaqnce to c/o 2 dead end structures 
348138
 
20100830
1051 
20100902
1439 
20100902
0800 
20100902
1800 
20100902
0943 
20100902
1343 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  GCB_8890_CB  BUTTERCUP    Open  138  CLEAR CB 8900 TO TEST LINE PANEL 
348139
 
20100830
1051 
20100902
1439 
20100902
0800 
20100902
1800 
20100902
0943 
20100902
1343 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_8891  BUTTERCUP    Open  138  CLEAR CB 8900 TO TEST LINE PANEL 
348140
 
20100830
1051 
20100902
1438 
20100902
0800 
20100902
1800 
20100902
0943 
20100902
1343 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_8889  BUTTERCUP    Open  138  CLEAR CB 8900 TO TEST LINE PANEL 
344218
 
20100729
1329 
20100902
1435 
20101108
0600 
20101110
1800 

 

 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  PT_SE_65  PETERS REIT  SEALY    138  line outage for plant outage at lubzol for plant maint 
347406
 
20100825
1217 
20100902
1433 
20101010
2015 
20101031
2000 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6009_A  WILLOW CREEK SWITCH  PARKER SWITCH    345  Outage to erect towers and pull wire for line reconductor. 
342608
 
20100715
1238 
20100902
1432 
20101011
0600 
20101013
1900 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  AS_6606  ROUND ROCK NORTHEAST    Open  138  move conductor to new Double Dead-end pole at Round Rock NE.. ne roundrock load fed from hutto 
334458
 
20100510
1118 
20100902
1423 
20100902
0700 
20100902
1630 
20100902
0635 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  SAN MARCOS  CAMP GARY    69  LINE OVERHAUL 
348593
 
20100901
1153 
20100902
1416 
20100916
0800 
20100916
1500 

 

 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  CB40  WEST GALVESTON    Open  138  MAINT 
348291
 
20100831
0756 
20100902
1413 
20100907
0300 
20100907
1200 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  105_B  ROANOKE SWITCH  LEWISVILLE SWITCH    345  Outage to install tower upgrade kits. 
348362
 
20100831
1059 
20100902
1413 
20100907
0700 
20100907
1500 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  HM_950  HAMILTON AEN    Open  138  Sub station GCB maintenance / testing. 
348201
 
20100830
1545 
20100902
1413 
20100907
0730 
20100923
1700 

 

 
Continuous  Approved  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  RBT9997_CB  SKYLINE    Open  345  To replace breaker. 
348206
 
20100830
1649 
20100902
1413 
20100907
0800 
20100909
1800 

 

 
Continuous  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  BEEVIL_MATHIS1  BEEVILLE  MATHIS    69  LINE OUTAGE TO REPLACE POLE AND DOUBLE DEADEND 
347716
 
20100826
1217 
20100902
1413 
20100902
0800 
20100902
1200 
20100902
0816 
20100902
1230 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_6601  ZORN    Open  138  CLEAR CB 6600 FOR OPERATOR MAINTENANCE 
347715
 
20100826
1217 
20100902
1413 
20100902
0800 
20100902
1200 
20100902
0816 
20100902
1230 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_6599  ZORN    Open  138  CLEAR CB 6600 FOR OPERATOR MAINTENANCE 
347714
 
20100826
1216 
20100902
1413 
20100902
0800 
20100902
1200 
20100902
0816 
20100902
1230 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  PCB_6600_CB  ZORN    Open  138  CLEAR CB 6600 FOR OPERATOR MAINTENANCE 
347652
 
20100826
1103 
20100902
1412 
20100831
1200 
20100902
1400 
20100831
1130 
20100902
1412 
Continuous  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_9454  HARWOOD    Open  69  SWITCH IS BEING OPENED TO CLEAR 69/12.5 KV T-1 XFMR FOR MAINT. T-1 LOAD WILL BE PUT ION A MOBILE XFMR INSTALLED ON THE LULING-HARWOOD 69 KV LINE 
347612
 
20100826
1021 
20100902
1411 
20100830
1200 
20100903
0900 
20100831
0826 
20100902
1120 
Continuous  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_5064  GAY HILL    Open  138  CLEAR 138/24.9 KV T-1 XFMR FOR MAINT. T-1 LOAD WILL BE PUT ON A MOBILE XFMR INSTALLED ON THE BYPASS BUS. 
348583
 
20100901
1051 
20100902
1411 
20100915
0800 
20100915
1130 

 

 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  T2HS  WEST BAY    Open  138  MAINTENANCE 
348581
 
20100901
1046 
20100902
1411 
20100914
0800 
20100914
1130 

 

 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  T1HS  WEST BAY    Open  138  MAINTENANCE 
347611
 
20100826
1021 
20100902
1411 
20100830
1200 
20100903
0900 
20100831
0826 
20100902
1320 
Continuous  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CS5065  GAY HILL    Open  138  CLEAR 138/24.9 KV T-1 XFMR FOR MAINT. T-1 LOAD WILL BE PUT ON A MOBILE XFMR INSTALLED ON THE BYPASS BUS. 
347638
 
20100826
1104 
20100902
1403 
20100909
0500 
20100909
1300 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  BG_GV_46  GARDEN VILLAS  BLODGETT    69  SET POLE BASE FOR CKT46 RELOCATION 
323762
 
20100211
1451 
20100902
1351 
20100920
0800 
20100923
1700 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  CB_1304  WEATHERFORD SWITCH    Open  138  Upgrade CB. 
348221
 
20100830
1425 
20100902
1335 
20100907
0500 
20100907
1300 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6020_D  EVERMAN SWITCH  COURTLAND    345  Outage for wireless work; antenna work. Close switch 6259 at Courtland for alternate source. 
348222
 
20100830
1426 
20100902
1335 
20100907
0500 
20100907
1300 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  6259  COURTLAND    Close  345  Outage for wireless work; antenna work. Close switch 6259 at Courtland for alternate source. 
348178
 
20100830
1354 
20100902
1335 
20100907
0700 
20100907
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
348157
 
20100830
1221 
20100902
1335 
20100907
0700 
20100907
0900 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_920_3  DECKER POWER PLANT    Open  138  Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage. 
348159
 
20100830
1224 
20100902
1335 
20100907
0700 
20100907
0900 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    LN  CKT_921  DECKER POWER PLANT  AUSTROP    138  Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage. 
348161
 
20100830
1226 
20100902
1335 
20100907
0700 
20100907
0900 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  AU_921_2_CB  AUSTROP    Open  138  Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage. 
348160
 
20100830
1225 
20100902
1335 
20100907
0700 
20100907
0900 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_921  DECKER POWER PLANT 
AUSTROP
 
Open  138  Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage. 
348158
 
20100830
1222 
20100902
1335 
20100907
0700 
20100907
0900 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_950  DECKER POWER PLANT    Close  138  Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage. 
348156
 
20100830
1221 
20100902
1335 
20100907
0700 
20100907
0900 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_920_2_CB  DECKER POWER PLANT    Open  138  Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage. 
348116
 
20100830
1049 
20100902
1335 
20100907
0700 
20100917
1700 

 

 
Continuous  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  ST_601M_CS  STECK    Open  138  ST-456 transformer maintenance and testing. 
348153
 
20100830
1219 
20100902
1335 
20100907
0700 
20100907
0900 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    LN  CKT_920  AUSTROP  DECKER POWER PLANT    138  Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage. 
348155
 
20100830
1220 
20100902
1335 
20100907
0700 
20100907
0900 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  AU_920_2_CB  AUSTROP    Open  138  Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage. 
348154
 
20100830
1220 
20100902
1335 
20100907
0700 
20100907
0900 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  AU_920_1_CB  AUSTROP    Open  138  Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage. 
348170
 
20100830
1226 
20100902
1335 
20100907
0700 
20100907
0900 

 

 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  AU_921_1_CB  AUSTROP    Open  138  Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage. 
348092
 
20100830
0718 
20100902
1335 
20100907
0600 
20100912
2000 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6009_A  WILLOW CREEK SWITCH  PARKER SWITCH    345  Outage to erect towers for re-conductor upgrade. 
345749
 
20100811
1304 
20100902
1335 
20100909
0500 
20100909
1400 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2829  ELM MOTT    Open  138  replacing poles and crossarms 
345747
 
20100811
1302 
20100902
1335 
20100909
0500 
20100909
1400 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1020_A  TRADINGHOUSE SES TAP  ELM MOTT    138  replacing poles and crossarms 
345748
 
20100811
1303 
20100902
1335 
20100909
0500 
20100909
1400 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  2830  ELM MOTT    Open  138  replacing poles and crossarms 
345750
 
20100811
1305 
20100902
1335 
20100909
0500 
20100909
1400 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2831  ELM MOTT    Open  138  replacing poles and crossarms 
345756
 
20100811
1320 
20100902
1335 
20100909
0500 
20100909
1400 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2707  TRADINGHOUSE SES TAP    Open  138  replacing poles and crossarms 
348106
 
20100830
0930 
20100902
1325 
20100904
0600 
20100904
1200 

 

 
Daily  Cancelled  Planned  CITY OF GARLAND (TDSP)    CB  OCB_9110_CB  WYNN JOYCE 
ROSEHILL
 
Open  138  Request is for ONCOR to work a trouble at Site # CLR 0262. 
348105
 
20100830
0929 
20100902
1325 
20100904
0600 
20100904
1200 

 

 
Daily  Cancelled  Planned  CITY OF GARLAND (TDSP)    DSC  9112  WYNN JOYCE    Open  138  Request is for ONCOR to work a trouble at Site # CLR 0262. 
348104
 
20100830
0929 
20100902
1325 
20100904
0600 
20100904
1200 

 

 
Daily  Cancelled  Planned  CITY OF GARLAND (TDSP)    DSC  1371  ROSEHILL    Open  138  Request is for ONCOR to work a trouble at Site # CLR 0262. 
348103
 
20100830
0928 
20100902
1325 
20100904
0600 
20100904
1200 

 

 
Daily  Cancelled  Planned  CITY OF GARLAND (TDSP)    LN  ROS-WYN  ROSEHILL  WYNN JOYCE    138  Request is for ONCOR to work a trouble at Site # CLR 0262. 
348293
 
20100831
0757 
20100902
1325 
20100909
0300 
20100909
1200 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  105_B  ROANOKE SWITCH  LEWISVILLE SWITCH    345  Outage to install tower upgrade kits. 
347635
 
20100826
1054 
20100902
1316 
20100902
0500 
20100902
1300 
20100902
0533 
20100902
1228 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  BG_GV_46  GARDEN VILLAS  BLODGETT    69  SET POLE BASE FOR CKT46 RELOCATION 
342417
 
20100714
1540 
20100902
1316 
20100902
0800 
20100902
1600 
20100902
0829 
20100902
1307 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  V380  BELLAIRE    Open  345  BREAKER LUBE MAINTENANCE 
346564
 
20100818
1028 
20100902
1315 
20100902
1200 
20100902
1530 

 

 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  F430  BAYWAY    Open  138  Lube maintenance. 
327460
 
20100315
1003 
20100902
1309 
20101101
0700 
20101106
1700 

 

 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  JN_WO_72  JEANETTA  WHITE OAK    345  INSTALL SOTF 
342130
 
20100713
0950 
20100902
1306 
20100831
0700 
20100902
1300 
20100831
0630 
20100902
1208 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  FW_WEB04  WEBSTER  FRIENDSWOOD REIT    138  FOUNDATION WORK FOR CKT93 RECONDUCTOR 
343880
 
20100727
1311 
20100902
1306 
20100920
0700 
20100925
1800 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  FAL_DOM  FALLCREEK  DOMINO    138  Reroute line into new Domino Sub and remove existing reroute. 
343879
 
20100727
1311 
20100902
1306 
20100920
0700 
20100925
1800 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  DOM_WPL  WAPLES  DOMINO    138  Reroute line into new Domino Sub and remove existing reroute. 
327458
 
20100315
1001 
20100902
1302 
20101101
0700 
20101106
1700 

 

 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  J810  JEANETTA    Open  345  INSTALL SOTF 
327459
 
20100315
1002 
20100902
1302 
20101101
0700 
20101106
1700 

 

 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  J820  JEANETTA    Open  345  INSTALL SOTF 
327457
 
20100315
1000 
20100902
1302 
20101101
0700 
20101106
1700 

 

 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  3724  JEANETTA    Open  345  INSTALL SOTF - SEE LN72 JN-WO 
347156
 
20100824
0816 
20100902
1253 
20100903
0300 
20100903
1200 

 

 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  105_A  CARROLLTON NORTHWEST  LEWISVILLE SWITCH    345  Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345 
347157
 
20100824
0816 
20100902
1253 
20100903
0300 
20100903
1200 

 

 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  575_A  CARROLLTON NORTHWEST  LEWISVILLE SWITCH    138  Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345 
327463
 
20100315
1007 
20100902
1253 
20101101
0700 
20101106
1700 

 

 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  Z930  WHITE OAK    Open  345  INSTALL SOTF 
327461
 
20100315
1005 
20100902
1253 
20101101
0700 
20101106
1700 

 

 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  4724  WHITE OAK    Open  345  INSTALL SOTF -SEE LN72 JN-WO 
327462
 
20100315
1006 
20100902
1253 
20101101
0700 
20101106
1700 

 

 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  Z920  WHITE OAK    Open  345  INSTALL SOTF 
348144
 
20100830
1118 
20100902
1250 
20100902
1200 
20100902
1400 
20100902
1135 
20100902
1245 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  5830_CB  LON HILL    Open  69  cb maint and testing 
347155
 
20100824
0816 
20100902
1212 
20100902
0300 
20100902
1200 
20100902
0726 
20100902
1209 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  105_A  CARROLLTON NORTHWEST  LEWISVILLE SWITCH    345  Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345 
347139
 
20100824
0815 
20100902
1212 
20100902
0300 
20100902
1200 
20100902
0726 
20100902
1209 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  575_A  CARROLLTON NORTHWEST  LEWISVILLE SWITCH    138  Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345 
348134
 
20100830
1040 
20100902
1211 
20100902
0730 
20100902
1230 
20100902
1014 
20100902
1207 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  50  SAGINAW SWITCH 
GEMINI
 
Open  138  Outage to replace a carrier unit on the relaying panel. 
347553
 
20100826
0756 
20100902
1153 
20100902
0600 
20100902
1200 
20100902
0642 
20100902
1138 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1710_A  SALADO  SONTERRA    138  replace crossarm 
347242
 
20100824
1305 
20100902
1151 
20100902
0400 
20100902
1300 
20100902
0558 
20100902
1104 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  5812  BOBTOWN    Close  138  verizon wireless site setting new equipment 
347915
 
20100827
1356 
20100902
1129 
20100901
2400 
20100902
1200 
20100901
2400 
20100902
1125 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6009_A  WILLOW CREEK SWITCH  PARKER SWITCH    345  Line outage to remove spacers and static wire bonds in preparation for erecting towers for future work. 
347246
 
20100824
1318 
20100902
1113 
20100902
0400 
20100902
1300 
20100902
0543 
20100902
1113 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1372  ROSEHILL    Close  138  verizon wireless site setting new equipment 
347248
 
20100824
1321 
20100902
1112 
20100902
0400 
20100902
1300 
20100902
0620 
20100902
1104 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_F  GARLAND BOBTOWN TAP  ROWLETT    138  verizon wireless site setting new equipment 
347237
 
20100824
1303 
20100902
1112 
20100902
0400 
20100902
1300 
20100902
0558 
20100902
1104 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_A  GARLAND BOBTOWN TAP  OATES TMPP    138  verizon wireless site setting new equipment 
347236
 
20100824
1302 
20100902
1112 
20100902
0400 
20100902
1300 
20100902
0558 
20100902
1104 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_G  GARLAND BOBTOWN TAP  BOBTOWN    138  verizon wireless site setting new equipment 
345643
 
20100811
0838 
20100902
1111 
20100902
0300 
20100902
1200 
20100902
0324 
20100902
1111 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    LN  CKT_902  DECKER POWER PLANT  SPRINKLE    138  Transmission clearance on 138kv circuit 902 DP-SK for TXDOT to drill piers for new tollway. 
345645
 
20100811
0838 
20100902
1110 
20100902
0300 
20100902
1200 
20100902
0324 
20100902
1110 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_902_3  DECKER POWER PLANT    Open  138  Transmission clearance on 138kv circuit 902 DP-SK for TXDOT to drill piers for new tollway. 
345644
 
20100811
0838 
20100902
1110 
20100902
0300 
20100902
1200 
20100902
0325 
20100902
1110 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_902_2_CB  DECKER POWER PLANT    Open  138  Transmission clearance on 138kv circuit 902 DP-SK for TXDOT to drill piers for new tollway. 
345646
 
20100811
0839 
20100902
1110 
20100902
0300 
20100902
1200 
20100902
0324 
20100902
1110 
Daily  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  SK_902  SPRINKLE 
DECKER POWER PLANT
 
Open  138  Transmission clearance on 138kv circuit 902 DP-SK for TXDOT to drill piers for new tollway. 
347706
 
20100826
1206 
20100902
1104 
20100902
0900 
20100902
1730 
20100902
0849 
20100902
1104 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_8699  SCHUMANSVILLE    Open  138  CLEAR CB 8700 FOR DIAGNOSTIC TESTING 
347705
 
20100826
1206 
20100902
1103 
20100902
0900 
20100902
1730 
20100902
0849 
20100902
1103 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_8700  SCHUMANSVILLE 
SHERRIFFS POSSE
 
Open  138  CLEAR CB 8700 FOR DIAGNOSTIC TESTING 
347707
 
20100826
1207 
20100902
1103 
20100902
0900 
20100902
1730 
20100902
0849 
20100902
1103 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_8701  SCHUMANSVILLE    Open  138  CLEAR CB 8700 FOR DIAGNOSTIC TESTING 
348497
 
20100901
0525 
20100902
1101 
20100908
1000 
20100908
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  11501  BITTER CREEK    Open  345  CLEAR CB 11500 FOR OPERATOR INSPECTION 
348496
 
20100901
0525 
20100902
1100 
20100908
1000 
20100908
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  11499  BITTER CREEK    Open  345  CLEAR CB 11500 FOR OPERATOR INSPECTION 
348495
 
20100901
0524 
20100902
1100 
20100908
1000 
20100908
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  11500  BITTER CREEK    Open  345  CLEAR CB 11500 FOR OPERATOR INSPECTION 
348164
 
20100830
1305 
20100902
1054 
20100902
0800 
20100902
1000 
20100902
0748 
20100902
0955 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  5720_CB  LON HILL 
SMITH
 
Open  69  cb maint and testing 
347220
 
20100824
1042 
20100902
1041 
20101116
0900 
20101203
1500 

 

 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  L100  WARVUE 
 
Open  12.5  CUST REQUEST SECTION OUTAGE TO REPLACE TR 2 
347222
 
20100824
1043 
20100902
1041 
20101116
0900 
20101203
1500 

 

 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  W131  WARVUE    Open  138  CUST REQUEST SECTION OUTAGE TO REPLACE TR 2 
347219
 
20100824
1042 
20100902
1041 
20101116
0900 
20101203
1500 

 

 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  W140  WARVUE 
 
Open  138  CUST REQUEST SECTION OUTAGE TO REPLACE TR 2 
348831
 
20100902
1020 
20100902
1029 
20101018
0800 
20101102
1215 

 

 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10850  AVERY RANCH    Open  138  CLEAR 138 KV BUSWORK BETWEEN SWITCHES 10879,10849,10854 TO LIFT JUMPERS ON BUSWORK FOR NEW CONSTRUCTION. T-2 LOAD WILL BE PUT ON T-1 FOR THIS WORK 
337841
 
20100607
1052 
20100902
1027 
20101115
0600 
20101118
1700 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  CB20  BELLAIRE    Open  138  REPL CB20 
342573
 
20100715
0915 
20100902
1019 
20100902
0600 
20100902
1400 
20100902
1017 
20100902
1019 
Daily  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  RBS_HRN  HEARNE  ROBERTSON    138  Line maintenance. 
346435
 
20100817
1253 
20100902
1015 
20100902
0700 
20100902
1400 
20100902
0700 

 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2105  ECTOR HARPER    Open  138  Outages to replace bad crossarms and poles. 
345627
 
20100811
0828 
20100902
1014 
20100906
0700 
20100906
1700 

 

 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2599  GRAHAM SES    Open  138  Outage to remove guys for Brazos Construction. 
345628
 
20100811
0829 
20100902
1014 
20100906
0700 
20100906
1700 

 

 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  LS_4907  RICE SWITCH    Open  138  Outage to remove guys for Brazos Construction. 
345623
 
20100811
0827 
20100902
1014 
20100906
0700 
20100906
1700 

 

 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  2600  GRAHAM SES 
RICE SWITCH
 
Open  138  Outage to remove guys for Brazos Construction. 
345625
 
20100811
0828 
20100902
1014 
20100906
0700 
20100906
1700 

 

 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2601  GRAHAM SES    Open  138  Outage to remove guys for Brazos Construction. 
345621
 
20100811
0827 
20100902
1014 
20100906
0700 
20100906
1700 

 

 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6560_A  GRAHAM SES  RICE SWITCH    138  Outage to remove guys for Brazos Construction. 
346449
 
20100817
1254 
20100902
1009 
20100902
0700 
20100902
1400 

 

 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6480_B  ECTOR HARPER  PERMIAN BASIN SES    138  Outages to replace bad crossarms and poles. 
346460
 
20100817
1257 
20100902
1008 
20100902
0700 
20100902
1400 

 

 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  2540  PERMIAN BASIN SES    Open  138  Outages to replace bad crossarms and poles. 
346455
 
20100817
1256 
20100902
1008 
20100902
0700 
20100902
1400 

 

 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  2460  PERMIAN BASIN SES    Open  138  Outages to replace bad crossarms and poles. 
348177
 
20100830
1350 
20100902
1004 
20100902
0600 
20100902
2000 
20100902
0948 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  765_A  CARROLLTON EAST  NORTH LAKE SES    138  Contractor will be working close to this line while setting a new structure just outside of Carrollton NW. 
345912
 
20100812
1006 
20100902
1002 
20100902
0700 
20100902
1700 
20100902
0731 
20100902
0930 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  5721  BRECKENRIDGE    Open  69  Outage to replace poles. 
345855
 
20100812
1005 
20100902
1002 
20100902
0700 
20100902
1700 
20100902
0731 
20100902
0930 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  5720  BRECKENRIDGE 
IVAN
 
Open  69  Outage to replace poles. 
345911
 
20100812
1005 
20100902
1001 
20100902
0700 
20100902
1700 
20100902
0731 
20100902
0930 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  5719  BRECKENRIDGE    Open  69  Outage to replace poles. 
344431
 
20100730
1407 
20100902
1001 
20100902
0700 
20100902
1700 
20100902
0702 
20100902
0930 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6630_A  BRECKENRIDGE  IVAN    69  Outage to replace poles. 
345913
 
20100812
1006 
20100902
1001 
20100902
0700 
20100902
1700 
20100902
0702 
20100902
0959 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1628  IVAN    Open  69  Outage to replace poles. 
348231
 
20100830
1615 
20100902
0924 
20100902
2030 
20100902
2200 

 

 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  9995_CB  DUPONT SWITCH - INGLESIDE    Open  138  INSTALLING NEW DME EQUIPMENT 
348230
 
20100830
1615 
20100902
0924 
20100902
2030 
20100902
2200 

 

 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  9985_CB  DUPONT SWITCH - INGLESIDE    Open  138  INSTALLING NEW DME EQUIPMENT 
347718
 
20100826
1220 
20100902
0911 
20100902
0700 
20100902
1100 
20100902
0755 
20100902
0911 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_5194  GABRIEL    Open  138  CLEAR CS 5195 FOR RELAY TRIP CHECK 
347717
 
20100826
1220 
20100902
0910 
20100902
0700 
20100902
1100 
20100902
0755 
20100902
0910 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CS5195  GABRIEL    Open  138  CLEAR CS 5195 FOR RELAY TRIP CHECK 
347918
 
20100827
1443 
20100902
0904 
20100902
0700 
20100902
1700 

 

 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6856_B  SEYMOUR TU  BOMARTON TU    69  OUtage to replace bad crossarms. 
348226
 
20100830
1559 
20100902
0829 
20100902
0800 
20100903
1500 
20100902
0810 

 
Continuous  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  840_CB  UVALDE CSW    Open  69  CB maintenance 
346031
 
20100813
1108 
20100902
0800 
20100823
0700 
20100903
1600 
20100823
1016 
20100902
0800 
Continuous  Approved  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  SK_600M_CS  SPRINKLE    Open  138  Scheduled maintenance for SK-123 transformer. Repair hot spots found with infra red. 
346717
 
20100819
0556 
20100902
0743 
20100902
0730 
20100902
1130 

 

 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  T240  UNIVERSITY REIT    Close  69  LUBE MAINTENANCE LN30>GV ON BYPASS 
346716
 
20100819
0555 
20100902
0742 
20100902
0730 
20100902
1130 

 

 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  2303  UNIVERSITY REIT    Close  69  LUBE MAINTENANCE LN30>GV ON BYPASS 
346715
 
20100819
0551 
20100902
0742 
20100902
0730 
20100902
1130 

 

 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  2300  UNIVERSITY REIT    Open  69  LUBE MAINTENANCE LN30>GV ON BYPASS 
348204
 
20100830
1611 
20100902
0737 
20100908
0730 
20100909
1700 

 

 
Continuous  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    CB  OCB_9094_CB  SAM RAYBURN SWITCHYD    Close  138  clearance on bkr 9074 to replace Reclosing Relay - will unilize transfer bkr 9094 
348205
 
20100830
1613 
20100902
0737 
20100908
0730 
20100909
1700 

 

 
Continuous  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    DSC  DSW_9072  SAM RAYBURN SWITCHYD    Close  138  clearance on bkr 9074 to replace Reclosing Relay - will utilize transfer bkr 9094 
348203
 
20100830
1610 
20100902
0737 
20100908
0730 
20100909
1700 

 

 
Continuous  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    CB  OCB_9074_CB  SAM RAYBURN SWITCHYD    Open  138  bkr clearance to replace Reclosing Relay - will unilize transfer bkr 9094 
347073
 
20100823
1402 
20100902
0718 
20100902
0600 
20100902
1900 
20100902
0630 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  9625  RATTLESNAKE ROAD SWITCH    Open  345  install jumpers on equipment 
347091
 
20100823
1401 
20100902
0718 
20100902
0600 
20100902
1900 
20100902
0630 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  9615  RATTLESNAKE ROAD SWITCH    Open  345  install jumpers on equipment 
345757
 
20100811
1322 
20100902
0642 
20100902
0500 
20100903
1400 
20100902
0535 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  757  WACO ATCO    Open  69  replacing poles and crossarms 
345746
 
20100811
1257 
20100902
0641 
20100902
0500 
20100903
1400 
20100902
0535 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  2330_B  WACO ATCO  MCGREGOR TU    69  replacing poles and crossarms 
346640
 
20100818
1407 
20100902
0602 
20100902
0730 
20100902
1700 

 

 
Daily  Cancelled  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  12P2  P2 
Q1
 
Open  138  FOUNDATION INSTALLATION 
346639
 
20100818
1405 
20100902
0602 
20100902
0730 
20100902
1700 

 

 
Daily  Cancelled  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  10Q1  Q1 
P2
 
Open  138  FOUNDATION INSTALLATION 
346635
 
20100818
1358 
20100902
0601 
20100902
0730 
20100902
1700 

 

 
Daily  Cancelled  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    LN  P2_Q1  P2  Q1    138  FOUNDATION INSTALLATION 
346377
 
20100817
0638 
20100902
0544 
20100902
0600 
20100902
1730 
20100902
0544 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL 
345758
 
20100811
1323 
20100902
0538 
20100902
0500 
20100903
1400 
20100902
0535 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  772  MCGREGOR TU    Open  69  replacing poles and crossarms 
347738
 
20100826
1337 
20100902
0337 
20100901
2400 
20100902
0800 
20100901
2400 
20100902
0001 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    XF  AXFMR1  HOLT SWITCH      69  Outage for Nerc mandated compliance relay testing. 
347736
 
20100826
1336 
20100902
0337 
20100901
2400 
20100902
0800 
20100901
2400 
20100902
0001 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  2830  HOLT SWITCH 
 
Open  69  Outage for Nerc mandated compliance relay testing. 
347737
 
20100826
1336 
20100902
0336 
20100901
2400 
20100902
0800 
20100901
2400 
20100902
0001 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  4412  HOLT SWITCH    Open  138  Outage for Nerc mandated compliance relay testing. 
345616
 
20100811
0815 
20100901
2216 
20100901
1300 
20100901
1900 
20100901
1346 
20100901
1633 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  9224  TONKAWA SWITCH    Open  345  Outage at wind farm customers request to perform maintenance in customers station. 
347037
 
20100823
0748 
20100901
1903 
20100901
1000 
20100901
1600 
20100901
1120 
20100901
1231 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_11711  BELLVILLE SOUTH    Open  138  CLEAR CB 11710 FOR SAN BERNARD ELECTRIC COOPERATIVE SWITCH TRAINING 
347036
 
20100823
0747 
20100901
1903 
20100901
1000 
20100901
1600 
20100901
1119 
20100901
1231 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_11709  BELLVILLE SOUTH    Open  138  CLEAR CB 11710 FOR SAN BERNARD ELECTRIC COOPERATIVE SWITCH TRAINING 
347035
 
20100823
0747 
20100901
1902 
20100901
1000 
20100901
1600 
20100901
1120 
20100901
1231 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_11710_CB  BELLVILLE SOUTH    Open  138  CLEAR CB 11710 FOR SAN BERNARD ELECTRIC COOPERATIVE SWITCH TRAINING 
346985
 
20100823
1342 
20100901
1735 
20100901
0700 
20100901
1600 
20100901
0847 
20100901
1511 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  1140  ROYSE SWITCH 
 
Open  69  RELAY CALIBRATION 
347384
 
20100825
1238 
20100901
1733 
20100901
0100 
20100901
0545 
20100901
0155 
20100901
0545 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  1844  JEWETT    Open  138  Work to be done trip test 138KV bus diff and Xfmr#4. 
337347
 
20100603
1333 
20100901
1717 
20100901
0700 
20100901
1730 

 
20100901
1717 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL 
346376
 
20100817
0638 
20100901
1717 
20100901
0600 
20100901
0645 
20100901
0543 
20100901
1717 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL 
346638
 
20100818
1404 
20100901
1705 
20100901
0730 
20100901
1700 
20100901
0741 
20100901
1705 
Daily  Approved  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  10Q1  Q1 
P2
 
Open  138  FOUNDATION INSTALLATION 
346637
 
20100818
1404 
20100901
1705 
20100901
0730 
20100901
1700 
20100901
0741 
20100901
1705 
Daily  Approved  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  12P2  P2 
Q1
 
Open  138  FOUNDATION INSTALLATION 
346633
 
20100818
1356 
20100901
1705 
20100901
0730 
20100901
1700 
20100901
0741 
20100901
1705 
Daily  Approved  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    LN  P2_Q1  P2  Q1    138  FOUNDATION INSTALLATION 
334457
 
20100510
1118 
20100901
1656 
20100901
0700 
20100901
1630 
20100901
0632 
20100901
1656 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  SAN MARCOS  CAMP GARY    69  LINE OVERHAUL 
348228
 
20100830
1614 
20100901
1638 
20100902
2030 
20100902
2200 

 

 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  2930_CB  WHITEPOINT    Open  138  INSTALLING NEW DME EQUIPMENT 
348229
 
20100830
1614 
20100901
1638 
20100902
2030 
20100902
2200 

 

 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  2920_CB  WHITEPOINT    Open  138  INSTALLING NEW DME EQUIPMENT 
348224
 
20100830
1553 
20100901
1638 
20100902
1900 
20100902
2030 

 

 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  2895_CB  WHITEPOINT    Open  138  INSTALLING NEW DME EQUIPMENT 
348227
 
20100830
1613 
20100901
1638 
20100902
1900 
20100902
2030 

 

 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  2940_CB  WHITEPOINT    Open  138  INSTALLING NEW DME EQUIPMENT 
337520
 
20100603
1418 
20100901
1631 
20101203
0700 
20101203
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  153T153  HILBIG  SIM GIDEON    138  OVERHAUL 
333465
 
20100504
1353 
20100901
1631 
20101203
0900 
20101203
1800 

 

 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  120  KOCH UP RIVER    Open  138  maintenance 
340375
 
20100629
0629 
20100901
1617 
20101202
0700 
20101202
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_1336  BELLVILLE    Open  138  CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE 
342890
 
20100719
0901 
20100901
1617 
20101202
0700 
20101204
1700 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  260_A  SINGLETON  JEWETT    345  REHAB WORK 
340251
 
20100629
0523 
20100901
1617 
20101202
0700 
20101202
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  467T467  BELLVILLE  HIGHWAY 36    138  CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE 
337519
 
20100603
1418 
20100901
1617 
20101202
0700 
20101202
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  153T153  HILBIG  SIM GIDEON    138  OVERHAUL 
340325
 
20100629
0550 
20100901
1617 
20101202
0700 
20101202
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  11942  HIGHWAY 36    Open  138  CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE 
333464
 
20100504
1351 
20100901
1617 
20101202
0900 
20101202
1800 

 

 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  40_CB  KOCH UP RIVER    Open  69  maintenance 
347212
 
20100824
1001 
20100901
1608 
20100901
0900 
20100901
1700 
20100901
0917 
20100901
1607 
Daily  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    LN  MCAD_PADC1  PADUCAH CITY  MCADAMS    69  LINE OUTAGE BETWEEN PADUCAH CITY - McADAMS TO REPLACE CROSS-ARMS @ STR 19-13, 33-8 
347514
 
20100826
0849 
20100901
1558 
20100901
0800 
20100901
1600 
20100901
0851 
20100901
1551 
Daily  Approved  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  COY_KENE  COY CITY SUB  KENEDY    69  Line Maint. 
343883
 
20100727
1319 
20100901
1554 
20100830
0700 
20100901
1700 
20100831
0726 
20100901
1700 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  W750  TIDAL ROAD COGEN    Open  138  SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2 
342572
 
20100715
0915 
20100901
1553 
20100901
0600 
20100901
1400 
20100901
0534 
20100901
1351 
Daily  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  RBS_HRN  HEARNE  ROBERTSON    138  Line maintenance. 
343884
 
20100727
1319 
20100901
1553 
20100830
0700 
20100901
1700 
20100831
0726 
20100901
1700 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  W760  TIDAL ROAD COGEN    Open  138  SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2 
343882
 
20100727
1318 
20100901
1553 
20100830
0700 
20100901
1700 
20100831
0726 
20100901
1700 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  W759  TIDAL ROAD COGEN    Open  138  SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2 
333463
 
20100504
1350 
20100901
1542 
20101201
0900 
20101201
1800 

 

 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  20_CB  KOCH UP RIVER    Open  69  maintenance 
333461
 
20100504
1347 
20100901
1541 
20101201
0900 
20101215
1800 

 

 
Continuous  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    XF  345_1382H  LON HILL      345  maintenance on high and low side thru to kingsville 
333462
 
20100504
1347 
20100901
1541 
20101201
0900 
20101215
1800 

 

 
Continuous  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    XF  345_1382L  LON HILL      138  maintenance on high and low side thru to kingsville 
343518
 
20100723
0732 
20100901
1535 
20101201
0700 
20101202
1700 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  CHLDPW55  DEEPWATER  CHANEL    69  OUTAGE TO INSTALL EQUIPTMENT 
308343
 
20090922
1459 
20100901
1535 
20101201
0800 
20101201
1700 

 

 
Daily  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  REN_CNTR  RENO  CENTER POINT A    138  Line maintenance. 
340250
 
20100629
0523 
20100901
1532 
20101201
0700 
20101201
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  467T467  BELLVILLE  HIGHWAY 36    138  CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE 
340374
 
20100629
0629 
20100901
1532 
20101201
0700 
20101201
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_1336  BELLVILLE    Open  138  CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE 
337518
 
20100603
1418 
20100901
1532 
20101201
0700 
20101201
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  153T153  HILBIG  SIM GIDEON    138  OVERHAUL 
340324
 
20100629
0550 
20100901
1532 
20101201
0700 
20101201
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  11942  HIGHWAY 36    Open  138  CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE 
348722
 
20100901
1513 
20100901
1514 
20100924
0700 
20100924
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348723
 
20100901
1513 
20100901
1514 
20100925
0700 
20100925
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348724
 
20100901
1513 
20100901
1514 
20100926
0700 
20100926
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348708
 
20100901
1512 
20100901
1514 
20100924
0700 
20100924
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348709
 
20100901
1512 
20100901
1514 
20100925
0700 
20100925
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348695
 
20100901
1511 
20100901
1514 
20100926
0700 
20100926
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348710
 
20100901
1512 
20100901
1514 
20100926
0700 
20100926
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348693
 
20100901
1511 
20100901
1514 
20100924
0700 
20100924
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348694
 
20100901
1511 
20100901
1514 
20100925
0700 
20100925
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348716
 
20100901
1513 
20100901
1514 
20100918
0700 
20100918
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348717
 
20100901
1513 
20100901
1514 
20100919
0700 
20100919
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348701
 
20100901
1512 
20100901
1514 
20100917
0700 
20100917
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348715
 
20100901
1513 
20100901
1514 
20100917
0700 
20100917
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348702
 
20100901
1512 
20100901
1514 
20100918
0700 
20100918
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348703
 
20100901
1512 
20100901
1514 
20100919
0700 
20100919
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348686
 
20100901
1511 
20100901
1514 
20100917
0700 
20100917
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348687
 
20100901
1511 
20100901
1514 
20100918
0700 
20100918
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348688
 
20100901
1511 
20100901
1514 
20100919
0700 
20100919
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
347071
 
20100823
1342 
20100901
1513 
20100901
0700 
20100901
1600 
20100901
0847 
20100901
1511 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    XF  AXFMR2  ROYSE SWITCH      69  RELAY CALIBRATION 
348681
 
20100901
1509 
20100901
1510 
20100926
0700 
20100926
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348680
 
20100901
1509 
20100901
1510 
20100925
0700 
20100925
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348679
 
20100901
1509 
20100901
1510 
20100924
0700 
20100924
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348674
 
20100901
1509 
20100901
1510 
20100919
0700 
20100919
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348673
 
20100901
1509 
20100901
1510 
20100918
0700 
20100918
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348672
 
20100901
1509 
20100901
1510 
20100917
0700 
20100917
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348646
 
20100901
1506 
20100901
1507 
20100926
0700 
20100926
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348645
 
20100901
1506 
20100901
1507 
20100925
0700 
20100925
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348639
 
20100901
1506 
20100901
1507 
20100919
0700 
20100919
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348644
 
20100901
1506 
20100901
1507 
20100924
0700 
20100924
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348637
 
20100901
1506 
20100901
1507 
20100917
0700 
20100917
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348638
 
20100901
1506 
20100901
1507 
20100918
0700 
20100918
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348632
 
20100901
1459 
20100901
1505 
20100927
0700 
20100927
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348630
 
20100901
1459 
20100901
1505 
20100925
0700 
20100925
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348631
 
20100901
1459 
20100901
1505 
20100926
0700 
20100926
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348629
 
20100901
1459 
20100901
1505 
20100924
0700 
20100924
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348628
 
20100901
1459 
20100901
1505 
20100923
0700 
20100923
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348627
 
20100901
1459 
20100901
1505 
20100922
0700 
20100922
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348626
 
20100901
1459 
20100901
1505 
20100921
0700 
20100921
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348625
 
20100901
1459 
20100901
1505 
20100920
0900 
20100920
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348624
 
20100901
1459 
20100901
1505 
20100919
0700 
20100919
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348623
 
20100901
1459 
20100901
1505 
20100918
0700 
20100918
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348622
 
20100901
1459 
20100901
1505 
20100917
0700 
20100917
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348620
 
20100901
1459 
20100901
1505 
20100915
0700 
20100915
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348621
 
20100901
1459 
20100901
1505 
20100916
0700 
20100916
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
337799
 
20100607
0838 
20100901
1455 
20100930
0700 
20100930
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
337797
 
20100607
0838 
20100901
1455 
20100928
0700 
20100928
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
337798
 
20100607
0838 
20100901
1455 
20100929
0700 
20100929
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
337795
 
20100607
0836 
20100901
1455 
20100923
0700 
20100923
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
337796
 
20100607
0838 
20100901
1455 
20100927
0900 
20100927
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
344440
 
20100730
1431 
20100901
1455 
20100901
0700 
20100901
1730 
20100901
0925 
20100901
1453 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  Y110  HIMONT    Open  138  replace hyd seal and maint 
337793
 
20100607
0836 
20100901
1455 
20100921
0700 
20100921
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
337794
 
20100607
0836 
20100901
1455 
20100922
0700 
20100922
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
337792
 
20100607
0835 
20100901
1455 
20100920
0900 
20100920
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
347674
 
20100826
1119 
20100901
1452 
20100901
0830 
20100901
1730 
20100901
0851 
20100901
1449 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_11289  RAYMOND BARKER    Open  138  CLEAR CB 11290 FOR OPERATOR INSPECTION 
347672
 
20100826
1118 
20100901
1452 
20100901
0830 
20100901
1730 
20100901
0851 
20100901
1449 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_11290  RAYMOND BARKER    Open  138  CLEAR CB 11290 FOR OPERATOR INSPECTION 
347673
 
20100826
1118 
20100901
1452 
20100901
0830 
20100901
1730 
20100901
0851 
20100901
1449 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_11291  RAYMOND BARKER    Open  138  CLEAR CB 11290 FOR OPERATOR INSPECTION 
347917
 
20100827
1442 
20100901
1449 
20100901
0700 
20100901
1700 
20100901
1043 
20100901
1410 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6856_B  SEYMOUR TU  BOMARTON TU    69  OUtage to replace bad crossarms. 
337593
 
20100603
1622 
20100901
1445 
20100914
0700 
20100914
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  109T220  CAMP GARY  REEDVILLE TAP    69  LINE OVERHAUL CANCELED DUE TO RIGHT OF WAY ISSUES DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
337594
 
20100603
1623 
20100901
1445 
20100915
1200 
20100915
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  109T220  CAMP GARY  REEDVILLE TAP    69  LINE OVERHAUL CANCELED DUE TO RIGHT OF WAY ISSUES DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
337550
 
20100603
1623 
20100901
1445 
20100916
0700 
20100916
1630 

 

 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  109T220  CAMP GARY  REEDVILLE TAP    69  LINE OVERHAUL CANCELED DUE TO RIGHT OF WAY ISSUES DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
347665
 
20100826
1114 
20100901
1440 
20100901
0800 
20100901
1730 
20100901
0757 
20100901
1440 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  499T499  SEGUIN  GERONIMO    138  CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN. 
347664
 
20100826
1114 
20100901
1440 
20100901
0800 
20100901
1730 
20100901
0840 
20100901
1440 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_3601  SEGUIN    Open  138  CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN. 
347663
 
20100826
1113 
20100901
1440 
20100901
0800 
20100901
1730 
20100901
0840 
20100901
1440 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_3599  SEGUIN    Open  138  CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN. 
347662
 
20100826
1113 
20100901
1440 
20100901
0800 
20100901
1730 
20100901
0840 
20100901
1440 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_3600_CB  SEGUIN    Open  138  CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN. 
347668
 
20100826
1115 
20100901
1438 
20100901
0800 
20100901
1730 
20100901
0759 
20100901
1438 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_9601  GERONIMO    Open  138  CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN. 
347669
 
20100826
1115 
20100901
1438 
20100901
0800 
20100901
1730 
20100901
0758 
20100901
1438 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_9599  GERONIMO    Open  138  CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN. 
347670
 
20100826
1115 
20100901
1438 
20100901
0800 
20100901
1730 
20100901
0758 
20100901
1438 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_13441  GERONIMO    Open  138  CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN. 
347671
 
20100826
1115 
20100901
1438 
20100901
0800 
20100901
1730 
20100901
0758 
20100901
1437 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_13439  GERONIMO    Open  138  CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN. 
347840
 
20100827
0754 
20100901
1437 
20100901
0700 
20100901
1600 
20100901
0852 
20100901
1437 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  3490  PAYNE SWITCH 
MEMC SW TAP
 
Open  138  Breaker operator maint. on CB 3490 
347666
 
20100826
1114 
20100901
1437 
20100901
0800 
20100901
1730 
20100901
0758 
20100901
1437 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_13440  GERONIMO    Open  138  CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN. 
347667
 
20100826
1114 
20100901
1437 
20100901
0800 
20100901
1730 
20100901
0758 
20100901
1437 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_9600  GERONIMO    Open  138  CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN. 
333459
 
20100504
1345 
20100901
1437 
20101130
0900 
20101130
1800 

 

 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    XF  138_69A1  ALICE      69  maintenance on high and low side thru to kingsville 
333460
 
20100504
1345 
20100901
1437 
20101130
0900 
20101130
1800 

 

 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  ALICE_KINGSV1  ALICE  KINGSVILLE    138  maintenance on high and low side thru to kingsville 
334469
 
20100510
1118 
20100901
1437 
20100913
1200 
20100913
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  SAN MARCOS  CAMP GARY    69  LINE OVERHAUL 
347732
 
20100826
1247 
20100901
1426 
20100901
0700 
20100901
1700 
20100901
0643 
20100901
1354 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P390  VELASCO    Open  138  section outage to install temp controll cables 
347647
 
20100826
1240 
20100901
1425 
20100901
0700 
20100901
1700 
20100901
0643 
20100901
1355 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P380  VELASCO    Open  138  section outage to install temp controll cables 
347646
 
20100826
1234 
20100901
1425 
20100901
0700 
20100901
1700 
20100901
0643 
20100901
1354 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  4825  VELASCO    Open  138  section outage to install temp controll cables 
345176
 
20100806
0944 
20100901
1425 
20100901
0700 
20100901
1700 
20100901
0642 
20100901
1354 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  T1H1  VELASCO    Open  138  section outage to install temp controll cables 
308869
 
20090928
1316 
20100901
1411 
20101130
0800 
20101216
1600 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  NOR_WRIG  NORFORK  WRIGHT    69  Capacity Increase, secondary voltage conversion to 25 kV and voltage conversion to 138 kV at Norfork. Line will be left open until the voltage conversion at Wright is complete next week. 
344655
 
20100803
0759 
20100901
1410 
20100901
0700 
20100901
1700 
20100901
0754 
20100901
1338 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  IM_WAP80  WA PARISH  IMPERIAL    138  rehab replace pole and insulators 
342416
 
20100714
1538 
20100901
1402 
20100901
0800 
20100901
1600 
20100901
0830 
20100901
1346 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  V310  BELLAIRE    Open  345  BREAKER LUBE MAINTENANCE 
340323
 
20100629
0550 
20100901
1401 
20101130
0700 
20101130
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  11942  HIGHWAY 36    Open  138  CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE 
340373
 
20100629
0629 
20100901
1401 
20101130
0700 
20101130
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_1336  BELLVILLE    Open  138  CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE 
337517
 
20100603
1418 
20100901
1401 
20101130
0700 
20101130
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  153T153  HILBIG  SIM GIDEON    138  OVERHAUL 
340249
 
20100629
0523 
20100901
1401 
20101130
0700 
20101130
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  467T467  BELLVILLE  HIGHWAY 36    138  CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE 
308342
 
20090922
1459 
20100901
1401 
20101130
0800 
20101130
1700 

 

 
Daily  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  CNT_BRIAR  BRIAR  CENTER POINT A    138  Line maintenance. 
343776
 
20100727
0642 
20100901
1330 
20100901
0800 
20100901
1800 
20100901
0848 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_1945  CENTEX    Close  69  SWITCH IS BEING CLOSED TO BYPASS CB 1950 WHILE OUT FOR OPERATOR INSPECTION / BREAKER MAINTENANCE / DIAGNOSTIC TESTING /// 
343774
 
20100727
0641 
20100901
1330 
20100901
0800 
20100901
1800 
20100901
0848 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_1950_CB  CENTEX    Open  69  OPERATOR INSPECTION / BREAKER MAINTENANCE / DIAGNOSTIC TESTING /// BREAKER WILL BE BYPASSED 
347245
 
20100824
1317 
20100901
1311 
20100901
0400 
20100901
1300 
20100901
0359 
20100901
1303 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1372  ROSEHILL    Close  138  verizon wireless site setting new equipment 
345615
 
20100811
0810 
20100901
1311 
20100901
0600 
20100901
1200 
20100901
0728 
20100901
1230 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  9221  TONKAWA SWITCH    Open  345  Outage at wind farm customers request to perform maintenance in customers station. 
347235
 
20100824
1302 
20100901
1310 
20100901
0400 
20100901
1300 
20100901
0426 
20100901
1224 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_G  GARLAND BOBTOWN TAP  BOBTOWN    138  verizon wireless site setting new equipment 
333458
 
20100504
1341 
20100901
1310 
20101129
0900 
20101129
1800 

 

 
Daily  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  55_CB  KOCH UP RIVER    Open  69  MAINTENANCE - 
340372
 
20100629
0629 
20100901
1310 
20101129
0900 
20101129
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_1336  BELLVILLE    Open  138  CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE 
340248
 
20100629
0523 
20100901
1310 
20101129
0900 
20101129
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  467T467  BELLVILLE  HIGHWAY 36    138  CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE 
340322
 
20100629
0550 
20100901
1310 
20101129
0900 
20101129
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  11942  HIGHWAY 36    Open  138  CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE 
308744
 
20090928
1318 
20100901
1310 
20101129
1400 
20101209
1700 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M20A  NORFORK    Open  69  Capacity Increase, secondary voltage conversion to 25 kV and voltage conversion to 138 kV at Norfork. 
308745
 
20090928
1318 
20100901
1310 
20101129
1400 
20101209
1700 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M20B  NORFORK    Open  69  Capacity Increase, secondary voltage conversion to 25 kV and voltage conversion to 138 kV at Norfork. 
308746
 
20090928
1319 
20100901
1310 
20101129
1400 
20101209
1700 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  M20CS  NORFORK    Open  69  Capacity Increase, secondary voltage conversion to 25 kV and voltage conversion to 138 kV at Norfork. Mobile Sub will carry UCS load during this time. 
347233
 
20100824
1301 
20100901
1309 
20100901
0400 
20100901
1300 
20100901
0426 
20100901
1224 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_A  GARLAND BOBTOWN TAP  OATES TMPP    138  verizon wireless site setting new equipment 
347234
 
20100824
1301 
20100901
1309 
20100901
0400 
20100901
1300 
20100901
0426 
20100901
1224 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_F  GARLAND BOBTOWN TAP  ROWLETT    138  verizon wireless site setting new equipment 
347387
 
20100825
1247 
20100901
1309 
20100901
0100 
20100901
0545 
20100901
0031 
20100901
0600 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  506  FAIRFIELD WEST    Close  138  trip test cb and test relays 
347410
 
20100825
1240 
20100901
1308 
20100901
0100 
20100901
0545 
20100901
0030 
20100901
0600 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2336  CROCKETT TU    Close  138  Work to be done trip test 138KV bus diff and Xfmr#4. 
347243
 
20100824
1306 
20100901
1308 
20100901
0400 
20100901
1300 
20100901
0426 
20100901
1224 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  5812  BOBTOWN    Close  138  verizon wireless site setting new equipment 
342889
 
20100719
0856 
20100901
1307 
20101129
0700 
20101201
1700 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  240_A  SINGLETON  JEWETT    345  REHAB WORK 
344858
 
20100804
0959 
20100901
1307 
20101129
0800 
20101202
1600 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_208_CB  REAGOR SPRINGS 
ROCKETT SWITCH
 
Open  69  Upgrade bus to 959 ACSS. 
344860
 
20100804
0959 
20100901
1307 
20101129
0800 
20101202
1600 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_212_CB  REAGOR SPRINGS 
BARRY TMPP
 
Open  69  Upgrade bus to 959 ACSS. 
344866
 
20100804
1025 
20100901
1307 
20101129
0800 
20101202
1600 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_250_CB  REAGOR SPRINGS 
SARDIS
 
Open  69  Upgrade bus to 959 ACSS. 
344859
 
20100804
0959 
20100901
1307 
20101129
0800 
20101202
1600 

 

 
Continuous  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_210_CB  REAGOR SPRINGS 
BETHEL
 
Open  69  Upgrade bus to 959 ACSS. 
347555
 
20100826
0810 
20100901
1302 
20100901
0600 
20100901
1600 
20100901
0616 
20100901
1246 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  2030_A  CORSICANA  POWELL    69  replace poles and crossarms 
347479
 
20100825
1510 
20100901
1257 
20100907
0830 
20100907
1700 

 

 
Daily  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    LN  ALPI_BELD1  ALPINE  BELDING    69  Replace crossarms 
342888
 
20100719
0848 
20100901
1255 
20101129
0700 
20101204
1700 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  D330  MOBIL CHEMICAL    Open  69  LINE MAINTENANCE 
342283
 
20100714
0852 
20100901
1255 
20101129
0700 
20101202
1700 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  CBYCVN86  CEDAR BAYOU PLANT  CHEVRON CHEMICAL    138  REHAB WORK 
342405
 
20100714
1453 
20100901
1255 
20101129
0700 
20101204
1700 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  S500  SOUTH CHANNEL    Open  69  REPLACE VARIOUS LINE EQUIPMENT 
342403
 
20100714
1449 
20100901
1255 
20101129
0700 
20101204
1700 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  3160  SOUTH CHANNEL    Open  69  REPLACE VARIOUS LINE EQUIPMENT 
342402
 
20100714
1445 
20100901
1255 
20101129
0700 
20101204
1700 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    XF  AT1_H  SOUTH CHANNEL      138  REPLACE VARIOUS LINE EQUIPMENT 
342406
 
20100714
1455 
20100901
1255 
20101129
0700 
20101204
1700 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  T040  SOUTH CHANNEL    Open  69  REPLACE VARIOUS LINE EQUIPMENT 
340979
 
20100701
0913 
20100901
1237 
20101129
0700 
20101209
1900 

 

 
Continuous  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  RELOCATING LINES AT DAVIS 
340978
 
20100701
0912 
20100901
1237 
20101129
0700 
20101209
1900 

 

 
Continuous  Approved  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_RODD_F1  BARNEY DAVIS  RODD FIELD    138  RELOCATING LINES AT DAVIS 
347634
 
20100826
1054 
20100901
1233 
20100901
0500 
20100901
1300 
20100901
0547 
20100901
1230 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  BG_GV_46  GARDEN VILLAS  BLODGETT    69  SET POLE BASE FOR CKT46 RELOCATION 
347903
 
20100827
1138 
20100901
1228 
20100907
1000 
20100909
1500 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  6775_CB  FRIEND RANCH 
 
Open  69  69 KV bus outage to replace bus CCVTs 
347905
 
20100827
1140 
20100901
1228 
20100907
1000 
20100909
1500 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  6780_CB  FRIEND RANCH 
OZONA
 
Open  69  69 KV bus outage to replace bus CCVTs 
347904
 
20100827
1139 
20100901
1228 
20100907
1000 
20100909
1500 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  7180_CB  FRIEND RANCH    Open  69  69 KV bus outage to replace bus CCVTs 
347906
 
20100827
1141 
20100901
1228 
20100907
1000 
20100909
1500 

 

 
Continuous  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  6785_CB  FRIEND RANCH 
CROCKETT HEIGHTS
 
Open  69  69 KV bus outage to replace bus CCVTs 
347412
 
20100825
1311 
20100901
1224 
20101129
0600 
20101212
2000 

 

 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6009_A  WILLOW CREEK SWITCH  PARKER SWITCH    345  Outage to erect towers and pull wire for line reconductor. 
337516
 
20100603
1418 
20100901
1224 
20101129
0700 
20101129
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  153T153  HILBIG  SIM GIDEON    138  OVERHAUL 
345862
 
20100812
1033 
20100901
1211 
20101129
0600 
20101204
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P680  VELASCO    Open  138  SECTION OUTAGE TO REPLACE RELAY PANELS 
345937
 
20100812
1032 
20100901
1211 
20101129
0600 
20101204
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  4265  VELASCO    Open  138  SECTION OUTAGE TO REPLACE RELAY PANELS 
345940
 
20100812
1033 
20100901
1211 
20101129
0600 
20101204
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P690  VELASCO    Open  138  SECTION OUTAGE TO REPLACE RELAY PANELS 
345935
 
20100812
1031 
20100901
1211 
20101129
0600 
20101204
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  SN_VL_26  VELASCO  SINTEK    138  REPLACE RELAY PANELS AT BOTH ENDS OF LINE 
337855
 
20100607
1336 
20100901
1209 
20101129
0600 
20101202
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  1094  BELLAIRE    Open  138  REPLACE 1094, W422 AND WAVE TRAP 
337772
 
20100607
1339 
20100901
1209 
20101129
0600 
20101202
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  T3HS  BELLAIRE    Open  138  REPLACE 1094, W422 AND WAVE TRAP 
337773
 
20100607
1341 
20100901
1209 
20101129
0600 
20101202
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  W420  BELLAIRE    Open  138  REPLACE 1094, W422 AND WAVE TRAP 
337857
 
20100607
1340 
20100901
1209 
20101129
0600 
20101202
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  W410  BELLAIRE    Open  138  REPLACE 1094, W422 AND WAVE TRAP 
337856
 
20100607
1337 
20100901
1209 
20101129
0600 
20101202
1800 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  BI_SF_09  BELLAIRE  SAN FELIPE    138  NEEDED FOR CLEARANCE 
347195
 
20100824
0929 
20100901
1202 
20100901
0700 
20100901
1200 
20100901
0738 
20100901
1144 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6251_A  COSDEN  MORGAN CREEK SES    138  Outage to replace a bad crossarm. 
334221
 
20100507
1049 
20100901
1155 
20100906
2200 
20100907
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M30  WHITT    Open  69  Line rebuild. 
334113
 
20100507
1039 
20100901
1155 
20100906
2200 
20100907
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_204_CB  ORAN TMPP 
WHITT
 
Open  69  Line rebuild. 
334005
 
20100507
1035 
20100901
1155 
20100906
2200 
20100907
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_202_CB  ORAN TMPP 
MORRIS SHEPPARD
 
Open  69  Line rebuild. 
334220
 
20100507
1049 
20100901
1154 
20100905
2200 
20100906
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M30  WHITT    Open  69  Line rebuild. 
334111
 
20100507
1039 
20100901
1154 
20100904
2200 
20100905
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_204_CB  ORAN TMPP 
WHITT
 
Open  69  Line rebuild. 
334219
 
20100507
1049 
20100901
1154 
20100904
2200 
20100905
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M30  WHITT    Open  69  Line rebuild. 
334112
 
20100507
1039 
20100901
1154 
20100905
2200 
20100906
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_204_CB  ORAN TMPP 
WHITT
 
Open  69  Line rebuild. 
334004
 
20100507
1035 
20100901
1154 
20100905
2200 
20100906
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_202_CB  ORAN TMPP 
MORRIS SHEPPARD
 
Open  69  Line rebuild. 
333897
 
20100507
1027 
20100901
1154 
20100906
2200 
20100907
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_10  MORRIS SHEPPARD    Open  69  Line rebuild. 
333896
 
20100507
1027 
20100901
1154 
20100905
2200 
20100906
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_10  MORRIS SHEPPARD    Open  69  Line rebuild. 
334217
 
20100507
1049 
20100901
1154 
20100902
2200 
20100903
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M30  WHITT    Open  69  Line rebuild. 
334218
 
20100507
1049 
20100901
1154 
20100903
2200 
20100904
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M30  WHITT    Open  69  Line rebuild. 
334110
 
20100507
1039 
20100901
1154 
20100903
2200 
20100904
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_204_CB  ORAN TMPP 
WHITT
 
Open  69  Line rebuild. 
334002
 
20100507
1035 
20100901
1154 
20100903
2200 
20100904
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_202_CB  ORAN TMPP 
MORRIS SHEPPARD
 
Open  69  Line rebuild. 
334003
 
20100507
1035 
20100901
1154 
20100904
2200 
20100905
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_202_CB  ORAN TMPP 
MORRIS SHEPPARD
 
Open  69  Line rebuild. 
333895
 
20100507
1027 
20100901
1154 
20100904
2200 
20100905
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_10  MORRIS SHEPPARD    Open  69  Line rebuild. 
333894
 
20100507
1027 
20100901
1154 
20100903
2200 
20100904
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_10  MORRIS SHEPPARD    Open  69  Line rebuild. 
334216
 
20100507
1049 
20100901
1152 
20100901
2200 
20100902
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M30  WHITT    Open  69  Line rebuild. 
334109
 
20100507
1039 
20100901
1152 
20100902
2200 
20100903
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_204_CB  ORAN TMPP 
WHITT
 
Open  69  Line rebuild. 
334000
 
20100507
1035 
20100901
1152 
20100901
2200 
20100902
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_202_CB  ORAN TMPP 
MORRIS SHEPPARD
 
Open  69  Line rebuild. 
334108
 
20100507
1039 
20100901
1152 
20100901
2200 
20100902
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_204_CB  ORAN TMPP 
WHITT
 
Open  69  Line rebuild. 
334001
 
20100507
1035 
20100901
1152 
20100902
2200 
20100903
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_202_CB  ORAN TMPP 
MORRIS SHEPPARD
 
Open  69  Line rebuild. 
333892
 
20100507
1027 
20100901
1152 
20100901
2200 
20100902
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_10  MORRIS SHEPPARD    Open  69  Line rebuild. 
333893
 
20100507
1027 
20100901
1152 
20100902
2200 
20100903
1000 

 

 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_10  MORRIS SHEPPARD    Open  69  Line rebuild. 
333999
 
20100507
1035 
20100901
1149 
20100901
0600 
20100901
1000 
20100901
0550 
20100901
1000 
Daily  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_202_CB  ORAN TMPP 
MORRIS SHEPPARD
 
Open  69  Line rebuild. 
333891
 
20100507
1027 
20100901
1148 
20100901
0600 
20100901
1000 
20100901
0551 
20100901
1000 
Daily  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_10  MORRIS SHEPPARD    Open  69  Line rebuild. 
345910
 
20100812
1004 
20100901
1148 
20100901
0700 
20100901
1700 
20100901
0704 
20100901
1134 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1628  IVAN    Open  69  Outage to replace poles. 
345900
 
20100812
0851 
20100901
1147 
20100901
0700 
20100901
1700 
20100901
0737 
20100901
1107 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  5719  BRECKENRIDGE    Open  69  Outage to replace poles. 
345854
 
20100812
0851 
20100901
1147 
20100901
0700 
20100901
1700 
20100901
0737 
20100901
1107 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  5721  BRECKENRIDGE    Open  69  Outage to replace poles. 
345899
 
20100812
0850 
20100901
1147 
20100901
0700 
20100901
1700 
20100901
0737 
20100901
1107 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  5720  BRECKENRIDGE 
IVAN
 
Open  69  Outage to replace poles. 
344430
 
20100730
1407 
20100901
1147 
20100901
0700 
20100901
1700 
20100901
0704 
20100901
1134 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6630_A  BRECKENRIDGE  IVAN    69  Outage to replace poles. 
347914
 
20100827
1356 
20100901
1141 
20100831
2400 
20100901
1200 
20100831
2352 
20100901
1133 
Continuous  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6009_A  WILLOW CREEK SWITCH  PARKER SWITCH    345  Line outage to remove spacers and static wire bonds in preparation for erecting towers for future work. 
348179
 
20100830
1354 
20100901
1129 
20100908
0700 
20100908
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
347231
 
20100824
1239 
20100901
1129 
20100908
0700 
20100908
1700 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6180_B  BRECKENRIDGE NORTH  RICOCHET SUBSTATION    138  Outage to replace crossarms. As part of TOAP open CB 5700 at Breckeridge for contingency. 
347232
 
20100824
1240 
20100901
1129 
20100908
0700 
20100908
1700 

 

 
Daily  Approved  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  5700  BRECKENRIDGE 
 
Open  69  Outage to replace crossarms. As part of TOAP open CB 5700 at Breckeridge for contingency. 
347629
 
20100826
1022 
20100901
1129 
20100908
0700 
20100908
1130 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  CB10  HARDY REIT    Open  138  LUBE MAINT 
348513
 
20100901
0539 
20100901
1129 
20100908
0715 
20100908
1130 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_13390  LAKEWAY LCRA 
MARBLE FALLS
 
Open  138  CLEAR CB 13390 FOR OPERATOR MAINTENANCE 
348515
 
20100901
0539 
20100901
1129 
20100908
0715 
20100908
1130 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_13389  LAKEWAY LCRA    Open  138  CLEAR CB 13390 FOR OPERATOR MAINTENANCE 
348514
 
20100901
0539 
20100901
1129 
20100908
0715 
20100908
1130 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_13391  LAKEWAY LCRA    Open  138  CLEAR CB 13390 FOR OPERATOR MAINTENANCE 
344744
 
20100803
1413 
20100901
1129 
20100908
0800 
20100908
1700 

 

 
Daily  Approved  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  2635  HAWKINS SWITCH    Open  138  Test relays. 
347733
 
20100826
1247 
20100901
1129 
20100908
0800 
20100908
1700 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  3827  CAVERN    Open  138  SECTION OUTAGE FOR SWITCH MAINT 
347734
 
20100826
1248 
20100901
1129 
20100908
0800 
20100908
1700 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  Y321  CAVERN    Open  138  SECTION OUTAGE FOR SWITCH MAINT 
347735
 
20100826
1249 
20100901
1129 
20100908
0800 
20100908
1700 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  Y301  CAVERN    Close  138  CLOSE SWITCH TO KEEP SERVICE ON DURING SECTION OUTAGE FOR SWITCH MAINT 
347348
 
20100825
0943 
20100901
1129 
20100908
0800 
20100908
1130 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  T130  H O CLARKE    Close  138  CLOSED TO BY-PASS BRKR 6900 FOR MAINT 
347148
 
20100824
0901 
20100901
1129 
20100908
0800 
20100908
1130 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  D970  CROSBY    Open  138  lube job 
347362
 
20100825
0939 
20100901
1129 
20100908
0800 
20100908
1130 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  6900  H O CLARKE    Open  138  LUBRICATE BREAKER 
347721
 
20100826
1248 
20100901
1129 
20100908
0800 
20100908
1700 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  Y322  CAVERN    Open  138  SECTION OUTAGE FOR SWITCH MAINT 
347720
 
20100826
1247 
20100901
1129 
20100908
0800 
20100908
1700 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  Y310  CAVERN    Open  138  SECTION OUTAGE FOR SWITCH MAINT 
348500
 
20100901
0528 
20100901
1129 
20100908
0800 
20100908
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_4370_CB  ZORN    Open  138  CLEAR CB 4370 TO REPAIR HYDRAULIC SYSTEM 
348499
 
20100901
0528 
20100901
1129 
20100908
0800 
20100908
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_4369  ZORN    Open  138  CLEAR CB 4370 TO REPAIR HYDRAULIC SYSTEM 
348498
 
20100901
0527 
20100901
1129 
20100908
0800 
20100908
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_4371  ZORN    Open  138  CLEAR CB 4370 TO REPAIR HYDRAULIC SYSTEM 
343848
 
20100727
1047 
20100901
1129 
20100908
0800 
20100908
1700 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  X720  BIPORT    Open  138  SECTION OUTAGE TO GO WITH LINE OUTAGE FOR TRIP CHECK 
343846
 
20100727
1045 
20100901
1129 
20100908
0800 
20100908
1700 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    LN  BFPCAV82  BIPORT  CAVERN    138  LINE OUTAGE FOR TRIP CHECK 
343847
 
20100727
1047 
20100901
1129 
20100908
0800 
20100908
1700 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  X710  BIPORT    Open  138  SECTION OUTAGE TO GO WITH LINE OUTAGE FOR TRIP CHECK 
347363
 
20100825
0942 
20100901
1129 
20100908
0800 
20100908
1130 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  6903  H O CLARKE    Close  138  CLOSED TO BY-PASS BRKR 6900 FOR MAINT 
347556
 
20100826
0839 
20100901
1129 
20100908
0800 
20100909
1600 

 

 
Continuous  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  N130  TOMBALL    Open  138  REPAIR HYD. LEAK - CONTINUOUS OUTAGE 9/8 THRU 9/9 
347480
 
20100825
1511 
20100901
1129 
20100908
0830 
20100908
1700 

 

 
Daily  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    LN  ALPI_BELD1  ALPINE  BELDING    69  Replace crossarms 
348493
 
20100901
0523 
20100901
1129 
20100908
0830 
20100908
1130 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_18929  FAYETTEVILLE    Open  138  CLEAR CB 18930 FOR OPERATOR INSPECTION 
348509
 
20100901
0535 
20100901
1129 
20100908
0830 
20100908
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  1769  GILLESPIE LCRA    Open  69  CLEAR CB 1770 FOR OPERATOR INSPECTION 
348508
 
20100901
0535 
20100901
1129 
20100908
0830 
20100908
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  1771  GILLESPIE LCRA    Open  69  CLEAR CB 1770 FOR OPERATOR INSPECTION 
348507
 
20100901
0534 
20100901
1129 
20100908
0830 
20100908
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  1770_CB  GILLESPIE LCRA    Open  69  CLEAR CB 1770 FOR OPERATOR INSPECTION 
348503
 
20100901
0530 
20100901
1129 
20100908
0830 
20100908
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_13439  GERONIMO    Open  138  CLEAR CB 13440 FOR DIAGNOSTIC TESTING 
348502
 
20100901
0530 
20100901
1129 
20100908
0830 
20100908
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_13441  GERONIMO    Open  138  CLEAR CB 13440 FOR DIAGNOSTIC TESTING 
348501
 
20100901
0529 
20100901
1129 
20100908
0830 
20100908
1730 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_13440  GERONIMO    Open  138  CLEAR CB 13440 FOR DIAGNOSTIC TESTING 
348494
 
20100901
0523 
20100901
1129 
20100908
0830 
20100908
1130 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_18930  FAYETTEVILLE    Open  138  CLEAR CB 18930 FOR OPERATOR INSPECTION 
348492
 
20100901
0522 
20100901
1129 
20100908
0830 
20100908
1130 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_18931  FAYETTEVILLE    Open  138  CLEAR CB 18930 FOR OPERATOR INSPECTION 
344983
 
20100805
0923 
20100901
1129 
20100908
0900 
20100908
1700 

 

 
Daily  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  12900  MCCAMEY NORTH SW    Open  138  #3 138 KV bus outage for relay modifications with the addition of the new CB 12930 
345049
 
20100805
0925 
20100901
1129 
20100908
0900 
20100908
1700 

 

 
Daily  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5820_CAP  MCCAMEY NORTH SW    Open  138  #3 138 KV bus outage for relay modifications with the addition of the new CB 12930 
345050
 
20100805
0925 
20100901
1129 
20100908
0900 
20100908
1700 

 

 
Daily  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  11660  MCCAMEY NORTH SW    Open  138  #3 138 KV bus outage for relay modifications with the addition of the new CB 12930 
345051
 
20100805
0926 
20100901
1129 
20100908
0900 
20100908
1700 

 

 
Daily  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  13280  MCCAMEY NORTH SW    Open  138  #3 138 KV bus outage for relay modifications with the addition of the new CB 12930 
345048
 
20100805
0925 
20100901
1129 
20100908
0900 
20100908
1700 

 

 
Daily  Approved  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  11680  MCCAMEY NORTH SW    Open  138  #3 138 KV bus outage for relay modifications with the addition of the new CB 12930 
347180
 
20100824
0902 
20100901
1129 
20100908
1200 
20100908
1600 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  D980  CROSBY    Open  138  lube job 
347630
 
20100826
1029 
20100901
1129 
20100908
1200 
20100908
1600 

 

 
Daily  Approved  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P270  HARDY REIT    Open  138  LUBE MAINT 
348489
 
20100901
0520 
20100901
1129 
20100908
1230 
20100908
1600 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_2650_CB  FAYETTEVILLE    Open  138  CLEAR CB 2650 FOR OPERATOR INSPECTION 
348490
 
20100901
0521 
20100901
1129 
20100908
1230 
20100908
1600 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_2651  FAYETTEVILLE    Open  138  CLEAR CB 2650 FOR OPERATOR INSPECTION 
348517
 
20100901
0540 
20100901
1129 
20100908
1230 
20100908
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_13399  LAKEWAY LCRA    Open  138  CLEAR CB 13400 FOR OPERATOR MAINTENANCE 
348518
 
20100901
0540 
20100901
1129 
20100908
1230 
20100908
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_13400  LAKEWAY LCRA 
LAKEWAY TAP
 
Open  138  CLEAR CB 13400 FOR OPERATOR MAINTENANCE 
348516
 
20100901
0540 
20100901
1129 
20100908
1230 
20100908
1630 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_13401  LAKEWAY LCRA    Open  138  CLEAR CB 13400 FOR OPERATOR MAINTENANCE 
348491
 
20100901
0522 
20100901
1129 
20100908
1230 
20100908
1600 

 

 
Daily  Approved  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC