348219   |
20100830 1414  |
20100830 1414  |
20100830 1415  |
20101231 2345  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
6287  |
COLRDO RVR MUNICIPL WTR 1  |
  |
Open  |
69  |
MOS 6287 opened for contingency problems at request of ERCOT  |
348147   |
20100830 1124  |
20100830 1124  |
20100910 0700  |
20100910 1800  |
  |
  |
Daily  |
Approved  |
Equipment Status Change  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
9028  |
THOMASTON  |
  |
Close  |
138  |
CLOSE DURING LINE OUTAGE BETWEEN THOMASTON - CUERO  |
347928   |
20100827 1532  |
20100827 1532  |
20100829 1130  |
20100831 0445  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
4247  |
LAS MILPAS  |
  |
Close  |
138  |
CS 4187 has bad contacts on C Phase and can not be opened. MOAS 4247 is closed to ease the load untill CS 4187 can be fixed.  |
318772   |
20091228 0907  |
20100827 1351  |
20091231 2400  |
20101231 1600  |
  |
20100827 1338  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
4183  |
CRANE GULF TAP  |
  |
Close  |
69  |
Unable to re-open sw 4183 Crane Tap 2 after breaker clearance on CB 4315 Crane due to line loading, so left switch 4183 closed and changing status of sw 4183 (to closed) and CB 4315 Crane (to open)  |
347286   |
20100824 1548  |
20100824 1548  |
20100824 1600  |
20100923 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M80-2  |
HASSE BEC POD  |
  |
Open  |
69  |
Not in service.  |
347285   |
20100824 1547  |
20100824 1547  |
20100824 1600  |
20100923 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M70-2  |
HASSE BEC POD  |
  |
Open  |
138  |
Not in service.  |
346945   |
20100820 1521  |
20100820 1521  |
20100823 0900  |
20100904 1800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
7350  |
SAN DIEGO  |
  |
Close  |
69  |
CB 7350 San Diego requested to be closed by ERCOT for a scheduled planned clearance that STEC has between Robstown and Corpus SS  |
346903   |
20100820 1131  |
20100820 1131  |
20100820 1145  |
20100905 2300  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1090  |
SEYMOUR TU  |
  |
Close  |
69  |
PCAP - Bepc Olney - Westover 69 kV single circuit. Closed at Ercot request due to Bepc sum of load above 7.5 MVA.  |
346786   |
20100819 1055  |
20100819 1055  |
20100920 0700  |
20101003 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
DSC  |
6614  |
MERIDIAN TAP  |
  |
Close  |
69  |
Requested by Oncor to close loop for outage at Walnut springs  |
345994   |
20100813 0840  |
20100816 0925  |
20100813 0845  |
20101015 1600  |
20100816 0845  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M70  |
PETTEWAY  |
  |
Open  |
69  |
Per ERCOT request M70 was open for summer line loading.  |
346200   |
20100816 0922  |
20100816 0922  |
20100816 0930  |
20100923 0700  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
TR_3435  |
PHILLIPS JOHNSON CITY  |
  |
Open  |
138  |
COMPLETION OF INSTALLATION AND CHECKOUTS STILL NEED TO BE COMPLETED BEFORE GOING INTO SERVICE.  |
346190   |
20100816 0752  |
20100816 0752  |
20100816 0800  |
20101231 2300  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M10  |
FAIRVIEW  |
  |
Open  |
138  |
Switch will need to stay open until the work at Waples is complete. We are adding a cap bank, new CB and new relay panels at Waples.  |
346109   |
20100813 1646  |
20100813 1646  |
20100813 1700  |
20100910 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
3810  |
JACK COUNTY 345KV SWITCHYARD  |
  |
Open  |
345  |
CB left open so that Fluor contractor can complete construction.  |
345868   |
20100813 1645  |
20100813 1645  |
20100813 1700  |
20100910 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
3805  |
JACK COUNTY 345KV SWITCHYARD  |
  |
Open  |
345  |
CB left open so that Fluor contractor can complete construction.  |
344101   |
20100728 1427  |
20100728 1427  |
20100728 1430  |
20100920 0645  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M70  |
DOMINO  |
  |
Close  |
138  |
Switch was closed so that the ERCOT model would be up to date.  |
343800   |
20100727 0849  |
20100727 0849  |
20100727 0900  |
20101231 2300  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
1513  |
CHRISTOVAL  |
  |
Open  |
69  |
Sw opened to solve for contingency overload problem on line  |
343159   |
20100720 1150  |
20100720 1150  |
20100720 1200  |
20100831 2300  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_1540  |
WINK  |
  |
Close  |
69  |
CB 1540 was closed for precontingency and a NOMCR will be sent to make this this breaker normally close.  |
341163   |
20100701 1559  |
20100701 1559  |
20100702 0100  |
20101031 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
DENTON MUNICIPAL ELECTRIC (TDSP)  |
  |
DSC  |
JC443  |
JIM CHRISTAL SUBSTATION  |
  |
Open  |
138  |
Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station.  |
341162   |
20100701 1558  |
20100701 1558  |
20100702 0100  |
20101031 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
DENTON MUNICIPAL ELECTRIC (TDSP)  |
  |
DSC  |
JC441  |
JIM CHRISTAL SUBSTATION  |
  |
Open  |
138  |
Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station.  |
341161   |
20100701 1557  |
20100701 1557  |
20100702 0100  |
20101031 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
DENTON MUNICIPAL ELECTRIC (TDSP)  |
  |
DSC  |
JC433  |
JIM CHRISTAL SUBSTATION  |
  |
Open  |
138  |
Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station.  |
341160   |
20100701 1556  |
20100701 1556  |
20100702 0100  |
20101031 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
DENTON MUNICIPAL ELECTRIC (TDSP)  |
  |
DSC  |
JC431  |
JIM CHRISTAL SUBSTATION  |
  |
Open  |
138  |
Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station.  |
341159   |
20100701 1555  |
20100701 1555  |
20100702 0100  |
20101031 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
DENTON MUNICIPAL ELECTRIC (TDSP)  |
  |
DSC  |
JC421  |
JIM CHRISTAL SUBSTATION  |
  |
Open  |
138  |
Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station.  |
341158   |
20100701 1553  |
20100701 1553  |
20100702 0100  |
20101031 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
DENTON MUNICIPAL ELECTRIC (TDSP)  |
  |
DSC  |
JC411  |
JIM CHRISTAL SUBSTATION  |
  |
Open  |
138  |
Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station.  |
341157   |
20100701 1551  |
20100701 1551  |
20100702 0100  |
20101031 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
DENTON MUNICIPAL ELECTRIC (TDSP)  |
  |
DSC  |
JC403  |
JIM CHRISTAL SUBSTATION  |
  |
Open  |
138  |
Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station.  |
341156   |
20100701 1550  |
20100701 1550  |
20100702 0100  |
20101031 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
DENTON MUNICIPAL ELECTRIC (TDSP)  |
  |
DSC  |
JC401  |
JIM CHRISTAL SUBSTATION  |
  |
Open  |
138  |
Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station.  |
341154   |
20100701 1545  |
20100701 1545  |
20100702 0100  |
20101031 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
DENTON MUNICIPAL ELECTRIC (TDSP)  |
  |
CB  |
JC440  |
JIM CHRISTAL SUBSTATION  |
  |
Open  |
138  |
Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station.  |
341153   |
20100701 1544  |
20100701 1544  |
20100702 0100  |
20101031 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
DENTON MUNICIPAL ELECTRIC (TDSP)  |
  |
CB  |
JC430  |
JIM CHRISTAL SUBSTATION  |
  |
Open  |
138  |
Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station.  |
341152   |
20100701 1543  |
20100701 1543  |
20100702 0100  |
20101031 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
DENTON MUNICIPAL ELECTRIC (TDSP)  |
  |
CB  |
JC420  |
JIM CHRISTAL SUBSTATION  |
  |
Open  |
138  |
Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station.  |
341151   |
20100701 1541  |
20100701 1541  |
20100702 0100  |
20101031 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
DENTON MUNICIPAL ELECTRIC (TDSP)  |
  |
CB  |
JC410  |
JIM CHRISTAL SUBSTATION  |
  |
Open  |
138  |
Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station.  |
341150   |
20100701 1540  |
20100701 1540  |
20100702 0100  |
20101031 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
DENTON MUNICIPAL ELECTRIC (TDSP)  |
  |
CB  |
JC400  |
JIM CHRISTAL SUBSTATION  |
  |
Open  |
138  |
Rebuilding substation. Distribution load has been moved off. Closed JC 8014 (TMPA) to bypass station.  |
341130   |
20100701 1441  |
20100701 1441  |
20100701 1500  |
20101231 2300  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
2171  |
ONYX SWITCHING STATION  |
  |
Open  |
69  |
This is a normally open switch.  |
339465   |
20100622 1023  |
20100624 1453  |
20100701 2100  |
20101022 1600  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TEXAS MUNICIPAL POWER AGENCY  |
  |
DSC  |
DSW_M8014  |
JIM CHRISTAL SUBSTATION  |
  |
Close  |
138  |
DME contractor work for Jim Christal rebuild. Jim Christal distribution load will be moved OFF Jim Christal before outage begins.  |
339655   |
20100623 1418  |
20100623 1418  |
20100630 1300  |
20101231 2345  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLS_1232  |
KILLEEN FORT HOOD  |
  |
Close  |
138  |
Closed for ERCOT  |
339654   |
20100623 1414  |
20100623 1414  |
20100630 1300  |
20101025 1900  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLS_1258  |
KILLEEN FORT HOOD  |
  |
Open  |
138  |
Changed due to Ercot Request  |
338792   |
20100615 1034  |
20100615 1034  |
20100615 1400  |
20100915 1400  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5830_CAP  |
ALAMITO CREEK  |
  |
Open  |
69  |
CAP BANK 5830 UNAVAILABLE -  |
337658   |
20100604 0933  |
20100604 0933  |
20100617 1615  |
20101015 1800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M10  |
MERIDIAN  |
  |
Open  |
69  |
Open for summer line loading per existing mitigation plan.  |
337642   |
20100604 0932  |
20100604 0932  |
20100617 1615  |
20101015 1800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M70  |
MERIDIAN  |
  |
Open  |
69  |
Open for summer line loading per existing mitigation plan.  |
337170   |
20100603 0801  |
20100603 0801  |
20101025 1915  |
20101231 2345  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
MLS_1258  |
KILLEEN FORT HOOD  |
  |
Open  |
138  |
Changed due to Ercot Request  |
336057   |
20100521 1427  |
20100521 1427  |
20100521 1430  |
20101015 1800  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
SUTTON  |
  |
Open  |
69  |
Open for summer line loading per existing mitigation plan.  |
330201   |
20100408 1125  |
20100408 1125  |
20100408 1130  |
20101231 1100  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7335  |
GONZALES AEP  |
  |
Close  |
69  |
source breaker to nas battery  |
319232   |
20091231 2221  |
20091231 2225  |
20100101 0015  |
20101231 2345  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
4130_CB  |
FORT STOCKTON SWITCH  |
  |
Open  |
69  |
open for Ercot contingency due to Wind Farm production  |
318269   |
20091222 1224  |
20091222 1224  |
20091231 2400  |
20101231 2345  |
  |
  |
Continuous  |
Approved  |
Equipment Status Change  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
27D5  |
LEON CREEK  |
  |
Close  |
138  |
Per ERCOT Darrell Jenkins to change the stastus of the breaker until the end of the year.  |
348763   |
20100901 2040  |
20100902 1705  |
20100901 1915  |
20100902 2000  |
20100901 1915  |
20100902 1653  |
Continuous  |
Approved  |
Forced  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6675_A  |
CHALK  |
GARDEN CITY  |
  |
69  |
Line locked out during a severe thunderstorm.  |
348825   |
20100902 1106  |
20100902 1408  |
20100902 1015  |
20100902 1800  |
20100902 1015  |
20100902 1355  |
Daily  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
3765_CS  |
NORTH LAREDO  |
  |
Open  |
138  |
Capacitor will not come online due to unbalance of cap cans, crew taking clearance to test and repair/relpace cans.  |
348820   |
20100902 1017  |
20100902 1106  |
20100902 1000  |
20100902 1600  |
20100902 1000  |
20100902 1048  |
Daily  |
Approved  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
H570  |
TH WHARTON  |
  |
Open  |
138  |
To repair air leak  |
348762   |
20100901 1853  |
20100902 1017  |
20100901 1700  |
20100903 2000  |
20100901 1700  |
20100902 0942  |
Continuous  |
Approved  |
Forced  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6730_C  |
WELCH TAP  |
WELCH  |
  |
69  |
5 poles down during a severe thunderstorm.  |
348778   |
20100902 0918  |
20100902 0919  |
20100902 0930  |
20100902 2330  |
20100902 0930  |
  |
Daily  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
4495  |
WEIL TRACT  |
  |
Open  |
138  |
Unit has a bad order motor. Crew to repair/replace.  |
348769   |
20100901 2356  |
20100902 0525  |
20100901 2330  |
20100902 1200  |
20100901 2330  |
20100902 0524  |
Continuous  |
Approved  |
Forced  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_405_CB  |
SEYMOUR TAP TMPP  |
  |
Open  |
69  |
Storms in the area.  |
348757   |
20100901 1719  |
20100901 2216  |
20100901 1530  |
20100901 2300  |
20100901 1530  |
20100901 2300  |
Daily  |
Approved  |
Forced  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6100_A  |
ANDREWS TAP  |
AMOCO THREE BAR TAP  |
  |
138  |
Line locked out during a severe thunderstorm.  |
348253   |
20100831 0048  |
20100901 2105  |
20100830 1830  |
20100901 1830  |
20100830 1830  |
20100901 1900  |
Continuous  |
Approved  |
Forced  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ALMC_PAIS0  |
PAISANO  |
ALAMITO CREEK  |
  |
69  |
Line operated to lock out by relay sectionalized between Paisano- Alamito crk. crew needs to patrol and make line repairs.  |
348758   |
20100901 1719  |
20100901 1913  |
20100901 1615  |
20100901 2100  |
20100901 1615  |
20100901 1743  |
Daily  |
Approved  |
Forced  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
CB  |
OCB_3B32_CB  |
TNP ONE PLANT  |
  |
Open  |
345  |
UNit 2 tripped by relay  |
348660   |
20100901 1717  |
20100901 1909  |
20100901 1615  |
20100901 2100  |
20100901 1615  |
20100901 1743  |
Daily  |
Approved  |
Forced  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
CB  |
OCB_3A28_CB  |
TNP ONE PLANT  |
  |
Open  |
345  |
Unit 2 tripped by relay  |
348547   |
20100901 0932  |
20100901 1554  |
20100901 0900  |
20100901 1700  |
20100901 0900  |
20100901 1700  |
Daily  |
Approved  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W780  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
Repair switch  |
348334   |
20100831 1109  |
20100901 1554  |
20100831 1045  |
20100901 1700  |
20100831 1045  |
20100901 1700  |
Continuous  |
Approved  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W770  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
Broken switch  |
348615   |
20100901 1440  |
20100901 1440  |
20100901 1445  |
20100901 2300  |
20100901 1445  |
  |
Daily  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
6300_CB  |
LAREDO PLANT  |
  |
Open  |
138  |
STATCOM unit tripped off line by relay.  |
348614   |
20100901 1439  |
20100901 1439  |
20100901 1445  |
20100901 2300  |
20100901 1445  |
  |
Daily  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
6305_CB  |
LAREDO PLANT  |
  |
Open  |
138  |
STATCOM unit tripped by relay.  |
348438   |
20100831 1624  |
20100831 2135  |
20100831 1615  |
20100831 2300  |
20100831 1615  |
20100831 2120  |
Daily  |
Approved  |
Forced  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6651_E  |
SHEPPARD FIELD TAP 1  |
BURKBURNETT  |
  |
69  |
Line relayed out.  |
348437   |
20100831 1621  |
20100831 2134  |
20100831 1615  |
20100831 2300  |
20100831 1615  |
20100831 2120  |
Daily  |
Approved  |
Forced  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6651_B  |
WICHITA FALLS NORTH TU  |
SHEPPARD FIELD TAP 1  |
  |
69  |
Line relayed out. problem unknown at this time.  |
348432   |
20100831 1606  |
20100831 1918  |
20100831 1600  |
20100831 1900  |
20100831 1600  |
20100831 1914  |
Daily  |
Approved  |
Forced  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ALPI_MARF1  |
ALPINE  |
MARFA  |
  |
69  |
line out by relaly  |
348269   |
20100830 2145  |
20100831 1517  |
20100830 2130  |
20100831 1800  |
20100830 2130  |
20100831 1517  |
Continuous  |
Approved  |
Forced  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
PCB_7460_CB  |
HAYS ENERGY  |
  |
Open  |
345  |
Issues with gas density monitor causing the breaker to become unreliable. Rotherham  |
348208   |
20100830 1712  |
20100831 0038  |
20100830 1600  |
20100831 1200  |
20100830 1600  |
20100831 0032  |
Continuous  |
Approved  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
XF  |
AT1_H  |
FORT BEND  |
  |
  |
69  |
Line 45 locked out.  |
348207   |
20100830 1703  |
20100831 0038  |
20100830 1600  |
20100831 1200  |
20100830 1600  |
20100831 0032  |
Continuous  |
Approved  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
FB_RS_45  |
FORT BEND  |
ROSENBERG  |
  |
69  |
Line locked out.  |
340962   |
20100701 0735  |
20100830 1018  |
20100701 0700  |
20100930 1800  |
20100701 0700  |
  |
Continuous  |
Approved  |
Forced  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
C840  |
CAPITOL COGEN  |
  |
Open  |
138  |
Customer waiting on parts to repair breaker. This outage is a continuation from 2/06/10. CenterPoint was unable to force extend and was advised to "Force" out per Grady.  |
347029   |
20100823 0531  |
20100823 0531  |
20100823 0600  |
20101119 1800  |
20100823 0600  |
  |
Continuous  |
Approved  |
Forced  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CS_5475  |
BUDA  |
  |
Open  |
138  |
CLEAR 138/24.9 KV T-2 POWERBANK FOR LTC REPLACEMENT. T-1 LOAD WILL BE ON MOBILE XFMR INSTALLED ON RUTHERFORS LINE  |
344347   |
20100730 0946  |
20100812 1143  |
20100730 0845  |
20100830 1600  |
20100730 0845  |
20100812 1138  |
Continuous  |
Approved  |
Forced  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
24D5  |
LEON CREEK  |
  |
Open  |
138  |
while in process of adding sf6 gas to 24D5 (Leon Creek) B phase bus side bushing faulted.  |
345547   |
20100810 1547  |
20100810 1547  |
20100731 2400  |
20101231 2345  |
20100731 2400  |
  |
Continuous  |
Approved  |
Forced  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
CP  |
HEIGH_C1  |
HEIGHTS SUB  |
  |
Open  |
69  |
Original forced outage expired on 07-31-10 at 2345. CAP Bank is still OOS waiting on parts. ETA unknown at this time.  |
336687   |
20100527 1449  |
20100527 1551  |
20100527 1500  |
20101031 1700  |
20100527 1500  |
20100527 1522  |
Continuous  |
Approved  |
Forced  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_2612  |
COMAL  |
  |
Open  |
138  |
Switch got damaged in new ongoing construction. To fix T-1 and T-2 will have to be out of service. Load will not allow putting load on T-3. To repair in fall when another bank goes in.  |
335133   |
20100515 2126  |
20100515 2126  |
20100515 1945  |
20101231 2300  |
20100515 1945  |
  |
Continuous  |
Approved  |
Forced  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
100_CB  |
COLETO CREEK  |
  |
Open  |
13.8  |
Reactor blew up due to internal fault.  |
348845   |
20100902 1210  |
20100902 1615  |
20100902 1615  |
20100902 1800  |
20100902 1545  |
20100902 1615  |
Daily  |
Approved  |
Forced Extension  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
129T145  |
HARWOOD  |
LULING  |
  |
69  |
Parts late in arriving  |
348847   |
20100902 1213  |
20100902 1557  |
20100902 1615  |
20100902 1800  |
20100902 1545  |
  |
Daily  |
Approved  |
Forced Extension  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_9456LW  |
HARWOOD  |
  |
Open  |
69  |
Parts late in arriving  |
348846   |
20100902 1210  |
20100902 1556  |
20100902 1415  |
20100902 1700  |
20100902 1414  |
20100902 1556  |
Daily  |
Approved  |
Forced Extension  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_9454  |
HARWOOD  |
  |
Open  |
69  |
Parts late in arriving  |
348922   |
20100902 1409  |
20100902 1529  |
20100902 1515  |
20100902 1800  |
20100902 1529  |
20100902 1529  |
Daily  |
Approved  |
Forced Extension  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
PK_900_CB  |
PILOT KNOB  |
  |
Open  |
138  |
New part is needed.  |
346938   |
20100820 1449  |
20100902 1522  |
20100820 2015  |
20100903 2000  |
20100820 2400  |
20100902 1520  |
Continuous  |
Approved  |
Forced Extension  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
DSC  |
DSW239-65  |
GAF SUB  |
  |
Open  |
138  |
Industrial customer requests more time due to addition equipment problems.  |
348827   |
20100902 1213  |
20100902 1449  |
20100902 1415  |
20100902 1700  |
20100902 1425  |
20100902 1449  |
Daily  |
Approved  |
Forced Extension  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_9458LW  |
HARWOOD  |
  |
Open  |
69  |
Parts late in arriving  |
348557   |
20100901 1046  |
20100902 1240  |
20100901 1215  |
20100902 1200  |
20100901 1215  |
20100902 1217  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
4187_CS  |
LAS MILPAS  |
  |
Open  |
138  |
problems getting sw 4187 adjusted - outages to reinstall moved to 9/2  |
348568   |
20100901 1453  |
20100902 1152  |
20100901 2015  |
20100902 1800  |
20100901 1947  |
20100902 1139  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1844  |
JEWETT  |
  |
Open  |
138  |
Part on order, awaiting part to repair breaker.  |
348826   |
20100902 1119  |
20100902 1121  |
20100902 1615  |
20101001 1600  |
  |
  |
Continuous  |
Approved  |
Forced Extension  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
DSC  |
HA_603M  |
HARRIS  |
  |
Open  |
69  |
The customer (U.T.) engineers are not ready to re-energize their transformer.  |
348447   |
20100831 1938  |
20100902 0718  |
20100831 2315  |
20100902 0545  |
20100831 2300  |
20100902 0615  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
9625  |
RATTLESNAKE ROAD SWITCH  |
  |
Open  |
345  |
Customer equipment not ready for service  |
348446   |
20100831 1937  |
20100902 0717  |
20100831 2315  |
20100902 0545  |
20100831 2300  |
20100902 0615  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
9615  |
RATTLESNAKE ROAD SWITCH  |
  |
Open  |
345  |
Customer equipment not ready for service  |
348664   |
20100901 1909  |
20100902 0406  |
20100901 2315  |
20100903 2000  |
20100901 2315  |
20100902 0405  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6100_A  |
ANDREWS TAP  |
AMOCO THREE BAR TAP  |
  |
138  |
Line locked out during a severe thunderstorm. 3 poles down.  |
348612   |
20100901 1427  |
20100901 2037  |
20100901 1715  |
20100901 2000  |
20100901 1705  |
20100901 2028  |
Daily  |
Approved  |
Forced Extension  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
10Q1  |
Q1  |
  |
Open  |
138  |
needed to complete job  |
348611   |
20100901 1426  |
20100901 2036  |
20100901 1715  |
20100901 2000  |
20100901 1705  |
20100901 2028  |
Daily  |
Approved  |
Forced Extension  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
12P2  |
P2  |
  |
Open  |
138  |
needed to complete job  |
348610   |
20100901 1424  |
20100901 2036  |
20100901 1715  |
20100901 2000  |
20100901 1705  |
20100901 2028  |
Daily  |
Approved  |
Forced Extension  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
P2_Q1  |
P2  |
Q1  |
  |
138  |
needed to complete job  |
348600   |
20100901 1326  |
20100901 1947  |
20100901 1045  |
20100901 2000  |
20100901 1030  |
20100901 1947  |
Daily  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1844  |
JEWETT  |
  |
Open  |
138  |
Awaiting replacement part for breaker operator.  |
348752   |
20100901 1552  |
20100901 1921  |
20100901 1715  |
20100901 2000  |
20100901 1715  |
20100901 1826  |
Daily  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
W759  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2  |
348750   |
20100901 1551  |
20100901 1920  |
20100901 1715  |
20100901 2000  |
20100901 1715  |
20100901 1826  |
Daily  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W780  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2  |
348749   |
20100901 1550  |
20100901 1920  |
20100901 1715  |
20100901 2000  |
20100901 1715  |
20100901 1825  |
Daily  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W770  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2  |
348748   |
20100901 1549  |
20100901 1920  |
20100901 1715  |
20100901 2000  |
20100901 1715  |
20100901 1830  |
Daily  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W750  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2  |
348657   |
20100901 1548  |
20100901 1917  |
20100901 1715  |
20100901 2000  |
20100901 1715  |
20100901 1824  |
Daily  |
Approved  |
Forced Extension  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W760  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2  |
348440   |
20100831 1636  |
20100901 1544  |
20100831 1715  |
20100903 1700  |
20100831 1700  |
20100901 1542  |
Continuous  |
Approved  |
Forced Extension  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_206  |
MARKHAM AIR SWITCH  |
  |
Close  |
69  |
temporary repairs still under way  |
348534   |
20100901 0710  |
20100901 1540  |
20100901 0600  |
20100901 1030  |
20100901 0600  |
20100901 1030  |
Daily  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1844  |
JEWETT  |
  |
Open  |
138  |
Problem with breaker , will not close.  |
348439   |
20100831 1634  |
20100901 1501  |
20100831 1715  |
20100903 1700  |
20100831 1700  |
20100901 1440  |
Continuous  |
Approved  |
Forced Extension  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
XF  |
138_69_1  |
FRANKLINS CAMP  |
  |
  |
69  |
pulling vacuume on auto now  |
348533   |
20100901 0708  |
20100901 0859  |
20100901 0600  |
20100901 1030  |
20100901 0600  |
20100901 0837  |
Daily  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1854  |
JEWETT  |
  |
Open  |
138  |
CB 1854 will not close, problems with breaker.  |
348539   |
20100901 0746  |
20100901 0810  |
20100901 0600  |
20100901 0745  |
20100901 0530  |
20100901 0721  |
Daily  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1860  |
JEWETT  |
  |
Open  |
138  |
finish work  |
348538   |
20100901 0745  |
20100901 0809  |
20100901 0600  |
20100901 0745  |
20100901 0530  |
20100901 0721  |
Daily  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_1814  |
JEWETT  |
  |
Open  |
138  |
finish work  |
348537   |
20100901 0744  |
20100901 0808  |
20100901 0600  |
20100901 0745  |
20100901 0530  |
20100901 0721  |
Daily  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1834  |
JEWETT  |
  |
Open  |
138  |
finish work  |
348536   |
20100901 0742  |
20100901 0808  |
20100901 0600  |
20100901 0745  |
20100901 0530  |
20100901 0721  |
Daily  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1804  |
JEWETT  |
  |
Open  |
138  |
finish work  |
348449   |
20100831 2340  |
20100831 2341  |
20100831 2015  |
20100930 2300  |
  |
  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
025  |
KIRKLAND PARK  |
  |
Open  |
138  |
Replace operator. New operator coming from Germany.  |
347939   |
20100827 1850  |
20100831 2033  |
20100827 1715  |
20100831 2300  |
20100828 0001  |
20100831 2300  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
9615  |
RATTLESNAKE ROAD SWITCH  |
  |
Open  |
345  |
Customer equipment not ready  |
347938   |
20100827 1848  |
20100831 2033  |
20100827 1715  |
20100831 2300  |
20100828 0001  |
20100831 2300  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
9625  |
RATTLESNAKE ROAD SWITCH  |
  |
Open  |
345  |
Customer equipment not ready.  |
348445   |
20100831 1933  |
20100831 1936  |
20100831 2315  |
20100902 0545  |
  |
  |
Continuous  |
Cancelled  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
9615  |
RATTLESNAKE ROAD SWITCH  |
  |
Open  |
345  |
Customer Equipment is not ready for service.  |
347435   |
20100825 1402  |
20100831 1704  |
20100825 1715  |
20100831 1700  |
20100825 1715  |
20100831 1700  |
Continuous  |
Approved  |
Forced Extension  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_206  |
MARKHAM AIR SWITCH  |
  |
Close  |
69  |
temporary repairs still under way  |
347451   |
20100825 1359  |
20100831 1704  |
20100825 1715  |
20100831 1700  |
20100825 1715  |
20100831 1700  |
Continuous  |
Approved  |
Forced Extension  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
XF  |
138_69_1  |
FRANKLINS CAMP  |
  |
  |
69  |
temporary repairs still under way  |
347872   |
20100827 1057  |
20100831 1508  |
20100827 1215  |
20100831 1930  |
20100827 1202  |
20100831 1508  |
Continuous  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CP  |
C2  |
STEWART ROAD  |
  |
Open  |
138  |
crew waiting on equipment (Can) to repace bad cap can.  |
348359   |
20100831 1020  |
20100831 1404  |
20100831 1015  |
20100831 1200  |
20100831 1015  |
20100831 1230  |
Daily  |
Approved  |
Forced Extension  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_202_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Contractor digger truck layed over on its side will digging piers. Dozer will need to pull truck back over on its side.  |
348357   |
20100831 1018  |
20100831 1404  |
20100831 1015  |
20100831 1200  |
20100831 1015  |
20100831 1230  |
Daily  |
Approved  |
Forced Extension  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_10  |
MORRIS SHEPPARD  |
  |
Open  |
69  |
Contractor digger truck layed over on its side will digging piers. Dozer will need to pull truck back over on its side.  |
348352   |
20100831 1005  |
20100831 1342  |
20100831 1215  |
20100831 1500  |
  |
20100831 1345  |
Daily  |
Approved  |
Forced Extension  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
GCB_5060_CB  |
GAY HILL  |
  |
Open  |
138  |
EXTENSION IS DUE TO IKSSUES WITH BUCKET TRUCK  |
348351   |
20100831 1004  |
20100831 1342  |
20100831 1215  |
20100831 1500  |
  |
20100831 1345  |
Daily  |
Approved  |
Forced Extension  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
GCB_5050_CB  |
GAY HILL  |
  |
Open  |
138  |
EXTENSION IS DUE TO ISSUES WITH BUCKET TRUCK  |
348330   |
20100831 1003  |
20100831 1342  |
20100831 1215  |
20100831 1500  |
  |
20100831 1345  |
Daily  |
Approved  |
Forced Extension  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
GCB_5070_CB  |
GAY HILL  |
  |
Open  |
138  |
EXTENSION IS DUE TO ISSUES WITH BUCKET TRUCK  |
348331   |
20100831 1018  |
20100831 1019  |
20100831 1715  |
20100930 2300  |
  |
  |
Continuous  |
Approved  |
Forced Extension  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CS_1475  |
ANDICE  |
  |
Open  |
138  |
WORK PROGRESSING SLOWER THAT ORIGINALLY FIGURED. PER PEDERNALES ELECTRIC COOPERATIVE  |
348310   |
20100831 0947  |
20100831 0947  |
20100831 1615  |
20101015 1630  |
  |
  |
Continuous  |
Approved  |
Forced Extension  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
7431  |
WALNUT  |
  |
Open  |
138  |
Supporting outages to pour tower foundations were delayed due to ERCOT summer loading issues.  |
348309   |
20100831 0946  |
20100831 0947  |
20100831 1615  |
20101015 1630  |
  |
  |
Continuous  |
Approved  |
Forced Extension  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
7430  |
WALNUT  |
  |
Open  |
138  |
Supporting outages to pour tower foundations were delayed due to ERCOT summer loading issues.  |
348124   |
20100830 1136  |
20100830 1714  |
20100830 1445  |
20100906 1430  |
20100830 1445  |
  |
Continuous  |
Approved  |
Forced Extension  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
CB  |
OCB_05_CB  |
SWEENY COGEN  |
  |
Open  |
138  |
Customer has not completed work  |
348123   |
20100830 1133  |
20100830 1714  |
20100830 1445  |
20100906 1430  |
20100830 1445  |
  |
Continuous  |
Approved  |
Forced Extension  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
CB  |
OCB_01_CB  |
SWEENY COGEN  |
  |
Open  |
138  |
Customer has not competed work  |
347936   |
20100827 1700  |
20100827 1741  |
20100827 2015  |
20100831 2000  |
  |
  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
025  |
KIRKLAND PARK  |
  |
Open  |
138  |
Bad Operator; parts on order.  |
345997   |
20100813 0850  |
20100826 1638  |
20100814 2400  |
20110131 2345  |
20100814 2348  |
20100826 1623  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
CS_918  |
FALFURRIAS  |
  |
Open  |
138  |
still waiting on parts  |
347361   |
20100825 0937  |
20100826 1404  |
20100825 1615  |
20100901 1800  |
20100825 2400  |
20100826 1404  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5845  |
WEIL TRACT  |
  |
Open  |
138  |
parts on order for repair  |
345786   |
20100811 1525  |
20100811 1550  |
20100811 1515  |
20100831 1800  |
20100811 1515  |
  |
Continuous  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
5431  |
FRIEND RANCH  |
  |
Open  |
138  |
need more time  |
345785   |
20100811 1524  |
20100811 1550  |
20100811 1515  |
20100831 1800  |
20100811 1515  |
  |
Continuous  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
7093  |
FRIEND RANCH  |
  |
Open  |
138  |
need more time  |
319206   |
20091231 1423  |
20100811 1513  |
20091231 2315  |
20101231 2300  |
20091231 2315  |
20100811 1511  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
255_CB  |
LAREDO PLANT  |
  |
Open  |
69  |
Capacitor did not test good  |
333079   |
20100430 1635  |
20100811 1152  |
20100430 1815  |
20101231 2300  |
20100511 0001  |
  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
XF  |
AXFMR1T  |
SULPHUR SPRINGS SWITCH  |
  |
  |
13.2  |
Reactor catastrophically failed. District to replace when new reactor arrives.  |
345435   |
20100810 0938  |
20100810 1728  |
20100810 1715  |
20100903 2345  |
20100810 1727  |
  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2005  |
NORTH CARBIDE  |
  |
Open  |
69  |
this is a new breaker, that will not be put in service at this time because the relay dept still needs to do some relay work  |
344291   |
20100729 1457  |
20100729 1504  |
20100731 2315  |
20101231 2300  |
  |
  |
Continuous  |
Approved  |
Forced Extension  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CS3525  |
FREIHEIT  |
  |
Open  |
138  |
T-2 POWERBANK WILL HAVE TO BE REPLACED. NBU IS LOOKING FOR A REPLACEMENT.  |
343573   |
20100723 1451  |
20100724 0838  |
20100723 1515  |
20100930 1800  |
20100723 2400  |
  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
XF  |
AXFMR4L  |
TRINIDAD SES  |
  |
  |
69  |
This extention reflects a more accurate in service date.  |
343572   |
20100723 1447  |
20100724 0837  |
20100723 1515  |
20100930 1800  |
20100723 2400  |
  |
Continuous  |
Approved  |
Forced Extension  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
XF  |
AXFMR4H  |
TRINIDAD SES  |
  |
  |
138  |
This extention reflects a more accurate in service date.  |
319205   |
20091231 1423  |
20100709 1016  |
20091231 2315  |
20101231 2300  |
20091231 2300  |
  |
Continuous  |
Approved  |
Forced Extension  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
4010  |
BARNEY DAVIS  |
  |
Open  |
138  |
bad order capacitor, blown cans  |
338989   |
20100618 0723  |
20100618 2248  |
20100618 1815  |
20100831 2300  |
20100618 1800  |
  |
Continuous  |
Approved  |
Forced Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
XF  |
138_69_1  |
LIVE OAK CSW  |
  |
  |
69  |
Engineering having to redesign LTC and SCADA controls  |
336044   |
20100521 1006  |
20100521 1710  |
20100521 1715  |
20101231 2200  |
20100521 1715  |
  |
Continuous  |
Approved  |
Forced Extension  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
102  |
SPENCER  |
  |
Open  |
69  |
Breaker relay protection and SCADA operation of the breaker are incomplete and not tested at this time.  |
336042   |
20100521 0956  |
20100521 1710  |
20100521 1715  |
20101231 2200  |
20100521 1715  |
  |
Continuous  |
Approved  |
Forced Extension  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
OCB_G340_CB  |
SPENCER  |
  |
Open  |
69  |
Breaker relay protection and SCADA operation of the breaker are incomplete and not tested at this time.  |
348659   |
20100901 1658  |
20100902 1454  |
20100902 0830  |
20100902 1400  |
20100902 0847  |
20100902 1427  |
Daily  |
Approved  |
Maintenance Level 1  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
SDRFT_PORT  |
PORT OCONNOR SUB  |
SEADRIFT  |
  |
69  |
Seadrift load has been backfed - line clearance to replace wave trap at Pt. OConnor  |
348658   |
20100901 1639  |
20100902 1245  |
20100902 0800  |
20100902 1700  |
20100902 0857  |
20100902 1145  |
Daily  |
Approved  |
Maintenance Level 1  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
10467  |
SANTIAGO  |
  |
Open  |
138  |
Switch to be opened at request of Langford WF. WF is scheduled to be offline for planned outage for substation work during this time  |
348587   |
20100901 1104  |
20100902 1241  |
20100902 1030  |
20100902 1200  |
20100902 1030  |
20100902 1217  |
Daily  |
Approved  |
Maintenance Level 1  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
4247  |
LAS MILPAS  |
  |
Open  |
138  |
las milpas - south mcallan to lift jumpers on cs 4187  |
348585   |
20100901 1054  |
20100902 1241  |
20100902 1030  |
20100902 1200  |
20100902 1001  |
20100902 1217  |
Daily  |
Approved  |
Maintenance Level 1  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
4545_CB  |
SOUTH MCALLEN  |
  |
Open  |
138  |
las milpas - south mcallan to lift jumpers on cs 4187  |
348558   |
20100901 1122  |
20100902 1050  |
20100902 0800  |
20100902 1530  |
20100902 0819  |
20100902 1010  |
Daily  |
Approved  |
Maintenance Level 1  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1032  |
DENISON DAM TAP  |
  |
Open  |
138  |
This is to replace open jumper at the Tap. This was done due to a emergency outage at Denison Dam.  |
348588   |
20100901 1120  |
20100902 1050  |
20100902 0800  |
20100902 1530  |
20100902 0819  |
20100902 1010  |
Daily  |
Approved  |
Maintenance Level 1  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1026  |
DENISON DAM TAP  |
  |
Open  |
138  |
This is to replace open jumper at the Tap. This was done due to a emergency outage at Denison Dam.  |
348584   |
20100901 1052  |
20100902 0918  |
20100902 0500  |
20100902 1000  |
20100902 0458  |
20100902 0856  |
Daily  |
Approved  |
Maintenance Level 1  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
4257  |
LAS MILPAS  |
  |
Open  |
138  |
las milpas - stewart rd to reinstall jumpers on cs 4187  |
348582   |
20100901 1050  |
20100902 0917  |
20100902 0500  |
20100902 1000  |
20100902 0437  |
20100902 0859  |
Daily  |
Approved  |
Maintenance Level 1  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
4907  |
STEWART ROAD  |
  |
Open  |
138  |
las milpas - stewart rd to reinstall jumpers on cs 4187  |
348436   |
20100831 1614  |
20100831 1729  |
20100831 1630  |
20100831 2000  |
20100831 1641  |
20100831 1726  |
Daily  |
Approved  |
Maintenance Level 1  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
4824  |
ELMONT POI  |
  |
Close  |
138  |
GCEC transformer is out of phase Line flow will not be interrupted.  |
348223   |
20100830 1443  |
20100831 1716  |
20100831 0800  |
20100831 1100  |
20100831 0739  |
20100831 1116  |
Daily  |
Approved  |
Maintenance Level 1  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ALPR_BARL1  |
BARRILLA  |
ALPINE REA  |
  |
69  |
Pole top reported broken and pole needs to be changed out  |
348329   |
20100831 0955  |
20100831 1423  |
20100831 1000  |
20100831 1500  |
20100831 0956  |
20100831 1423  |
Daily  |
Approved  |
Maintenance Level 1  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6850_A  |
ARCHER CITY  |
BLACKWELL WICHITA FALLS TAP  |
  |
69  |
Line section outaged to repair broken crossarms.  |
348171   |
20100830 1236  |
20100831 0938  |
20100831 0900  |
20100904 1600  |
20100831 0927  |
  |
Continuous  |
Approved  |
Maintenance Level 1  |
BROWNSVILLE PUBLIC UTILITY BOARD (TDSP)  |
  |
LN  |
LM_UC  |
UNION CARBIDE  |
LOMA ALTA  |
  |
69  |
Need to change out flashed over buss insulators at Union Carbide Substation. It appears that it is the possible cause for the operations on this transmission line. Distribution Load will be transferred out.  |
347990   |
20100829 1455  |
20100830 1000  |
20100830 0900  |
20100830 1200  |
20100830 0914  |
20100830 0949  |
Daily  |
Approved  |
Maintenance Level 1  |
BROWNSVILLE PUBLIC UTILITY BOARD (TDSP)  |
  |
CB  |
H220  |
FILTER PLANT  |
  |
Open  |
138  |
Need outage to recharge H220 Circuit Switcher with SF6.  |
347966   |
20100830 0805  |
20100902 1608  |
20100901 0800  |
20100903 1600  |
20100901 0937  |
20100902 1606  |
Continuous  |
Approved  |
Maintenance Level 2  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
MV_MV_7  |
MVEC (LA SARA)  |
MVEC (RAYMONDVILLE TAP)  |
  |
138  |
clearance to replace bad interruptors - this is a radial line - La Sara load to be backfed.  |
348109   |
20100830 0848  |
20100901 0853  |
20100901 0800  |
20100901 1700  |
20100901 0853  |
  |
Daily  |
Approved  |
Maintenance Level 2  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
10467  |
SANTIAGO  |
  |
Open  |
138  |
Switch to be opened at request of Langford WF. WF is scheduled to be offline for planned outage for substation work during this time  |
347365   |
20100825 0952  |
20100902 1654  |
20100909 0600  |
20100909 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1255_C  |
NECHES RIVER PUMP  |
PALESTINE SOUTH  |
  |
138  |
line maint  |
348931   |
20100902 1439  |
20100902 1646  |
20100907 0900  |
20100907 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Open  |
69  |
CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL  |
348932   |
20100902 1439  |
20100902 1646  |
20100907 0900  |
20100907 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Open  |
69  |
CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL  |
348560   |
20100901 1145  |
20100902 1646  |
20100907 1000  |
20100909 1500  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
2881  |
CITY OF SONORA  |
  |
Open  |
69  |
Switch opened while having the 69 KV bus clearance at Friend Ranch  |
348592   |
20100901 1143  |
20100902 1646  |
20100907 1000  |
20100909 1500  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
3965_CB  |
SONORA  |
  |
Close  |
69  |
Close CB 3965 Sonora while having a 69 KV bus clearance at Friend Ranch to utilize the capacitor at Sonora City  |
347916   |
20100827 1356  |
20100902 1638  |
20100902 2400  |
20100903 1200  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6009_A  |
WILLOW CREEK SWITCH  |
PARKER SWITCH  |
  |
345  |
Line outage to remove spacers and static wire bonds in preparation for erecting towers for future work.  |
348364   |
20100831 1116  |
20100902 1638  |
20100907 0800  |
20101210 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
2140  |
PUTNAM 69kv  |
  |
Open  |
69  |
NEED SWITCH OPEN TO DE-ENERGIZE LINE TO PUTNAM. BREAKER 2123 @ PUTNAM ALREADY IN OUTAGE SCHEDULER AND APPROVED.  |
348535   |
20100901 0725  |
20100902 1638  |
20100907 0800  |
20100915 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
3742  |
JACK COUNTY 345KV SWITCHYARD  |
  |
Open  |
345  |
Fluor contractor will check out generator protection.  |
348335   |
20100831 1113  |
20100902 1638  |
20100907 0800  |
20101210 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
2255  |
MORAN CSW  |
  |
Open  |
69  |
NEED SWITCH OPEN TO DE-ENERGIZE LINE TO PUTNAM. BREAKER 2122 @ PUTNAM ALREADY IN OUTAGE SCHEDULER AND APPROVED.  |
348459   |
20100901 0726  |
20100902 1638  |
20100907 0800  |
20100915 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
3792  |
JACK COUNTY 345KV SWITCHYARD  |
  |
Open  |
345  |
Fluor contractor will check out generator protection.  |
348458   |
20100901 0726  |
20100902 1638  |
20100907 0800  |
20100915 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
3791  |
JACK COUNTY 345KV SWITCHYARD  |
  |
Open  |
345  |
Fluor contractor will check out generator protection.  |
348363   |
20100831 1115  |
20100902 1638  |
20100907 0800  |
20101210 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
5117  |
BAIRD  |
  |
Open  |
69  |
NEED SWITCH OPEN TO DE-ENERGIZE LINE TO PUTNAM. BREAKER 4575 @ PUTNAM ALREADY IN OUTAGE SCHEDULER AND APPROVED.  |
348454   |
20100901 0725  |
20100902 1638  |
20100907 0800  |
20100915 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
3785  |
JACK COUNTY 345KV SWITCHYARD  |
  |
Open  |
345  |
Fluor contractor will check out generator protection.  |
348455   |
20100901 0725  |
20100902 1638  |
20100907 0800  |
20100915 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
3790  |
JACK COUNTY 345KV SWITCHYARD  |
  |
Open  |
345  |
Fluor contractor will check out generator protection.  |
348457   |
20100901 0726  |
20100902 1638  |
20100907 0800  |
20100915 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
3786  |
JACK COUNTY 345KV SWITCHYARD  |
  |
Open  |
345  |
Fluor contractor will check out generator protection.  |
348456   |
20100901 0726  |
20100902 1638  |
20100907 0800  |
20100915 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
3784  |
JACK COUNTY 345KV SWITCHYARD  |
  |
Open  |
345  |
Fluor contractor will check out generator protection.  |
347181   |
20100824 0904  |
20100902 1637  |
20100909 1200  |
20100909 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
5080  |
CROSBY  |
  |
Open  |
138  |
lube job  |
343854   |
20100727 1049  |
20100902 1636  |
20100909 0800  |
20100909 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
X710  |
BIPORT  |
  |
Open  |
138  |
SECTION OUTAGE TO GO WITH LINE OUTAGE FOR TRIP CHECK  |
343857   |
20100727 1051  |
20100902 1636  |
20100909 0800  |
20100909 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
X740  |
BIPORT  |
  |
Open  |
138  |
SECTION OUTAGE TO GO WITH LINE OUTAGE FOR TRIP CHECK  |
343858   |
20100727 1051  |
20100902 1636  |
20100909 0800  |
20100909 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BFPVL_82  |
BIPORT  |
VELASCO  |
  |
138  |
LINE OUTAGE FOR TRIP CHECK  |
348333   |
20100831 1100  |
20100902 1627  |
20100909 0700  |
20100909 1500  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
BE_950_CB  |
BERGSTROM  |
  |
Open  |
138  |
Sub station GCB maintenance / testing.  |
348180   |
20100830 1354  |
20100902 1623  |
20100909 0700  |
20100909 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
348143   |
20100830 1117  |
20100902 1618  |
20100909 0700  |
20100909 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
THOMAS_VICTOR1  |
THOMASTON  |
VICTORIA  |
  |
138  |
LINE OUTAGE BETWEEN THOMASTON - VICTORIA PS TO DIG FOUNDATIONS UNDER LINE  |
347631   |
20100826 1035  |
20100902 1617  |
20100830 0730  |
20100902 1600  |
20100830 0822  |
20100902 1525  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
E990  |
EXXON  |
  |
Open  |
138  |
section outage at exxon for new construction  |
338956   |
20100616 1307  |
20100902 1616  |
20100830 0730  |
20100902 1600  |
20100830 0823  |
20100902 1525  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
E960  |
EXXON  |
  |
Open  |
138  |
CUST TO TIE IN NEW X990  |
346834   |
20100819 1611  |
20100902 1616  |
20100902 0900  |
20100902 1700  |
20100902 0903  |
20100902 1609  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
CELANE_KLEBER1  |
CELANESE BISHOP  |
KLEBERG CSW  |
  |
138  |
replacing b/o ccvt  |
338955   |
20100616 1306  |
20100902 1615  |
20100830 0730  |
20100902 1600  |
20100830 0823  |
20100902 1525  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
E930  |
EXXON  |
  |
Open  |
138  |
CUST TO TIE IN NEW X990  |
338954   |
20100616 1305  |
20100902 1615  |
20100830 0730  |
20100902 1600  |
20100830 0824  |
20100902 1526  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
E780  |
EXXON  |
  |
Open  |
138  |
CUST TO TIE IN NEW X990  |
338953   |
20100616 1304  |
20100902 1614  |
20100830 0730  |
20100902 1600  |
20100830 0824  |
20100902 1527  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
E750  |
EXXON  |
  |
Open  |
138  |
CUST TO TIE IN NEW X990  |
338952   |
20100616 1303  |
20100902 1613  |
20100830 0730  |
20100902 1600  |
20100830 0824  |
20100902 1527  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
E720  |
EXXON  |
  |
Open  |
138  |
CUST TO TIE IN NEW X990  |
338951   |
20100616 1302  |
20100902 1612  |
20100830 0730  |
20100902 1600  |
20100830 0824  |
20100902 1527  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
E360  |
EXXON  |
  |
Open  |
138  |
CUST TO TIE IN NEW X990  |
347604   |
20100826 0933  |
20100902 1610  |
20100909 0700  |
20100909 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
H810  |
VELASCO  |
  |
Open  |
138  |
install temp control cables  |
345856   |
20100812 1013  |
20100902 1609  |
20100909 0700  |
20100909 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1019  |
SWEETWATER NO 2  |
  |
Open  |
69  |
Outage to replace the relay panel.  |
345922   |
20100812 1014  |
20100902 1609  |
20100909 0700  |
20100909 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1021  |
SWEETWATER NO 2  |
  |
Open  |
69  |
Outage to replace the relay panel.  |
348299   |
20100831 0819  |
20100902 1605  |
20100909 0630  |
20100909 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
7150  |
WOLF HOLLOW  |
  |
Open  |
345  |
Outage to repair SF-6 pressure gauges. Will be removing SF-6 from the circuit breaker.  |
347711   |
20100826 1213  |
20100902 1558  |
20100902 1400  |
20100902 1600  |
20100902 1506  |
20100902 1558  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
HSW_1291  |
LULING  |
  |
Open  |
69  |
CLEAR LULING TO HARWOOD 69 KV LINE TO REMOVE PORTABLE FROM LINE AT HARWOOD  |
347712   |
20100826 1213  |
20100902 1558  |
20100902 1400  |
20100902 1600  |
20100902 1506  |
20100902 1558  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
HSW_1289  |
LULING  |
  |
Open  |
69  |
CLEAR LULING TO HARWOOD 69 KV LINE TO REMOVE PORTABLE FROM LINE AT HARWOOD  |
347900   |
20100827 1056  |
20100902 1558  |
20100830 1130  |
20100902 1700  |
20100830 1109  |
20100902 1555  |
Continuous  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
MCF_RFUG  |
MCFADDIN SUB  |
REFUGIO SUB  |
  |
69  |
line rehab  |
347710   |
20100826 1212  |
20100902 1556  |
20100902 1400  |
20100902 1600  |
20100902 1449  |
20100902 1556  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_9456LW  |
HARWOOD  |
  |
Open  |
69  |
CLEAR LULING TO HARWOOD 69 KV LINE TO REMOVE PORTABLE FROM LINE AT HARWOOD  |
347709   |
20100826 1212  |
20100902 1556  |
20100902 1400  |
20100902 1600  |
20100902 1450  |
20100902 1556  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
129T145  |
HARWOOD  |
LULING  |
  |
69  |
CLEAR LULING TO HARWOOD 69 KV LINE TO REMOVE PORTABLE FROM LINE AT HARWOOD  |
347713   |
20100826 1213  |
20100902 1556  |
20100902 1400  |
20100902 1600  |
20100902 1505  |
20100902 1555  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
1290_CB  |
LULING  |
  |
Open  |
69  |
CLEAR LULING TO HARWOOD 69 KV LINE TO REMOVE PORTABLE FROM LINE AT HARWOOD  |
347477   |
20100825 1459  |
20100902 1554  |
20100902 1200  |
20100902 1600  |
20100902 1200  |
20100902 1521  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
SANTIA_SAPS1  |
SAN ANGELO POWER STATION  |
SANTIAGO  |
  |
138  |
Replace crossarms  |
346809   |
20100819 1445  |
20100902 1552  |
20101011 0700  |
20101016 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T520  |
GARDEN VILLAS  |
  |
Open  |
69  |
outage for wave trap maint.  |
345457   |
20100810 1106  |
20100902 1552  |
20101011 0700  |
20101014 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
3368  |
VALLEY SES  |
  |
Open  |
345  |
I will be testing the transformer.  |
347269   |
20100824 1337  |
20100902 1552  |
20101011 0700  |
20101011 2000  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
L750  |
STRANG  |
  |
Open  |
138  |
REPLACE BUSHING  |
345459   |
20100810 1107  |
20100902 1552  |
20101011 0700  |
20101014 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
6090  |
VALLEY SES  |
  |
Open  |
138  |
I will be testing the transformer.  |
345456   |
20100810 1105  |
20100902 1552  |
20101011 0700  |
20101014 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
XF  |
AXFMR1  |
VALLEY SES  |
  |
  |
345  |
I will be testing the transformer.  |
345458   |
20100810 1107  |
20100902 1552  |
20101011 0700  |
20101014 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
6089  |
VALLEY SES  |
  |
Open  |
138  |
I will be testing the transformer.  |
343520   |
20100723 0802  |
20100902 1552  |
20101011 0730  |
20101011 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
AI_SRB55  |
SR BERTRON  |
ALEXANDER ISLAND  |
  |
69  |
OUTAGE TO DISCONNECT TEMP MOBLE TRANSFORMER  |
347444   |
20100825 1452  |
20100902 1552  |
20101011 0800  |
20101021 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M50  |
HOLDER  |
  |
Open  |
138  |
Upgrade relay panels. Total restoration time will be 290 hrs.  |
347474   |
20100825 1452  |
20100902 1552  |
20101011 0800  |
20101021 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_395_CB  |
HOLDER  |
  |
Open  |
69  |
Upgrade relay panels. Total restoration time will be 290 hrs.  |
347476   |
20100825 1453  |
20100902 1552  |
20101011 0800  |
20101021 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
394  |
HOLDER  |
  |
Open  |
69  |
Upgrade relay panels. Total restoration time will be 290 hrs.  |
347445   |
20100825 1453  |
20100902 1552  |
20101011 0800  |
20101021 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
396  |
HOLDER  |
  |
Open  |
69  |
Upgrade relay panels. Total restoration time will be 290 hrs.  |
347515   |
20100826 0849  |
20100902 1552  |
20100902 0800  |
20100902 1600  |
20100902 0853  |
20100902 1552  |
Daily  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
COY_KENE  |
COY CITY SUB  |
KENEDY  |
  |
69  |
Line Maint.  |
344743   |
20100803 1412  |
20100902 1552  |
20100907 0800  |
20100907 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
2625  |
HAWKINS SWITCH  |
  |
Open  |
138  |
Test relays.  |
347566   |
20100826 0904  |
20100902 1535  |
20101011 0600  |
20101011 0645  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL NOTE: EARLIER START REQUESTED BY CONTRACTOR  |
345076   |
20100805 1349  |
20100902 1535  |
20101011 0700  |
20101015 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_455_CB  |
LILLIAN  |
  |
Open  |
69  |
New control house and upgrade relay panels.  |
345083   |
20100805 1352  |
20100902 1535  |
20101011 0700  |
20101015 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M60  |
LILLIAN  |
  |
Open  |
69  |
New control house and upgrade relay panels.  |
345080   |
20100805 1352  |
20100902 1535  |
20101011 0700  |
20101015 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M20A  |
LILLIAN  |
  |
Open  |
69  |
New control house and upgrade relay panels.  |
345073   |
20100805 1348  |
20100902 1535  |
20101011 0700  |
20101015 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
1885  |
LILLIAN  |
  |
Open  |
138  |
New control house and upgrade relay panels.  |
345075   |
20100805 1349  |
20100902 1535  |
20101011 0700  |
20101015 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_2045  |
LILLIAN  |
  |
Open  |
138  |
New control house and upgrade relay panels.  |
345079   |
20100805 1351  |
20100902 1535  |
20101011 0700  |
20101015 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
M20BCS  |
LILLIAN  |
  |
Open  |
138  |
New control house and upgrade relay panels. Mobile Sub will carry UCS load during this time.  |
345081   |
20100805 1352  |
20100902 1535  |
20101011 0700  |
20101015 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M50  |
LILLIAN  |
  |
Open  |
138  |
New control house and upgrade relay panels.  |
345078   |
20100805 1351  |
20100902 1535  |
20101011 0700  |
20101015 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
M20ACS  |
LILLIAN  |
  |
Open  |
69  |
New control house and upgrade relay panels. Mobile Sub will carry UCS load during this time.  |
345074   |
20100805 1348  |
20100902 1535  |
20101011 0700  |
20101015 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_1875_CB  |
LILLIAN  |
  |
Open  |
138  |
New control house and upgrade relay panels.  |
347060   |
20100823 1017  |
20100902 1533  |
20101011 0600  |
20101013 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
290_A  |
LAKE CREEK SES  |
TRADINGHOUSE SES  |
  |
345  |
install Dynamic Line Rating equipment  |
348102   |
20100830 0855  |
20100902 1528  |
20100902 0700  |
20100902 1500  |
20100902 0734  |
20100902 1528  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
PK_900_CB  |
PILOT KNOB  |
  |
Open  |
138  |
Sub station GCB maintenance / testing  |
348485   |
20100901 0518  |
20100902 1520  |
20100907 0800  |
20100907 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
GCB_8900_CB  |
BUTTERCUP  |
  |
Open  |
138  |
CLEAR CB 8900 TO TEST LINE PANEL  |
348487   |
20100901 0519  |
20100902 1520  |
20100907 0800  |
20100907 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_8899  |
BUTTERCUP  |
  |
Open  |
138  |
CLEAR CB 8900 TO TEST LINE PANEL  |
348488   |
20100901 0519  |
20100902 1520  |
20100907 0800  |
20100907 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_8901  |
BUTTERCUP  |
  |
Open  |
138  |
CLEAR CB 8900 TO TEST LINE PANEL  |
348933   |
20100902 1439  |
20100902 1520  |
20100907 0900  |
20100907 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Open  |
69  |
CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL  |
348934   |
20100902 1439  |
20100902 1520  |
20100907 0900  |
20100907 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Open  |
69  |
CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL  |
348482   |
20100901 0516  |
20100902 1520  |
20100907 0930  |
20100907 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
PCB_6220_CB  |
AUSTROP  |
  |
Open  |
345  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348484   |
20100901 0516  |
20100902 1520  |
20100907 0930  |
20100907 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_6219  |
AUSTROP  |
  |
Open  |
345  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348483   |
20100901 0516  |
20100902 1520  |
20100907 0930  |
20100907 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_6221  |
AUSTROP  |
  |
Open  |
345  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
347577   |
20100826 0929  |
20100902 1517  |
20100909 0800  |
20100909 1030  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
4340  |
HEIGHTS REIT  |
  |
Open  |
69  |
BRKR MAINT - ONE ENDS 34 WO  |
347481   |
20100825 1515  |
20100902 1517  |
20100909 0830  |
20100909 1400  |
  |
  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
COCS_FTST1  |
FORT STOCKTON PLANT  |
CONOCO COMP STATION  |
  |
69  |
Replace crossarms  |
347344   |
20100825 0844  |
20100902 1514  |
20100909 0800  |
20100909 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W540  |
BELLAIRE  |
  |
Open  |
138  |
LUBE MAINTENANCE  |
347349   |
20100825 0751  |
20100902 1513  |
20100909 0800  |
20100909 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
V530  |
OASIS  |
  |
Open  |
345  |
LUBE MAINTENANCE  |
348476   |
20100901 0504  |
20100902 1513  |
20100907 0800  |
20100907 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_6579  |
ZORN  |
  |
Open  |
345  |
CLEAR CB 6580 FOR OPERATOR MAINTENANCE  |
348477   |
20100901 0504  |
20100902 1513  |
20100907 0800  |
20100907 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_6581  |
ZORN  |
  |
Open  |
345  |
CLEAR CB 6580 FOR OPERATOR MAINTENANCE  |
348478   |
20100901 0504  |
20100902 1513  |
20100907 0800  |
20100907 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
PCB_6580_CB  |
ZORN  |
  |
Open  |
345  |
CLEAR CB 6580 FOR OPERATOR MAINTENANCE  |
348475   |
20100901 0501  |
20100902 1513  |
20100907 0900  |
20100907 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
181  |
LAVERNIA  |
  |
Open  |
69  |
CLEAR CB 180 FOR DIAGNOSTIC TESTING  |
348479   |
20100901 0506  |
20100902 1513  |
20100907 1030  |
20100907 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
11480  |
BITTER CREEK  |
  |
Open  |
345  |
CLEAR CB 11480 FOR OPERATOR INSPECTION  |
348480   |
20100901 0506  |
20100902 1513  |
20100907 1030  |
20100907 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
11481  |
BITTER CREEK  |
  |
Open  |
345  |
CLEAR CB 11480 FOR OPERATOR INSPECTION  |
348481   |
20100901 0506  |
20100902 1513  |
20100907 1030  |
20100907 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
11479  |
BITTER CREEK  |
  |
Open  |
345  |
CLEAR CB 11480 FOR OPERATOR INSPECTION  |
347189   |
20100824 0903  |
20100902 1509  |
20100909 0800  |
20100909 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
CB10  |
CROSBY  |
  |
Open  |
138  |
lube job  |
345776   |
20100811 1359  |
20100902 1506  |
20100830 1300  |
20100902 1600  |
20100831 0809  |
20100902 1115  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_20B  |
KATZ  |
  |
Open  |
69  |
Replace delivery transformer at Katz substation.  |
345775   |
20100811 1359  |
20100902 1506  |
20100830 1300  |
20100902 1600  |
20100831 0810  |
20100902 1116  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_20A  |
KATZ  |
  |
Open  |
69  |
Replace delivery transformer at Katz substation.  |
345774   |
20100811 1358  |
20100902 1506  |
20100830 1300  |
20100902 1600  |
20100831 0808  |
20100902 1117  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
X_LD_CB  |
KATZ  |
  |
Open  |
69  |
Replace delivery transformer at Katz substation. Mobile Sub will carry Tri-County load during this time.  |
348407   |
20100901 0454  |
20100902 1505  |
20100907 0830  |
20100907 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_2630_CB  |
FAYETTEVILLE  |
  |
Open  |
138  |
CLEAR CB 2630 FOR OPERATOR INSPECTION  |
348408   |
20100901 0455  |
20100902 1505  |
20100907 0830  |
20100907 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_2631  |
FAYETTEVILLE  |
  |
Open  |
138  |
CLEAR CB 2630 FOR OPERATOR INSPECTION  |
348469   |
20100901 0455  |
20100902 1505  |
20100907 0830  |
20100907 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_2629  |
FAYETTEVILLE  |
  |
Open  |
138  |
CLEAR CB 2630 FOR OPERATOR INSPECTION  |
348473   |
20100901 0500  |
20100902 1505  |
20100907 0900  |
20100907 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
180  |
LAVERNIA  |
  |
Open  |
69  |
CLEAR CB 180 FOR DIAGNOSTIC TESTING  |
348474   |
20100901 0500  |
20100902 1505  |
20100907 0900  |
20100907 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
179  |
LAVERNIA  |
  |
Open  |
69  |
CLEAR CB 180 FOR DIAGNOSTIC TESTING  |
348470   |
20100901 0458  |
20100902 1505  |
20100907 1230  |
20100907 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_2641  |
FAYETTEVILLE  |
  |
Open  |
138  |
CLEAR CB 2640 FOR OPERATOR INSPECTION  |
348472   |
20100901 0459  |
20100902 1505  |
20100907 1230  |
20100907 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_2640_CB  |
FAYETTEVILLE  |
  |
Open  |
138  |
CLEAR CB 2640 FOR OPERATOR INSPECTION  |
348471   |
20100901 0459  |
20100902 1505  |
20100907 1230  |
20100907 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_2639  |
FAYETTEVILLE  |
  |
Open  |
138  |
CLEAR CB 2640 FOR OPERATOR INSPECTION  |
348353   |
20100831 1005  |
20100902 1500  |
20100909 0100  |
20100909 0900  |
  |
  |
Daily  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
D110_CB  |
PHARR MVEC  |
  |
Open  |
138  |
remove Goliath Mobile from Doedyns line  |
348354   |
20100831 1010  |
20100902 1500  |
20100909 0100  |
20100909 0900  |
  |
  |
Daily  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
20620_CB  |
MVEC (DOEDYNS)  |
  |
Open  |
138  |
remove Goliath Mobile from Doedyns line Doedyns load to be backfed  |
348570   |
20100901 0943  |
20100902 1458  |
20100907 0600  |
20100907 1400  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
1607  |
ROBERTSON  |
  |
Open  |
138  |
Line maintenance.  |
348880   |
20100902 1330  |
20100902 1458  |
20100907 0700  |
20100910 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M10  |
FALLCREEK  |
  |
Open  |
138  |
Reroute line into new Domino Sub and remove existing reroute.  |
348909   |
20100902 1329  |
20100902 1458  |
20100907 0700  |
20100910 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M10  |
DOMINO  |
  |
Open  |
138  |
Reroute line into new Domino Sub and remove existing reroute.  |
348906   |
20100902 1328  |
20100902 1458  |
20100907 0700  |
20100910 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
2277  |
WAPLES  |
  |
Open  |
138  |
Reroute line into new Domino Sub and remove existing reroute.  |
348910   |
20100902 1329  |
20100902 1458  |
20100907 0700  |
20100910 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M30  |
DOMINO  |
  |
Open  |
138  |
Reroute line into new Domino Sub and remove existing reroute.  |
348817   |
20100902 0939  |
20100902 1458  |
20100907 1300  |
20100909 1600  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
PETTEWAY  |
  |
Open  |
69  |
Repair oil leak on the delivery transformer located on the no load tap were the inspection plates are located. Mobile Sub will carry Navasota Valley Coop load during this time.  |
348780   |
20100902 0938  |
20100902 1458  |
20100907 1300  |
20100909 1600  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
M20CS  |
PETTEWAY  |
  |
Open  |
69  |
Repair oil leak on the delivery transformer located on the no load tap were the inspection plates are located. Mobile Sub will carry Navasota Valley Coop load during this time.  |
347708   |
20100826 1209  |
20100902 1457  |
20100902 0830  |
20100902 1730  |
20100902 0810  |
20100902 1454  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_5290_CB  |
BERGHEIM  |
  |
Open  |
138  |
CLEAR CB 5290 FOR OPERATOR INSPECTION  |
346019   |
20100813 1041  |
20100902 1455  |
20100909 0700  |
20100909 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
LN  |
CKT_906  |
DESSAU  |
SPRINKLE  |
  |
138  |
Ckt maintenance  |
346021   |
20100813 1046  |
20100902 1455  |
20100909 0700  |
20100909 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DE_906_CB  |
DESSAU  |
  |
Open  |
138  |
Ckt maintenance  |
346020   |
20100813 1042  |
20100902 1455  |
20100909 0700  |
20100909 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DE_951_CB  |
DESSAU  |
  |
Open  |
138  |
Ckt maintenance  |
346022   |
20100813 1046  |
20100902 1455  |
20100909 0700  |
20100909 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
SK_906  |
SPRINKLE  |
  |
Open  |
138  |
Ckt maintenance  |
345220   |
20100806 1511  |
20100902 1455  |
20100817 0900  |
20100902 1700  |
20100817 0830  |
20100902 1324  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
RBT9998_CB  |
SKYLINE  |
  |
Open  |
345  |
To replace breaker.  |
347207   |
20100824 1309  |
20100902 1446  |
20100909 0700  |
20100909 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
5700  |
BRECKENRIDGE  |
  |
Open  |
69  |
Outage to replace crossarms. Open CB 5700 as part of TOAP.  |
347206   |
20100824 1308  |
20100902 1446  |
20100909 0700  |
20100909 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6180_C  |
GRAHAM SES  |
SUN ECU TAP  |
  |
138  |
Outage to replace crossarms. Open CB 5700 as part of TOAP.  |
348350   |
20100831 1000  |
20100902 1442  |
20100910 0100  |
20100917 1400  |
  |
  |
Continuous  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
AB112  |
MVEC ALBERTA ROAD TAP  |
  |
Open  |
138  |
line clearaqnce to c/o 2 dead end structures  |
348349   |
20100831 0959  |
20100902 1441  |
20100910 0100  |
20100917 1400  |
  |
  |
Continuous  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
V120  |
MVEC (VAL VERDE RD)  |
  |
Open  |
138  |
line clearaqnce to c/o 2 dead end structures  |
348138   |
20100830 1051  |
20100902 1439  |
20100902 0800  |
20100902 1800  |
20100902 0943  |
20100902 1343  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
GCB_8890_CB  |
BUTTERCUP  |
  |
Open  |
138  |
CLEAR CB 8900 TO TEST LINE PANEL  |
348139   |
20100830 1051  |
20100902 1439  |
20100902 0800  |
20100902 1800  |
20100902 0943  |
20100902 1343  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_8891  |
BUTTERCUP  |
  |
Open  |
138  |
CLEAR CB 8900 TO TEST LINE PANEL  |
348140   |
20100830 1051  |
20100902 1438  |
20100902 0800  |
20100902 1800  |
20100902 0943  |
20100902 1343  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_8889  |
BUTTERCUP  |
  |
Open  |
138  |
CLEAR CB 8900 TO TEST LINE PANEL  |
344218   |
20100729 1329  |
20100902 1435  |
20101108 0600  |
20101110 1800  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
PT_SE_65  |
PETERS REIT  |
SEALY  |
  |
138  |
line outage for plant outage at lubzol for plant maint  |
347406   |
20100825 1217  |
20100902 1433  |
20101010 2015  |
20101031 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6009_A  |
WILLOW CREEK SWITCH  |
PARKER SWITCH  |
  |
345  |
Outage to erect towers and pull wire for line reconductor.  |
342608   |
20100715 1238  |
20100902 1432  |
20101011 0600  |
20101013 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
AS_6606  |
ROUND ROCK NORTHEAST  |
  |
Open  |
138  |
move conductor to new Double Dead-end pole at Round Rock NE.. ne roundrock load fed from hutto  |
334458   |
20100510 1118  |
20100902 1423  |
20100902 0700  |
20100902 1630  |
20100902 0635  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
SAN MARCOS  |
CAMP GARY  |
  |
69  |
LINE OVERHAUL  |
348593   |
20100901 1153  |
20100902 1416  |
20100916 0800  |
20100916 1500  |
  |
  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
CB40  |
WEST GALVESTON  |
  |
Open  |
138  |
MAINT  |
348291   |
20100831 0756  |
20100902 1413  |
20100907 0300  |
20100907 1200  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
105_B  |
ROANOKE SWITCH  |
LEWISVILLE SWITCH  |
  |
345  |
Outage to install tower upgrade kits.  |
348362   |
20100831 1059  |
20100902 1413  |
20100907 0700  |
20100907 1500  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
HM_950  |
HAMILTON AEN  |
  |
Open  |
138  |
Sub station GCB maintenance / testing.  |
348201   |
20100830 1545  |
20100902 1413  |
20100907 0730  |
20100923 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
RBT9997_CB  |
SKYLINE  |
  |
Open  |
345  |
To replace breaker.  |
348206   |
20100830 1649  |
20100902 1413  |
20100907 0800  |
20100909 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
BEEVIL_MATHIS1  |
BEEVILLE  |
MATHIS  |
  |
69  |
LINE OUTAGE TO REPLACE POLE AND DOUBLE DEADEND  |
347716   |
20100826 1217  |
20100902 1413  |
20100902 0800  |
20100902 1200  |
20100902 0816  |
20100902 1230  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_6601  |
ZORN  |
  |
Open  |
138  |
CLEAR CB 6600 FOR OPERATOR MAINTENANCE  |
347715   |
20100826 1217  |
20100902 1413  |
20100902 0800  |
20100902 1200  |
20100902 0816  |
20100902 1230  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_6599  |
ZORN  |
  |
Open  |
138  |
CLEAR CB 6600 FOR OPERATOR MAINTENANCE  |
347714   |
20100826 1216  |
20100902 1413  |
20100902 0800  |
20100902 1200  |
20100902 0816  |
20100902 1230  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
PCB_6600_CB  |
ZORN  |
  |
Open  |
138  |
CLEAR CB 6600 FOR OPERATOR MAINTENANCE  |
347652   |
20100826 1103  |
20100902 1412  |
20100831 1200  |
20100902 1400  |
20100831 1130  |
20100902 1412  |
Continuous  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_9454  |
HARWOOD  |
  |
Open  |
69  |
SWITCH IS BEING OPENED TO CLEAR 69/12.5 KV T-1 XFMR FOR MAINT. T-1 LOAD WILL BE PUT ION A MOBILE XFMR INSTALLED ON THE LULING-HARWOOD 69 KV LINE  |
347612   |
20100826 1021  |
20100902 1411  |
20100830 1200  |
20100903 0900  |
20100831 0826  |
20100902 1120  |
Continuous  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_5064  |
GAY HILL  |
  |
Open  |
138  |
CLEAR 138/24.9 KV T-1 XFMR FOR MAINT. T-1 LOAD WILL BE PUT ON A MOBILE XFMR INSTALLED ON THE BYPASS BUS.  |
348583   |
20100901 1051  |
20100902 1411  |
20100915 0800  |
20100915 1130  |
  |
  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T2HS  |
WEST BAY  |
  |
Open  |
138  |
MAINTENANCE  |
348581   |
20100901 1046  |
20100902 1411  |
20100914 0800  |
20100914 1130  |
  |
  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T1HS  |
WEST BAY  |
  |
Open  |
138  |
MAINTENANCE  |
347611   |
20100826 1021  |
20100902 1411  |
20100830 1200  |
20100903 0900  |
20100831 0826  |
20100902 1320  |
Continuous  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CS5065  |
GAY HILL  |
  |
Open  |
138  |
CLEAR 138/24.9 KV T-1 XFMR FOR MAINT. T-1 LOAD WILL BE PUT ON A MOBILE XFMR INSTALLED ON THE BYPASS BUS.  |
347638   |
20100826 1104  |
20100902 1403  |
20100909 0500  |
20100909 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BG_GV_46  |
GARDEN VILLAS  |
BLODGETT  |
  |
69  |
SET POLE BASE FOR CKT46 RELOCATION  |
323762   |
20100211 1451  |
20100902 1351  |
20100920 0800  |
20100923 1700  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
CB_1304  |
WEATHERFORD SWITCH  |
  |
Open  |
138  |
Upgrade CB.  |
348221   |
20100830 1425  |
20100902 1335  |
20100907 0500  |
20100907 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6020_D  |
EVERMAN SWITCH  |
COURTLAND  |
  |
345  |
Outage for wireless work; antenna work. Close switch 6259 at Courtland for alternate source.  |
348222   |
20100830 1426  |
20100902 1335  |
20100907 0500  |
20100907 1300  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
6259  |
COURTLAND  |
  |
Close  |
345  |
Outage for wireless work; antenna work. Close switch 6259 at Courtland for alternate source.  |
348178   |
20100830 1354  |
20100902 1335  |
20100907 0700  |
20100907 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
348157   |
20100830 1221  |
20100902 1335  |
20100907 0700  |
20100907 0900  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_920_3  |
DECKER POWER PLANT  |
  |
Open  |
138  |
Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage.  |
348159   |
20100830 1224  |
20100902 1335  |
20100907 0700  |
20100907 0900  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
LN  |
CKT_921  |
DECKER POWER PLANT  |
AUSTROP  |
  |
138  |
Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage.  |
348161   |
20100830 1226  |
20100902 1335  |
20100907 0700  |
20100907 0900  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
AU_921_2_CB  |
AUSTROP  |
  |
Open  |
138  |
Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage.  |
348160   |
20100830 1225  |
20100902 1335  |
20100907 0700  |
20100907 0900  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_921  |
DECKER POWER PLANT  |
  |
Open  |
138  |
Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage.  |
348158   |
20100830 1222  |
20100902 1335  |
20100907 0700  |
20100907 0900  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_950  |
DECKER POWER PLANT  |
  |
Close  |
138  |
Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage.  |
348156   |
20100830 1221  |
20100902 1335  |
20100907 0700  |
20100907 0900  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_920_2_CB  |
DECKER POWER PLANT  |
  |
Open  |
138  |
Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage.  |
348116   |
20100830 1049  |
20100902 1335  |
20100907 0700  |
20100917 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
ST_601M_CS  |
STECK  |
  |
Open  |
138  |
ST-456 transformer maintenance and testing.  |
348153   |
20100830 1219  |
20100902 1335  |
20100907 0700  |
20100907 0900  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
LN  |
CKT_920  |
AUSTROP  |
DECKER POWER PLANT  |
  |
138  |
Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage.  |
348155   |
20100830 1220  |
20100902 1335  |
20100907 0700  |
20100907 0900  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
AU_920_2_CB  |
AUSTROP  |
  |
Open  |
138  |
Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage.  |
348154   |
20100830 1220  |
20100902 1335  |
20100907 0700  |
20100907 0900  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
AU_920_1_CB  |
AUSTROP  |
  |
Open  |
138  |
Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage.  |
348170   |
20100830 1226  |
20100902 1335  |
20100907 0700  |
20100907 0900  |
  |
  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
AU_921_1_CB  |
AUSTROP  |
  |
Open  |
138  |
Transmission crew to repair static / maintenance. The SPS at AU will be out of service for the duration of the outage.  |
348092   |
20100830 0718  |
20100902 1335  |
20100907 0600  |
20100912 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6009_A  |
WILLOW CREEK SWITCH  |
PARKER SWITCH  |
  |
345  |
Outage to erect towers for re-conductor upgrade.  |
345749   |
20100811 1304  |
20100902 1335  |
20100909 0500  |
20100909 1400  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2829  |
ELM MOTT  |
  |
Open  |
138  |
replacing poles and crossarms  |
345747   |
20100811 1302  |
20100902 1335  |
20100909 0500  |
20100909 1400  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1020_A  |
TRADINGHOUSE SES TAP  |
ELM MOTT  |
  |
138  |
replacing poles and crossarms  |
345748   |
20100811 1303  |
20100902 1335  |
20100909 0500  |
20100909 1400  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
2830  |
ELM MOTT  |
  |
Open  |
138  |
replacing poles and crossarms  |
345750   |
20100811 1305  |
20100902 1335  |
20100909 0500  |
20100909 1400  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2831  |
ELM MOTT  |
  |
Open  |
138  |
replacing poles and crossarms  |
345756   |
20100811 1320  |
20100902 1335  |
20100909 0500  |
20100909 1400  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2707  |
TRADINGHOUSE SES TAP  |
  |
Open  |
138  |
replacing poles and crossarms  |
348106   |
20100830 0930  |
20100902 1325  |
20100904 0600  |
20100904 1200  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
OCB_9110_CB  |
WYNN JOYCE  |
  |
Open  |
138  |
Request is for ONCOR to work a trouble at Site # CLR 0262.  |
348105   |
20100830 0929  |
20100902 1325  |
20100904 0600  |
20100904 1200  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
9112  |
WYNN JOYCE  |
  |
Open  |
138  |
Request is for ONCOR to work a trouble at Site # CLR 0262.  |
348104   |
20100830 0929  |
20100902 1325  |
20100904 0600  |
20100904 1200  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
1371  |
ROSEHILL  |
  |
Open  |
138  |
Request is for ONCOR to work a trouble at Site # CLR 0262.  |
348103   |
20100830 0928  |
20100902 1325  |
20100904 0600  |
20100904 1200  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
LN  |
ROS-WYN  |
ROSEHILL  |
WYNN JOYCE  |
  |
138  |
Request is for ONCOR to work a trouble at Site # CLR 0262.  |
348293   |
20100831 0757  |
20100902 1325  |
20100909 0300  |
20100909 1200  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
105_B  |
ROANOKE SWITCH  |
LEWISVILLE SWITCH  |
  |
345  |
Outage to install tower upgrade kits.  |
347635   |
20100826 1054  |
20100902 1316  |
20100902 0500  |
20100902 1300  |
20100902 0533  |
20100902 1228  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BG_GV_46  |
GARDEN VILLAS  |
BLODGETT  |
  |
69  |
SET POLE BASE FOR CKT46 RELOCATION  |
342417   |
20100714 1540  |
20100902 1316  |
20100902 0800  |
20100902 1600  |
20100902 0829  |
20100902 1307  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
V380  |
BELLAIRE  |
  |
Open  |
345  |
BREAKER LUBE MAINTENANCE  |
346564   |
20100818 1028  |
20100902 1315  |
20100902 1200  |
20100902 1530  |
  |
  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
F430  |
BAYWAY  |
  |
Open  |
138  |
Lube maintenance.  |
327460   |
20100315 1003  |
20100902 1309  |
20101101 0700  |
20101106 1700  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
JN_WO_72  |
JEANETTA  |
WHITE OAK  |
  |
345  |
INSTALL SOTF  |
342130   |
20100713 0950  |
20100902 1306  |
20100831 0700  |
20100902 1300  |
20100831 0630  |
20100902 1208  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
FW_WEB04  |
WEBSTER  |
FRIENDSWOOD REIT  |
  |
138  |
FOUNDATION WORK FOR CKT93 RECONDUCTOR  |
343880   |
20100727 1311  |
20100902 1306  |
20100920 0700  |
20100925 1800  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
FAL_DOM  |
FALLCREEK  |
DOMINO  |
  |
138  |
Reroute line into new Domino Sub and remove existing reroute.  |
343879   |
20100727 1311  |
20100902 1306  |
20100920 0700  |
20100925 1800  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
DOM_WPL  |
WAPLES  |
DOMINO  |
  |
138  |
Reroute line into new Domino Sub and remove existing reroute.  |
327458   |
20100315 1001  |
20100902 1302  |
20101101 0700  |
20101106 1700  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
J810  |
JEANETTA  |
  |
Open  |
345  |
INSTALL SOTF  |
327459   |
20100315 1002  |
20100902 1302  |
20101101 0700  |
20101106 1700  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
J820  |
JEANETTA  |
  |
Open  |
345  |
INSTALL SOTF  |
327457   |
20100315 1000  |
20100902 1302  |
20101101 0700  |
20101106 1700  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
3724  |
JEANETTA  |
  |
Open  |
345  |
INSTALL SOTF - SEE LN72 JN-WO  |
347156   |
20100824 0816  |
20100902 1253  |
20100903 0300  |
20100903 1200  |
  |
  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
105_A  |
CARROLLTON NORTHWEST  |
LEWISVILLE SWITCH  |
  |
345  |
Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345  |
347157   |
20100824 0816  |
20100902 1253  |
20100903 0300  |
20100903 1200  |
  |
  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
575_A  |
CARROLLTON NORTHWEST  |
LEWISVILLE SWITCH  |
  |
138  |
Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345  |
327463   |
20100315 1007  |
20100902 1253  |
20101101 0700  |
20101106 1700  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
Z930  |
WHITE OAK  |
  |
Open  |
345  |
INSTALL SOTF  |
327461   |
20100315 1005  |
20100902 1253  |
20101101 0700  |
20101106 1700  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
4724  |
WHITE OAK  |
  |
Open  |
345  |
INSTALL SOTF -SEE LN72 JN-WO  |
327462   |
20100315 1006  |
20100902 1253  |
20101101 0700  |
20101106 1700  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
Z920  |
WHITE OAK  |
  |
Open  |
345  |
INSTALL SOTF  |
348144   |
20100830 1118  |
20100902 1250  |
20100902 1200  |
20100902 1400  |
20100902 1135  |
20100902 1245  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5830_CB  |
LON HILL  |
  |
Open  |
69  |
cb maint and testing  |
347155   |
20100824 0816  |
20100902 1212  |
20100902 0300  |
20100902 1200  |
20100902 0726  |
20100902 1209  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
105_A  |
CARROLLTON NORTHWEST  |
LEWISVILLE SWITCH  |
  |
345  |
Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345  |
347139   |
20100824 0815  |
20100902 1212  |
20100902 0300  |
20100902 1200  |
20100902 0726  |
20100902 1209  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
575_A  |
CARROLLTON NORTHWEST  |
LEWISVILLE SWITCH  |
  |
138  |
Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345  |
348134   |
20100830 1040  |
20100902 1211  |
20100902 0730  |
20100902 1230  |
20100902 1014  |
20100902 1207  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
50  |
SAGINAW SWITCH  |
  |
Open  |
138  |
Outage to replace a carrier unit on the relaying panel.  |
347553   |
20100826 0756  |
20100902 1153  |
20100902 0600  |
20100902 1200  |
20100902 0642  |
20100902 1138  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1710_A  |
SALADO  |
SONTERRA  |
  |
138  |
replace crossarm  |
347242   |
20100824 1305  |
20100902 1151  |
20100902 0400  |
20100902 1300  |
20100902 0558  |
20100902 1104  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
5812  |
BOBTOWN  |
  |
Close  |
138  |
verizon wireless site setting new equipment  |
347915   |
20100827 1356  |
20100902 1129  |
20100901 2400  |
20100902 1200  |
20100901 2400  |
20100902 1125  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6009_A  |
WILLOW CREEK SWITCH  |
PARKER SWITCH  |
  |
345  |
Line outage to remove spacers and static wire bonds in preparation for erecting towers for future work.  |
347246   |
20100824 1318  |
20100902 1113  |
20100902 0400  |
20100902 1300  |
20100902 0543  |
20100902 1113  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1372  |
ROSEHILL  |
  |
Close  |
138  |
verizon wireless site setting new equipment  |
347248   |
20100824 1321  |
20100902 1112  |
20100902 0400  |
20100902 1300  |
20100902 0620  |
20100902 1104  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_F  |
GARLAND BOBTOWN TAP  |
ROWLETT  |
  |
138  |
verizon wireless site setting new equipment  |
347237   |
20100824 1303  |
20100902 1112  |
20100902 0400  |
20100902 1300  |
20100902 0558  |
20100902 1104  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_A  |
GARLAND BOBTOWN TAP  |
OATES TMPP  |
  |
138  |
verizon wireless site setting new equipment  |
347236   |
20100824 1302  |
20100902 1112  |
20100902 0400  |
20100902 1300  |
20100902 0558  |
20100902 1104  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_G  |
GARLAND BOBTOWN TAP  |
BOBTOWN  |
  |
138  |
verizon wireless site setting new equipment  |
345643   |
20100811 0838  |
20100902 1111  |
20100902 0300  |
20100902 1200  |
20100902 0324  |
20100902 1111  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
LN  |
CKT_902  |
DECKER POWER PLANT  |
SPRINKLE  |
  |
138  |
Transmission clearance on 138kv circuit 902 DP-SK for TXDOT to drill piers for new tollway.  |
345645   |
20100811 0838  |
20100902 1110  |
20100902 0300  |
20100902 1200  |
20100902 0324  |
20100902 1110  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_902_3  |
DECKER POWER PLANT  |
  |
Open  |
138  |
Transmission clearance on 138kv circuit 902 DP-SK for TXDOT to drill piers for new tollway.  |
345644   |
20100811 0838  |
20100902 1110  |
20100902 0300  |
20100902 1200  |
20100902 0325  |
20100902 1110  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_902_2_CB  |
DECKER POWER PLANT  |
  |
Open  |
138  |
Transmission clearance on 138kv circuit 902 DP-SK for TXDOT to drill piers for new tollway.  |
345646   |
20100811 0839  |
20100902 1110  |
20100902 0300  |
20100902 1200  |
20100902 0324  |
20100902 1110  |
Daily  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
SK_902  |
SPRINKLE  |
  |
Open  |
138  |
Transmission clearance on 138kv circuit 902 DP-SK for TXDOT to drill piers for new tollway.  |
347706   |
20100826 1206  |
20100902 1104  |
20100902 0900  |
20100902 1730  |
20100902 0849  |
20100902 1104  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_8699  |
SCHUMANSVILLE  |
  |
Open  |
138  |
CLEAR CB 8700 FOR DIAGNOSTIC TESTING  |
347705   |
20100826 1206  |
20100902 1103  |
20100902 0900  |
20100902 1730  |
20100902 0849  |
20100902 1103  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_8700  |
SCHUMANSVILLE  |
  |
Open  |
138  |
CLEAR CB 8700 FOR DIAGNOSTIC TESTING  |
347707   |
20100826 1207  |
20100902 1103  |
20100902 0900  |
20100902 1730  |
20100902 0849  |
20100902 1103  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_8701  |
SCHUMANSVILLE  |
  |
Open  |
138  |
CLEAR CB 8700 FOR DIAGNOSTIC TESTING  |
348497   |
20100901 0525  |
20100902 1101  |
20100908 1000  |
20100908 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
11501  |
BITTER CREEK  |
  |
Open  |
345  |
CLEAR CB 11500 FOR OPERATOR INSPECTION  |
348496   |
20100901 0525  |
20100902 1100  |
20100908 1000  |
20100908 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
11499  |
BITTER CREEK  |
  |
Open  |
345  |
CLEAR CB 11500 FOR OPERATOR INSPECTION  |
348495   |
20100901 0524  |
20100902 1100  |
20100908 1000  |
20100908 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
11500  |
BITTER CREEK  |
  |
Open  |
345  |
CLEAR CB 11500 FOR OPERATOR INSPECTION  |
348164   |
20100830 1305  |
20100902 1054  |
20100902 0800  |
20100902 1000  |
20100902 0748  |
20100902 0955  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5720_CB  |
LON HILL  |
  |
Open  |
69  |
cb maint and testing  |
347220   |
20100824 1042  |
20100902 1041  |
20101116 0900  |
20101203 1500  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
L100  |
WARVUE  |
  |
Open  |
12.5  |
CUST REQUEST SECTION OUTAGE TO REPLACE TR 2  |
347222   |
20100824 1043  |
20100902 1041  |
20101116 0900  |
20101203 1500  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
W131  |
WARVUE  |
  |
Open  |
138  |
CUST REQUEST SECTION OUTAGE TO REPLACE TR 2  |
347219   |
20100824 1042  |
20100902 1041  |
20101116 0900  |
20101203 1500  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W140  |
WARVUE  |
  |
Open  |
138  |
CUST REQUEST SECTION OUTAGE TO REPLACE TR 2  |
348831   |
20100902 1020  |
20100902 1029  |
20101018 0800  |
20101102 1215  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10850  |
AVERY RANCH  |
  |
Open  |
138  |
CLEAR 138 KV BUSWORK BETWEEN SWITCHES 10879,10849,10854 TO LIFT JUMPERS ON BUSWORK FOR NEW CONSTRUCTION. T-2 LOAD WILL BE PUT ON T-1 FOR THIS WORK  |
337841   |
20100607 1052  |
20100902 1027  |
20101115 0600  |
20101118 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
CB20  |
BELLAIRE  |
  |
Open  |
138  |
REPL CB20  |
342573   |
20100715 0915  |
20100902 1019  |
20100902 0600  |
20100902 1400  |
20100902 1017  |
20100902 1019  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
RBS_HRN  |
HEARNE  |
ROBERTSON  |
  |
138  |
Line maintenance.  |
346435   |
20100817 1253  |
20100902 1015  |
20100902 0700  |
20100902 1400  |
20100902 0700  |
  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2105  |
ECTOR HARPER  |
  |
Open  |
138  |
Outages to replace bad crossarms and poles.  |
345627   |
20100811 0828  |
20100902 1014  |
20100906 0700  |
20100906 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2599  |
GRAHAM SES  |
  |
Open  |
138  |
Outage to remove guys for Brazos Construction.  |
345628   |
20100811 0829  |
20100902 1014  |
20100906 0700  |
20100906 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
LS_4907  |
RICE SWITCH  |
  |
Open  |
138  |
Outage to remove guys for Brazos Construction.  |
345623   |
20100811 0827  |
20100902 1014  |
20100906 0700  |
20100906 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
2600  |
GRAHAM SES  |
  |
Open  |
138  |
Outage to remove guys for Brazos Construction.  |
345625   |
20100811 0828  |
20100902 1014  |
20100906 0700  |
20100906 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2601  |
GRAHAM SES  |
  |
Open  |
138  |
Outage to remove guys for Brazos Construction.  |
345621   |
20100811 0827  |
20100902 1014  |
20100906 0700  |
20100906 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6560_A  |
GRAHAM SES  |
RICE SWITCH  |
  |
138  |
Outage to remove guys for Brazos Construction.  |
346449   |
20100817 1254  |
20100902 1009  |
20100902 0700  |
20100902 1400  |
  |
  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6480_B  |
ECTOR HARPER  |
PERMIAN BASIN SES  |
  |
138  |
Outages to replace bad crossarms and poles.  |
346460   |
20100817 1257  |
20100902 1008  |
20100902 0700  |
20100902 1400  |
  |
  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
2540  |
PERMIAN BASIN SES  |
  |
Open  |
138  |
Outages to replace bad crossarms and poles.  |
346455   |
20100817 1256  |
20100902 1008  |
20100902 0700  |
20100902 1400  |
  |
  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
2460  |
PERMIAN BASIN SES  |
  |
Open  |
138  |
Outages to replace bad crossarms and poles.  |
348177   |
20100830 1350  |
20100902 1004  |
20100902 0600  |
20100902 2000  |
20100902 0948  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
765_A  |
CARROLLTON EAST  |
NORTH LAKE SES  |
  |
138  |
Contractor will be working close to this line while setting a new structure just outside of Carrollton NW.  |
345912   |
20100812 1006  |
20100902 1002  |
20100902 0700  |
20100902 1700  |
20100902 0731  |
20100902 0930  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
5721  |
BRECKENRIDGE  |
  |
Open  |
69  |
Outage to replace poles.  |
345855   |
20100812 1005  |
20100902 1002  |
20100902 0700  |
20100902 1700  |
20100902 0731  |
20100902 0930  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
5720  |
BRECKENRIDGE  |
  |
Open  |
69  |
Outage to replace poles.  |
345911   |
20100812 1005  |
20100902 1001  |
20100902 0700  |
20100902 1700  |
20100902 0731  |
20100902 0930  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
5719  |
BRECKENRIDGE  |
  |
Open  |
69  |
Outage to replace poles.  |
344431   |
20100730 1407  |
20100902 1001  |
20100902 0700  |
20100902 1700  |
20100902 0702  |
20100902 0930  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6630_A  |
BRECKENRIDGE  |
IVAN  |
  |
69  |
Outage to replace poles.  |
345913   |
20100812 1006  |
20100902 1001  |
20100902 0700  |
20100902 1700  |
20100902 0702  |
20100902 0959  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1628  |
IVAN  |
  |
Open  |
69  |
Outage to replace poles.  |
348231   |
20100830 1615  |
20100902 0924  |
20100902 2030  |
20100902 2200  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
9995_CB  |
DUPONT SWITCH - INGLESIDE  |
  |
Open  |
138  |
INSTALLING NEW DME EQUIPMENT  |
348230   |
20100830 1615  |
20100902 0924  |
20100902 2030  |
20100902 2200  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
9985_CB  |
DUPONT SWITCH - INGLESIDE  |
  |
Open  |
138  |
INSTALLING NEW DME EQUIPMENT  |
347718   |
20100826 1220  |
20100902 0911  |
20100902 0700  |
20100902 1100  |
20100902 0755  |
20100902 0911  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_5194  |
GABRIEL  |
  |
Open  |
138  |
CLEAR CS 5195 FOR RELAY TRIP CHECK  |
347717   |
20100826 1220  |
20100902 0910  |
20100902 0700  |
20100902 1100  |
20100902 0755  |
20100902 0910  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CS5195  |
GABRIEL  |
  |
Open  |
138  |
CLEAR CS 5195 FOR RELAY TRIP CHECK  |
347918   |
20100827 1443  |
20100902 0904  |
20100902 0700  |
20100902 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6856_B  |
SEYMOUR TU  |
BOMARTON TU  |
  |
69  |
OUtage to replace bad crossarms.  |
348226   |
20100830 1559  |
20100902 0829  |
20100902 0800  |
20100903 1500  |
20100902 0810  |
  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
840_CB  |
UVALDE CSW  |
  |
Open  |
69  |
CB maintenance  |
346031   |
20100813 1108  |
20100902 0800  |
20100823 0700  |
20100903 1600  |
20100823 1016  |
20100902 0800  |
Continuous  |
Approved  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
SK_600M_CS  |
SPRINKLE  |
  |
Open  |
138  |
Scheduled maintenance for SK-123 transformer. Repair hot spots found with infra red.  |
346717   |
20100819 0556  |
20100902 0743  |
20100902 0730  |
20100902 1130  |
  |
  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T240  |
UNIVERSITY REIT  |
  |
Close  |
69  |
LUBE MAINTENANCE LN30>GV ON BYPASS  |
346716   |
20100819 0555  |
20100902 0742  |
20100902 0730  |
20100902 1130  |
  |
  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
2303  |
UNIVERSITY REIT  |
  |
Close  |
69  |
LUBE MAINTENANCE LN30>GV ON BYPASS  |
346715   |
20100819 0551  |
20100902 0742  |
20100902 0730  |
20100902 1130  |
  |
  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
2300  |
UNIVERSITY REIT  |
  |
Open  |
69  |
LUBE MAINTENANCE LN30>GV ON BYPASS  |
348204   |
20100830 1611  |
20100902 0737  |
20100908 0730  |
20100909 1700  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_9094_CB  |
SAM RAYBURN SWITCHYD  |
  |
Close  |
138  |
clearance on bkr 9074 to replace Reclosing Relay - will unilize transfer bkr 9094  |
348205   |
20100830 1613  |
20100902 0737  |
20100908 0730  |
20100909 1700  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_9072  |
SAM RAYBURN SWITCHYD  |
  |
Close  |
138  |
clearance on bkr 9074 to replace Reclosing Relay - will utilize transfer bkr 9094  |
348203   |
20100830 1610  |
20100902 0737  |
20100908 0730  |
20100909 1700  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_9074_CB  |
SAM RAYBURN SWITCHYD  |
  |
Open  |
138  |
bkr clearance to replace Reclosing Relay - will unilize transfer bkr 9094  |
347073   |
20100823 1402  |
20100902 0718  |
20100902 0600  |
20100902 1900  |
20100902 0630  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
9625  |
RATTLESNAKE ROAD SWITCH  |
  |
Open  |
345  |
install jumpers on equipment  |
347091   |
20100823 1401  |
20100902 0718  |
20100902 0600  |
20100902 1900  |
20100902 0630  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
9615  |
RATTLESNAKE ROAD SWITCH  |
  |
Open  |
345  |
install jumpers on equipment  |
345757   |
20100811 1322  |
20100902 0642  |
20100902 0500  |
20100903 1400  |
20100902 0535  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
757  |
WACO ATCO  |
  |
Open  |
69  |
replacing poles and crossarms  |
345746   |
20100811 1257  |
20100902 0641  |
20100902 0500  |
20100903 1400  |
20100902 0535  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
2330_B  |
WACO ATCO  |
MCGREGOR TU  |
  |
69  |
replacing poles and crossarms  |
346640   |
20100818 1407  |
20100902 0602  |
20100902 0730  |
20100902 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
12P2  |
P2  |
  |
Open  |
138  |
FOUNDATION INSTALLATION  |
346639   |
20100818 1405  |
20100902 0602  |
20100902 0730  |
20100902 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
10Q1  |
Q1  |
  |
Open  |
138  |
FOUNDATION INSTALLATION  |
346635   |
20100818 1358  |
20100902 0601  |
20100902 0730  |
20100902 1700  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
P2_Q1  |
P2  |
Q1  |
  |
138  |
FOUNDATION INSTALLATION  |
346377   |
20100817 0638  |
20100902 0544  |
20100902 0600  |
20100902 1730  |
20100902 0544  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL  |
345758   |
20100811 1323  |
20100902 0538  |
20100902 0500  |
20100903 1400  |
20100902 0535  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
772  |
MCGREGOR TU  |
  |
Open  |
69  |
replacing poles and crossarms  |
347738   |
20100826 1337  |
20100902 0337  |
20100901 2400  |
20100902 0800  |
20100901 2400  |
20100902 0001  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
XF  |
AXFMR1  |
HOLT SWITCH  |
  |
  |
69  |
Outage for Nerc mandated compliance relay testing.  |
347736   |
20100826 1336  |
20100902 0337  |
20100901 2400  |
20100902 0800  |
20100901 2400  |
20100902 0001  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
2830  |
HOLT SWITCH  |
  |
Open  |
69  |
Outage for Nerc mandated compliance relay testing.  |
347737   |
20100826 1336  |
20100902 0336  |
20100901 2400  |
20100902 0800  |
20100901 2400  |
20100902 0001  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
4412  |
HOLT SWITCH  |
  |
Open  |
138  |
Outage for Nerc mandated compliance relay testing.  |
345616   |
20100811 0815  |
20100901 2216  |
20100901 1300  |
20100901 1900  |
20100901 1346  |
20100901 1633  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
9224  |
TONKAWA SWITCH  |
  |
Open  |
345  |
Outage at wind farm customers request to perform maintenance in customers station.  |
347037   |
20100823 0748  |
20100901 1903  |
20100901 1000  |
20100901 1600  |
20100901 1120  |
20100901 1231  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_11711  |
BELLVILLE SOUTH  |
  |
Open  |
138  |
CLEAR CB 11710 FOR SAN BERNARD ELECTRIC COOPERATIVE SWITCH TRAINING  |
347036   |
20100823 0747  |
20100901 1903  |
20100901 1000  |
20100901 1600  |
20100901 1119  |
20100901 1231  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_11709  |
BELLVILLE SOUTH  |
  |
Open  |
138  |
CLEAR CB 11710 FOR SAN BERNARD ELECTRIC COOPERATIVE SWITCH TRAINING  |
347035   |
20100823 0747  |
20100901 1902  |
20100901 1000  |
20100901 1600  |
20100901 1120  |
20100901 1231  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_11710_CB  |
BELLVILLE SOUTH  |
  |
Open  |
138  |
CLEAR CB 11710 FOR SAN BERNARD ELECTRIC COOPERATIVE SWITCH TRAINING  |
346985   |
20100823 1342  |
20100901 1735  |
20100901 0700  |
20100901 1600  |
20100901 0847  |
20100901 1511  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1140  |
ROYSE SWITCH  |
  |
Open  |
69  |
RELAY CALIBRATION  |
347384   |
20100825 1238  |
20100901 1733  |
20100901 0100  |
20100901 0545  |
20100901 0155  |
20100901 0545  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1844  |
JEWETT  |
  |
Open  |
138  |
Work to be done trip test 138KV bus diff and Xfmr#4.  |
337347   |
20100603 1333  |
20100901 1717  |
20100901 0700  |
20100901 1730  |
  |
20100901 1717  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL  |
346376   |
20100817 0638  |
20100901 1717  |
20100901 0600  |
20100901 0645  |
20100901 0543  |
20100901 1717  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL  |
346638   |
20100818 1404  |
20100901 1705  |
20100901 0730  |
20100901 1700  |
20100901 0741  |
20100901 1705  |
Daily  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
10Q1  |
Q1  |
  |
Open  |
138  |
FOUNDATION INSTALLATION  |
346637   |
20100818 1404  |
20100901 1705  |
20100901 0730  |
20100901 1700  |
20100901 0741  |
20100901 1705  |
Daily  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
12P2  |
P2  |
  |
Open  |
138  |
FOUNDATION INSTALLATION  |
346633   |
20100818 1356  |
20100901 1705  |
20100901 0730  |
20100901 1700  |
20100901 0741  |
20100901 1705  |
Daily  |
Approved  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
P2_Q1  |
P2  |
Q1  |
  |
138  |
FOUNDATION INSTALLATION  |
334457   |
20100510 1118  |
20100901 1656  |
20100901 0700  |
20100901 1630  |
20100901 0632  |
20100901 1656  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
SAN MARCOS  |
CAMP GARY  |
  |
69  |
LINE OVERHAUL  |
348228   |
20100830 1614  |
20100901 1638  |
20100902 2030  |
20100902 2200  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2930_CB  |
WHITEPOINT  |
  |
Open  |
138  |
INSTALLING NEW DME EQUIPMENT  |
348229   |
20100830 1614  |
20100901 1638  |
20100902 2030  |
20100902 2200  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2920_CB  |
WHITEPOINT  |
  |
Open  |
138  |
INSTALLING NEW DME EQUIPMENT  |
348224   |
20100830 1553  |
20100901 1638  |
20100902 1900  |
20100902 2030  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2895_CB  |
WHITEPOINT  |
  |
Open  |
138  |
INSTALLING NEW DME EQUIPMENT  |
348227   |
20100830 1613  |
20100901 1638  |
20100902 1900  |
20100902 2030  |
  |
  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2940_CB  |
WHITEPOINT  |
  |
Open  |
138  |
INSTALLING NEW DME EQUIPMENT  |
337520   |
20100603 1418  |
20100901 1631  |
20101203 0700  |
20101203 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
153T153  |
HILBIG  |
SIM GIDEON  |
  |
138  |
OVERHAUL  |
333465   |
20100504 1353  |
20100901 1631  |
20101203 0900  |
20101203 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
120  |
KOCH UP RIVER  |
  |
Open  |
138  |
maintenance  |
340375   |
20100629 0629  |
20100901 1617  |
20101202 0700  |
20101202 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_1336  |
BELLVILLE  |
  |
Open  |
138  |
CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE  |
342890   |
20100719 0901  |
20100901 1617  |
20101202 0700  |
20101204 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
260_A  |
SINGLETON  |
JEWETT  |
  |
345  |
REHAB WORK  |
340251   |
20100629 0523  |
20100901 1617  |
20101202 0700  |
20101202 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
467T467  |
BELLVILLE  |
HIGHWAY 36  |
  |
138  |
CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE  |
337519   |
20100603 1418  |
20100901 1617  |
20101202 0700  |
20101202 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
153T153  |
HILBIG  |
SIM GIDEON  |
  |
138  |
OVERHAUL  |
340325   |
20100629 0550  |
20100901 1617  |
20101202 0700  |
20101202 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
11942  |
HIGHWAY 36  |
  |
Open  |
138  |
CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE  |
333464   |
20100504 1351  |
20100901 1617  |
20101202 0900  |
20101202 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
40_CB  |
KOCH UP RIVER  |
  |
Open  |
69  |
maintenance  |
347212   |
20100824 1001  |
20100901 1608  |
20100901 0900  |
20100901 1700  |
20100901 0917  |
20100901 1607  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
MCAD_PADC1  |
PADUCAH CITY  |
MCADAMS  |
  |
69  |
LINE OUTAGE BETWEEN PADUCAH CITY - McADAMS TO REPLACE CROSS-ARMS @ STR 19-13, 33-8  |
347514   |
20100826 0849  |
20100901 1558  |
20100901 0800  |
20100901 1600  |
20100901 0851  |
20100901 1551  |
Daily  |
Approved  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
COY_KENE  |
COY CITY SUB  |
KENEDY  |
  |
69  |
Line Maint.  |
343883   |
20100727 1319  |
20100901 1554  |
20100830 0700  |
20100901 1700  |
20100831 0726  |
20100901 1700  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W750  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2  |
342572   |
20100715 0915  |
20100901 1553  |
20100901 0600  |
20100901 1400  |
20100901 0534  |
20100901 1351  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
RBS_HRN  |
HEARNE  |
ROBERTSON  |
  |
138  |
Line maintenance.  |
343884   |
20100727 1319  |
20100901 1553  |
20100830 0700  |
20100901 1700  |
20100831 0726  |
20100901 1700  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W760  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2  |
343882   |
20100727 1318  |
20100901 1553  |
20100830 0700  |
20100901 1700  |
20100831 0726  |
20100901 1700  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
W759  |
TIDAL ROAD COGEN  |
  |
Open  |
138  |
SECTION OUTAGE TO REPLACE BUSHINGS ON AUTO#2  |
333463   |
20100504 1350  |
20100901 1542  |
20101201 0900  |
20101201 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
20_CB  |
KOCH UP RIVER  |
  |
Open  |
69  |
maintenance  |
333461   |
20100504 1347  |
20100901 1541  |
20101201 0900  |
20101215 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
XF  |
345_1382H  |
LON HILL  |
  |
  |
345  |
maintenance on high and low side thru to kingsville  |
333462   |
20100504 1347  |
20100901 1541  |
20101201 0900  |
20101215 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
XF  |
345_1382L  |
LON HILL  |
  |
  |
138  |
maintenance on high and low side thru to kingsville  |
343518   |
20100723 0732  |
20100901 1535  |
20101201 0700  |
20101202 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
CHLDPW55  |
DEEPWATER  |
CHANEL  |
  |
69  |
OUTAGE TO INSTALL EQUIPTMENT  |
308343   |
20090922 1459  |
20100901 1535  |
20101201 0800  |
20101201 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
REN_CNTR  |
RENO  |
CENTER POINT A  |
  |
138  |
Line maintenance.  |
340250   |
20100629 0523  |
20100901 1532  |
20101201 0700  |
20101201 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
467T467  |
BELLVILLE  |
HIGHWAY 36  |
  |
138  |
CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE  |
340374   |
20100629 0629  |
20100901 1532  |
20101201 0700  |
20101201 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_1336  |
BELLVILLE  |
  |
Open  |
138  |
CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE  |
337518   |
20100603 1418  |
20100901 1532  |
20101201 0700  |
20101201 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
153T153  |
HILBIG  |
SIM GIDEON  |
  |
138  |
OVERHAUL  |
340324   |
20100629 0550  |
20100901 1532  |
20101201 0700  |
20101201 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
11942  |
HIGHWAY 36  |
  |
Open  |
138  |
CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE  |
348722   |
20100901 1513  |
20100901 1514  |
20100924 0700  |
20100924 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348723   |
20100901 1513  |
20100901 1514  |
20100925 0700  |
20100925 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348724   |
20100901 1513  |
20100901 1514  |
20100926 0700  |
20100926 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348708   |
20100901 1512  |
20100901 1514  |
20100924 0700  |
20100924 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348709   |
20100901 1512  |
20100901 1514  |
20100925 0700  |
20100925 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348695   |
20100901 1511  |
20100901 1514  |
20100926 0700  |
20100926 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348710   |
20100901 1512  |
20100901 1514  |
20100926 0700  |
20100926 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348693   |
20100901 1511  |
20100901 1514  |
20100924 0700  |
20100924 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348694   |
20100901 1511  |
20100901 1514  |
20100925 0700  |
20100925 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348716   |
20100901 1513  |
20100901 1514  |
20100918 0700  |
20100918 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348717   |
20100901 1513  |
20100901 1514  |
20100919 0700  |
20100919 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348701   |
20100901 1512  |
20100901 1514  |
20100917 0700  |
20100917 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348715   |
20100901 1513  |
20100901 1514  |
20100917 0700  |
20100917 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348702   |
20100901 1512  |
20100901 1514  |
20100918 0700  |
20100918 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348703   |
20100901 1512  |
20100901 1514  |
20100919 0700  |
20100919 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348686   |
20100901 1511  |
20100901 1514  |
20100917 0700  |
20100917 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348687   |
20100901 1511  |
20100901 1514  |
20100918 0700  |
20100918 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348688   |
20100901 1511  |
20100901 1514  |
20100919 0700  |
20100919 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
347071   |
20100823 1342  |
20100901 1513  |
20100901 0700  |
20100901 1600  |
20100901 0847  |
20100901 1511  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
XF  |
AXFMR2  |
ROYSE SWITCH  |
  |
  |
69  |
RELAY CALIBRATION  |
348681   |
20100901 1509  |
20100901 1510  |
20100926 0700  |
20100926 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348680   |
20100901 1509  |
20100901 1510  |
20100925 0700  |
20100925 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348679   |
20100901 1509  |
20100901 1510  |
20100924 0700  |
20100924 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348674   |
20100901 1509  |
20100901 1510  |
20100919 0700  |
20100919 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348673   |
20100901 1509  |
20100901 1510  |
20100918 0700  |
20100918 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348672   |
20100901 1509  |
20100901 1510  |
20100917 0700  |
20100917 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348646   |
20100901 1506  |
20100901 1507  |
20100926 0700  |
20100926 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348645   |
20100901 1506  |
20100901 1507  |
20100925 0700  |
20100925 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348639   |
20100901 1506  |
20100901 1507  |
20100919 0700  |
20100919 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348644   |
20100901 1506  |
20100901 1507  |
20100924 0700  |
20100924 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348637   |
20100901 1506  |
20100901 1507  |
20100917 0700  |
20100917 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348638   |
20100901 1506  |
20100901 1507  |
20100918 0700  |
20100918 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348632   |
20100901 1459  |
20100901 1505  |
20100927 0700  |
20100927 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348630   |
20100901 1459  |
20100901 1505  |
20100925 0700  |
20100925 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348631   |
20100901 1459  |
20100901 1505  |
20100926 0700  |
20100926 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348629   |
20100901 1459  |
20100901 1505  |
20100924 0700  |
20100924 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348628   |
20100901 1459  |
20100901 1505  |
20100923 0700  |
20100923 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348627   |
20100901 1459  |
20100901 1505  |
20100922 0700  |
20100922 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348626   |
20100901 1459  |
20100901 1505  |
20100921 0700  |
20100921 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348625   |
20100901 1459  |
20100901 1505  |
20100920 0900  |
20100920 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348624   |
20100901 1459  |
20100901 1505  |
20100919 0700  |
20100919 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348623   |
20100901 1459  |
20100901 1505  |
20100918 0700  |
20100918 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348622   |
20100901 1459  |
20100901 1505  |
20100917 0700  |
20100917 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348620   |
20100901 1459  |
20100901 1505  |
20100915 0700  |
20100915 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348621   |
20100901 1459  |
20100901 1505  |
20100916 0700  |
20100916 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
337799   |
20100607 0838  |
20100901 1455  |
20100930 0700  |
20100930 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
337797   |
20100607 0838  |
20100901 1455  |
20100928 0700  |
20100928 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
337798   |
20100607 0838  |
20100901 1455  |
20100929 0700  |
20100929 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
337795   |
20100607 0836  |
20100901 1455  |
20100923 0700  |
20100923 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
337796   |
20100607 0838  |
20100901 1455  |
20100927 0900  |
20100927 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
344440   |
20100730 1431  |
20100901 1455  |
20100901 0700  |
20100901 1730  |
20100901 0925  |
20100901 1453  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
Y110  |
HIMONT  |
  |
Open  |
138  |
replace hyd seal and maint  |
337793   |
20100607 0836  |
20100901 1455  |
20100921 0700  |
20100921 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
337794   |
20100607 0836  |
20100901 1455  |
20100922 0700  |
20100922 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
337792   |
20100607 0835  |
20100901 1455  |
20100920 0900  |
20100920 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
347674   |
20100826 1119  |
20100901 1452  |
20100901 0830  |
20100901 1730  |
20100901 0851  |
20100901 1449  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_11289  |
RAYMOND BARKER  |
  |
Open  |
138  |
CLEAR CB 11290 FOR OPERATOR INSPECTION  |
347672   |
20100826 1118  |
20100901 1452  |
20100901 0830  |
20100901 1730  |
20100901 0851  |
20100901 1449  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_11290  |
RAYMOND BARKER  |
  |
Open  |
138  |
CLEAR CB 11290 FOR OPERATOR INSPECTION  |
347673   |
20100826 1118  |
20100901 1452  |
20100901 0830  |
20100901 1730  |
20100901 0851  |
20100901 1449  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_11291  |
RAYMOND BARKER  |
  |
Open  |
138  |
CLEAR CB 11290 FOR OPERATOR INSPECTION  |
347917   |
20100827 1442  |
20100901 1449  |
20100901 0700  |
20100901 1700  |
20100901 1043  |
20100901 1410  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6856_B  |
SEYMOUR TU  |
BOMARTON TU  |
  |
69  |
OUtage to replace bad crossarms.  |
337593   |
20100603 1622  |
20100901 1445  |
20100914 0700  |
20100914 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
109T220  |
CAMP GARY  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED DUE TO RIGHT OF WAY ISSUES DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
337594   |
20100603 1623  |
20100901 1445  |
20100915 1200  |
20100915 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
109T220  |
CAMP GARY  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED DUE TO RIGHT OF WAY ISSUES DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
337550   |
20100603 1623  |
20100901 1445  |
20100916 0700  |
20100916 1630  |
  |
  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
109T220  |
CAMP GARY  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED DUE TO RIGHT OF WAY ISSUES DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
347665   |
20100826 1114  |
20100901 1440  |
20100901 0800  |
20100901 1730  |
20100901 0757  |
20100901 1440  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
499T499  |
SEGUIN  |
GERONIMO  |
  |
138  |
CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN.  |
347664   |
20100826 1114  |
20100901 1440  |
20100901 0800  |
20100901 1730  |
20100901 0840  |
20100901 1440  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3601  |
SEGUIN  |
  |
Open  |
138  |
CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN.  |
347663   |
20100826 1113  |
20100901 1440  |
20100901 0800  |
20100901 1730  |
20100901 0840  |
20100901 1440  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3599  |
SEGUIN  |
  |
Open  |
138  |
CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN.  |
347662   |
20100826 1113  |
20100901 1440  |
20100901 0800  |
20100901 1730  |
20100901 0840  |
20100901 1440  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_3600_CB  |
SEGUIN  |
  |
Open  |
138  |
CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN.  |
347668   |
20100826 1115  |
20100901 1438  |
20100901 0800  |
20100901 1730  |
20100901 0759  |
20100901 1438  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_9601  |
GERONIMO  |
  |
Open  |
138  |
CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN.  |
347669   |
20100826 1115  |
20100901 1438  |
20100901 0800  |
20100901 1730  |
20100901 0758  |
20100901 1438  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_9599  |
GERONIMO  |
  |
Open  |
138  |
CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN.  |
347670   |
20100826 1115  |
20100901 1438  |
20100901 0800  |
20100901 1730  |
20100901 0758  |
20100901 1438  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_13441  |
GERONIMO  |
  |
Open  |
138  |
CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN.  |
347671   |
20100826 1115  |
20100901 1438  |
20100901 0800  |
20100901 1730  |
20100901 0758  |
20100901 1437  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_13439  |
GERONIMO  |
  |
Open  |
138  |
CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN.  |
347840   |
20100827 0754  |
20100901 1437  |
20100901 0700  |
20100901 1600  |
20100901 0852  |
20100901 1437  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
3490  |
PAYNE SWITCH  |
  |
Open  |
138  |
Breaker operator maint. on CB 3490  |
347666   |
20100826 1114  |
20100901 1437  |
20100901 0800  |
20100901 1730  |
20100901 0758  |
20100901 1437  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_13440  |
GERONIMO  |
  |
Open  |
138  |
CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN.  |
347667   |
20100826 1114  |
20100901 1437  |
20100901 0800  |
20100901 1730  |
20100901 0758  |
20100901 1437  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_9600  |
GERONIMO  |
  |
Open  |
138  |
CLEAR SEGUIN-GERONIMO 138 KV LINE TO REAPIR HOT SPOT ON LINE SWITCH 3601 AT SEGUIN.  |
333459   |
20100504 1345  |
20100901 1437  |
20101130 0900  |
20101130 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
XF  |
138_69A1  |
ALICE  |
  |
  |
69  |
maintenance on high and low side thru to kingsville  |
333460   |
20100504 1345  |
20100901 1437  |
20101130 0900  |
20101130 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
ALICE_KINGSV1  |
ALICE  |
KINGSVILLE  |
  |
138  |
maintenance on high and low side thru to kingsville  |
334469   |
20100510 1118  |
20100901 1437  |
20100913 1200  |
20100913 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
SAN MARCOS  |
CAMP GARY  |
  |
69  |
LINE OVERHAUL  |
347732   |
20100826 1247  |
20100901 1426  |
20100901 0700  |
20100901 1700  |
20100901 0643  |
20100901 1354  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P390  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp controll cables  |
347647   |
20100826 1240  |
20100901 1425  |
20100901 0700  |
20100901 1700  |
20100901 0643  |
20100901 1355  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P380  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp controll cables  |
347646   |
20100826 1234  |
20100901 1425  |
20100901 0700  |
20100901 1700  |
20100901 0643  |
20100901 1354  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
4825  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp controll cables  |
345176   |
20100806 0944  |
20100901 1425  |
20100901 0700  |
20100901 1700  |
20100901 0642  |
20100901 1354  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T1H1  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp controll cables  |
308869   |
20090928 1316  |
20100901 1411  |
20101130 0800  |
20101216 1600  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
NOR_WRIG  |
NORFORK  |
WRIGHT  |
  |
69  |
Capacity Increase, secondary voltage conversion to 25 kV and voltage conversion to 138 kV at Norfork. Line will be left open until the voltage conversion at Wright is complete next week.  |
344655   |
20100803 0759  |
20100901 1410  |
20100901 0700  |
20100901 1700  |
20100901 0754  |
20100901 1338  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
IM_WAP80  |
WA PARISH  |
IMPERIAL  |
  |
138  |
rehab replace pole and insulators  |
342416   |
20100714 1538  |
20100901 1402  |
20100901 0800  |
20100901 1600  |
20100901 0830  |
20100901 1346  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
V310  |
BELLAIRE  |
  |
Open  |
345  |
BREAKER LUBE MAINTENANCE  |
340323   |
20100629 0550  |
20100901 1401  |
20101130 0700  |
20101130 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
11942  |
HIGHWAY 36  |
  |
Open  |
138  |
CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE  |
340373   |
20100629 0629  |
20100901 1401  |
20101130 0700  |
20101130 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_1336  |
BELLVILLE  |
  |
Open  |
138  |
CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE  |
337517   |
20100603 1418  |
20100901 1401  |
20101130 0700  |
20101130 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
153T153  |
HILBIG  |
SIM GIDEON  |
  |
138  |
OVERHAUL  |
340249   |
20100629 0523  |
20100901 1401  |
20101130 0700  |
20101130 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
467T467  |
BELLVILLE  |
HIGHWAY 36  |
  |
138  |
CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE  |
308342   |
20090922 1459  |
20100901 1401  |
20101130 0800  |
20101130 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
CNT_BRIAR  |
BRIAR  |
CENTER POINT A  |
  |
138  |
Line maintenance.  |
343776   |
20100727 0642  |
20100901 1330  |
20100901 0800  |
20100901 1800  |
20100901 0848  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_1945  |
CENTEX  |
  |
Close  |
69  |
SWITCH IS BEING CLOSED TO BYPASS CB 1950 WHILE OUT FOR OPERATOR INSPECTION / BREAKER MAINTENANCE / DIAGNOSTIC TESTING ///  |
343774   |
20100727 0641  |
20100901 1330  |
20100901 0800  |
20100901 1800  |
20100901 0848  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_1950_CB  |
CENTEX  |
  |
Open  |
69  |
OPERATOR INSPECTION / BREAKER MAINTENANCE / DIAGNOSTIC TESTING /// BREAKER WILL BE BYPASSED  |
347245   |
20100824 1317  |
20100901 1311  |
20100901 0400  |
20100901 1300  |
20100901 0359  |
20100901 1303  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1372  |
ROSEHILL  |
  |
Close  |
138  |
verizon wireless site setting new equipment  |
345615   |
20100811 0810  |
20100901 1311  |
20100901 0600  |
20100901 1200  |
20100901 0728  |
20100901 1230  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
9221  |
TONKAWA SWITCH  |
  |
Open  |
345  |
Outage at wind farm customers request to perform maintenance in customers station.  |
347235   |
20100824 1302  |
20100901 1310  |
20100901 0400  |
20100901 1300  |
20100901 0426  |
20100901 1224  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_G  |
GARLAND BOBTOWN TAP  |
BOBTOWN  |
  |
138  |
verizon wireless site setting new equipment  |
333458   |
20100504 1341  |
20100901 1310  |
20101129 0900  |
20101129 1800  |
  |
  |
Daily  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
55_CB  |
KOCH UP RIVER  |
  |
Open  |
69  |
MAINTENANCE -  |
340372   |
20100629 0629  |
20100901 1310  |
20101129 0900  |
20101129 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_1336  |
BELLVILLE  |
  |
Open  |
138  |
CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE  |
340248   |
20100629 0523  |
20100901 1310  |
20101129 0900  |
20101129 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
467T467  |
BELLVILLE  |
HIGHWAY 36  |
  |
138  |
CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE  |
340322   |
20100629 0550  |
20100901 1310  |
20101129 0900  |
20101129 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
11942  |
HIGHWAY 36  |
  |
Open  |
138  |
CLEAR HIGHWAY 36 TO BELLVILLE NORTH 138 KV LINE T-467 TO REPLACE DAMPERS ON THE LINE  |
308744   |
20090928 1318  |
20100901 1310  |
20101129 1400  |
20101209 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M20A  |
NORFORK  |
  |
Open  |
69  |
Capacity Increase, secondary voltage conversion to 25 kV and voltage conversion to 138 kV at Norfork.  |
308745   |
20090928 1318  |
20100901 1310  |
20101129 1400  |
20101209 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M20B  |
NORFORK  |
  |
Open  |
69  |
Capacity Increase, secondary voltage conversion to 25 kV and voltage conversion to 138 kV at Norfork.  |
308746   |
20090928 1319  |
20100901 1310  |
20101129 1400  |
20101209 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
M20CS  |
NORFORK  |
  |
Open  |
69  |
Capacity Increase, secondary voltage conversion to 25 kV and voltage conversion to 138 kV at Norfork. Mobile Sub will carry UCS load during this time.  |
347233   |
20100824 1301  |
20100901 1309  |
20100901 0400  |
20100901 1300  |
20100901 0426  |
20100901 1224  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_A  |
GARLAND BOBTOWN TAP  |
OATES TMPP  |
  |
138  |
verizon wireless site setting new equipment  |
347234   |
20100824 1301  |
20100901 1309  |
20100901 0400  |
20100901 1300  |
20100901 0426  |
20100901 1224  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_F  |
GARLAND BOBTOWN TAP  |
ROWLETT  |
  |
138  |
verizon wireless site setting new equipment  |
347387   |
20100825 1247  |
20100901 1309  |
20100901 0100  |
20100901 0545  |
20100901 0031  |
20100901 0600  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
506  |
FAIRFIELD WEST  |
  |
Close  |
138  |
trip test cb and test relays  |
347410   |
20100825 1240  |
20100901 1308  |
20100901 0100  |
20100901 0545  |
20100901 0030  |
20100901 0600  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2336  |
CROCKETT TU  |
  |
Close  |
138  |
Work to be done trip test 138KV bus diff and Xfmr#4.  |
347243   |
20100824 1306  |
20100901 1308  |
20100901 0400  |
20100901 1300  |
20100901 0426  |
20100901 1224  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
5812  |
BOBTOWN  |
  |
Close  |
138  |
verizon wireless site setting new equipment  |
342889   |
20100719 0856  |
20100901 1307  |
20101129 0700  |
20101201 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
240_A  |
SINGLETON  |
JEWETT  |
  |
345  |
REHAB WORK  |
344858   |
20100804 0959  |
20100901 1307  |
20101129 0800  |
20101202 1600  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_208_CB  |
REAGOR SPRINGS  |
  |
Open  |
69  |
Upgrade bus to 959 ACSS.  |
344860   |
20100804 0959  |
20100901 1307  |
20101129 0800  |
20101202 1600  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_212_CB  |
REAGOR SPRINGS  |
  |
Open  |
69  |
Upgrade bus to 959 ACSS.  |
344866   |
20100804 1025  |
20100901 1307  |
20101129 0800  |
20101202 1600  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_250_CB  |
REAGOR SPRINGS  |
  |
Open  |
69  |
Upgrade bus to 959 ACSS.  |
344859   |
20100804 0959  |
20100901 1307  |
20101129 0800  |
20101202 1600  |
  |
  |
Continuous  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_210_CB  |
REAGOR SPRINGS  |
  |
Open  |
69  |
Upgrade bus to 959 ACSS.  |
347555   |
20100826 0810  |
20100901 1302  |
20100901 0600  |
20100901 1600  |
20100901 0616  |
20100901 1246  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
2030_A  |
CORSICANA  |
POWELL  |
  |
69  |
replace poles and crossarms  |
347479   |
20100825 1510  |
20100901 1257  |
20100907 0830  |
20100907 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ALPI_BELD1  |
ALPINE  |
BELDING  |
  |
69  |
Replace crossarms  |
342888   |
20100719 0848  |
20100901 1255  |
20101129 0700  |
20101204 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
D330  |
MOBIL CHEMICAL  |
  |
Open  |
69  |
LINE MAINTENANCE  |
342283   |
20100714 0852  |
20100901 1255  |
20101129 0700  |
20101202 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
CBYCVN86  |
CEDAR BAYOU PLANT  |
CHEVRON CHEMICAL  |
  |
138  |
REHAB WORK  |
342405   |
20100714 1453  |
20100901 1255  |
20101129 0700  |
20101204 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
S500  |
SOUTH CHANNEL  |
  |
Open  |
69  |
REPLACE VARIOUS LINE EQUIPMENT  |
342403   |
20100714 1449  |
20100901 1255  |
20101129 0700  |
20101204 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
3160  |
SOUTH CHANNEL  |
  |
Open  |
69  |
REPLACE VARIOUS LINE EQUIPMENT  |
342402   |
20100714 1445  |
20100901 1255  |
20101129 0700  |
20101204 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
XF  |
AT1_H  |
SOUTH CHANNEL  |
  |
  |
138  |
REPLACE VARIOUS LINE EQUIPMENT  |
342406   |
20100714 1455  |
20100901 1255  |
20101129 0700  |
20101204 1700  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T040  |
SOUTH CHANNEL  |
  |
Open  |
69  |
REPLACE VARIOUS LINE EQUIPMENT  |
340979   |
20100701 0913  |
20100901 1237  |
20101129 0700  |
20101209 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
RELOCATING LINES AT DAVIS  |
340978   |
20100701 0912  |
20100901 1237  |
20101129 0700  |
20101209 1900  |
  |
  |
Continuous  |
Approved  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_RODD_F1  |
BARNEY DAVIS  |
RODD FIELD  |
  |
138  |
RELOCATING LINES AT DAVIS  |
347634   |
20100826 1054  |
20100901 1233  |
20100901 0500  |
20100901 1300  |
20100901 0547  |
20100901 1230  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BG_GV_46  |
GARDEN VILLAS  |
BLODGETT  |
  |
69  |
SET POLE BASE FOR CKT46 RELOCATION  |
347903   |
20100827 1138  |
20100901 1228  |
20100907 1000  |
20100909 1500  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
6775_CB  |
FRIEND RANCH  |
  |
Open  |
69  |
69 KV bus outage to replace bus CCVTs  |
347905   |
20100827 1140  |
20100901 1228  |
20100907 1000  |
20100909 1500  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
6780_CB  |
FRIEND RANCH  |
  |
Open  |
69  |
69 KV bus outage to replace bus CCVTs  |
347904   |
20100827 1139  |
20100901 1228  |
20100907 1000  |
20100909 1500  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
7180_CB  |
FRIEND RANCH  |
  |
Open  |
69  |
69 KV bus outage to replace bus CCVTs  |
347906   |
20100827 1141  |
20100901 1228  |
20100907 1000  |
20100909 1500  |
  |
  |
Continuous  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
6785_CB  |
FRIEND RANCH  |
  |
Open  |
69  |
69 KV bus outage to replace bus CCVTs  |
347412   |
20100825 1311  |
20100901 1224  |
20101129 0600  |
20101212 2000  |
  |
  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6009_A  |
WILLOW CREEK SWITCH  |
PARKER SWITCH  |
  |
345  |
Outage to erect towers and pull wire for line reconductor.  |
337516   |
20100603 1418  |
20100901 1224  |
20101129 0700  |
20101129 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
153T153  |
HILBIG  |
SIM GIDEON  |
  |
138  |
OVERHAUL  |
345862   |
20100812 1033  |
20100901 1211  |
20101129 0600  |
20101204 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P680  |
VELASCO  |
  |
Open  |
138  |
SECTION OUTAGE TO REPLACE RELAY PANELS  |
345937   |
20100812 1032  |
20100901 1211  |
20101129 0600  |
20101204 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
4265  |
VELASCO  |
  |
Open  |
138  |
SECTION OUTAGE TO REPLACE RELAY PANELS  |
345940   |
20100812 1033  |
20100901 1211  |
20101129 0600  |
20101204 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P690  |
VELASCO  |
  |
Open  |
138  |
SECTION OUTAGE TO REPLACE RELAY PANELS  |
345935   |
20100812 1031  |
20100901 1211  |
20101129 0600  |
20101204 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
SN_VL_26  |
VELASCO  |
SINTEK  |
  |
138  |
REPLACE RELAY PANELS AT BOTH ENDS OF LINE  |
337855   |
20100607 1336  |
20100901 1209  |
20101129 0600  |
20101202 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
1094  |
BELLAIRE  |
  |
Open  |
138  |
REPLACE 1094, W422 AND WAVE TRAP  |
337772   |
20100607 1339  |
20100901 1209  |
20101129 0600  |
20101202 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T3HS  |
BELLAIRE  |
  |
Open  |
138  |
REPLACE 1094, W422 AND WAVE TRAP  |
337773   |
20100607 1341  |
20100901 1209  |
20101129 0600  |
20101202 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W420  |
BELLAIRE  |
  |
Open  |
138  |
REPLACE 1094, W422 AND WAVE TRAP  |
337857   |
20100607 1340  |
20100901 1209  |
20101129 0600  |
20101202 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
W410  |
BELLAIRE  |
  |
Open  |
138  |
REPLACE 1094, W422 AND WAVE TRAP  |
337856   |
20100607 1337  |
20100901 1209  |
20101129 0600  |
20101202 1800  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BI_SF_09  |
BELLAIRE  |
SAN FELIPE  |
  |
138  |
NEEDED FOR CLEARANCE  |
347195   |
20100824 0929  |
20100901 1202  |
20100901 0700  |
20100901 1200  |
20100901 0738  |
20100901 1144  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6251_A  |
COSDEN  |
MORGAN CREEK SES  |
  |
138  |
Outage to replace a bad crossarm.  |
334221   |
20100507 1049  |
20100901 1155  |
20100906 2200  |
20100907 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
WHITT  |
  |
Open  |
69  |
Line rebuild.  |
334113   |
20100507 1039  |
20100901 1155  |
20100906 2200  |
20100907 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_204_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334005   |
20100507 1035  |
20100901 1155  |
20100906 2200  |
20100907 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_202_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334220   |
20100507 1049  |
20100901 1154  |
20100905 2200  |
20100906 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
WHITT  |
  |
Open  |
69  |
Line rebuild.  |
334111   |
20100507 1039  |
20100901 1154  |
20100904 2200  |
20100905 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_204_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334219   |
20100507 1049  |
20100901 1154  |
20100904 2200  |
20100905 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
WHITT  |
  |
Open  |
69  |
Line rebuild.  |
334112   |
20100507 1039  |
20100901 1154  |
20100905 2200  |
20100906 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_204_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334004   |
20100507 1035  |
20100901 1154  |
20100905 2200  |
20100906 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_202_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
333897   |
20100507 1027  |
20100901 1154  |
20100906 2200  |
20100907 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_10  |
MORRIS SHEPPARD  |
  |
Open  |
69  |
Line rebuild.  |
333896   |
20100507 1027  |
20100901 1154  |
20100905 2200  |
20100906 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_10  |
MORRIS SHEPPARD  |
  |
Open  |
69  |
Line rebuild.  |
334217   |
20100507 1049  |
20100901 1154  |
20100902 2200  |
20100903 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
WHITT  |
  |
Open  |
69  |
Line rebuild.  |
334218   |
20100507 1049  |
20100901 1154  |
20100903 2200  |
20100904 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
WHITT  |
  |
Open  |
69  |
Line rebuild.  |
334110   |
20100507 1039  |
20100901 1154  |
20100903 2200  |
20100904 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_204_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334002   |
20100507 1035  |
20100901 1154  |
20100903 2200  |
20100904 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_202_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334003   |
20100507 1035  |
20100901 1154  |
20100904 2200  |
20100905 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_202_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
333895   |
20100507 1027  |
20100901 1154  |
20100904 2200  |
20100905 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_10  |
MORRIS SHEPPARD  |
  |
Open  |
69  |
Line rebuild.  |
333894   |
20100507 1027  |
20100901 1154  |
20100903 2200  |
20100904 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_10  |
MORRIS SHEPPARD  |
  |
Open  |
69  |
Line rebuild.  |
334216   |
20100507 1049  |
20100901 1152  |
20100901 2200  |
20100902 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
WHITT  |
  |
Open  |
69  |
Line rebuild.  |
334109   |
20100507 1039  |
20100901 1152  |
20100902 2200  |
20100903 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_204_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334000   |
20100507 1035  |
20100901 1152  |
20100901 2200  |
20100902 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_202_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334108   |
20100507 1039  |
20100901 1152  |
20100901 2200  |
20100902 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_204_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334001   |
20100507 1035  |
20100901 1152  |
20100902 2200  |
20100903 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_202_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
333892   |
20100507 1027  |
20100901 1152  |
20100901 2200  |
20100902 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_10  |
MORRIS SHEPPARD  |
  |
Open  |
69  |
Line rebuild.  |
333893   |
20100507 1027  |
20100901 1152  |
20100902 2200  |
20100903 1000  |
  |
  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_10  |
MORRIS SHEPPARD  |
  |
Open  |
69  |
Line rebuild.  |
333999   |
20100507 1035  |
20100901 1149  |
20100901 0600  |
20100901 1000  |
20100901 0550  |
20100901 1000  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_202_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
333891   |
20100507 1027  |
20100901 1148  |
20100901 0600  |
20100901 1000  |
20100901 0551  |
20100901 1000  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_10  |
MORRIS SHEPPARD  |
  |
Open  |
69  |
Line rebuild.  |
345910   |
20100812 1004  |
20100901 1148  |
20100901 0700  |
20100901 1700  |
20100901 0704  |
20100901 1134  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1628  |
IVAN  |
  |
Open  |
69  |
Outage to replace poles.  |
345900   |
20100812 0851  |
20100901 1147  |
20100901 0700  |
20100901 1700  |
20100901 0737  |
20100901 1107  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
5719  |
BRECKENRIDGE  |
  |
Open  |
69  |
Outage to replace poles.  |
345854   |
20100812 0851  |
20100901 1147  |
20100901 0700  |
20100901 1700  |
20100901 0737  |
20100901 1107  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
5721  |
BRECKENRIDGE  |
  |
Open  |
69  |
Outage to replace poles.  |
345899   |
20100812 0850  |
20100901 1147  |
20100901 0700  |
20100901 1700  |
20100901 0737  |
20100901 1107  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
5720  |
BRECKENRIDGE  |
  |
Open  |
69  |
Outage to replace poles.  |
344430   |
20100730 1407  |
20100901 1147  |
20100901 0700  |
20100901 1700  |
20100901 0704  |
20100901 1134  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6630_A  |
BRECKENRIDGE  |
IVAN  |
  |
69  |
Outage to replace poles.  |
347914   |
20100827 1356  |
20100901 1141  |
20100831 2400  |
20100901 1200  |
20100831 2352  |
20100901 1133  |
Continuous  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6009_A  |
WILLOW CREEK SWITCH  |
PARKER SWITCH  |
  |
345  |
Line outage to remove spacers and static wire bonds in preparation for erecting towers for future work.  |
348179   |
20100830 1354  |
20100901 1129  |
20100908 0700  |
20100908 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
347231   |
20100824 1239  |
20100901 1129  |
20100908 0700  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6180_B  |
BRECKENRIDGE NORTH  |
RICOCHET SUBSTATION  |
  |
138  |
Outage to replace crossarms. As part of TOAP open CB 5700 at Breckeridge for contingency.  |
347232   |
20100824 1240  |
20100901 1129  |
20100908 0700  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
5700  |
BRECKENRIDGE  |
  |
Open  |
69  |
Outage to replace crossarms. As part of TOAP open CB 5700 at Breckeridge for contingency.  |
347629   |
20100826 1022  |
20100901 1129  |
20100908 0700  |
20100908 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
CB10  |
HARDY REIT  |
  |
Open  |
138  |
LUBE MAINT  |
348513   |
20100901 0539  |
20100901 1129  |
20100908 0715  |
20100908 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_13390  |
LAKEWAY LCRA  |
  |
Open  |
138  |
CLEAR CB 13390 FOR OPERATOR MAINTENANCE  |
348515   |
20100901 0539  |
20100901 1129  |
20100908 0715  |
20100908 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_13389  |
LAKEWAY LCRA  |
  |
Open  |
138  |
CLEAR CB 13390 FOR OPERATOR MAINTENANCE  |
348514   |
20100901 0539  |
20100901 1129  |
20100908 0715  |
20100908 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_13391  |
LAKEWAY LCRA  |
  |
Open  |
138  |
CLEAR CB 13390 FOR OPERATOR MAINTENANCE  |
344744   |
20100803 1413  |
20100901 1129  |
20100908 0800  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
2635  |
HAWKINS SWITCH  |
  |
Open  |
138  |
Test relays.  |
347733   |
20100826 1247  |
20100901 1129  |
20100908 0800  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
3827  |
CAVERN  |
  |
Open  |
138  |
SECTION OUTAGE FOR SWITCH MAINT  |
347734   |
20100826 1248  |
20100901 1129  |
20100908 0800  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
Y321  |
CAVERN  |
  |
Open  |
138  |
SECTION OUTAGE FOR SWITCH MAINT  |
347735   |
20100826 1249  |
20100901 1129  |
20100908 0800  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
Y301  |
CAVERN  |
  |
Close  |
138  |
CLOSE SWITCH TO KEEP SERVICE ON DURING SECTION OUTAGE FOR SWITCH MAINT  |
347348   |
20100825 0943  |
20100901 1129  |
20100908 0800  |
20100908 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T130  |
H O CLARKE  |
  |
Close  |
138  |
CLOSED TO BY-PASS BRKR 6900 FOR MAINT  |
347148   |
20100824 0901  |
20100901 1129  |
20100908 0800  |
20100908 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
D970  |
CROSBY  |
  |
Open  |
138  |
lube job  |
347362   |
20100825 0939  |
20100901 1129  |
20100908 0800  |
20100908 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
6900  |
H O CLARKE  |
  |
Open  |
138  |
LUBRICATE BREAKER  |
347721   |
20100826 1248  |
20100901 1129  |
20100908 0800  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
Y322  |
CAVERN  |
  |
Open  |
138  |
SECTION OUTAGE FOR SWITCH MAINT  |
347720   |
20100826 1247  |
20100901 1129  |
20100908 0800  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
Y310  |
CAVERN  |
  |
Open  |
138  |
SECTION OUTAGE FOR SWITCH MAINT  |
348500   |
20100901 0528  |
20100901 1129  |
20100908 0800  |
20100908 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_4370_CB  |
ZORN  |
  |
Open  |
138  |
CLEAR CB 4370 TO REPAIR HYDRAULIC SYSTEM  |
348499   |
20100901 0528  |
20100901 1129  |
20100908 0800  |
20100908 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_4369  |
ZORN  |
  |
Open  |
138  |
CLEAR CB 4370 TO REPAIR HYDRAULIC SYSTEM  |
348498   |
20100901 0527  |
20100901 1129  |
20100908 0800  |
20100908 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_4371  |
ZORN  |
  |
Open  |
138  |
CLEAR CB 4370 TO REPAIR HYDRAULIC SYSTEM  |
343848   |
20100727 1047  |
20100901 1129  |
20100908 0800  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
X720  |
BIPORT  |
  |
Open  |
138  |
SECTION OUTAGE TO GO WITH LINE OUTAGE FOR TRIP CHECK  |
343846   |
20100727 1045  |
20100901 1129  |
20100908 0800  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BFPCAV82  |
BIPORT  |
CAVERN  |
  |
138  |
LINE OUTAGE FOR TRIP CHECK  |
343847   |
20100727 1047  |
20100901 1129  |
20100908 0800  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
X710  |
BIPORT  |
  |
Open  |
138  |
SECTION OUTAGE TO GO WITH LINE OUTAGE FOR TRIP CHECK  |
347363   |
20100825 0942  |
20100901 1129  |
20100908 0800  |
20100908 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
6903  |
H O CLARKE  |
  |
Close  |
138  |
CLOSED TO BY-PASS BRKR 6900 FOR MAINT  |
347556   |
20100826 0839  |
20100901 1129  |
20100908 0800  |
20100909 1600  |
  |
  |
Continuous  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
N130  |
TOMBALL  |
  |
Open  |
138  |
REPAIR HYD. LEAK - CONTINUOUS OUTAGE 9/8 THRU 9/9  |
347480   |
20100825 1511  |
20100901 1129  |
20100908 0830  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
LN  |
ALPI_BELD1  |
ALPINE  |
BELDING  |
  |
69  |
Replace crossarms  |
348493   |
20100901 0523  |
20100901 1129  |
20100908 0830  |
20100908 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_18929  |
FAYETTEVILLE  |
  |
Open  |
138  |
CLEAR CB 18930 FOR OPERATOR INSPECTION  |
348509   |
20100901 0535  |
20100901 1129  |
20100908 0830  |
20100908 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
1769  |
GILLESPIE LCRA  |
  |
Open  |
69  |
CLEAR CB 1770 FOR OPERATOR INSPECTION  |
348508   |
20100901 0535  |
20100901 1129  |
20100908 0830  |
20100908 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
1771  |
GILLESPIE LCRA  |
  |
Open  |
69  |
CLEAR CB 1770 FOR OPERATOR INSPECTION  |
348507   |
20100901 0534  |
20100901 1129  |
20100908 0830  |
20100908 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
1770_CB  |
GILLESPIE LCRA  |
  |
Open  |
69  |
CLEAR CB 1770 FOR OPERATOR INSPECTION  |
348503   |
20100901 0530  |
20100901 1129  |
20100908 0830  |
20100908 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_13439  |
GERONIMO  |
  |
Open  |
138  |
CLEAR CB 13440 FOR DIAGNOSTIC TESTING  |
348502   |
20100901 0530  |
20100901 1129  |
20100908 0830  |
20100908 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_13441  |
GERONIMO  |
  |
Open  |
138  |
CLEAR CB 13440 FOR DIAGNOSTIC TESTING  |
348501   |
20100901 0529  |
20100901 1129  |
20100908 0830  |
20100908 1730  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_13440  |
GERONIMO  |
  |
Open  |
138  |
CLEAR CB 13440 FOR DIAGNOSTIC TESTING  |
348494   |
20100901 0523  |
20100901 1129  |
20100908 0830  |
20100908 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_18930  |
FAYETTEVILLE  |
  |
Open  |
138  |
CLEAR CB 18930 FOR OPERATOR INSPECTION  |
348492   |
20100901 0522  |
20100901 1129  |
20100908 0830  |
20100908 1130  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_18931  |
FAYETTEVILLE  |
  |
Open  |
138  |
CLEAR CB 18930 FOR OPERATOR INSPECTION  |
344983   |
20100805 0923  |
20100901 1129  |
20100908 0900  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
12900  |
MCCAMEY NORTH SW  |
  |
Open  |
138  |
#3 138 KV bus outage for relay modifications with the addition of the new CB 12930  |
345049   |
20100805 0925  |
20100901 1129  |
20100908 0900  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5820_CAP  |
MCCAMEY NORTH SW  |
  |
Open  |
138  |
#3 138 KV bus outage for relay modifications with the addition of the new CB 12930  |
345050   |
20100805 0925  |
20100901 1129  |
20100908 0900  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
11660  |
MCCAMEY NORTH SW  |
  |
Open  |
138  |
#3 138 KV bus outage for relay modifications with the addition of the new CB 12930  |
345051   |
20100805 0926  |
20100901 1129  |
20100908 0900  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
13280  |
MCCAMEY NORTH SW  |
  |
Open  |
138  |
#3 138 KV bus outage for relay modifications with the addition of the new CB 12930  |
345048   |
20100805 0925  |
20100901 1129  |
20100908 0900  |
20100908 1700  |
  |
  |
Daily  |
Approved  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
11680  |
MCCAMEY NORTH SW  |
  |
Open  |
138  |
#3 138 KV bus outage for relay modifications with the addition of the new CB 12930  |
347180   |
20100824 0902  |
20100901 1129  |
20100908 1200  |
20100908 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
D980  |
CROSBY  |
  |
Open  |
138  |
lube job  |
347630   |
20100826 1029  |
20100901 1129  |
20100908 1200  |
20100908 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P270  |
HARDY REIT  |
  |
Open  |
138  |
LUBE MAINT  |
348489   |
20100901 0520  |
20100901 1129  |
20100908 1230  |
20100908 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_2650_CB  |
FAYETTEVILLE  |
  |
Open  |
138  |
CLEAR CB 2650 FOR OPERATOR INSPECTION  |
348490   |
20100901 0521  |
20100901 1129  |
20100908 1230  |
20100908 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_2651  |
FAYETTEVILLE  |
  |
Open  |
138  |
CLEAR CB 2650 FOR OPERATOR INSPECTION  |
348517   |
20100901 0540  |
20100901 1129  |
20100908 1230  |
20100908 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_13399  |
LAKEWAY LCRA  |
  |
Open  |
138  |
CLEAR CB 13400 FOR OPERATOR MAINTENANCE  |
348518   |
20100901 0540  |
20100901 1129  |
20100908 1230  |
20100908 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_13400  |
LAKEWAY LCRA  |
  |
Open  |
138  |
CLEAR CB 13400 FOR OPERATOR MAINTENANCE  |
348516   |
20100901 0540  |
20100901 1129  |
20100908 1230  |
20100908 1630  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_13401  |
LAKEWAY LCRA  |
  |
Open  |
138  |
CLEAR CB 13400 FOR OPERATOR MAINTENANCE  |
348491   |
20100901 0522  |
20100901 1129  |
20100908 1230  |
20100908 1600  |
  |
  |
Daily  |
Approved  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |