334001   |
20100507 1035  |
20100901 1152  |
20100902 2200  |
20100903 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_202_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334109   |
20100507 1039  |
20100901 1152  |
20100902 2200  |
20100903 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_204_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334217   |
20100507 1049  |
20100901 1154  |
20100902 2200  |
20100903 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
WHITT  |
  |
Open  |
69  |
Line rebuild.  |
337348   |
20100603 1333  |
20100826 0846  |
20100902 0700  |
20100902 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL  |
347268   |
20100824 1416  |
20100830 1052  |
20100902 0800  |
20100902 1200  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
1418  |
PALACIOS  |
  |
Open  |
69  |
#2-69KV BUS OUTAGE TO REPLACE N.O. TIE SWITCH 3833. DISTRIBUTION LOAD WILL BE TRANSFERRED TO #1 XFMR. STEC ADVISED TO OUTAGE THEIR LINE FROM CARANCAHUA-PALACIOS.  |
346715   |
20100819 0551  |
20100902 0742  |
20100902 0730  |
20100902 1130  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
2300  |
UNIVERSITY REIT  |
  |
Open  |
69  |
LUBE MAINTENANCE LN30>GV ON BYPASS  |
346717   |
20100819 0556  |
20100902 0743  |
20100902 0730  |
20100902 1130  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T240  |
UNIVERSITY REIT  |
  |
Close  |
69  |
LUBE MAINTENANCE LN30>GV ON BYPASS  |
346860   |
20100820 0532  |
20100831 1540  |
20100902 0800  |
20100902 1800  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_9069  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR CB 9070 FOR OPERATOR INSPECTION Canceled by PEC. 8/31/2010  |
342508   |
20100715 0852  |
20100726 1537  |
20100902 0700  |
20100902 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_RODD_F1  |
BARNEY DAVIS  |
RODD FIELD  |
  |
138  |
install foundations for new structures  |
348231   |
20100830 1615  |
20100902 0924  |
20100902 2030  |
20100902 2200  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
9995_CB  |
DUPONT SWITCH - INGLESIDE  |
  |
Open  |
138  |
INSTALLING NEW DME EQUIPMENT  |
348230   |
20100830 1615  |
20100902 0924  |
20100902 2030  |
20100902 2200  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
9985_CB  |
DUPONT SWITCH - INGLESIDE  |
  |
Open  |
138  |
INSTALLING NEW DME EQUIPMENT  |
348229   |
20100830 1614  |
20100901 1638  |
20100902 2030  |
20100902 2200  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2920_CB  |
WHITEPOINT  |
  |
Open  |
138  |
INSTALLING NEW DME EQUIPMENT  |
348228   |
20100830 1614  |
20100901 1638  |
20100902 2030  |
20100902 2200  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2930_CB  |
WHITEPOINT  |
  |
Open  |
138  |
INSTALLING NEW DME EQUIPMENT  |
348227   |
20100830 1613  |
20100901 1638  |
20100902 1900  |
20100902 2030  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2940_CB  |
WHITEPOINT  |
  |
Open  |
138  |
INSTALLING NEW DME EQUIPMENT  |
348225   |
20100830 1554  |
20100830 1613  |
20100902 0700  |
20100902 0830  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2940_CB  |
WHITEPOINT  |
  |
Open  |
138  |
INSTALLING NEW DME EQUIPMENT  |
348224   |
20100830 1553  |
20100901 1638  |
20100902 1900  |
20100902 2030  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
2895_CB  |
WHITEPOINT  |
  |
Open  |
138  |
INSTALLING NEW DME EQUIPMENT  |
347437   |
20100825 1446  |
20100827 1003  |
20100902 0600  |
20100902 1400  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
2190_A  |
WACO KATY TAP  |
ELM MOTT  |
  |
69  |
repair conductor damaged by storm on 4/24/10  |
342524   |
20100715 0858  |
20100726 1538  |
20100902 0700  |
20100902 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
install foundations for new structures  |
345918   |
20100812 1012  |
20100813 1423  |
20100902 2400  |
20100903 1230  |
Continuous  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2739  |
SPRABERRY SWITCH  |
  |
Open  |
69  |
Outage to calibrate relays on the Autotransformer.  |
344138   |
20100728 1502  |
20100813 1344  |
20100902 0015  |
20100902 1200  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6009_A  |
WILLOW CREEK SWITCH  |
PARKER SWITCH  |
  |
345  |
Outage to install foundations under the line in preparation for line rebuild. Crez Project upgrade.  |
346449   |
20100817 1254  |
20100902 1009  |
20100902 0700  |
20100902 1400  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6480_B  |
ECTOR HARPER  |
PERMIAN BASIN SES  |
  |
138  |
Outages to replace bad crossarms and poles.  |
345916   |
20100812 1011  |
20100813 1423  |
20100902 2400  |
20100903 1230  |
Continuous  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2805  |
SPRABERRY SWITCH  |
  |
Open  |
138  |
Outage to calibrate relays on the Autotransformer.  |
345915   |
20100812 1007  |
20100827 0839  |
20100902 0700  |
20100902 1800  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1011  |
SWEETWATER NO 2  |
  |
Open  |
69  |
Outage to replace the relay panel.  |
345914   |
20100812 1007  |
20100827 0839  |
20100902 0700  |
20100902 1800  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1009  |
SWEETWATER NO 2  |
  |
Open  |
69  |
Outage to replace the relay panel.  |
346640   |
20100818 1407  |
20100902 0602  |
20100902 0730  |
20100902 1700  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
12P2  |
P2  |
  |
Open  |
138  |
FOUNDATION INSTALLATION  |
346639   |
20100818 1405  |
20100902 0602  |
20100902 0730  |
20100902 1700  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
10Q1  |
Q1  |
  |
Open  |
138  |
FOUNDATION INSTALLATION  |
346635   |
20100818 1358  |
20100902 0601  |
20100902 0730  |
20100902 1700  |
Daily  |
Cancelled  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
P2_Q1  |
P2  |
Q1  |
  |
138  |
FOUNDATION INSTALLATION  |
346460   |
20100817 1257  |
20100902 1008  |
20100902 0700  |
20100902 1400  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
2540  |
PERMIAN BASIN SES  |
  |
Open  |
138  |
Outages to replace bad crossarms and poles.  |
346455   |
20100817 1256  |
20100902 1008  |
20100902 0700  |
20100902 1400  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
2460  |
PERMIAN BASIN SES  |
  |
Open  |
138  |
Outages to replace bad crossarms and poles.  |
347039   |
20100823 0815  |
20100831 1540  |
20100902 0800  |
20100902 1800  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3993  |
MARSHALL FORD  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO BYPASS CB 9070 WHILE OUT FOR OPERATOR INSPECTION Canceled by PEC. 8/31/2010  |
347038   |
20100823 0815  |
20100831 1540  |
20100902 0800  |
20100902 1800  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_9073  |
MARSHALL FORD  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO BYPASS CB 9070 WHILE OUT FOR OPERATOR INSPECTION Canceled by PEC. 8/31/2010  |
346435   |
20100817 1253  |
20100902 1015  |
20100902 0700  |
20100902 1400  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2105  |
ECTOR HARPER  |
  |
Open  |
138  |
Outages to replace bad crossarms and poles.  |
346564   |
20100818 1028  |
20100902 1315  |
20100902 1200  |
20100902 1530  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
F430  |
BAYWAY  |
  |
Open  |
138  |
Lube maintenance.  |
346481   |
20100817 1302  |
20100824 1340  |
20100902 2300  |
20100903 0900  |
Continuous  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
015  |
LOMO ALTO  |
  |
Close  |
138  |
close for contingency outage, Chapman to install foundations, structures, & move wire for reroute  |
345920   |
20100812 1012  |
20100813 1423  |
20100902 2400  |
20100903 1230  |
Continuous  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
2740  |
SPRABERRY SWITCH  |
  |
Open  |
69  |
Outage to calibrate relays on the Autotransformer.  |
345919   |
20100812 1012  |
20100813 1423  |
20100902 2400  |
20100903 1230  |
Continuous  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2743  |
SPRABERRY SWITCH  |
  |
Open  |
69  |
Outage to calibrate relays on the Autotransformer.  |
347918   |
20100827 1443  |
20100902 0904  |
20100902 0700  |
20100902 1700  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6856_B  |
SEYMOUR TU  |
BOMARTON TU  |
  |
69  |
OUtage to replace bad crossarms.  |
347916   |
20100827 1356  |
20100902 1638  |
20100902 2400  |
20100903 1200  |
Continuous  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6009_A  |
WILLOW CREEK SWITCH  |
PARKER SWITCH  |
  |
345  |
Line outage to remove spacers and static wire bonds in preparation for erecting towers for future work.  |
345618   |
20100811 0824  |
20100813 1423  |
20100902 2400  |
20100903 1230  |
Continuous  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
XF  |
AXFMR1  |
SPRABERRY SWITCH  |
  |
  |
69  |
Outage to calibrate relays on the Autotransformer.  |
345800   |
20100811 1528  |
20100820 1549  |
20100902 0800  |
20100902 1800  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
EDROY_MATHIS1  |
MATHIS  |
EDROY  |
  |
69  |
replacing insulators  |
345617   |
20100811 0818  |
20100827 0839  |
20100902 0700  |
20100902 1800  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1010  |
SWEETWATER NO 2  |
  |
Open  |
69  |
Outage to replace the relay panel.  |
346861   |
20100820 0532  |
20100831 1540  |
20100902 0800  |
20100902 1800  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_9071  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR CB 9070 FOR OPERATOR INSPECTION Canceled by PEC. 8/31/2010  |
346859   |
20100820 0531  |
20100831 1540  |
20100902 0800  |
20100902 1800  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_9070  |
MARSHALL FORD  |
  |
Open  |
138  |
CLEAR CB 9070 FOR OPERATOR INSPECTION Canceled by PEC. 8/31/2010  |
346716   |
20100819 0555  |
20100902 0742  |
20100902 0730  |
20100902 1130  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
2303  |
UNIVERSITY REIT  |
  |
Close  |
69  |
LUBE MAINTENANCE LN30>GV ON BYPASS  |
346988   |
20100823 1349  |
20100827 1019  |
20100902 0600  |
20100902 1300  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1250_J  |
LAKEVIEW  |
PALESTINE SOUTH  |
  |
138  |
LINE MAINT  |
333893   |
20100507 1027  |
20100901 1152  |
20100902 2200  |
20100903 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_10  |
MORRIS SHEPPARD  |
  |
Open  |
69  |
Line rebuild.  |
334002   |
20100507 1035  |
20100901 1154  |
20100903 2200  |
20100904 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_202_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
333894   |
20100507 1027  |
20100901 1154  |
20100903 2200  |
20100904 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_10  |
MORRIS SHEPPARD  |
  |
Open  |
69  |
Line rebuild.  |
347156   |
20100824 0816  |
20100902 1253  |
20100903 0300  |
20100903 1200  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
105_A  |
CARROLLTON NORTHWEST  |
LEWISVILLE SWITCH  |
  |
345  |
Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345  |
344139   |
20100728 1502  |
20100813 1344  |
20100903 0015  |
20100903 1200  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6009_A  |
WILLOW CREEK SWITCH  |
PARKER SWITCH  |
  |
345  |
Outage to install foundations under the line in preparation for line rebuild. Crez Project upgrade.  |
347241   |
20100824 1305  |
20100901 0853  |
20100903 0400  |
20100903 1300  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
5812  |
BOBTOWN  |
  |
Close  |
138  |
verizon wireless site setting new equipment  |
347238   |
20100824 1303  |
20100901 0853  |
20100903 0400  |
20100903 1300  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_A  |
GARLAND BOBTOWN TAP  |
OATES TMPP  |
  |
138  |
verizon wireless site setting new equipment  |
347157   |
20100824 0816  |
20100902 1253  |
20100903 0300  |
20100903 1200  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
575_A  |
CARROLLTON NORTHWEST  |
LEWISVILLE SWITCH  |
  |
138  |
Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345  |
348174   |
20100830 1304  |
20100830 1351  |
20100903 0730  |
20100903 1030  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1212  |
HENRIETTA TU  |
  |
Close  |
69  |
Outage to check the Bus Differential relaying and functional test. The station will be on mobile sub bypass and switch 1212 will be closed to serve the mobile sub from Wichita Falls radially during test. Note sent to 1outagecoordinator.com.  |
348173   |
20100830 1303  |
20100831 0656  |
20100903 0730  |
20100903 1030  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1340  |
HENRIETTA TU  |
  |
Open  |
69  |
Outage to check the Bus Differential relaying and functional test. The station will be on mobile sub bypass and switch 1212 will be closed to serve the mobile sub from Wichita Falls radially during test. Note sent to 1outagecoordinator.com.  |
348172   |
20100830 1303  |
20100831 0656  |
20100903 0730  |
20100903 1030  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1210  |
HENRIETTA TU  |
  |
Open  |
69  |
Outage to check the Bus Differential relaying and functional test. The station will be on mobile sub bypass and switch 1212 will be closed to serve the mobile sub from Wichita Falls radially during test. Note sent to 1outagecoordinator.com.  |
342525   |
20100715 0858  |
20100726 1538  |
20100903 0700  |
20100903 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
install foundations for new structures  |
342509   |
20100715 0852  |
20100726 1537  |
20100903 0700  |
20100903 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_RODD_F1  |
BARNEY DAVIS  |
RODD FIELD  |
  |
138  |
install foundations for new structures  |
347089   |
20100823 1349  |
20100827 1019  |
20100903 0600  |
20100903 1300  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1250_J  |
LAKEVIEW  |
PALESTINE SOUTH  |
  |
138  |
LINE MAINT  |
345801   |
20100811 1528  |
20100820 1549  |
20100903 0800  |
20100903 1800  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
EDROY_MATHIS1  |
MATHIS  |
EDROY  |
  |
69  |
replacing insulators  |
347247   |
20100824 1318  |
20100901 0853  |
20100903 0400  |
20100903 1300  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1372  |
ROSEHILL  |
  |
Close  |
138  |
verizon wireless site setting new equipment  |
347240   |
20100824 1304  |
20100901 0853  |
20100903 0400  |
20100903 1300  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_G  |
GARLAND BOBTOWN TAP  |
BOBTOWN  |
  |
138  |
verizon wireless site setting new equipment  |
347239   |
20100824 1303  |
20100901 0853  |
20100903 0400  |
20100903 1300  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_F  |
GARLAND BOBTOWN TAP  |
ROWLETT  |
  |
138  |
verizon wireless site setting new equipment  |
334459   |
20100510 1118  |
20100510 1126  |
20100903 0700  |
20100903 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
SAN MARCOS  |
CAMP GARY  |
  |
69  |
LINE OVERHAUL  |
334218   |
20100507 1049  |
20100901 1154  |
20100903 2200  |
20100904 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
WHITT  |
  |
Open  |
69  |
Line rebuild.  |
334110   |
20100507 1039  |
20100901 1154  |
20100903 2200  |
20100904 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_204_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334003   |
20100507 1035  |
20100901 1154  |
20100904 2200  |
20100905 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_202_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334111   |
20100507 1039  |
20100901 1154  |
20100904 2200  |
20100905 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_204_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334219   |
20100507 1049  |
20100901 1154  |
20100904 2200  |
20100905 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
WHITT  |
  |
Open  |
69  |
Line rebuild.  |
348106   |
20100830 0930  |
20100902 1325  |
20100904 0600  |
20100904 1200  |
Daily  |
Cancelled  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
OCB_9110_CB  |
WYNN JOYCE  |
  |
Open  |
138  |
Request is for ONCOR to work a trouble at Site # CLR 0262.  |
348105   |
20100830 0929  |
20100902 1325  |
20100904 0600  |
20100904 1200  |
Daily  |
Cancelled  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
9112  |
WYNN JOYCE  |
  |
Open  |
138  |
Request is for ONCOR to work a trouble at Site # CLR 0262.  |
348104   |
20100830 0929  |
20100902 1325  |
20100904 0600  |
20100904 1200  |
Daily  |
Cancelled  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
1371  |
ROSEHILL  |
  |
Open  |
138  |
Request is for ONCOR to work a trouble at Site # CLR 0262.  |
348103   |
20100830 0928  |
20100902 1325  |
20100904 0600  |
20100904 1200  |
Daily  |
Cancelled  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
LN  |
ROS-WYN  |
ROSEHILL  |
WYNN JOYCE  |
  |
138  |
Request is for ONCOR to work a trouble at Site # CLR 0262.  |
342526   |
20100715 0858  |
20100726 1538  |
20100904 0700  |
20100904 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
install foundations for new structures  |
342538   |
20100715 0900  |
20100726 1538  |
20100904 0700  |
20100904 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_RODD_F1  |
BARNEY DAVIS  |
RODD FIELD  |
  |
138  |
install foundations for new structures  |
337350   |
20100603 1333  |
20100603 1337  |
20100904 0700  |
20100904 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL  |
334460   |
20100510 1118  |
20100510 1126  |
20100904 0700  |
20100904 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
SAN MARCOS  |
CAMP GARY  |
  |
69  |
LINE OVERHAUL  |
333895   |
20100507 1027  |
20100901 1154  |
20100904 2200  |
20100905 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_10  |
MORRIS SHEPPARD  |
  |
Open  |
69  |
Line rebuild.  |
334004   |
20100507 1035  |
20100901 1154  |
20100905 2200  |
20100906 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_202_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
342527   |
20100715 0858  |
20100726 1538  |
20100905 0700  |
20100905 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
install foundations for new structures  |
342539   |
20100715 0900  |
20100726 1538  |
20100905 0700  |
20100905 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_RODD_F1  |
BARNEY DAVIS  |
RODD FIELD  |
  |
138  |
install foundations for new structures  |
337351   |
20100603 1333  |
20100603 1337  |
20100905 0700  |
20100905 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL  |
334461   |
20100510 1118  |
20100510 1126  |
20100905 0700  |
20100905 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
SAN MARCOS  |
CAMP GARY  |
  |
69  |
LINE OVERHAUL  |
333896   |
20100507 1027  |
20100901 1154  |
20100905 2200  |
20100906 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_10  |
MORRIS SHEPPARD  |
  |
Open  |
69  |
Line rebuild.  |
334112   |
20100507 1039  |
20100901 1154  |
20100905 2200  |
20100906 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_204_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334220   |
20100507 1049  |
20100901 1154  |
20100905 2200  |
20100906 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
WHITT  |
  |
Open  |
69  |
Line rebuild.  |
326760   |
20100310 0821  |
20100323 0829  |
20100906 0700  |
20100906 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
FW_WEB04  |
WEBSTER  |
FRIENDSWOOD REIT  |
  |
138  |
FOUNDATION WORK FOR CKT93 RECONDUCTOR  |
345621   |
20100811 0827  |
20100902 1014  |
20100906 0700  |
20100906 1700  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6560_A  |
GRAHAM SES  |
RICE SWITCH  |
  |
138  |
Outage to remove guys for Brazos Construction.  |
343715   |
20100726 1434  |
20100826 1338  |
20100906 0900  |
20101001 1800  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
RVR_ROBS  |
ROBSTOWN SUB  |
CALALLEN SUB  |
  |
69  |
line clearance to replace conductor and static wire  |
345628   |
20100811 0829  |
20100902 1014  |
20100906 0700  |
20100906 1700  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
LS_4907  |
RICE SWITCH  |
  |
Open  |
138  |
Outage to remove guys for Brazos Construction.  |
345627   |
20100811 0828  |
20100902 1014  |
20100906 0700  |
20100906 1700  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2599  |
GRAHAM SES  |
  |
Open  |
138  |
Outage to remove guys for Brazos Construction.  |
345625   |
20100811 0828  |
20100902 1014  |
20100906 0700  |
20100906 1700  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2601  |
GRAHAM SES  |
  |
Open  |
138  |
Outage to remove guys for Brazos Construction.  |
345623   |
20100811 0827  |
20100902 1014  |
20100906 0700  |
20100906 1700  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
2600  |
GRAHAM SES  |
  |
Open  |
138  |
Outage to remove guys for Brazos Construction.  |
347358   |
20100825 0852  |
20100901 0657  |
20100906 0900  |
20100906 1400  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6625_E  |
HENRIETTA TU  |
RINGGOLD MAGNOLIA TAP  |
  |
69  |
Disconnect 15MVA Mobile Sub from 69kv bypass switch 1342. Connections from Sw 1342 to 69kv line will be reinstalled.  |
342528   |
20100715 0858  |
20100726 1538  |
20100906 0700  |
20100906 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
install foundations for new structures  |
342510   |
20100715 0852  |
20100726 1538  |
20100906 0700  |
20100906 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_RODD_F1  |
BARNEY DAVIS  |
RODD FIELD  |
  |
138  |
install foundations for new structures  |
342574   |
20100715 0915  |
20100901 0942  |
20100906 0600  |
20100906 1400  |
Daily  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
RBS_HRN  |
HEARNE  |
ROBERTSON  |
  |
138  |
Line maintenance.  |
337352   |
20100603 1333  |
20100603 1343  |
20100906 0700  |
20100906 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL  |
333897   |
20100507 1027  |
20100901 1154  |
20100906 2200  |
20100907 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_10  |
MORRIS SHEPPARD  |
  |
Open  |
69  |
Line rebuild.  |
334221   |
20100507 1049  |
20100901 1155  |
20100906 2200  |
20100907 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_M30  |
WHITT  |
  |
Open  |
69  |
Line rebuild.  |
331565   |
20100420 1539  |
20100812 1211  |
20100906 0800  |
20100917 1800  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
DER_DILL  |
DERBY SUB  |
DILLEY SUB  |
  |
69  |
double circuit line  |
334462   |
20100510 1118  |
20100510 1128  |
20100906 0700  |
20100906 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
SAN MARCOS  |
CAMP GARY  |
  |
69  |
LINE OVERHAUL  |
334113   |
20100507 1039  |
20100901 1155  |
20100906 2200  |
20100907 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_204_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
334005   |
20100507 1035  |
20100901 1155  |
20100906 2200  |
20100907 1000  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_202_CB  |
ORAN TMPP  |
  |
Open  |
69  |
Line rebuild.  |
326758   |
20100310 0816  |
20100615 1604  |
20100907 0700  |
20100907 1200  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
AL_PHR93  |
PH ROBINSON  |
ALTA LOMA  |
  |
138  |
CUT JUMPERS LOOKING TOWARDS AL  |
326761   |
20100310 0826  |
20100615 1551  |
20100907 0700  |
20100907 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
FW_WEB04  |
WEBSTER  |
FRIENDSWOOD REIT  |
  |
138  |
FOUNDATION WORK FOR CKT93 RECONDUCTOR  |
348775   |
20100902 0847  |
20100902 0847  |
20100907 0930  |
20100907 1500  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
3263  |
SNYDER  |
  |
Open  |
138  |
Outage to to perform Nerc mandated relay testing and fuctional testing.  |
348774   |
20100902 0846  |
20100902 0846  |
20100907 0930  |
20100907 1500  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
2360  |
SNYDER  |
  |
Open  |
69  |
Outage to to perform Nerc mandated relay testing and fuctional testing.  |
348773   |
20100902 0846  |
20100902 0846  |
20100907 0930  |
20100907 1500  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
XF  |
AXFMR1  |
SNYDER  |
  |
  |
69  |
Outage to to perform Nerc mandated relay testing and fuctional testing.  |
348770   |
20100902 0721  |
20100902 0721  |
20100907 0800  |
20100910 1500  |
Continuous  |
Received at ERCOT  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
MCF_RFUG  |
MCFADDIN SUB  |
REFUGIO SUB  |
  |
69  |
line rehab  |
348603   |
20100901 1332  |
20100901 1332  |
20100907 0700  |
20100910 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
3950_A  |
FISH CREEK SWITCH  |
MOUNTAIN CREEK SES  |
  |
69  |
working under line  |
348486   |
20100901 0518  |
20100901 0519  |
20100907 0800  |
20100907 1800  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_8889  |
BUTTERCUP  |
  |
Open  |
138  |
CLEAR CB 8900 TO TEST LINE PANEL  |
348756   |
20100901 1703  |
20100901 1703  |
20100907 1300  |
20100907 1500  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
3035_CB  |
SAN ANGELO COLLEGE HILLS  |
| SAN ANGELO GRAPE CREEK TAP |   |
Open  |
69  |
Maintenance testing of relays  |
348957   |
20100902 1533  |
20100902 1533  |
20100907 0700  |
20100907 1600  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_208_CB  |
MCCREE  |
  |
Open  |
69  |
Garland to make repairs on PD and EPS metering at McCree.  |
345157   |
20100806 0950  |
20100812 0913  |
20100907 0700  |
20100907 1100  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P880  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp controll cables  |
347968   |
20100830 0845  |
20100830 1206  |
20100907 0800  |
20100907 2400  |
Daily  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
OCB_D110  |
MVEC (VAL VERDE RD)  |
MVEC ALBERTA ROAD TAP  |
  |
138  |
line clearaqnce to c/o 2 dead end structures  |
347967   |
20100830 0835  |
20100830 0849  |
20100907 0800  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
MVALR_PHA  |
PHARR MVEC  |
MVEC ALBERTA ROAD TAP  |
  |
138  |
line clearaqnce to c/o 2 dead end structures  |
348945   |
20100902 1534  |
20100902 1534  |
20100907 0700  |
20100907 1600  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
30  |
SOUTHSIDE POI  |
  |
Open  |
69  |
Garland to make repairs on PD and EPS metering at McCree.  |
346424   |
20100817 1222  |
20100826 0834  |
20100907 0600  |
20100907 0645  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL  |
343537   |
20100723 0938  |
20100831 0959  |
20100907 0700  |
20100909 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T1HS  |
ANBUSH  |
  |
Open  |
138  |
MAINT AT ANBUSH  |
343536   |
20100723 0938  |
20100831 0959  |
20100907 0700  |
20100909 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
B830  |
ANBUSH  |
  |
Open  |
138  |
MAINT AT ANBUSH  |
343535   |
20100723 0937  |
20100831 0959  |
20100907 0700  |
20100909 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
B820  |
ANBUSH  |
  |
Open  |
138  |
MAINT AT ANBUSH  |
347140   |
20100824 0817  |
20100831 0724  |
20100907 0300  |
20100907 1200  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
575_A  |
CARROLLTON NORTHWEST  |
LEWISVILLE SWITCH  |
  |
138  |
Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345  |
344857   |
20100804 0952  |
20100826 0947  |
20100907 0700  |
20100907 1500  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
XF  |
AT3_H  |
OBRIEN  |
  |
  |
345  |
RELAY TEST  |
345185   |
20100806 0951  |
20100826 1335  |
20100907 0700  |
20100907 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
H810  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp controll cables  |
347158   |
20100824 0817  |
20100831 0724  |
20100907 0300  |
20100907 1200  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
105_A  |
CARROLLTON NORTHWEST  |
LEWISVILLE SWITCH  |
  |
345  |
Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345  |
348452   |
20100901 0656  |
20100901 0656  |
20100907 0900  |
20100907 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6625_E  |
HENRIETTA TU  |
RINGGOLD MAGNOLIA TAP  |
  |
69  |
Disconnect 15MVA Mobile Sub from 69kv bypass switch 1342. Connections from Sw 1342 to 69kv line will be reinstalled.  |
342529   |
20100715 0858  |
20100726 1538  |
20100907 0700  |
20100907 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
install foundations for new structures  |
342511   |
20100715 0852  |
20100726 1538  |
20100907 0700  |
20100907 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_RODD_F1  |
BARNEY DAVIS  |
RODD FIELD  |
  |
138  |
install foundations for new structures  |
342419   |
20100714 1548  |
20100827 1402  |
20100907 0600  |
20100909 1800  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T1HS  |
UVALDE REIT  |
  |
Open  |
138  |
REPLACE T1HS - SEE LN03 GBY-EXS  |
342418   |
20100714 1545  |
20100723 0809  |
20100907 0600  |
20100909 1800  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
GBYUV_03  |
GREENS BAYOU  |
UVALDE REIT  |
  |
138  |
NEEDED FOR CLEARANCE TO REPLACE T1HS @ UV  |
344743   |
20100803 1412  |
20100902 1552  |
20100907 0800  |
20100907 1700  |
Daily  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
2625  |
HAWKINS SWITCH  |
  |
Open  |
138  |
Test relays.  |
347519   |
20100826 0909  |
20100830 1352  |
20100907 0600  |
20100907 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
337353   |
20100603 1333  |
20100826 0846  |
20100907 0700  |
20100907 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
overhaul Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010  |
337059   |
20100602 1407  |
20100830 0919  |
20100907 0700  |
20100913 0645  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
ADKBM_09  |
BRITMOORE  |
ADDICKS  |
  |
138  |
RECONDUCTORING  |
338044   |
20100608 1226  |
20100713 1630  |
20100907 0800  |
20100916 1700  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
MVALR_PHA  |
PHARR MVEC  |
MVEC ALBERTA ROAD TAP  |
  |
138  |
Pour foundations for new steel poles  |
332629   |
20100428 0809  |
20100826 1053  |
20100907 0700  |
20100911 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BG_GV_46  |
GARDEN VILLAS  |
BLODGETT  |
  |
69  |
VARIOUS EQUIPMENT MAINTENANCE  |
331328   |
20100419 1426  |
20100727 1020  |
20100907 0700  |
20101016 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
1936  |
HITCHCOCK  |
  |
Open  |
138  |
REHAB. CUT JUMPERS LOOKING TOWARDS AL  |
326762   |
20100310 0826  |
20100615 1552  |
20100908 0700  |
20100908 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
FW_WEB04  |
WEBSTER  |
FRIENDSWOOD REIT  |
  |
138  |
FOUNDATION WORK FOR CKT93 RECONDUCTOR  |
335245   |
20100517 1302  |
20100826 0949  |
20100908 0800  |
20100908 1200  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P480  |
HARDY REIT  |
  |
Open  |
138  |
TEST RECLOSERS  |
335244   |
20100517 1301  |
20100826 0949  |
20100908 0800  |
20100908 1200  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P120  |
HARDY REIT  |
  |
Open  |
138  |
TEST RECLOSERS  |
335243   |
20100517 1300  |
20100826 0949  |
20100908 0800  |
20100908 1200  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
6865  |
HARDY REIT  |
  |
Open  |
138  |
TEST RECLOSERS  |
348205   |
20100830 1613  |
20100902 0737  |
20100908 0730  |
20100909 1700  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_9072  |
SAM RAYBURN SWITCHYD  |
  |
Close  |
138  |
clearance on bkr 9074 to replace Reclosing Relay - will utilize transfer bkr 9094  |
348204   |
20100830 1611  |
20100902 0737  |
20100908 0730  |
20100909 1700  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_9094_CB  |
SAM RAYBURN SWITCHYD  |
  |
Close  |
138  |
clearance on bkr 9074 to replace Reclosing Relay - will unilize transfer bkr 9094  |
348203   |
20100830 1610  |
20100902 0737  |
20100908 0730  |
20100909 1700  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_9074_CB  |
SAM RAYBURN SWITCHYD  |
  |
Open  |
138  |
bkr clearance to replace Reclosing Relay - will unilize transfer bkr 9094  |
347823   |
20100827 0931  |
20100830 0816  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_10010  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348595   |
20100901 1256  |
20100901 1256  |
20100908 0600  |
20100908 1200  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M10VW  |
IBM B  |
  |
Open  |
138  |
Oncor wireless work.  |
348937   |
20100902 1442  |
20100902 1442  |
20100908 0700  |
20100908 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Open  |
69  |
CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL  |
348936   |
20100902 1442  |
20100902 1442  |
20100908 0700  |
20100908 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Open  |
69  |
CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL  |
348935   |
20100902 1442  |
20100902 1442  |
20100908 0700  |
20100908 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Open  |
69  |
CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL  |
348903   |
20100902 1321  |
20100902 1321  |
20100908 0600  |
20100909 1200  |
Continuous  |
Received at ERCOT  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
DISC1389  |
OATES TMPP  |
  |
Open  |
138  |
ONCOR work - UMTS antenna upgrade.  |
348772   |
20100902 0826  |
20100902 1102  |
20100908 1000  |
20100908 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
6026_A  |
BITTER CREEK  |
ABILENE MULBERRY CREEK  |
  |
345  |
CLEAR BITTER CREEK TO MULBERRY CREEK 345 KV LINE T-491 FOR REPAIRS TO GROUIND SWITCH 11486 AT THE BITTERC REEK END OF LINE. ONCOR HAS OKAYED WORK.  |
348771   |
20100902 0825  |
20100902 1101  |
20100908 1000  |
20100908 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
11482  |
BITTER CREEK  |
  |
Open  |
345  |
CLEAR BITTER CREEK TO MULBERRY CREEK 345 KV LINE T-491 FOR REPAIRS TO GROUIND SWITCH 11486 AT THE BITTERC REEK END OF LINE. ONCOR HAS OKAYED WORK.  |
348760   |
20100901 1823  |
20100901 1823  |
20100908 0900  |
20100908 1500  |
Daily  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5090_CB  |
PLEASANTON  |
  |
Open  |
69  |
CB maintenance  |
348609   |
20100901 1411  |
20100901 1411  |
20100908 0800  |
20100909 1500  |
Continuous  |
Received at ERCOT  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
FRI_PEAR  |
PEARSALL SWITCH  |
FRIO TOWN SUB  |
  |
69  |
line clearance for line maintenance  |
348608   |
20100901 1411  |
20100901 1411  |
20100908 0800  |
20100909 1500  |
Continuous  |
Received at ERCOT  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSW_4872  |
SOUTH BATESVILLE SUB  |
  |
Close  |
69  |
switch closed durring clearance on Pearsall to Frio Town for line maintenance  |
347827   |
20100827 0932  |
20100830 0817  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_17949  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
347854   |
20100827 0934  |
20100830 0817  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10071  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
347853   |
20100827 0934  |
20100830 0817  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10069  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
347852   |
20100827 0934  |
20100830 0817  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10011  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
347851   |
20100827 0933  |
20100830 0817  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10009  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
347850   |
20100827 0933  |
20100830 0817  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10051  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
347849   |
20100827 0933  |
20100830 0817  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10049  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
347828   |
20100827 0932  |
20100830 0816  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_17951  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
347826   |
20100827 0931  |
20100830 0816  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_17950  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
347825   |
20100827 0931  |
20100830 0816  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10050  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
347824   |
20100827 0931  |
20100830 0816  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_10030  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
347822   |
20100827 0930  |
20100830 0816  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10070  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348901   |
20100902 1317  |
20100902 1317  |
20100908 0500  |
20100908 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_F  |
GARLAND BOBTOWN TAP  |
ROWLETT  |
  |
138  |
verizon wireless site setting new equipment  |
348949   |
20100902 1440  |
20100902 1440  |
20100908 0700  |
20100908 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Open  |
69  |
CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL  |
346389   |
20100817 0841  |
20100826 0946  |
20100908 0700  |
20100908 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
FL_OB_73  |
FLEWELLEN  |
OBRIEN  |
  |
138  |
install bird guards  |
343327   |
20100721 1038  |
20100723 1440  |
20100908 0800  |
20100909 1700  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_1303_CB  |
RW MILLER  |
  |
Open  |
138  |
Dig pier holes and pour foundations for new DE tower.  |
346425   |
20100817 1222  |
20100826 0836  |
20100908 0600  |
20100908 0645  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL  |
347199   |
20100824 0950  |
20100830 1356  |
20100908 0015  |
20100908 1100  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
DNWD_5047  |
WEST DENTON  |
  |
Open  |
345  |
Contractor to relocate two lattice towers.  |
347197   |
20100824 0950  |
20100830 1355  |
20100908 0015  |
20100908 1100  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
7717  |
JACKSBORO SWITCHING  |
  |
Open  |
345  |
Contractor to relocate two lattice towers.  |
347141   |
20100824 0818  |
20100831 0726  |
20100908 0300  |
20100908 1200  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
575_A  |
CARROLLTON NORTHWEST  |
LEWISVILLE SWITCH  |
  |
138  |
Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345  |
348875   |
20100902 1321  |
20100902 1321  |
20100908 0500  |
20100908 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1372  |
ROSEHILL  |
  |
Close  |
138  |
verizon wireless site setting new equipment  |
348874   |
20100902 1321  |
20100902 1321  |
20100908 0500  |
20100908 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
5812  |
BOBTOWN  |
  |
Close  |
138  |
verizon wireless site setting new equipment  |
348873   |
20100902 1319  |
20100902 1319  |
20100908 0500  |
20100908 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_G  |
GARLAND BOBTOWN TAP  |
BOBTOWN  |
  |
138  |
verizon wireless site setting new equipment  |
348872   |
20100902 1317  |
20100902 1317  |
20100908 0500  |
20100908 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_A  |
GARLAND BOBTOWN TAP  |
OATES TMPP  |
  |
138  |
verizon wireless site setting new equipment  |
348663   |
20100901 1809  |
20100901 1809  |
20100908 1030  |
20100908 1230  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5065_CB  |
SAN ANGELO COLLEGE HILLS  |
  |
Open  |
138  |
Maintenance test of relays  |
348661   |
20100901 1752  |
20100901 1752  |
20100908 0800  |
20100908 1000  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5060_CB  |
SAN ANGELO COLLEGE HILLS  |
| SAN ANGELO SOUTHLAND HILLS |   |
Open  |
138  |
Maintenance testing of relays  |
347159   |
20100824 0818  |
20100831 0726  |
20100908 0300  |
20100908 1200  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
105_A  |
CARROLLTON NORTHWEST  |
LEWISVILLE SWITCH  |
  |
345  |
Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345  |
348563   |
20100901 1258  |
20100901 1258  |
20100908 0600  |
20100908 1200  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M30SWVW  |
CROSS TIMBERS  |
  |
Open  |
138  |
Oncor wireless work.  |
347845   |
20100827 0933  |
20100830 0817  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10031  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
347844   |
20100827 0933  |
20100830 0817  |
20100908 0700  |
20100910 1800  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10029  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
342530   |
20100715 0858  |
20100726 1538  |
20100908 0700  |
20100908 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
install foundations for new structures  |
342512   |
20100715 0852  |
20100726 1538  |
20100908 0700  |
20100908 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_RODD_F1  |
BARNEY DAVIS  |
RODD FIELD  |
  |
138  |
install foundations for new structures  |
343346   |
20100721 1043  |
20100723 1440  |
20100908 0800  |
20100909 1700  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
3730  |
STEPHENVILLE TU  |
  |
Open  |
138  |
Dig pier holes and pour foundations for new DE tower.  |
343344   |
20100721 1037  |
20100723 1440  |
20100908 0800  |
20100909 1700  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
1303  |
STEPHENVILLE TMPP  |
  |
Open  |
138  |
Dig pier holes and pour foundations for new DE tower.  |
347520   |
20100826 0910  |
20100830 1352  |
20100908 0600  |
20100908 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
337354   |
20100603 1333  |
20100826 0846  |
20100908 0700  |
20100908 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010  |
283008   |
20090205 1032  |
20100706 1301  |
20100909 0800  |
20100909 1700  |
Daily  |
Cancelled  |
Planned  |
BRYAN TEXAS UTILITIES (TDSP)  |
  |
CB  |
8030  |
EAST  |
  |
Open  |
138  |
BREAKER MAINTENANCE  |
347521   |
20100826 0910  |
20100830 1352  |
20100909 0600  |
20100909 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
337355   |
20100603 1333  |
20100826 0846  |
20100909 0700  |
20100909 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010  |
342513   |
20100715 0852  |
20100726 1538  |
20100909 0700  |
20100909 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_RODD_F1  |
BARNEY DAVIS  |
RODD FIELD  |
  |
138  |
install foundations for new structures  |
347160   |
20100824 0818  |
20100831 0726  |
20100909 0300  |
20100909 1200  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
575_A  |
CARROLLTON NORTHWEST  |
LEWISVILLE SWITCH  |
  |
138  |
Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345  |
348662   |
20100901 1758  |
20100901 1758  |
20100909 0730  |
20100909 0830  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
4705_CB  |
SAN ANGELO COLLEGE HILLS  |
  |
Open  |
69  |
Maintenance test of relays  |
348877   |
20100902 1323  |
20100902 1323  |
20100909 0500  |
20100909 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
5812  |
BOBTOWN  |
  |
Close  |
138  |
verizon wireless site setting new equipment  |
348879   |
20100902 1324  |
20100902 1324  |
20100909 0500  |
20100909 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_G  |
GARLAND BOBTOWN TAP  |
BOBTOWN  |
  |
138  |
verizon wireless site setting new equipment  |
348506   |
20100901 0531  |
20100901 0532  |
20100909 0830  |
20100909 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_13450  |
GERONIMO  |
  |
Open  |
138  |
CLEAR CB 13450 FOR DIAGNOSTIC TESTING  |
348505   |
20100901 0531  |
20100901 0531  |
20100909 0830  |
20100909 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_13451  |
GERONIMO  |
  |
Open  |
138  |
CLEAR CB 13450 FOR DIAGNOSTIC TESTING  |
348504   |
20100901 0531  |
20100901 0531  |
20100909 0830  |
20100909 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_13449  |
GERONIMO  |
  |
Open  |
138  |
CLEAR CB 13450 FOR DIAGNOSTIC TESTING  |
348904   |
20100902 1324  |
20100902 1324  |
20100909 0500  |
20100909 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_F  |
GARLAND BOBTOWN TAP  |
ROWLETT  |
  |
138  |
verizon wireless site setting new equipment  |
348759   |
20100901 1803  |
20100901 1803  |
20100909 0900  |
20100909 1030  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
4065_CB  |
SAN ANGELO COLLEGE HILLS  |
  |
Open  |
69  |
Maintenance test of relays  |
348169   |
20100830 1218  |
20100831 1008  |
20100909 0100  |
20100909 0900  |
Daily  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
MVALR_PHA  |
PHARR MVEC  |
MVEC ALBERTA ROAD TAP  |
  |
138  |
remove Goliath Mobile from Doedyns line  |
348950   |
20100902 1440  |
20100902 1441  |
20100909 0700  |
20100909 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Open  |
69  |
CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL  |
348828   |
20100902 1240  |
20100902 1240  |
20100909 0400  |
20100909 1100  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
219_A  |
TOPEKA TRANSITION STATION  |
WEST LEVEE SWITCH  |
  |
345  |
taking oil sample  |
345439   |
20100810 1045  |
20100810 1045  |
20100909 0700  |
20100909 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
XF  |
AXFMR1L  |
SULPHUR SPRINGS SWITCH  |
  |
  |
138  |
Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff  |
345438   |
20100810 1044  |
20100810 1044  |
20100909 0700  |
20100909 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
XF  |
AXFMR1H  |
SULPHUR SPRINGS SWITCH  |
  |
  |
345  |
Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff  |
345436   |
20100810 1044  |
20100810 1044  |
20100909 0700  |
20100909 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
2538  |
SULPHUR SPRINGS SWITCH  |
  |
Open  |
138  |
Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff  |
345468   |
20100810 1128  |
20100810 1129  |
20100909 0700  |
20100909 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2537  |
SULPHUR SPRINGS SWITCH  |
  |
Open  |
138  |
Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff  |
345453   |
20100810 1053  |
20100810 1053  |
20100909 0700  |
20100909 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2503  |
MONTICELLO TAP  |
  |
Open  |
138  |
opened per guide, Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff  |
345444   |
20100810 1049  |
20100810 1049  |
20100909 0700  |
20100909 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
3385  |
SULPHUR SPRINGS SWITCH  |
  |
Open  |
345  |
Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff  |
345437   |
20100810 1044  |
20100810 1044  |
20100909 0700  |
20100909 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
3386  |
SULPHUR SPRINGS SWITCH  |
  |
Open  |
345  |
Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff  |
346388   |
20100817 0839  |
20100826 1428  |
20100909 0700  |
20100909 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
FL_MAR25  |
FLEWELLEN  |
MASON ROAD  |
  |
138  |
install bird guards  |
343330   |
20100721 1045  |
20100721 1327  |
20100909 0800  |
20100909 1700  |
Daily  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
1303  |
STEPHENVILLE TMPP  |
  |
Open  |
138  |
Dig pier holes and pour foundations for new DE tower.  |
343329   |
20100721 1045  |
20100721 1327  |
20100909 0800  |
20100909 1700  |
Daily  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_1303_CB  |
RW MILLER  |
  |
Open  |
138  |
Dig pier holes and pour foundations for new DE tower.  |
343328   |
20100721 1044  |
20100721 1327  |
20100909 0800  |
20100909 1700  |
Daily  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
3730  |
STEPHENVILLE TU  |
  |
Open  |
138  |
Dig pier holes and pour foundations for new DE tower.  |
347207   |
20100824 1309  |
20100902 1446  |
20100909 0700  |
20100909 1700  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
5700  |
BRECKENRIDGE  |
  |
Open  |
69  |
Outage to replace crossarms. Open CB 5700 as part of TOAP.  |
347206   |
20100824 1308  |
20100902 1446  |
20100909 0700  |
20100909 1700  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6180_C  |
GRAHAM SES  |
SUN ECU TAP  |
  |
138  |
Outage to replace crossarms. Open CB 5700 as part of TOAP.  |
346426   |
20100817 1222  |
20100826 0836  |
20100909 0600  |
20100909 0645  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL  |
345664   |
20100811 0916  |
20100811 0916  |
20100909 0700  |
20100909 1800  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1020  |
SWEETWATER NO 2  |
  |
Open  |
69  |
Outage to replace the relay panel.  |
348354   |
20100831 1010  |
20100902 1500  |
20100909 0100  |
20100909 0900  |
Daily  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
20620_CB  |
MVEC (DOEDYNS)  |
  |
Open  |
138  |
remove Goliath Mobile from Doedyns line Doedyns load to be backfed  |
348353   |
20100831 1005  |
20100902 1500  |
20100909 0100  |
20100909 0900  |
Daily  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
D110_CB  |
PHARR MVEC  |
  |
Open  |
138  |
remove Goliath Mobile from Doedyns line  |
348152   |
20100830 1219  |
20100831 1012  |
20100909 0100  |
20100909 0900  |
Daily  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
MVDO_MVALRD  |
MVEC (DOEDYNS)  |
MVEC ALBERTA ROAD TAP  |
  |
138  |
remove Goliath Mobile from Doedyns line Doedyns load to be backfed  |
348127   |
20100830 1205  |
20100831 1003  |
20100909 0100  |
20100917 1400  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
OCB_D110  |
MVEC (VAL VERDE RD)  |
MVEC ALBERTA ROAD TAP  |
  |
138  |
line clearaqnce to c/o 2 dead end structures  |
348598   |
20100901 1258  |
20100901 1258  |
20100909 0600  |
20100909 1200  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M30SWVW  |
CROSS TIMBERS  |
  |
Open  |
138  |
Oncor wireless work.  |
348596   |
20100901 1257  |
20100901 1257  |
20100909 0600  |
20100909 1200  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M10VW  |
IBM B  |
  |
Open  |
138  |
Oncor wireless work.  |
348940   |
20100902 1443  |
20100902 1443  |
20100909 0700  |
20100909 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Open  |
69  |
CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL  |
348939   |
20100902 1443  |
20100902 1443  |
20100909 0700  |
20100909 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Open  |
69  |
CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL  |
348938   |
20100902 1442  |
20100902 1442  |
20100909 0700  |
20100909 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Open  |
69  |
CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL  |
348921   |
20100902 1409  |
20100902 1409  |
20100909 0830  |
20100909 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_575LW  |
SANDSTONE MOUNTAIN  |
  |
Close  |
69  |
SWITCH IS BEING CLOSED FOR VOLTAGE SUPPORT IF THE AUTO IS LOSS AT FREDERICKSBURG WHILE CB 1800IS OUT FOR OPERATOR INSPECTION AT GILLESPIE  |
348852   |
20100902 1240  |
20100902 1240  |
20100909 0400  |
20100909 1100  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
219_B  |
TOPEKA TRANSITION STATION  |
NORWOOD SWITCH  |
  |
345  |
taking oil sample  |
348512   |
20100901 0537  |
20100902 1427  |
20100909 0830  |
20100909 1730  |
Daily  |
Study  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
1801  |
GILLESPIE LCRA  |
  |
Open  |
69  |
CLEAR CB 1800 FOR OPERATOR INSPECTION  |
348511   |
20100901 0537  |
20100902 1427  |
20100909 0830  |
20100909 1730  |
Daily  |
Study  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
1799  |
GILLESPIE LCRA  |
  |
Open  |
69  |
CLEAR CB 1800 FOR OPERATOR INSPECTION  |
348510   |
20100901 0536  |
20100902 1427  |
20100909 0830  |
20100909 1730  |
Daily  |
Study  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
1800_CB  |
GILLESPIE LCRA  |
  |
Open  |
69  |
CLEAR CB 1800 FOR OPERATOR INSPECTION  |
345451   |
20100810 1052  |
20100810 1052  |
20100909 0700  |
20100909 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
4311  |
MONTICELLO SES  |
  |
Open  |
345  |
Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff  |
345450   |
20100810 1051  |
20100810 1051  |
20100909 0700  |
20100909 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
4309  |
MONTICELLO SES  |
  |
Open  |
345  |
Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff  |
345448   |
20100810 1051  |
20100810 1051  |
20100909 0700  |
20100909 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
4310  |
MONTICELLO SES  |
  |
Open  |
345  |
Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff  |
345446   |
20100810 1050  |
20100810 1050  |
20100909 0700  |
20100909 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
205_A  |
SULPHUR SPRINGS SWITCH  |
MONTICELLO SES  |
  |
345  |
Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff  |
345445   |
20100810 1049  |
20100810 1049  |
20100909 0700  |
20100909 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
3388  |
SULPHUR SPRINGS SWITCH  |
  |
Open  |
345  |
Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff  |
345442   |
20100810 1048  |
20100810 1048  |
20100909 0700  |
20100909 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
3387  |
SULPHUR SPRINGS SWITCH  |
  |
Open  |
345  |
Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff  |
348532   |
20100901 0552  |
20100901 0552  |
20100909 1200  |
20100909 1600  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_1169  |
SAN SABA SWITCH  |
  |
Open  |
69  |
CLEAR CB 1170 FOR CITY OF SAN SABA PERSONNEL SWITCH TRAINING. BREAKER WILL BE BYPASSED  |
348531   |
20100901 0552  |
20100901 0552  |
20100909 1200  |
20100909 1600  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_1171  |
SAN SABA SWITCH  |
  |
Open  |
69  |
CLEAR CB 1170 FOR CITY OF SAN SABA PERSONNEL SWITCH TRAINING. BREAKER WILL BE BYPASSED  |
348530   |
20100901 0550  |
20100901 0551  |
20100909 0800  |
20100909 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
PCB_6580_CB  |
ZORN  |
  |
Open  |
345  |
CLEAR MOS 6589 TO ALLOW FOR TEST OPERATING AFTER REPAIRS MADE TO MOTOR OPERATOR  |
348529   |
20100901 0550  |
20100901 0550  |
20100909 0800  |
20100909 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_6591  |
ZORN  |
  |
Open  |
345  |
CLEAR MOS 6589 TO ALLOW FOR TEST OPERATING AFTER REPAIRS MADE TO MOTOR OPERATOR  |
348528   |
20100901 0549  |
20100901 0550  |
20100909 0800  |
20100909 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_6589  |
ZORN  |
  |
Open  |
345  |
CLEAR MOS 6589 TO ALLOW FOR TEST OPERATING AFTER REPAIRS MADE TO MOTOR OPERATOR  |
348527   |
20100901 0547  |
20100901 0547  |
20100909 0730  |
20100909 1130  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
PCB_3130  |
MCNEIL LCRA  |
  |
Open  |
138  |
CLEAR CB 3130 TO REPLACE OPERATION COUNTER  |
348526   |
20100901 0546  |
20100901 0546  |
20100909 0730  |
20100909 1130  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3129  |
MCNEIL LCRA  |
  |
Open  |
138  |
CLEAR CB 3130 TO REPLACE OPERATION COUNTER  |
348525   |
20100901 0546  |
20100901 0546  |
20100909 0730  |
20100909 1130  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3131  |
MCNEIL LCRA  |
  |
Open  |
138  |
CLEAR CB 3130 TO REPLACE OPERATION COUNTER  |
348524   |
20100901 0545  |
20100901 0545  |
20100909 0830  |
20100909 1200  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
5789  |
GLIDDEN LCRA  |
  |
Open  |
138  |
CLEAR CB 5790 FOR OPERATOR INSPECTION  |
348523   |
20100901 0544  |
20100901 0544  |
20100909 0830  |
20100909 1200  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
5791  |
GLIDDEN LCRA  |
  |
Open  |
138  |
CLEAR CB 5790 FOR OPERATOR INSPECTION  |
348522   |
20100901 0544  |
20100901 0544  |
20100909 0830  |
20100909 1200  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_5790_CB  |
GLIDDEN LCRA  |
  |
Open  |
138  |
CLEAR CB 5790 FOR OPERATOR INSPECTION  |
348521   |
20100901 0543  |
20100901 0543  |
20100909 0730  |
20100909 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
11489  |
BITTER CREEK  |
  |
Open  |
345  |
CLEAR CB 11490 FOR OPERATOR INSPECTION  |
348520   |
20100901 0542  |
20100901 0542  |
20100909 0730  |
20100909 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
11491  |
BITTER CREEK  |
  |
Open  |
345  |
CLEAR CB 11490 FOR OPERATOR INSPECTION  |
348519   |
20100901 0542  |
20100901 0542  |
20100909 0730  |
20100909 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
11490  |
BITTER CREEK  |
  |
Open  |
345  |
CLEAR CB 11490 FOR OPERATOR INSPECTION  |
348878   |
20100902 1324  |
20100902 1324  |
20100909 0500  |
20100909 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1391_A  |
GARLAND BOBTOWN TAP  |
OATES TMPP  |
  |
138  |
verizon wireless site setting new equipment  |
348876   |
20100902 1322  |
20100902 1322  |
20100909 0500  |
20100909 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1372  |
ROSEHILL  |
  |
Close  |
138  |
verizon wireless site setting new equipment  |
347161   |
20100824 0819  |
20100831 0726  |
20100909 0300  |
20100909 1200  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
105_A  |
CARROLLTON NORTHWEST  |
LEWISVILLE SWITCH  |
  |
345  |
Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345  |
348556   |
20100901 0946  |
20100901 0946  |
20100909 0600  |
20100909 1400  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
1607  |
ROBERTSON  |
  |
Open  |
138  |
Line maintenance.  |
342531   |
20100715 0858  |
20100726 1538  |
20100909 0700  |
20100909 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
install foundations for new structures  |
326763   |
20100310 0826  |
20100615 1552  |
20100909 0700  |
20100909 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
FW_WEB04  |
WEBSTER  |
FRIENDSWOOD REIT  |
  |
138  |
FOUNDATION WORK FOR CKT93 RECONDUCTOR  |
326764   |
20100310 0826  |
20100615 1553  |
20100910 0700  |
20100910 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
FW_WEB04  |
WEBSTER  |
FRIENDSWOOD REIT  |
  |
138  |
FOUNDATION WORK FOR CKT93 RECONDUCTOR  |
347522   |
20100826 0910  |
20100830 1352  |
20100910 0600  |
20100910 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
348881   |
20100902 1330  |
20100902 1330  |
20100910 0600  |
20100910 1200  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
1371  |
ROSEHILL  |
  |
Open  |
138  |
This is a rescheduled outage. ONCOR to work Trouble ticket at cell site.  |
347366   |
20100825 0952  |
20100825 0952  |
20100910 0600  |
20100910 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1255_C  |
NECHES RIVER PUMP  |
PALESTINE SOUTH  |
  |
138  |
line maint  |
345754   |
20100811 1308  |
20100811 1308  |
20100910 0500  |
20100910 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1020_A  |
TRADINGHOUSE SES TAP  |
ELM MOTT  |
  |
138  |
replacing poles and crossarms  |
345752   |
20100811 1307  |
20100811 1307  |
20100910 0500  |
20100910 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2829  |
ELM MOTT  |
  |
Open  |
138  |
replacing poles and crossarms  |
346427   |
20100817 1222  |
20100826 0836  |
20100910 0600  |
20100910 0645  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL  |
347190   |
20100824 0906  |
20100824 0906  |
20100910 1200  |
20100910 1600  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
D650  |
CROSBY  |
  |
Open  |
138  |
lube job  |
348883   |
20100902 1341  |
20100902 1341  |
20100910 0500  |
20100910 2000  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
3330_D  |
LOMBARDY LANE  |
MORRISON LANE SWITCH  |
  |
138  |
Work to be performed, Release hold and switch in temporary jumper T-001 to line side of switch 121 @ Lombardy Lane  |
348882   |
20100902 1339  |
20100902 1339  |
20100910 0600  |
20100910 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1535_A  |
TENASKA TU  |
PARIS SWITCH  |
  |
138  |
line maint  |
347639   |
20100826 1104  |
20100826 1104  |
20100910 0500  |
20100910 1300  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BG_GV_46  |
GARDEN VILLAS  |
BLODGETT  |
  |
69  |
SET POLE BASE FOR CKT46 RELOCATION  |
346910   |
20100820 1217  |
20100820 1218  |
20100910 1815  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
DSC6988  |
DESERT SKY  |
  |
Open  |
138  |
MCCAMEY SW 1548 THRU TO SW 6988 AT INDN ENRON 2 AS SAFETY FOR LCRA TO PULL NEW CONDUCTOR  |
347182   |
20100824 0905  |
20100824 0905  |
20100910 0800  |
20100910 1130  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
D660  |
CROSBY  |
  |
Open  |
138  |
lube job  |
347163   |
20100824 0820  |
20100831 0725  |
20100910 0300  |
20100910 1200  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
575_A  |
CARROLLTON NORTHWEST  |
LEWISVILLE SWITCH  |
  |
138  |
Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345  |
347162   |
20100824 0819  |
20100831 0725  |
20100910 0300  |
20100910 1200  |
Daily  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
105_A  |
CARROLLTON NORTHWEST  |
LEWISVILLE SWITCH  |
  |
345  |
Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345  |
348181   |
20100830 1354  |
20100830 1354  |
20100910 0700  |
20100910 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
348145   |
20100830 1122  |
20100830 1122  |
20100910 0700  |
20100910 1800  |
Daily  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
9027  |
THOMASTON  |
  |
Open  |
138  |
LINE OUTAGE BETWEEN THOMASTON - CUERO TO DIG FOUNDATIONS UNDER LINE  |
348151   |
20100830 1209  |
20100830 1209  |
20100910 0700  |
20100910 1800  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_20359  |
CUERO LCRA  |
  |
Open  |
138  |
CLEAR CUERO TO THOMASTON 138 KV LINE FOR AEP TO DIG FOOTINGS UNDER LINE.  |
348150   |
20100830 1209  |
20100830 1209  |
20100910 0700  |
20100910 1800  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_20361  |
CUERO LCRA  |
  |
Open  |
138  |
CLEAR CUERO TO THOMASTON 138 KV LINE FOR AEP TO DIG FOOTINGS UNDER LINE.  |
348149   |
20100830 1209  |
20100830 1209  |
20100910 0700  |
20100910 1800  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_20360  |
CUERO LCRA  |
  |
Open  |
138  |
CLEAR CUERO TO THOMASTON 138 KV LINE FOR AEP TO DIG FOOTINGS UNDER LINE.  |
348128   |
20100830 1208  |
20100830 1208  |
20100910 0700  |
20100910 1800  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
CUELCA_THOMAS1  |
CUERO LCRA  |
THOMASTON  |
  |
138  |
CLEAR CUERO TO THOMASTON 138 KV LINE FOR AEP TO DIG FOOTINGS UNDER LINE.  |
348597   |
20100901 1258  |
20100901 1258  |
20100910 0600  |
20100910 1200  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M30SWVW  |
CROSS TIMBERS  |
  |
Open  |
138  |
Oncor wireless work.  |
348943   |
20100902 1447  |
20100902 1447  |
20100910 0100  |
20100910 0900  |
Daily  |
Received at ERCOT  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
20620_CB  |
MVEC (DOEDYNS)  |
  |
Open  |
138  |
remove Goliath Mobile from Doedyns line Doedyns load to be backfed  |
348941   |
20100902 1444  |
20100902 1444  |
20100910 0100  |
20100910 0900  |
Daily  |
Received at ERCOT  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
CB  |
D110_CB  |
PHARR MVEC  |
  |
Open  |
138  |
remove Goliath Mobile from Doedyns line  |
348911   |
20100902 1329  |
20100902 1329  |
20100910 0600  |
20100910 1200  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
9112  |
WYNN JOYCE  |
  |
Open  |
138  |
This is a rescheduled outage. ONCOR to work Trouble ticket at cell site.  |
348908   |
20100902 1329  |
20100902 1329  |
20100910 0600  |
20100910 1200  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
OCB_9110_CB  |
WYNN JOYCE  |
  |
Open  |
138  |
This is a rescheduled outage. ONCOR to work Trouble ticket at cell site.  |
348907   |
20100902 1328  |
20100902 1328  |
20100910 0600  |
20100910 1200  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
LN  |
ROS-WYN  |
WYNN JOYCE  |
ROSEHILL  |
  |
138  |
This is a rescheduled outage. ONCOR to work Trouble ticket at cell site.  |
348761   |
20100901 1830  |
20100901 1830  |
20100910 0900  |
20100910 1500  |
Daily  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
6520_CB  |
PLEASANTON  |
  |
Open  |
138  |
CB maintenance  |
345755   |
20100811 1319  |
20100811 1319  |
20100910 0500  |
20100910 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2707  |
TRADINGHOUSE SES TAP  |
  |
Open  |
138  |
replacing poles and crossarms  |
345753   |
20100811 1307  |
20100811 1307  |
20100910 0500  |
20100910 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2831  |
ELM MOTT  |
  |
Open  |
138  |
replacing poles and crossarms  |
345751   |
20100811 1306  |
20100811 1306  |
20100910 0500  |
20100910 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
2830  |
ELM MOTT  |
  |
Open  |
138  |
replacing poles and crossarms  |
348294   |
20100831 0757  |
20100831 0757  |
20100910 0300  |
20100910 1200  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
105_B  |
ROANOKE SWITCH  |
LEWISVILLE SWITCH  |
  |
345  |
Outage to install tower upgrade kits.  |
348146   |
20100830 1123  |
20100830 1123  |
20100910 0700  |
20100910 1800  |
Daily  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
8968_CS  |
THOMASTON  |
  |
Open  |
138  |
LINE OUTAGE BETWEEN THOMASTON - CUERO TO DIG FOUNDATIONS UNDER LINE  |
347729   |
20100826 1241  |
20100826 1241  |
20100910 0600  |
20100910 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1797  |
FRANKSTON  |
  |
Close  |
69  |
line maint  |
347648   |
20100826 1240  |
20100826 1240  |
20100910 0600  |
20100910 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1910_B  |
JACKSONVILLE  |
FRANKSTON  |
  |
69  |
line maint  |
348952   |
20100902 1445  |
20100902 1445  |
20100910 0700  |
20100910 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
5700  |
BRECKENRIDGE  |
  |
Open  |
69  |
Outage to replace crossarms. Open CB 5700 as part of TOAP.  |
348951   |
20100902 1444  |
20100902 1444  |
20100910 0700  |
20100910 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6180_C  |
GRAHAM SES  |
SUN ECU TAP  |
  |
138  |
Outage to replace crossarms. Open CB 5700 as part of TOAP.  |
348562   |
20100901 1257  |
20100901 1257  |
20100910 0600  |
20100910 1200  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M10VW  |
IBM B  |
  |
Open  |
138  |
Oncor wireless work.  |
346909   |
20100820 1217  |
20100820 1217  |
20100910 1815  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
1548  |
MCCAMEY  |
  |
Open  |
138  |
MCCAMEY SW 1548 THRU TO SW 6988 AT INDN ENRON 2 AS SAFETY FOR LCRA TO PULL NEW CONDUCTOR  |
342532   |
20100715 0858  |
20100726 1538  |
20100910 0700  |
20100910 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
install foundations for new structures  |
342514   |
20100715 0852  |
20100726 1538  |
20100910 0700  |
20100910 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_RODD_F1  |
BARNEY DAVIS  |
RODD FIELD  |
  |
138  |
install foundations for new structures  |
337356   |
20100603 1333  |
20100826 0846  |
20100910 0700  |
20100910 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL  |
334466   |
20100510 1118  |
20100510 1126  |
20100910 0700  |
20100910 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
SAN MARCOS  |
CAMP GARY  |
  |
69  |
LINE OVERHAUL  |
326765   |
20100310 0826  |
20100615 1554  |
20100911 0700  |
20100911 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
FW_WEB04  |
WEBSTER  |
FRIENDSWOOD REIT  |
  |
138  |
FOUNDATION WORK FOR CKT93 RECONDUCTOR  |
337357   |
20100603 1333  |
20100603 1337  |
20100911 0700  |
20100911 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL  |
347640   |
20100826 1104  |
20100826 1104  |
20100911 0500  |
20100911 1300  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BG_GV_46  |
GARDEN VILLAS  |
BLODGETT  |
  |
69  |
SET POLE BASE FOR CKT46 RELOCATION  |
348182   |
20100830 1354  |
20100830 1354  |
20100911 0700  |
20100911 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
342533   |
20100715 0858  |
20100726 1538  |
20100911 0700  |
20100911 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
install foundations for new structures  |
347523   |
20100826 0910  |
20100826 0912  |
20100911 0600  |
20100911 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
334467   |
20100510 1118  |
20100510 1126  |
20100911 0700  |
20100911 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
SAN MARCOS  |
CAMP GARY  |
  |
69  |
LINE OVERHAUL  |
334468   |
20100510 1118  |
20100510 1126  |
20100912 0700  |
20100912 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
SAN MARCOS  |
CAMP GARY  |
  |
69  |
LINE OVERHAUL  |
342534   |
20100715 0858  |
20100726 1538  |
20100912 0700  |
20100912 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
install foundations for new structures  |
347524   |
20100826 0910  |
20100826 0912  |
20100912 0600  |
20100912 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
348300   |
20100831 0835  |
20100831 0835  |
20100912 2015  |
20100927 0545  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6009_A  |
WILLOW CREEK SWITCH  |
PARKER SWITCH  |
  |
345  |
Outage to erect towers for re-conductor upgrade.  |
348183   |
20100830 1354  |
20100830 1354  |
20100912 0700  |
20100912 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
337358   |
20100603 1333  |
20100603 1337  |
20100912 0700  |
20100912 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL  |
308837   |
20090927 1541  |
20100603 1328  |
20100913 0900  |
20100915 1600  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_455_CB  |
LILLIAN  |
  |
Open  |
69  |
Upgrade CB.  |
347489   |
20100825 1652  |
20100825 1652  |
20100913 1000  |
20100916 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
20  |
FLAT ROCK TMPP  |
  |
Open  |
138  |
Upgrade relay panel and add MO to the 20 switch.  |
347488   |
20100825 1652  |
20100825 1653  |
20100913 1000  |
20100916 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
M20CS  |
FLAT ROCK TMPP  |
  |
Open  |
138  |
Upgrade relay panel and add MO to the 20 switch.Mobile Sub will carry Tri-County load during this time.  |
346650   |
20100818 1459  |
20100818 1459  |
20100913 0730  |
20100913 1700  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
R5_T5  |
CAGNON  |
HILL COUNTRY  |
  |
345  |
345KV TOWER FOUNDATION INSTALLATION  |
344736   |
20100803 1025  |
20100803 1025  |
20100913 0700  |
20100916 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
QNTSRF47  |
QUINTANA   |
SURFSI  |
  |
69  |
line and section outage at qnt to repair switch  |
344735   |
20100803 1020  |
20100803 1020  |
20100913 0700  |
20100916 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
6477  |
QUINTANA   |
  |
Open  |
69  |
line and section outage at qnt to repair switch  |
344734   |
20100803 1020  |
20100803 1020  |
20100913 0700  |
20100916 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T830  |
QUINTANA   |
  |
Open  |
69  |
line and section outage at qnt to repair switch  |
347256   |
20100824 1333  |
20100824 1333  |
20100913 0700  |
20100913 1200  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_950  |
DECKER POWER PLANT  |
  |
Open  |
138  |
Sync test on DP-920-2 & DP-1013 breakers  |
348958   |
20100902 1543  |
20100902 1543  |
20100913 0800  |
20100917 1600  |
Continuous  |
Received at ERCOT  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
1383  |
APOLLO  |
  |
Open  |
138  |
Tranformer #2 maintenance. Internal visual inspection and testing.  |
347253   |
20100824 1332  |
20100824 1332  |
20100913 0700  |
20100913 1200  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_1013  |
DECKER POWER PLANT  |
  |
Open  |
138  |
Sync test on DP-920-2 & DP-1013 breakers  |
347252   |
20100824 1332  |
20100824 1332  |
20100913 0700  |
20100913 1200  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_902_3  |
DECKER POWER PLANT  |
  |
Open  |
138  |
Sync test on DP-920-2 & DP-1013 breakers  |
347250   |
20100824 1329  |
20100824 1329  |
20100913 0700  |
20100913 1200  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_920_3  |
DECKER POWER PLANT  |
  |
Open  |
138  |
Sync test on DP-920-2 & DP-1013 breakers  |
347249   |
20100824 1329  |
20100824 1329  |
20100913 0700  |
20100913 1200  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_920_2_CB  |
DECKER POWER PLANT  |
  |
Open  |
138  |
Sync test on DP-920-2 & DP-1013 breakers  |
347262   |
20100824 1338  |
20100824 1338  |
20100913 0800  |
20100917 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2234  |
BARNSLEY  |
  |
Close  |
69  |
Outage to replace bad crossarms. Close switch 2234 at Barnsley for alternate source.  |
347261   |
20100824 1337  |
20100824 1337  |
20100913 0800  |
20100917 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6720_D  |
CRANE TU  |
CRANE ATLANTIC TAP  |
  |
69  |
Outage to replace bad crossarms. Close switch 2234 at Barnsley for alternate source.  |
348462   |
20100901 0803  |
20100901 0803  |
20100913 1000  |
20101001 1730  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CP  |
YOAKU_C1  |
YOAKUM  |
  |
Open  |
138  |
CLEAR 138 KV CAPACITOR BANK FOR REPLACEMENT  |
348254   |
20100831 0808  |
20100831 0808  |
20100913 1400  |
20100917 1730  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_5684  |
DEVILS HILL  |
  |
Open  |
138  |
CLEAR 138/12.5 KV T-1 POWERBANK FOR MAINTENANCE AND TESTING. T-1 LOAD WILL BE PUT ON A MOBILE XFMR INSTALLED ON THE DEVILs HILL TO BLANCO 69 KV LINE T-318  |
348569   |
20100901 0942  |
20100901 0942  |
20100913 0700  |
20100914 1730  |
Continuous  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
D242  |
HADEN  |
  |
Close  |
138  |
CLOSE BACK OF RING FOR MAINT ON D220  |
348548   |
20100901 0941  |
20100901 0941  |
20100913 0700  |
20100914 1730  |
Continuous  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
D220  |
HADEN  |
  |
Open  |
138  |
MAINT  |
348541   |
20100901 0803  |
20100901 0803  |
20100913 1000  |
20101001 1730  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
4216  |
YOAKUM  |
  |
Open  |
138  |
CLEAR 138 KV CAPACITOR BANK FOR REPLACEMENT  |
348540   |
20100901 0803  |
20100901 0803  |
20100913 1000  |
20101001 1730  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CS_4245  |
YOAKUM  |
  |
Open  |
138  |
CLEAR 138 KV CAPACITOR BANK FOR REPLACEMENT  |
347031   |
20100823 0624  |
20100823 0624  |
20100913 0700  |
20100920 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
DSC  |
DSW239-60  |
GAF SUB  |
  |
Open  |
138  |
Centerpoint energy requesting an outage on line 138-1A  |
346497   |
20100817 1413  |
20100817 1413  |
20100913 0800  |
20100917 1500  |
Continuous  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
9950_CB  |
COLETO CREEK  |
  |
Open  |
138  |
REPLACE BREAKER  |
344727   |
20100803 1254  |
20100803 1305  |
20100913 1400  |
20100917 1730  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CS5685_CS  |
DEVILS HILL  |
  |
Open  |
138  |
CLEAR 138/12.5 KV T-1 POWERBANK FOR MAINTENANCE AND TESTING. T-1 LOAD WILL BE PUT ON A MOBILE XFMR INSTALLED ON THE DEVILs HILL TO BLANCO 69 KV LINE T-318  |
344723   |
20100803 1020  |
20100803 1020  |
20100913 0700  |
20100916 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T820  |
QUINTANA   |
  |
Open  |
69  |
line and section outage at qnt to repair switch  |
347347   |
20100825 0908  |
20100825 0908  |
20100913 0700  |
20100913 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6540_A  |
WEATHERFORD SWITCH  |
ORAN TU  |
  |
138  |
Outage to replace bad crossarms.  |
347264   |
20100824 1344  |
20100824 1344  |
20100913 0700  |
20100913 1200  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_993_2  |
DECKER POWER PLANT  |
  |
Open  |
138  |
Sync test on DP-920-2 & DP-1013 breakers  |
347258   |
20100824 1334  |
20100824 1334  |
20100913 0700  |
20100913 1200  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
AU_920_1_CB  |
AUSTROP  |
  |
Open  |
138  |
Sync test on DP-920-2 & DP-1013 breakers  |
342535   |
20100715 0858  |
20100726 1538  |
20100913 0700  |
20100913 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
install foundations for new structures  |
342515   |
20100715 0852  |
20100726 1538  |
20100913 0700  |
20100913 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_RODD_F1  |
BARNEY DAVIS  |
RODD FIELD  |
  |
138  |
install foundations for new structures  |
346805   |
20100819 1514  |
20100831 0807  |
20100913 1400  |
20100917 1730  |
Continuous  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_5684  |
DEVILS HILL  |
  |
Open  |
138  |
CLEAR 138/12.5 KV T-1 POWERBANK FOR MAINTENANCE AND TESTING. T-1 LOAD WILL BE PUT ON A MOBILE XFMR INSTALLED ON THE DEVILs HILL TO BLANCO 69 KV LINE T-318  |
347369   |
20100825 0958  |
20100825 0958  |
20100913 1100  |
20100922 1000  |
Continuous  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
3665  |
BLUFF CREEK  |
  |
Open  |
138  |
SANDBLAST AND PAINT REACTOR  |
347259   |
20100824 1335  |
20100824 1335  |
20100913 0700  |
20100913 1200  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
AU_920_2_CB  |
AUSTROP  |
  |
Open  |
138  |
Sync test on DP-920-2 & DP-1013 breakers  |
347255   |
20100824 1333  |
20100824 1344  |
20100913 0700  |
20100913 1200  |
Daily  |
Cancelled  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_993_3  |
DECKER POWER PLANT  |
  |
Open  |
138  |
Sync test on DP-920-2 & DP-1013 breakers  |
347251   |
20100824 1331  |
20100824 1331  |
20100913 0700  |
20100913 1200  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
DP_975_3_CB  |
DECKER POWER PLANT  |
  |
Open  |
138  |
Sync test on DP-920-2 & DP-1013 breakers  |
347525   |
20100826 0910  |
20100830 1352  |
20100913 0600  |
20100913 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
348184   |
20100830 1354  |
20100830 1354  |
20100913 0700  |
20100913 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
343201   |
20100720 1541  |
20100720 1544  |
20100913 0700  |
20100915 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
BW_CN_94  |
CELANESE CHEMICAL  |
BAYWAY  |
  |
138  |
replace ccvt, line tuner and coax at celnec  |
348650   |
20100901 1511  |
20100901 1511  |
20100913 0800  |
20100913 1100  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
1123  |
UNIVERSITY REIT  |
  |
Close  |
69  |
LUBE MAINTENANCE LN12>GF ON BYPASS  |
348566   |
20100901 1436  |
20100901 1436  |
20100913 0800  |
20100913 1100  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T240  |
UNIVERSITY REIT  |
  |
Close  |
69  |
LUBE MAINTENANCE LN12>GF ON BYPASS  |
348565   |
20100901 1433  |
20100901 1433  |
20100913 0800  |
20100913 1100  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
1120  |
UNIVERSITY REIT  |
  |
Open  |
69  |
LUBE MAINTENANCE LN12>GF ON BYPASS  |
337359   |
20100603 1333  |
20100826 0846  |
20100913 0700  |
20100913 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010  |
337058   |
20100602 1326  |
20100824 0919  |
20100913 0600  |
20100918 1800  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T240  |
UNIVERSITY REIT  |
  |
Open  |
69  |
VARIOUS EQUIPMENT MAINTENANCE  |
332639   |
20100428 0840  |
20100824 0917  |
20100913 0600  |
20100918 1800  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
GV_UN_30  |
UNIVERSITY REIT  |
GARDEN VILLAS  |
  |
69  |
VARIOUS EQUIPMENT MAINTENANCE  |
326768   |
20100310 0832  |
20100429 1107  |
20100914 0700  |
20100914 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
ADKBM_09  |
BRITMOORE  |
ADDICKS  |
  |
138  |
FOUNDATION WORK - OUTAGE FOR THERMAL UPRATE  |
326786   |
20100310 0900  |
20100429 1114  |
20100914 0700  |
20100914 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
ADKBM_24  |
BRITMOORE  |
ADDICKS  |
  |
138  |
FOUNDATION WORK - OUTAGE FOR THERMAL UPPRATE  |
334552   |
20100511 0537  |
20100603 1306  |
20100914 0700  |
20100914 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL  |
334470   |
20100510 1118  |
20100510 1531  |
20100914 0700  |
20100914 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
SAN MARCOS  |
CAMP GARY  |
  |
69  |
LINE OVERHAUL  |
337360   |
20100603 1333  |
20100826 0846  |
20100914 0700  |
20100914 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010  |
348712   |
20100901 1513  |
20100901 1513  |
20100914 0700  |
20100914 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348698   |
20100901 1512  |
20100901 1512  |
20100914 0700  |
20100914 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348683   |
20100901 1511  |
20100901 1511  |
20100914 0700  |
20100914 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348669   |
20100901 1508  |
20100901 1508  |
20100914 0700  |
20100914 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348619   |
20100901 1458  |
20100901 1505  |
20100914 0700  |
20100914 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348337   |
20100831 1232  |
20100831 1232  |
20100914 0700  |
20100914 1500  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
JV_1012  |
JOLLYVILLE  |
  |
Open  |
138  |
Sub station GCB maintenance / testing  |
347758   |
20100826 1451  |
20100826 1451  |
20100914 0600  |
20100914 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1255_C  |
PALESTINE SOUTH  |
NECHES RIVER PUMP  |
  |
138  |
line maint  |
348581   |
20100901 1046  |
20100902 1411  |
20100914 0800  |
20100914 1130  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T1HS  |
WEST BAY  |
  |
Open  |
138  |
MAINTENANCE  |
345894   |
20100812 0848  |
20100812 0848  |
20100914 0500  |
20100914 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2839  |
LAKE CREEK SES  |
  |
Open  |
138  |
replace poles and crossarms  |
348189   |
20100830 1330  |
20100830 1330  |
20100914 1000  |
20100914 1600  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_3070_CB  |
WALLER LCRA  |
  |
Open  |
138  |
CLEAR CB 3070 FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING. BREAKER WILL BE BYPASSED  |
348613   |
20100901 1429  |
20100901 1429  |
20100914 0700  |
20100914 1230  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
F280  |
OBRIEN  |
  |
Open  |
345  |
DOBLE TEST  |
348605   |
20100901 1359  |
20100901 1359  |
20100914 0700  |
20100914 1230  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
N130  |
TOMBALL  |
  |
Open  |
138  |
DOBLE TEST  |
348602   |
20100901 1329  |
20100901 1329  |
20100914 0800  |
20100914 1100  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T240  |
UNIVERSITY REIT  |
  |
Close  |
69  |
BYPASS LOWSIDE AT1 FOR K310 LUBE MAINT  |
348601   |
20100901 1327  |
20100901 1327  |
20100914 0800  |
20100914 1100  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
K313  |
UNIVERSITY REIT  |
  |
Close  |
69  |
BYPASS LOWSIDE AT1 FOR K310 LUBE MAINT  |
348599   |
20100901 1321  |
20100901 1321  |
20100914 0800  |
20100914 1100  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
K310  |
UNIVERSITY REIT  |
  |
Open  |
69  |
LUBE JOB  |
348889   |
20100902 1252  |
20100902 1252  |
20100914 0800  |
20100914 1700  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
DSC_1576  |
ROANOKE SWITCH  |
  |
Open  |
138  |
Replace M10 switch at Cross Timbers.  |
348868   |
20100902 1252  |
20100902 1252  |
20100914 0800  |
20100914 1700  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
CB_1575  |
ROANOKE SWITCH  |
  |
Open  |
138  |
Replace M10 switch at Cross Timbers.  |
348867   |
20100902 1250  |
20100902 1250  |
20100914 0800  |
20100914 1700  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M50SW  |
CROSS TIMBERS  |
  |
Open  |
138  |
Replace M10 switch at Cross Timbers.  |
348191   |
20100830 1330  |
20100830 1330  |
20100914 1000  |
20100914 1600  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3069  |
WALLER LCRA  |
  |
Open  |
138  |
CLEAR CB 3070 FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING. BREAKER WILL BE BYPASSED  |
348190   |
20100830 1330  |
20100830 1330  |
20100914 1000  |
20100914 1600  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3071  |
WALLER LCRA  |
  |
Open  |
138  |
CLEAR CB 3070 FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING. BREAKER WILL BE BYPASSED  |
345876   |
20100812 0840  |
20100812 0840  |
20100914 0500  |
20100914 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1280_A  |
WACO LASALLE  |
LAKE CREEK SES  |
  |
138  |
replace poles and crossarms  |
346047   |
20100813 1117  |
20100813 1117  |
20100914 0700  |
20100914 1600  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
HV965  |
HIDDEN VALLEY  |
  |
Open  |
138  |
Circuit maintenance  |
346046   |
20100813 1116  |
20100813 1116  |
20100914 0700  |
20100914 1600  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
RP_965_CB  |
RIVERPLACE  |
  |
Open  |
138  |
Circuit maintenance  |
345901   |
20100812 0852  |
20100812 0852  |
20100914 0500  |
20100914 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2841  |
LAKE CREEK SES  |
  |
Open  |
138  |
replace poles and crossarms  |
345883   |
20100812 0844  |
20100812 0844  |
20100914 0500  |
20100914 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
8167  |
WACO LASALLE  |
  |
Open  |
138  |
replace poles and crossarms  |
347080   |
20100823 1524  |
20100823 1525  |
20100914 0700  |
20100914 1700  |
Daily  |
Received at ERCOT  |
Planned  |
GEUS (TDSP)  |
  |
LN  |
STE_MAMI  |
STEAM  |
MAMIE  |
  |
69  |
Line needs to be out so GEUS can do ERCOT Blcak Start Test with line energizing.  |
347079   |
20100823 1522  |
20100823 1522  |
20100914 0700  |
20100914 1700  |
Daily  |
Received at ERCOT  |
Planned  |
GEUS (TDSP)  |
  |
LN  |
LTV_MAMI  |
LTV TMPP  |
MAMIE  |
  |
69  |
Clearnces for ERCOT Black Start test  |
346651   |
20100818 1500  |
20100818 1500  |
20100914 0730  |
20100914 1700  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
R5_T5  |
CAGNON  |
HILL COUNTRY  |
  |
345  |
345KV TOWER FOUNDATION INSTALLATION  |
348869   |
20100902 1250  |
20100902 1250  |
20100914 0800  |
20100914 1700  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M10SWVW  |
CROSS TIMBERS  |
  |
Open  |
138  |
Replace M10 switch at Cross Timbers.  |
347741   |
20100826 1347  |
20100826 1347  |
20100914 0700  |
20100915 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
BRYAN TEXAS UTILITIES (TDSP)  |
  |
LN  |
TAM_SWI  |
SOUTH BRYAN SWITCHING  |
TEXAS AM  |
  |
138  |
line work on transmission structure  |
347447   |
20100825 1628  |
20100831 0836  |
20100914 0700  |
20100914 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
14408  |
CHILDRESS 20TH ST  |
  |
Close  |
69  |
CLOSE DURING OUTAGE @ W. CHILDRESS  |
345864   |
20100813 1111  |
20100813 1111  |
20100914 0700  |
20100914 1600  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
LN  |
CKT_965  |
RIVERPLACE  |
HIDDEN VALLEY  |
  |
138  |
Circuit maintenance  |
347183   |
20100824 0907  |
20100824 0907  |
20100914 0800  |
20100914 1130  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
D960  |
CROSBY  |
  |
Open  |
138  |
lube job  |
348185   |
20100830 1354  |
20100830 1354  |
20100914 0700  |
20100914 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
348561   |
20100901 1248  |
20100901 1248  |
20100914 0800  |
20100914 1600  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
V360  |
BELLAIRE  |
  |
Open  |
345  |
BREAKER LUBE MAINTENANCE  |
342536   |
20100715 0858  |
20100726 1538  |
20100914 0700  |
20100914 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
install foundations for new structures  |
342516   |
20100715 0852  |
20100726 1538  |
20100914 0700  |
20100914 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_RODD_F1  |
BARNEY DAVIS  |
RODD FIELD  |
  |
138  |
install foundations for new structures  |
347486   |
20100825 1627  |
20100831 0842  |
20100914 0700  |
20100914 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5815  |
CHILDRESS WEST  |
  |
Open  |
69  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
347485   |
20100825 1626  |
20100831 0842  |
20100914 0700  |
20100914 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
3020_CB  |
CHILDRESS WEST  |
  |
Open  |
69  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
347484   |
20100825 1626  |
20100831 0842  |
20100914 0700  |
20100914 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5225_CB  |
CHILDRESS WEST  |
  |
Open  |
138  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
347483   |
20100825 1625  |
20100831 0842  |
20100914 0700  |
20100914 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
XF  |
138_69T1  |
CHILDRESS WEST  |
  |
  |
138  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
344745   |
20100803 1425  |
20100803 1425  |
20100914 0800  |
20100914 1700  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
2655  |
WHITESBORO JORDAN  |
  |
Open  |
138  |
Test relays.  |
347526   |
20100826 0910  |
20100830 1352  |
20100914 0600  |
20100914 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
337593   |
20100603 1622  |
20100901 1445  |
20100914 0700  |
20100914 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
109T220  |
CAMP GARY  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED DUE TO RIGHT OF WAY ISSUES DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
326769   |
20100310 0832  |
20100429 1108  |
20100915 0700  |
20100915 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
ADKBM_09  |
BRITMOORE  |
ADDICKS  |
  |
138  |
FOUNDATION WORK - OUTAGE FOR THERMAL UPRATE  |
326787   |
20100310 0900  |
20100429 1115  |
20100915 0700  |
20100915 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
ADKBM_24  |
BRITMOORE  |
ADDICKS  |
  |
138  |
FOUNDATION WORK - OUTAGE FOR THERMAL UPPRATE  |
347527   |
20100826 0910  |
20100830 1352  |
20100915 0600  |
20100915 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
348369   |
20100831 1145  |
20100831 1145  |
20100915 0700  |
20100917 1600  |
Continuous  |
Received at ERCOT  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
9310  |
ROSEHILL  |
  |
Open  |
138  |
INSTALLATION AND TESTING OF NEW LINE DIFFERENTIAL BACKUP RELAY. LINE BREAKERS WILL BE TRIP TESTED DURING THE TESTING PHASE.  |
348371   |
20100831 1146  |
20100831 1146  |
20100915 0700  |
20100917 1600  |
Continuous  |
Received at ERCOT  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
9311  |
ROSEHILL  |
  |
Open  |
138  |
INSTALLATION AND TESTING OF NEW LINE DIFFERENTIAL BACKUP RELAY. LINE BREAKERS WILL BE TRIP TESTED DURING THE TESTING PHASE.  |
348864   |
20100902 1243  |
20100902 1243  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10051  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348863   |
20100902 1242  |
20100902 1242  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10049  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348862   |
20100902 1242  |
20100902 1242  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10031  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348861   |
20100902 1242  |
20100902 1242  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10029  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348860   |
20100902 1242  |
20100902 1242  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10011  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348859   |
20100902 1242  |
20100902 1242  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10009  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348858   |
20100902 1241  |
20100902 1241  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10071  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348857   |
20100902 1241  |
20100902 1241  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10069  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348856   |
20100902 1241  |
20100902 1241  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_17950  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348193   |
20100830 1333  |
20100830 1333  |
20100915 1000  |
20100915 1600  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3083  |
WALLER LCRA  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO BYPASS CB 3070 WHILE OUT FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING.  |
348192   |
20100830 1331  |
20100830 1331  |
20100915 1000  |
20100915 1600  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_3073  |
WALLER LCRA  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO BYPASS CB 3070 WHILE OUT FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING.  |
348168   |
20100830 1329  |
20100830 1329  |
20100915 1000  |
20100915 1600  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
5093  |
GLIDDEN LCRA  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO BYPASS CB 5790 WHILE OUT FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING.  |
348167   |
20100830 1324  |
20100830 1325  |
20100915 1000  |
20100915 1600  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
5793  |
GLIDDEN LCRA  |
  |
Open  |
138  |
SWITCH IS BEING CLOSED TO BYPASS CB 5790 WHILE OUT FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING.  |
348166   |
20100830 1322  |
20100830 1322  |
20100915 1000  |
20100915 1600  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
5791  |
GLIDDEN LCRA  |
  |
Open  |
138  |
CLEAR CB 5790 FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINGING. BREAKER WILL BE BYPASSED  |
348165   |
20100830 1322  |
20100830 1322  |
20100915 1000  |
20100915 1600  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_5790_CB  |
GLIDDEN LCRA  |
  |
Open  |
138  |
CLEAR CB 5790 FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINGING. BREAKER WILL BE BYPASSED  |
348260   |
20100831 0852  |
20100831 0852  |
20100915 0700  |
20100915 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
3020_CB  |
CHILDRESS WEST  |
  |
Open  |
69  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
348258   |
20100831 0847  |
20100831 0847  |
20100915 0700  |
20100915 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
XF  |
138_69T1  |
CHILDRESS WEST  |
  |
  |
138  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
348255   |
20100831 0844  |
20100831 0844  |
20100915 0700  |
20100915 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
14408  |
CHILDRESS 20TH ST  |
  |
Close  |
69  |
CLOSE DURING OUTAGE @ W. CHILDRESS  |
348604   |
20100901 1340  |
20100901 1340  |
20100915 0700  |
20100915 1230  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
G480  |
GREENS BAYOU  |
  |
Open  |
138  |
DOBLE TEST  |
348594   |
20100901 1252  |
20100901 1252  |
20100915 0800  |
20100915 1600  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
V350  |
BELLAIRE  |
  |
Open  |
345  |
BREAKER LUBE MAINTENANCE  |
348572   |
20100901 0944  |
20100901 0944  |
20100915 0700  |
20100916 1730  |
Continuous  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
D230  |
HADEN  |
  |
Open  |
138  |
MAINT  |
348571   |
20100901 0944  |
20100901 0944  |
20100915 0700  |
20100916 1730  |
Continuous  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
D242  |
HADEN  |
  |
Close  |
138  |
CLOSE BACK OF RING FOR MAINT ON D230  |
348896   |
20100902 1301  |
20100902 1301  |
20100915 1100  |
20100916 1600  |
Continuous  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M10VW  |
IBM B  |
  |
Open  |
138  |
Replace M30 switch.  |
348895   |
20100902 1301  |
20100902 1301  |
20100915 1100  |
20100916 1600  |
Continuous  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M30SWVW  |
CROSS TIMBERS  |
  |
Open  |
138  |
Replace M30 switch.  |
348894   |
20100902 1300  |
20100902 1300  |
20100915 1100  |
20100916 1600  |
Continuous  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M60SW  |
CROSS TIMBERS  |
  |
Open  |
138  |
Replace M30 switch.  |
348893   |
20100902 1300  |
20100902 1300  |
20100915 1100  |
20100916 1600  |
Continuous  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
DSC  |
M20-1SW  |
CROSS TIMBERS  |
  |
Open  |
138  |
LTC maintenance.  |
348892   |
20100902 1259  |
20100902 1259  |
20100915 1100  |
20100916 1600  |
Continuous  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
M20-1CS  |
CROSS TIMBERS  |
  |
Open  |
138  |
LTC maintenance. Mobile Sub will carry CoServ Coop load during this time.  |
348866   |
20100902 1243  |
20100902 1243  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_17951  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348865   |
20100902 1243  |
20100902 1243  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_17949  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348855   |
20100902 1241  |
20100902 1241  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10050  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348854   |
20100902 1241  |
20100902 1241  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_10030  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348853   |
20100902 1240  |
20100902 1240  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
OCB_10010  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348851   |
20100902 1240  |
20100902 1240  |
20100915 0700  |
20100917 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10070  |
CLEAR SPRINGS  |
  |
Open  |
345  |
CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK  |
348336   |
20100831 1144  |
20100831 1144  |
20100915 0700  |
20100917 1600  |
Continuous  |
Received at ERCOT  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
OCB_9110_CB  |
WYNN JOYCE  |
  |
Open  |
138  |
INSTALLATION AND TESTING OF NEW LINE DIFFERENTIAL BACKUP RELAY. LINE BREAKERS WILL BE TRIP TESTED DURING THE TESTING PHASE.  |
348713   |
20100901 1513  |
20100901 1513  |
20100915 0700  |
20100915 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348699   |
20100901 1512  |
20100901 1512  |
20100915 0700  |
20100915 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348684   |
20100901 1511  |
20100901 1511  |
20100915 0700  |
20100915 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348670   |
20100901 1509  |
20100901 1509  |
20100915 0700  |
20100915 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348635   |
20100901 1506  |
20100901 1506  |
20100915 0700  |
20100915 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348620   |
20100901 1459  |
20100901 1505  |
20100915 0700  |
20100915 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348265   |
20100831 0911  |
20100831 0911  |
20100915 0700  |
20100915 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5815  |
CHILDRESS WEST  |
  |
Open  |
69  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
348262   |
20100831 0857  |
20100831 0857  |
20100915 0700  |
20100915 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5225_CB  |
CHILDRESS WEST  |
  |
Open  |
138  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
348583   |
20100901 1051  |
20100902 1411  |
20100915 0800  |
20100915 1130  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T2HS  |
WEST BAY  |
  |
Open  |
138  |
MAINTENANCE  |
348176   |
20100830 1326  |
20100830 1326  |
20100915 1000  |
20100915 1600  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
5793  |
GLIDDEN LCRA  |
  |
Close  |
138  |
SWITCH IS BEING CLOSED TO BYPASS CB 5790 WHILE OUT FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING.  |
348175   |
20100830 1323  |
20100830 1323  |
20100915 1000  |
20100915 1600  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
5789  |
GLIDDEN LCRA  |
  |
Open  |
138  |
CLEAR CB 5790 FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINGING. BREAKER WILL BE BYPASSED  |
348367   |
20100831 1144  |
20100831 1144  |
20100915 0700  |
20100917 1600  |
Continuous  |
Received at ERCOT  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
LN  |
ROS-WYN  |
WYNN JOYCE  |
ROSEHILL  |
  |
138  |
INSTALLATION AND TESTING OF NEW LINE DIFFERENTIAL BACKUP RELAY. LINE BREAKERS WILL BE TRIP TESTED DURING THE TESTING PHASE.  |
344107   |
20100728 1442  |
20100826 0917  |
20100915 0700  |
20101001 1700  |
Continuous  |
Cancelled  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
FI_826_CB  |
FIESTA  |
  |
Open  |
69  |
Sub station relay to remove old relaying from the plant.  |
344105   |
20100728 1440  |
20100826 0917  |
20100915 0700  |
20101001 1700  |
Continuous  |
Cancelled  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
LN  |
CKT_826  |
HOLLY POWER PLANT  |
FIESTA  |
  |
69  |
Sub station relay to remove old relaying from the plant.  |
345902   |
20100812 0853  |
20100812 0853  |
20100915 0500  |
20100915 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2841  |
LAKE CREEK SES  |
  |
Open  |
138  |
replace poles and crossarms  |
345896   |
20100812 0849  |
20100812 0849  |
20100915 0500  |
20100915 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2839  |
LAKE CREEK SES  |
  |
Open  |
138  |
replace poles and crossarms  |
346661   |
20100818 1520  |
20100818 1520  |
20100915 0730  |
20100915 1700  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
10M2  |
COLISEUM  |
  |
Open  |
138  |
FOUNDATION INSTALL FOR TWR #68  |
344106   |
20100728 1441  |
20100826 0917  |
20100915 0700  |
20101001 1700  |
Continuous  |
Cancelled  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
HP_826_CB  |
HOLLY POWER PLANT  |
  |
Open  |
69  |
Sub station relay to remove old relaying from the plant.  |
344752   |
20100803 1426  |
20100803 1426  |
20100915 0800  |
20100915 1800  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
2665  |
WHITESBORO JORDAN  |
  |
Open  |
138  |
Test relays.  |
345884   |
20100812 0844  |
20100812 0844  |
20100915 0500  |
20100915 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
8167  |
WACO LASALLE  |
  |
Open  |
138  |
replace poles and crossarms  |
345879   |
20100812 0841  |
20100812 0841  |
20100915 0500  |
20100915 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1280_A  |
WACO LASALLE  |
LAKE CREEK SES  |
  |
138  |
replace poles and crossarms  |
347271   |
20100824 1340  |
20100824 1340  |
20100915 0700  |
20100915 1700  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
9408  |
LONGSHORE SWITCHING STATION  |
  |
Open  |
345  |
EON Wind Farm has requested this switch open to perform maintenance inside their yard.  |
344113   |
20100728 1444  |
20100826 0917  |
20100915 0700  |
20101001 1700  |
Continuous  |
Cancelled  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
HP_851_CB  |
HOLLY POWER PLANT  |
  |
Open  |
69  |
Sub station relay to remove old relaying from the plant.  |
347576   |
20100826 0920  |
20100826 0920  |
20100915 0700  |
20101001 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
HP_851_CB  |
HOLLY POWER PLANT  |
  |
Open  |
69  |
Sub station relay to remove old relaying from the plant.  |
347575   |
20100826 0920  |
20100826 0920  |
20100915 0700  |
20101001 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
FI_826_CB  |
FIESTA  |
  |
Open  |
69  |
Sub station relay to remove old relaying from the plant.  |
347770   |
20100826 1452  |
20100826 1452  |
20100915 0600  |
20100915 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1255_C  |
PALESTINE SOUTH  |
NECHES RIVER PUMP  |
  |
138  |
line maint  |
348955   |
20100902 1520  |
20100902 1520  |
20100915 0730  |
20100915 1130  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
T2H0  |
UNIVERSITY REIT  |
  |
Open  |
69  |
MAINT  |
348186   |
20100830 1354  |
20100830 1354  |
20100915 0700  |
20100915 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
347254   |
20100824 1333  |
20100824 1333  |
20100915 0700  |
20100915 1700  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
L740  |
STRANG  |
  |
Open  |
138  |
BREAKER REPAIR  |
347175   |
20100824 0853  |
20100824 0853  |
20100915 1200  |
20100915 1600  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
J510  |
SHELDON  |
  |
Open  |
345  |
lube job  |
348435   |
20100831 1610  |
20100831 1610  |
20100915 0800  |
20100915 1600  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
9567  |
LONGSHORE SWITCHING STATION  |
  |
Open  |
345  |
Elbow Creek Wind Farm has requested line out for required maintenance. Breakers open for end to end testing.  |
348434   |
20100831 1610  |
20100831 1610  |
20100915 0800  |
20100915 1600  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
9405  |
LONGSHORE SWITCHING STATION  |
  |
Open  |
345  |
Elbow Creek Wind Farm has requested line out for required maintenance. Breakers open for end to end testing.  |
348433   |
20100831 1609  |
20100831 1609  |
20100915 0800  |
20100915 1600  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
9390  |
LONGSHORE SWITCHING STATION  |
  |
Open  |
345  |
Elbow Creek Wind Farm has requested line out for required maintenance. Breakers open for end to end testing.  |
342537   |
20100715 0858  |
20100726 1538  |
20100915 0700  |
20100915 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
AIRLIN_B_DAVI1  |
BARNEY DAVIS  |
AIRLINE CSW  |
  |
138  |
install foundations for new structures  |
342517   |
20100715 0852  |
20100726 1538  |
20100915 0700  |
20100915 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_RODD_F1  |
BARNEY DAVIS  |
RODD FIELD  |
  |
138  |
install foundations for new structures  |
347574   |
20100826 0919  |
20100826 0919  |
20100915 0700  |
20101001 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
HP_826_CB  |
HOLLY POWER PLANT  |
  |
Open  |
69  |
Sub station relay to remove old relaying from the plant.  |
347573   |
20100826 0919  |
20100826 0919  |
20100915 0700  |
20101001 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
LN  |
CKT_826  |
HOLLY POWER PLANT  |
FIESTA  |
  |
69  |
Sub station relay to remove old relaying from the plant.  |
347146   |
20100824 0852  |
20100824 0852  |
20100915 0800  |
20100915 1130  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
J500  |
SHELDON  |
  |
Open  |
345  |
lube job  |
346662   |
20100818 1520  |
20100818 1520  |
20100915 0730  |
20100915 1700  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
13Y1  |
Y1  |
  |
Open  |
138  |
FOUNDATION INSTALL FOR TWR #68  |
346660   |
20100818 1518  |
20100818 1518  |
20100915 0730  |
20100915 1700  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
M2_Y1  |
COLISEUM  |
Y1  |
  |
138  |
FOUNDATION INSTALL FOR TWR #68  |
346657   |
20100818 1509  |
20100818 1509  |
20100915 0730  |
20100915 1700  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
12T2  |
T2  |
  |
Open  |
138  |
FOUNDATION INSTALL FOR TWR #68  |
346656   |
20100818 1505  |
20100818 1505  |
20100915 0730  |
20100915 1700  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
CB  |
20D0  |
D0  |
  |
Open  |
138  |
FOUNDATION INSTALL FOR TWR #68  |
346655   |
20100818 1503  |
20100818 1503  |
20100915 0730  |
20100915 1700  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
D0_T2  |
D0  |
T2  |
  |
138  |
FOUNDATION INSTALL FOR TWR #68  |
346652   |
20100818 1500  |
20100818 1500  |
20100915 0730  |
20100915 1700  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
R5_T5  |
CAGNON  |
HILL COUNTRY  |
  |
345  |
345KV TOWER FOUNDATION INSTALLATION  |
348372   |
20100831 1146  |
20100831 1146  |
20100915 0700  |
20100917 1600  |
Continuous  |
Received at ERCOT  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
9331  |
ROSEHILL  |
  |
Open  |
138  |
INSTALLATION AND TESTING OF NEW LINE DIFFERENTIAL BACKUP RELAY. LINE BREAKERS WILL BE TRIP TESTED DURING THE TESTING PHASE.  |
348370   |
20100831 1145  |
20100831 1145  |
20100915 0700  |
20100917 1600  |
Continuous  |
Received at ERCOT  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
CB  |
9330  |
ROSEHILL  |
  |
Open  |
138  |
INSTALLATION AND TESTING OF NEW LINE DIFFERENTIAL BACKUP RELAY. LINE BREAKERS WILL BE TRIP TESTED DURING THE TESTING PHASE.  |
348368   |
20100831 1145  |
20100831 1145  |
20100915 0700  |
20100917 1600  |
Continuous  |
Received at ERCOT  |
Planned  |
CITY OF GARLAND (TDSP)  |
  |
DSC  |
9111  |
WYNN JOYCE  |
  |
Open  |
138  |
INSTALLATION AND TESTING OF NEW LINE DIFFERENTIAL BACKUP RELAY. LINE BREAKERS WILL BE TRIP TESTED DURING THE TESTING PHASE.  |
337594   |
20100603 1623  |
20100901 1445  |
20100915 1200  |
20100915 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
109T220  |
CAMP GARY  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED DUE TO RIGHT OF WAY ISSUES DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
334471   |
20100510 1118  |
20100510 1531  |
20100915 1200  |
20100915 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
SAN MARCOS  |
CAMP GARY  |
  |
69  |
LINE OVERHAUL  |
337300   |
20100603 1338  |
20100826 0851  |
20100915 0700  |
20100915 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010  |
334553   |
20100511 0538  |
20100603 1306  |
20100915 1200  |
20100915 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL  |
326770   |
20100310 0832  |
20100429 1108  |
20100916 0700  |
20100916 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
ADKBM_09  |
BRITMOORE  |
ADDICKS  |
  |
138  |
FOUNDATION WORK - OUTAGE FOR THERMAL UPRATE  |
348266   |
20100831 0912  |
20100831 0912  |
20100916 0700  |
20100916 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5815  |
CHILDRESS WEST  |
  |
Open  |
69  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
348256   |
20100831 0845  |
20100831 0845  |
20100916 0700  |
20100916 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
14408  |
CHILDRESS 20TH ST  |
  |
Close  |
69  |
CLOSE DURING OUTAGE @ W. CHILDRESS  |
348714   |
20100901 1513  |
20100901 1513  |
20100916 0700  |
20100916 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348700   |
20100901 1512  |
20100901 1512  |
20100916 0700  |
20100916 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348685   |
20100901 1511  |
20100901 1511  |
20100916 0700  |
20100916 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348671   |
20100901 1509  |
20100901 1509  |
20100916 0700  |
20100916 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348405   |
20100831 1505  |
20100831 1505  |
20100916 0600  |
20100917 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
6098  |
BRIDGEPORT TAP TU  |
  |
Open  |
138  |
Outage to repalce switch 6097 at Bridgeport Tap.  |
348636   |
20100901 1506  |
20100901 1506  |
20100916 0700  |
20100916 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348621   |
20100901 1459  |
20100901 1505  |
20100916 0700  |
20100916 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348593   |
20100901 1153  |
20100902 1416  |
20100916 0800  |
20100916 1500  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
CB40  |
WEST GALVESTON  |
  |
Open  |
138  |
MAINT  |
348338   |
20100831 1233  |
20100831 1233  |
20100916 0700  |
20100916 1500  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
SH_1006_CB  |
SAND HILL ENERGY CTR  |
  |
Open  |
138  |
Sub station GCB maintenance / testing  |
348263   |
20100831 0857  |
20100831 0857  |
20100916 0700  |
20100916 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5225_CB  |
CHILDRESS WEST  |
  |
Open  |
138  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
348261   |
20100831 0855  |
20100831 0855  |
20100916 0700  |
20100916 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
3020_CB  |
CHILDRESS WEST  |
  |
Open  |
69  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
348729   |
20100901 1519  |
20100901 1519  |
20100916 0500  |
20100916 0800  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
DSC  |
CF_651  |
COMMONS FORD  |
  |
Open  |
138  |
Transmission will install static / maintenance.  |
348728   |
20100901 1518  |
20100901 1518  |
20100916 0500  |
20100916 0800  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
DSC  |
CF_601M  |
COMMONS FORD  |
  |
Open  |
138  |
Transmission will install static / maintenance.  |
348727   |
20100901 1518  |
20100901 1518  |
20100916 0500  |
20100916 0800  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
CF_900_CB  |
COMMONS FORD  |
  |
Open  |
138  |
Transmission will install static / maintenance.  |
345903   |
20100812 0853  |
20100812 0853  |
20100916 0500  |
20100916 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2841  |
LAKE CREEK SES  |
  |
Open  |
138  |
replace poles and crossarms  |
345897   |
20100812 0849  |
20100812 0849  |
20100916 0500  |
20100916 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2839  |
LAKE CREEK SES  |
  |
Open  |
138  |
replace poles and crossarms  |
345925   |
20100812 1017  |
20100812 1017  |
20100916 0700  |
20100916 1800  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1031  |
SWEETWATER NO 2  |
  |
Open  |
69  |
Outage to replace relay panel.  |
345924   |
20100812 1016  |
20100812 1016  |
20100916 0700  |
20100916 1800  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
1029  |
SWEETWATER NO 2  |
  |
Open  |
69  |
Outage to replace relay panel.  |
345923   |
20100812 1016  |
20100812 1016  |
20100916 0700  |
20100916 1800  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
1030  |
SWEETWATER NO 2  |
  |
Open  |
69  |
Outage to replace relay panel.  |
345885   |
20100812 0844  |
20100812 0844  |
20100916 0500  |
20100916 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
8167  |
WACO LASALLE  |
  |
Open  |
138  |
replace poles and crossarms  |
345880   |
20100812 0841  |
20100812 0841  |
20100916 0500  |
20100916 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1280_A  |
WACO LASALLE  |
LAKE CREEK SES  |
  |
138  |
replace poles and crossarms  |
347581   |
20100826 0938  |
20100826 1411  |
20100916 0700  |
20100916 1700  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T2HS  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp control cables  |
347580   |
20100826 0937  |
20100826 1359  |
20100916 0700  |
20100916 1700  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P890  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp control cables  |
347579   |
20100826 0936  |
20100826 1357  |
20100916 0700  |
20100916 1700  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P880  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp control cables  |
347578   |
20100826 0935  |
20100826 1341  |
20100916 0700  |
20100916 1700  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
6027  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp control cables  |
346653   |
20100818 1500  |
20100818 1500  |
20100916 0730  |
20100916 1700  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
R5_T5  |
CAGNON  |
HILL COUNTRY  |
  |
345  |
345KV TOWER FOUNDATION INSTALLATION  |
347771   |
20100826 1452  |
20100826 1452  |
20100916 0600  |
20100916 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1255_C  |
PALESTINE SOUTH  |
NECHES RIVER PUMP  |
  |
138  |
line maint  |
348187   |
20100830 1354  |
20100830 1354  |
20100916 0700  |
20100916 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
345173   |
20100806 0941  |
20100826 1309  |
20100916 0700  |
20100916 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P390  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp controll cables  |
345172   |
20100806 0941  |
20100826 1308  |
20100916 0700  |
20100916 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P380  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp controll cables  |
348655   |
20100901 1516  |
20100901 1516  |
20100916 0500  |
20100916 1600  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
DSC  |
CF_650M  |
COMMONS FORD  |
  |
Open  |
138  |
Transmission will install static / maintenance.  |
348654   |
20100901 1516  |
20100901 1516  |
20100916 0500  |
20100916 1600  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
DSC  |
CF_600M  |
COMMONS FORD  |
  |
Open  |
138  |
Transmission will install static / maintenance.  |
347177   |
20100824 0855  |
20100824 0855  |
20100916 1200  |
20100916 1600  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
J530  |
SHELDON  |
  |
Open  |
345  |
lube job  |
347176   |
20100824 0854  |
20100824 0854  |
20100916 0800  |
20100916 1130  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
J520  |
SHELDON  |
  |
Open  |
345  |
lube job  |
348653   |
20100901 1514  |
20100901 1514  |
20100916 0500  |
20100916 1600  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
BA_931_CB  |
BARTON  |
  |
Open  |
138  |
Transmission will install static / maintenance.  |
348652   |
20100901 1514  |
20100901 1514  |
20100916 0500  |
20100916 1600  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
CF_931_CB  |
COMMONS FORD  |
  |
Open  |
138  |
Transmission will install static / maintenance.  |
348651   |
20100901 1513  |
20100901 1513  |
20100916 0500  |
20100916 1600  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
LN  |
CKT_931  |
COMMONS FORD  |
BARTON  |
  |
138  |
Transmission will install static / maintenance.  |
348551   |
20100901 0807  |
20100901 0807  |
20100916 0700  |
20100916 1230  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
V340  |
BELLAIRE  |
  |
Open  |
345  |
doble  |
348463   |
20100901 0804  |
20100901 0804  |
20100916 0700  |
20100916 1230  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
H600  |
TH WHARTON  |
  |
Open  |
345  |
doble  |
342555   |
20100715 0907  |
20100726 1538  |
20100916 0700  |
20100916 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_WOOLRI1  |
BARNEY DAVIS  |
WOOLDRIDGE  |
  |
138  |
install foundations for new structures  |
342540   |
20100715 0903  |
20100726 1538  |
20100916 0700  |
20100916 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_PHARAO1  |
BARNEY DAVIS  |
PHAROAH  |
  |
138  |
install foundations for new structures  |
344746   |
20100803 1427  |
20100803 1427  |
20100916 0800  |
20100916 1700  |
Daily  |
Received at ERCOT  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
2675  |
WHITESBORO JORDAN  |
  |
Open  |
138  |
Test relays.  |
348301   |
20100831 0848  |
20100831 0848  |
20100916 0700  |
20100916 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
XF  |
138_69T1  |
CHILDRESS WEST  |
  |
  |
138  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
348418   |
20100831 1504  |
20100831 1504  |
20100916 0600  |
20100917 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
9092  |
BENNETT ROAD SWITCH  |
  |
Open  |
138  |
Outage to repalce switch 6097 at Bridgeport Tap.  |
347528   |
20100826 0910  |
20100830 1352  |
20100916 0600  |
20100916 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
338045   |
20100608 1230  |
20100713 1630  |
20100916 1800  |
20101108 1800  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
PMVEC_MER  |
PHARR MVEC  |
MERETT  |
  |
138  |
Pour foundations for new steel poles and construct  |
337550   |
20100603 1623  |
20100901 1445  |
20100916 0700  |
20100916 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
109T220  |
CAMP GARY  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED DUE TO RIGHT OF WAY ISSUES DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
337301   |
20100603 1338  |
20100826 0846  |
20100916 0700  |
20100916 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010  |
334472   |
20100510 1118  |
20100510 1531  |
20100916 0700  |
20100916 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
SAN MARCOS  |
CAMP GARY  |
  |
69  |
LINE OVERHAUL  |
326788   |
20100310 0900  |
20100429 1115  |
20100916 0700  |
20100916 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
ADKBM_24  |
BRITMOORE  |
ADDICKS  |
  |
138  |
FOUNDATION WORK - OUTAGE FOR THERMAL UPPRATE  |
334554   |
20100511 0538  |
20100603 1306  |
20100916 0700  |
20100916 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL  |
326771   |
20100310 0832  |
20100429 1109  |
20100917 0700  |
20100917 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
ADKBM_09  |
BRITMOORE  |
ADDICKS  |
  |
138  |
FOUNDATION WORK - OUTAGE FOR THERMAL UPRATE  |
334555   |
20100511 0538  |
20100511 0541  |
20100917 0700  |
20100917 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL  |
348163   |
20100830 1242  |
20100830 1243  |
20100917 1815  |
20100924 1800  |
Continuous  |
Received at ERCOT  |
Planned Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
1548  |
MCCAMEY  |
  |
Open  |
138  |
MCCAMEY SW 1548 THRU TO SW 6988 AT INDN ENRON 2 AS SAFETY FOR LCRA TO PULL NEW CONDUCTOR. LCRA ADVISES CREWS NOT COMPLETE WITH WORK  |
348162   |
20100830 1240  |
20100830 1241  |
20100917 1815  |
20100924 1800  |
Continuous  |
Received at ERCOT  |
Planned Extension  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
DSC6988  |
DESERT SKY  |
  |
Open  |
138  |
MCCAMEY SW 1548 THRU TO SW 6988 AT INDN ENRON 2 AS SAFETY FOR LCRA TO PULL NEW CONDUCTOR. LCRA ADVISES CREWS NOT COMPLETE WITH WORK  |
348259   |
20100831 0850  |
20100831 0850  |
20100917 0700  |
20100917 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
XF  |
138_69T1  |
CHILDRESS WEST  |
  |
  |
138  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
348783   |
20100902 0944  |
20100902 0944  |
20100917 0800  |
20100917 1200  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_20539  |
LONEST  |
  |
Open  |
69  |
CLEAR MATTHEWS TO LONESTAR 69 KV LINE TO RAISE LINE ON ONE STRUCTURE FOR AEP UNDERBUILD.  |
348782   |
20100902 0943  |
20100902 0943  |
20100917 0800  |
20100917 1200  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_20579  |
MATTHE  |
  |
Open  |
69  |
CLEAR MATTHEWS TO LONESTAR 69 KV LINE TO RAISE LINE ON ONE STRUCTURE FOR AEP UNDERBUILD.  |
348781   |
20100902 0943  |
20100902 0943  |
20100917 0800  |
20100917 1200  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
810T548  |
MATTHE  |
LONEST  |
  |
69  |
CLEAR MATTHEWS TO LONESTAR 69 KV LINE TO RAISE LINE ON ONE STRUCTURE FOR AEP UNDERBUILD.  |
348715   |
20100901 1513  |
20100901 1514  |
20100917 0700  |
20100917 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348701   |
20100901 1512  |
20100901 1514  |
20100917 0700  |
20100917 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348686   |
20100901 1511  |
20100901 1514  |
20100917 0700  |
20100917 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348672   |
20100901 1509  |
20100901 1510  |
20100917 0700  |
20100917 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348637   |
20100901 1506  |
20100901 1507  |
20100917 0700  |
20100917 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348622   |
20100901 1459  |
20100901 1505  |
20100917 0700  |
20100917 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348264   |
20100831 0859  |
20100831 0859  |
20100917 0700  |
20100917 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5225_CB  |
CHILDRESS WEST  |
  |
Open  |
138  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
348257   |
20100831 0846  |
20100831 0846  |
20100917 0700  |
20100917 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
DSC  |
14408  |
CHILDRESS 20TH ST  |
  |
Close  |
69  |
CLOSE DURING OUTAGE @ W. CHILDRESS  |
345904   |
20100812 0853  |
20100812 0853  |
20100917 0500  |
20100917 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2841  |
LAKE CREEK SES  |
  |
Open  |
138  |
replace poles and crossarms  |
345898   |
20100812 0849  |
20100812 0849  |
20100917 0500  |
20100917 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2839  |
LAKE CREEK SES  |
  |
Open  |
138  |
replace poles and crossarms  |
345886   |
20100812 0844  |
20100812 0844  |
20100917 0500  |
20100917 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
8167  |
WACO LASALLE  |
  |
Open  |
138  |
replace poles and crossarms  |
345881   |
20100812 0841  |
20100812 0841  |
20100917 0500  |
20100917 1400  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1280_A  |
WACO LASALLE  |
LAKE CREEK SES  |
  |
138  |
replace poles and crossarms  |
345154   |
20100806 0944  |
20100826 1306  |
20100917 0700  |
20100917 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
4825  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp controll cables  |
347147   |
20100824 0856  |
20100824 0856  |
20100917 0800  |
20100917 1130  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
J540  |
SHELDON  |
  |
Open  |
345  |
lube job  |
346654   |
20100818 1500  |
20100818 1500  |
20100917 0730  |
20100917 1700  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)  |
  |
LN  |
R5_T5  |
CAGNON  |
HILL COUNTRY  |
  |
345  |
345KV TOWER FOUNDATION INSTALLATION  |
347772   |
20100826 1452  |
20100826 1452  |
20100917 0600  |
20100917 1300  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1255_C  |
PALESTINE SOUTH  |
NECHES RIVER PUMP  |
  |
138  |
line maint  |
347746   |
20100826 1412  |
20100826 1412  |
20100917 0700  |
20100917 1700  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T2HS  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp control cables  |
347744   |
20100826 1400  |
20100826 1400  |
20100917 0700  |
20100917 1700  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P890  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp control cables  |
347743   |
20100826 1358  |
20100826 1358  |
20100917 0700  |
20100917 1700  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P880  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp control cables  |
347740   |
20100826 1341  |
20100826 1341  |
20100917 0700  |
20100917 1700  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
6027  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp control cables  |
348188   |
20100830 1354  |
20100830 1354  |
20100917 0700  |
20100917 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
345175   |
20100806 0944  |
20100826 1309  |
20100917 0700  |
20100917 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P380  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp controll cables  |
345174   |
20100806 0943  |
20100826 1310  |
20100917 0700  |
20100917 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
P390  |
VELASCO  |
  |
Open  |
138  |
section outage to install temp controll cables  |
348467   |
20100901 0805  |
20100901 0805  |
20100917 0700  |
20100917 1230  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
H060  |
TH WHARTON  |
  |
Open  |
138  |
doble  |
348461   |
20100901 0802  |
20100901 0802  |
20100917 0700  |
20100917 1230  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
U100  |
SAUER  |
  |
Open  |
138  |
doble  |
348460   |
20100901 0801  |
20100901 0801  |
20100917 0700  |
20100917 1230  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
J830  |
JEANETTA  |
  |
Open  |
345  |
doble  |
342556   |
20100715 0907  |
20100726 1538  |
20100917 0700  |
20100917 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_WOOLRI1  |
BARNEY DAVIS  |
WOOLDRIDGE  |
  |
138  |
install foundations for new structures  |
342541   |
20100715 0906  |
20100726 1538  |
20100917 0700  |
20100917 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_PHARAO1  |
BARNEY DAVIS  |
PHAROAH  |
  |
138  |
install foundations for new structures  |
348303   |
20100831 0912  |
20100831 0912  |
20100917 0700  |
20100917 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
5815  |
CHILDRESS WEST  |
  |
Open  |
69  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
348302   |
20100831 0856  |
20100831 0856  |
20100917 0700  |
20100917 1700  |
Daily  |
Received at ERCOT  |
Planned  |
WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)  |
  |
CB  |
3020_CB  |
CHILDRESS WEST  |
  |
Open  |
69  |
INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION  |
347589   |
20100826 0910  |
20100830 1352  |
20100917 0600  |
20100917 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
337302   |
20100603 1338  |
20100826 0846  |
20100917 0700  |
20100917 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010  |
326789   |
20100310 0900  |
20100429 1115  |
20100917 0700  |
20100917 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
ADKBM_24  |
BRITMOORE  |
ADDICKS  |
  |
138  |
FOUNDATION WORK - OUTAGE FOR THERMAL UPPRATE  |
326772   |
20100310 0832  |
20100429 1109  |
20100918 0700  |
20100918 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
ADKBM_09  |
BRITMOORE  |
ADDICKS  |
  |
138  |
FOUNDATION WORK - OUTAGE FOR THERMAL UPRATE  |
342542   |
20100715 0906  |
20100726 1538  |
20100918 0700  |
20100918 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_PHARAO1  |
BARNEY DAVIS  |
PHAROAH  |
  |
138  |
install foundations for new structures  |
348673   |
20100901 1509  |
20100901 1510  |
20100918 0700  |
20100918 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348638   |
20100901 1506  |
20100901 1507  |
20100918 0700  |
20100918 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348623   |
20100901 1459  |
20100901 1505  |
20100918 0700  |
20100918 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
347390   |
20100825 1010  |
20100825 1010  |
20100918 0600  |
20100927 2000  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6030_A  |
SWEETWATER GENERATING PLANT  |
LONG CREEK SWITCHING STATION  |
  |
345  |
Contractor will be erecting the Station DEs and transferring conductor to new station-Sweetwater East. This outage will limit the wind farm connected at Champion Creek to flow towards Morgan Crk. for the duration of the outage.  |
347389   |
20100825 1006  |
20100825 1006  |
20100918 0600  |
20100927 2000  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6026_A  |
ABILENE MULBERRY CREEK  |
BITTER CREEK  |
  |
345  |
Contractor will be erecting the Station DEs and transferring conductor to new station-Sweetwater East. This outage will limit the wind farm connected at Bitter Creek to flow towards Morgan Crk. for the duration of the outage.  |
348209   |
20100830 1354  |
20100830 1354  |
20100918 0700  |
20100918 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
342557   |
20100715 0907  |
20100726 1538  |
20100918 0700  |
20100918 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_WOOLRI1  |
BARNEY DAVIS  |
WOOLDRIDGE  |
  |
138  |
install foundations for new structures  |
347590   |
20100826 0910  |
20100826 0912  |
20100918 0600  |
20100918 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
338832   |
20100615 1509  |
20100803 0932  |
20100918 1715  |
20101105 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
HK_RB_58  |
HOCKLEY  |
RACOON BEND  |
  |
69  |
REHAB LINE  |
334556   |
20100511 0538  |
20100511 0541  |
20100918 0700  |
20100918 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL  |
348716   |
20100901 1513  |
20100901 1514  |
20100918 0700  |
20100918 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348702   |
20100901 1512  |
20100901 1514  |
20100918 0700  |
20100918 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348687   |
20100901 1511  |
20100901 1514  |
20100918 0700  |
20100918 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
326790   |
20100310 0900  |
20100429 1116  |
20100918 0700  |
20100918 1700  |
Daily  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
ADKBM_24  |
BRITMOORE  |
ADDICKS  |
  |
138  |
FOUNDATION WORK - OUTAGE FOR THERMAL UPPRATE  |
334557   |
20100511 0538  |
20100511 0541  |
20100919 0700  |
20100919 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL  |
342543   |
20100715 0906  |
20100726 1538  |
20100919 0700  |
20100919 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_PHARAO1  |
BARNEY DAVIS  |
PHAROAH  |
  |
138  |
install foundations for new structures  |
348624   |
20100901 1459  |
20100901 1505  |
20100919 0700  |
20100919 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348717   |
20100901 1513  |
20100901 1514  |
20100919 0700  |
20100919 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348703   |
20100901 1512  |
20100901 1514  |
20100919 0700  |
20100919 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348688   |
20100901 1511  |
20100901 1514  |
20100919 0700  |
20100919 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348674   |
20100901 1509  |
20100901 1510  |
20100919 0700  |
20100919 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348639   |
20100901 1506  |
20100901 1507  |
20100919 0700  |
20100919 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348210   |
20100830 1354  |
20100830 1354  |
20100919 0700  |
20100919 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
342558   |
20100715 0907  |
20100726 1538  |
20100919 0700  |
20100919 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_WOOLRI1  |
BARNEY DAVIS  |
WOOLDRIDGE  |
  |
138  |
install foundations for new structures  |
347591   |
20100826 0910  |
20100826 0912  |
20100919 0600  |
20100919 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
308838   |
20090927 1542  |
20100211 1446  |
20100920 1000  |
20100923 1600  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
OCB_395_CB  |
HOLDER  |
  |
Open  |
69  |
Upgrade CB.  |
348339   |
20100831 1237  |
20100831 1243  |
20100920 0700  |
20101001 1600  |
Continuous  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
SP_607CS  |
SEAHOLM  |
  |
Open  |
138  |
Sub station LTC maintenance / testing SNT1 transformer.  |
348718   |
20100901 1513  |
20100901 1516  |
20100920 0900  |
20100920 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348704   |
20100901 1512  |
20100901 1516  |
20100920 0900  |
20100920 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348689   |
20100901 1511  |
20100901 1516  |
20100920 0900  |
20100920 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348675   |
20100901 1509  |
20100901 1515  |
20100920 0900  |
20100920 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
MOS_497  |
CAMP GARY  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348640   |
20100901 1506  |
20100901 1506  |
20100920 0900  |
20100920 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348625   |
20100901 1459  |
20100901 1505  |
20100920 0900  |
20100920 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348607   |
20100901 1402  |
20100901 1402  |
20100920 0700  |
20100920 1700  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
CC_944_CB  |
CARSON CREEK  |
  |
Open  |
138  |
Clearance for drilling and installing cages.  |
348606   |
20100901 1401  |
20100901 1401  |
20100920 0700  |
20100920 1700  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
LN  |
CKT_944  |
CARSON CREEK  |
PILOT KNOB  |
  |
138  |
Clearance for drilling and installing cages.  |
343727   |
20100726 1529  |
20100817 1449  |
20100920 0800  |
20100923 1700  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
AGN_WTH  |
WEATHERFORD SWITCH  |
AGNES SWITCH  |
  |
138  |
Upgrade Weatherford Switch CB 1304.  |
346503   |
20100817 1422  |
20100817 1422  |
20100920 1000  |
20100926 2000  |
Continuous  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
DSC  |
17  |
COLETO CREEK  |
  |
Open  |
345  |
#2-345-138 XFMR OUTAGE TO REPAIR OIL LEAKS.  |
346501   |
20100817 1421  |
20100817 1421  |
20100920 1000  |
20100926 2000  |
Continuous  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
200_CB  |
COLETO CREEK  |
  |
Open  |
13.8  |
#2-345-138 XFMR OUTAGE TO REPAIR OIL LEAKS.  |
346500   |
20100817 1421  |
20100817 1421  |
20100920 1000  |
20100926 2000  |
Continuous  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
30  |
COLETO CREEK  |
  |
Open  |
138  |
#2-345-138 XFMR OUTAGE TO REPAIR OIL LEAKS.  |
346499   |
20100817 1421  |
20100817 1421  |
20100920 1000  |
20100926 2000  |
Continuous  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
20  |
COLETO CREEK  |
  |
Open  |
138  |
#2-345-138 XFMR OUTAGE TO REPAIR OIL LEAKS.  |
343880   |
20100727 1311  |
20100902 1306  |
20100920 0700  |
20100925 1800  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
FAL_DOM  |
FALLCREEK  |
DOMINO  |
  |
138  |
Reroute line into new Domino Sub and remove existing reroute.  |
343879   |
20100727 1311  |
20100902 1306  |
20100920 0700  |
20100925 1800  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
LN  |
DOM_WPL  |
WAPLES  |
DOMINO  |
  |
138  |
Reroute line into new Domino Sub and remove existing reroute.  |
343539   |
20100723 0941  |
20100831 1016  |
20100920 0700  |
20100922 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T3HS  |
ANBUSH  |
  |
Open  |
138  |
MAINT AT ANBUSH  |
346502   |
20100817 1421  |
20100817 1421  |
20100920 1000  |
20100926 2000  |
Continuous  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
210_CB  |
COLETO CREEK  |
  |
Open  |
13.8  |
#2-345-138 XFMR OUTAGE TO REPAIR OIL LEAKS.  |
346877   |
20100820 1023  |
20100820 1023  |
20100920 0800  |
20100928 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1010_B  |
WACO NORTHEAST TAP  |
BELLMEAD  |
  |
138  |
replACE CB 3020 and add lightning arresters  |
343541   |
20100723 0942  |
20100831 1016  |
20100920 0700  |
20100922 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
B840  |
ANBUSH  |
  |
Open  |
138  |
MAINT AT ANBUSH  |
343540   |
20100723 0942  |
20100831 1016  |
20100920 0700  |
20100922 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
B820  |
ANBUSH  |
  |
Open  |
138  |
MAINT AT ANBUSH  |
348211   |
20100830 1354  |
20100830 1354  |
20100920 0700  |
20100920 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
346949   |
20100820 1609  |
20100820 1609  |
20100920 0800  |
20100929 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
5180  |
SAN DIEGO  |
  |
Open  |
69  |
Open 69 KV CB 5180 to solve contingency problem while having the clearance on the Lobo - Bruni 138 KV line  |
341992   |
20100712 0831  |
20100721 1528  |
20100920 0700  |
20100927 0645  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
5045  |
WEST COLUMBIA  |
  |
Open  |
138  |
REHAB WORK  |
337792   |
20100607 0835  |
20100901 1455  |
20100920 0900  |
20100920 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010  |
334558   |
20100511 0538  |
20100603 1347  |
20100920 0900  |
20100920 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL  |
331566   |
20100420 1541  |
20100812 1211  |
20100920 0800  |
20101015 1800  |
Continuous  |
Cancelled  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
DIL_DIL9  |
DILLEY SUB  |
DILLEY SWITCH CSW  |
  |
69  |
double circuit line  |
335260   |
20100517 1400  |
20100721 1531  |
20100920 0700  |
20100927 0645  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
NEWTGF04  |
TEXAS GULF SULPHUR  |
NEW GULF  |
  |
138  |
REHAB WORK  |
345972   |
20100812 1246  |
20100812 1246  |
20100920 0700  |
20100924 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
5121  |
WICHITA FALLS NORTH TU  |
  |
Open  |
69  |
Outage to replace circuit breaker 5120.  |
345971   |
20100812 1246  |
20100812 1246  |
20100920 0700  |
20100924 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
5119  |
WICHITA FALLS NORTH TU  |
  |
Open  |
69  |
Outage to replace circuit breaker 5120.  |
345970   |
20100812 1245  |
20100812 1245  |
20100920 0700  |
20100924 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
5120  |
WICHITA FALLS NORTH TU  |
  |
Open  |
69  |
Outage to replace circuit breaker 5120.  |
345969   |
20100812 1240  |
20100812 1240  |
20100920 0600  |
20101003 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
CB  |
CB_1196  |
WALNUT SPRINGS TU  |
  |
Open  |
69  |
Outage to repair transformer leaks, remove oil and re-gasket .  |
345968   |
20100812 1240  |
20100812 1240  |
20100920 0600  |
20101003 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
DISC1197  |
WALNUT SPRINGS TU  |
  |
Open  |
69  |
Outage to repair transformer leaks, remove oil and re-gasket .  |
345967   |
20100812 1240  |
20100812 1240  |
20100920 0600  |
20101003 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
DISC1195  |
WALNUT SPRINGS TU  |
  |
Open  |
69  |
Outage to repair transformer leaks, remove oil and re-gasket .  |
345966   |
20100812 1240  |
20100812 1240  |
20100920 0600  |
20101003 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
AS_1077  |
WALNUT SPRINGS TU  |
  |
Open  |
138  |
Outage to repair transformer leaks, remove oil and re-gasket .  |
345965   |
20100812 1239  |
20100812 1239  |
20100920 0600  |
20101003 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
AS_1076  |
WALNUT SPRINGS TU  |
  |
Open  |
69  |
Outage to repair transformer leaks, remove oil and re-gasket .  |
345944   |
20100812 1035  |
20100812 1035  |
20100920 0800  |
20101015 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)  |
  |
LN  |
DER_DILL  |
DILLEY SUB  |
DERBY SUB  |
  |
69  |
double circuit line  |
326829   |
20100310 1100  |
20100617 1048  |
20100920 0700  |
20100925 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
G220  |
UNIVERSITY REIT  |
  |
Open  |
138  |
INSTALL WAVE TRAP CCVTs TUNER AND PANEL 6/17/2010 - CANCELLED OUTAGE PER ERCOT'S' REQUEST DUE TO N-1 CRITERIA LOAD STUDY  |
326828   |
20100310 1058  |
20100617 1047  |
20100920 0700  |
20100925 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
3915  |
UNIVERSITY REIT  |
  |
Open  |
138  |
INSTALL WAVE TRAP CCVTs TUNER AND PANEL 6/17/2010 - CANCELLED OUTAGE PER ERCOT'S' REQUEST DUE TO N-1 CRITERIA LOAD STUDY  |
326727   |
20100310 1055  |
20100617 1046  |
20100920 0700  |
20100925 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
ES_UN_91  |
UNIVERSITY REIT  |
EASTSIDE  |
  |
138  |
REPLACE LINE EQUIPMENT 6/17/2010 - CANCELLED OUTAGE PER ERCOT'S' REQUEST DUE TO N-1 CRITERIA LOAD STUDY  |
326726   |
20100310 1052  |
20100617 1044  |
20100920 0700  |
20100925 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
DSC  |
T2HS  |
EASTSIDE  |
  |
Open  |
138  |
INSTALL WAVE TRAP CCVTs TUNER AND PANEL 6/17/2010 - CANCELLED OUTAGE PER ERCOT'S' REQUEST DUE TO N-1 CRITERIA LOAD STUDY  |
326725   |
20100310 1051  |
20100617 1043  |
20100920 0700  |
20100925 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
CB10  |
EASTSIDE  |
  |
Open  |
138  |
INSTALL WAVE TRAP CCVTs TUNER AND PANEL 6/17/2010 - CANCELLED OUTAGE PER ERCOT'S' REQUEST DUE TO N-1 CRITERIA LOAD STUDY  |
326724   |
20100310 1050  |
20100617 1043  |
20100920 0700  |
20100925 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
4910  |
EASTSIDE  |
  |
Open  |
138  |
INSTALL WAVE TRAP CCVTs TUNER AND PANEL 6/17/2010 - CANCELLED OUTAGE PER ERCOT'S' REQUEST DUE TO N-1 CRITERIA LOAD STUDY  |
326723   |
20100310 1045  |
20100830 0930  |
20100920 0700  |
20100925 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
LN  |
ADKBM_24  |
BRITMOORE  |
ADDICKS  |
  |
138  |
THERMAL UPRATE  |
326819   |
20100310 1059  |
20100617 1047  |
20100920 0700  |
20100925 1700  |
Continuous  |
Cancelled  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
G200  |
UNIVERSITY REIT  |
  |
Open  |
138  |
INSTALL WAVE TRAP CCVTs TUNER AND PANEL 6/17/2010 - CANCELLED OUTAGE PER ERCOT'S' REQUEST DUE TO N-1 CRITERIA LOAD STUDY  |
345963   |
20100812 1239  |
20100812 1239  |
20100920 0600  |
20101003 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
XF  |
AXFMR2  |
WALNUT SPRINGS TU  |
  |
  |
69  |
Outage to repair transformer leaks, remove oil and re-gasket .  |
348135   |
20100830 1043  |
20100830 1043  |
20100920 0800  |
20100920 1000  |
Daily  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
CB  |
8530_CB  |
LON HILL  |
  |
Close  |
138  |
testing  |
348564   |
20100901 1402  |
20100901 1402  |
20100920 0700  |
20100920 1700  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
PK_944_CB  |
PILOT KNOB  |
  |
Open  |
138  |
Clearance for drilling and installing cages.  |
346948   |
20100820 1604  |
20100820 1604  |
20100920 0800  |
20100929 1800  |
Continuous  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
LAQUIN_LOBO1  |
LAQUINTA  |
LOBO   |
  |
138  |
CUT IN NEW LA QUINTA SWITCHING STATION AND THE CEDRO HILL WF BETWEEN LOBO & BRUNI MEC AND RELAY CHANGEOUT AT LOBO  |
346947   |
20100820 1604  |
20100820 1604  |
20100920 0800  |
20100927 1200  |
Continuous  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
BRUNI_LAQUIN1  |
BRUNI SUB  |
LAQUINTA  |
  |
138  |
CUT IN NEW LA QUINTA SWITCHING STATION AND THE CEDRO HILL WF BETWEEN LOBO & BRUNI MEC AND RELAY CHANGEOUT AT LOBO  |
346946   |
20100820 1603  |
20100820 1603  |
20100920 0800  |
20100927 1200  |
Continuous  |
Received at ERCOT  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
BRU_MECB  |
BRUNI  |
BRUNI SUB  |
  |
138  |
CUT IN NEW LA QUINTA SWITCHING STATION AND THE CEDRO HILL WF BETWEEN LOBO & BRUNI MEC AND RELAY CHANGEOUT AT LOBO  |
342559   |
20100715 0907  |
20100726 1538  |
20100920 0700  |
20100920 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_WOOLRI1  |
BARNEY DAVIS  |
WOOLDRIDGE  |
  |
138  |
install foundations for new structures  |
342544   |
20100715 0906  |
20100726 1538  |
20100920 0700  |
20100920 1900  |
Daily  |
Cancelled  |
Planned  |
CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)  |
  |
LN  |
B_DAVI_PHARAO1  |
BARNEY DAVIS  |
PHAROAH  |
  |
138  |
install foundations for new structures  |
346897   |
20100820 1023  |
20100820 1023  |
20100920 0800  |
20100928 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1010_C  |
WACO NORTHEAST TAP  |
WACO EAST  |
  |
138  |
replACE CB 3020 and add lightning arresters  |
347376   |
20100825 1149  |
20100831 0831  |
20100920 0600  |
20100926 2000  |
Continuous  |
Cancelled  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
6009_A  |
WILLOW CREEK SWITCH  |
PARKER SWITCH  |
  |
345  |
Outage to erect towers and pull wire for line reconductor.  |
347592   |
20100826 0910  |
20100830 1352  |
20100920 0600  |
20100920 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
337366   |
20100603 1349  |
20100826 0851  |
20100920 0700  |
20100920 1730  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
126T153  |
LOCKHART  |
RED ROCK  |
  |
138  |
OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010  |
323762   |
20100211 1451  |
20100902 1351  |
20100920 0800  |
20100923 1700  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
CB_1304  |
WEATHERFORD SWITCH  |
  |
Open  |
138  |
Upgrade CB.  |
323644   |
20100210 1545  |
20100211 1446  |
20100920 0800  |
20100923 1700  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
CB_1304  |
WEATHERFORD SWITCH  |
  |
Open  |
138  |
Upgrade CB.  |
334559   |
20100511 0538  |
20100603 1347  |
20100921 0700  |
20100921 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
519T519  |
LOCKHART  |
REEDVILLE TAP  |
  |
69  |
LINE OVERHAUL  |
348905   |
20100902 1325  |
20100902 1325  |
20100921 0700  |
20100921 1230  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
H240  |
WA PARISH  |
  |
Open  |
138  |
DOBLE  |
348719   |
20100901 1513  |
20100901 1513  |
20100921 0700  |
20100921 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10789  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348705   |
20100901 1512  |
20100901 1512  |
20100921 0700  |
20100921 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
DSC  |
DSW_10791  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348690   |
20100901 1511  |
20100901 1511  |
20100921 0700  |
20100921 1630  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
CB  |
CB_10790  |
SAN MARCOS  |
  |
Close  |
69  |
CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL  |
348626   |
20100901 1459  |
20100901 1505  |
20100921 0700  |
20100921 1630  |
Daily  |
Cancelled  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
150T220  |
CAMP GARY  |
SAN MARCOS  |
  |
69  |
CLEAR CB 6220 FOR OPERATOR MAINTENANCE  |
348142   |
20100830 1058  |
20100830 1058  |
20100921 0700  |
20100921 1600  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
2336  |
CROCKETT TU  |
  |
Close  |
138  |
line maint. close at Crockett  |
348141   |
20100830 1057  |
20100830 1057  |
20100921 0700  |
20100921 1600  |
Daily  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
LN  |
1230_D  |
CENTERVILLE I45  |
PLEASANT SPRINGS TU  |
  |
138  |
line maint. close at Crockett  |
343730   |
20100726 1531  |
20100728 1000  |
20100921 0800  |
20100922 1600  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
790  |
WEATHERFORD SWITCH  |
  |
Open  |
138  |
Upgrade CB 1304, replace line and bus side disconnects.  |
343729   |
20100726 1531  |
20100728 1000  |
20100921 0800  |
20100922 1600  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
780  |
WEATHERFORD SWITCH  |
  |
Open  |
138  |
Upgrade CB 1304, replace line and bus side disconnects.  |
348340   |
20100831 1238  |
20100831 1239  |
20100921 0700  |
20100921 1500  |
Daily  |
Received at ERCOT  |
Planned  |
CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)  |
  |
CB  |
OC_950  |
ONION CREEK  |
  |
Open  |
138  |
Sub station GCB maintenance / testing.  |
348914   |
20100902 1340  |
20100902 1340  |
20100921 0700  |
20100921 1230  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
C300  |
CROCKETT REIT  |
  |
Open  |
138  |
DOBLE  |
348913   |
20100902 1337  |
20100902 1337  |
20100921 0700  |
20100921 1230  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
C490  |
ADDICKS  |
  |
Open  |
138  |
DOBLE  |
343728   |
20100726 1531  |
20100728 1000  |
20100921 0800  |
20100922 1600  |
Continuous  |
Cancelled  |
Planned  |
BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)  |
  |
CB  |
1550  |
WEATHERFORD SWITCH  |
  |
Open  |
138  |
Upgrade CB 1304, replace line and bus side disconnects.  |
347030   |
20100823 0613  |
20100823 0613  |
20100921 0700  |
20100927 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TEXAS-NEW MEXICO POWER COMPANY  |
  |
DSC  |
239_01  |
HEIGHTS SUB  |
  |
Open  |
138  |
Centerpoint energy requesting an outage on line 138-3-2  |
347145   |
20100824 0844  |
20100824 0844  |
20100921 0800  |
20100921 1130  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
G050  |
CHANNELVIEW  |
  |
Open  |
138  |
lube job  |
348212   |
20100830 1354  |
20100830 1354  |
20100921 0700  |
20100921 1730  |
Daily  |
Received at ERCOT  |
Planned  |
LOWER COLORADO RIVER AUTHORITY (TDSP)  |
  |
LN  |
271T153  |
RED ROCK  |
HILBIG  |
  |
138  |
OVERHAUL  |
347168   |
20100824 0846  |
20100824 0846  |
20100921 1200  |
20100921 1600  |
Daily  |
Received at ERCOT  |
Planned  |
RELIANT ENERGY HL&P (TDSP)  |
  |
CB  |
G060  |
CHANNELVIEW  |
  |
Open  |
138  |
lube job  |
347616   |
20100826 1040  |
20100826 1040  |
20100921 0600  |
20100922 1700  |
Continuous  |
Received at ERCOT  |
Planned  |
TXU ELECTRIC COMPANY (TDSP)  |
  |
DSC  |
6098&n |