PROPOSED TRANSMISSION OUTAGES Data queried at: 02-SEP-2010 Time: 17:11:23 Comma Delimited Format
OutageId Date Posted Last Updated Start End Duration Status Request
Type
Company Multi CB Equipment
Type
Equipment From
Station
To
Station
State Voltage Comment
334001
 
20100507
1035 
20100901
1152 
20100902
2200 
20100903
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_202_CB  ORAN TMPP 
MORRIS SHEPPARD
 
Open  69  Line rebuild. 
334109
 
20100507
1039 
20100901
1152 
20100902
2200 
20100903
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_204_CB  ORAN TMPP 
WHITT
 
Open  69  Line rebuild. 
334217
 
20100507
1049 
20100901
1154 
20100902
2200 
20100903
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M30  WHITT    Open  69  Line rebuild. 
337348
 
20100603
1333 
20100826
0846 
20100902
0700 
20100902
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL 
347268
 
20100824
1416 
20100830
1052 
20100902
0800 
20100902
1200 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    DSC  1418  PALACIOS    Open  69  #2-69KV BUS OUTAGE TO REPLACE N.O. TIE SWITCH 3833. DISTRIBUTION LOAD WILL BE TRANSFERRED TO #1 XFMR. STEC ADVISED TO OUTAGE THEIR LINE FROM CARANCAHUA-PALACIOS. 
346715
 
20100819
0551 
20100902
0742 
20100902
0730 
20100902
1130 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  2300  UNIVERSITY REIT    Open  69  LUBE MAINTENANCE LN30>GV ON BYPASS 
346717
 
20100819
0556 
20100902
0743 
20100902
0730 
20100902
1130 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  T240  UNIVERSITY REIT    Close  69  LUBE MAINTENANCE LN30>GV ON BYPASS 
346860
 
20100820
0532 
20100831
1540 
20100902
0800 
20100902
1800 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_9069  MARSHALL FORD    Open  138  CLEAR CB 9070 FOR OPERATOR INSPECTION Canceled by PEC. 8/31/2010 
342508
 
20100715
0852 
20100726
1537 
20100902
0700 
20100902
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_RODD_F1  BARNEY DAVIS  RODD FIELD    138  install foundations for new structures 
348231
 
20100830
1615 
20100902
0924 
20100902
2030 
20100902
2200 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  9995_CB  DUPONT SWITCH - INGLESIDE    Open  138  INSTALLING NEW DME EQUIPMENT 
348230
 
20100830
1615 
20100902
0924 
20100902
2030 
20100902
2200 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  9985_CB  DUPONT SWITCH - INGLESIDE    Open  138  INSTALLING NEW DME EQUIPMENT 
348229
 
20100830
1614 
20100901
1638 
20100902
2030 
20100902
2200 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  2920_CB  WHITEPOINT    Open  138  INSTALLING NEW DME EQUIPMENT 
348228
 
20100830
1614 
20100901
1638 
20100902
2030 
20100902
2200 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  2930_CB  WHITEPOINT    Open  138  INSTALLING NEW DME EQUIPMENT 
348227
 
20100830
1613 
20100901
1638 
20100902
1900 
20100902
2030 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  2940_CB  WHITEPOINT    Open  138  INSTALLING NEW DME EQUIPMENT 
348225
 
20100830
1554 
20100830
1613 
20100902
0700 
20100902
0830 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  2940_CB  WHITEPOINT    Open  138  INSTALLING NEW DME EQUIPMENT 
348224
 
20100830
1553 
20100901
1638 
20100902
1900 
20100902
2030 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  2895_CB  WHITEPOINT    Open  138  INSTALLING NEW DME EQUIPMENT 
347437
 
20100825
1446 
20100827
1003 
20100902
0600 
20100902
1400 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  2190_A  WACO KATY TAP  ELM MOTT    69  repair conductor damaged by storm on 4/24/10 
342524
 
20100715
0858 
20100726
1538 
20100902
0700 
20100902
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  install foundations for new structures 
345918
 
20100812
1012 
20100813
1423 
20100902
2400 
20100903
1230 
Continuous  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2739  SPRABERRY SWITCH    Open  69  Outage to calibrate relays on the Autotransformer. 
344138
 
20100728
1502 
20100813
1344 
20100902
0015 
20100902
1200 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6009_A  WILLOW CREEK SWITCH  PARKER SWITCH    345  Outage to install foundations under the line in preparation for line rebuild. Crez Project upgrade. 
346449
 
20100817
1254 
20100902
1009 
20100902
0700 
20100902
1400 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6480_B  ECTOR HARPER  PERMIAN BASIN SES    138  Outages to replace bad crossarms and poles. 
345916
 
20100812
1011 
20100813
1423 
20100902
2400 
20100903
1230 
Continuous  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2805  SPRABERRY SWITCH    Open  138  Outage to calibrate relays on the Autotransformer. 
345915
 
20100812
1007 
20100827
0839 
20100902
0700 
20100902
1800 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1011  SWEETWATER NO 2    Open  69  Outage to replace the relay panel. 
345914
 
20100812
1007 
20100827
0839 
20100902
0700 
20100902
1800 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1009  SWEETWATER NO 2    Open  69  Outage to replace the relay panel. 
346640
 
20100818
1407 
20100902
0602 
20100902
0730 
20100902
1700 
Daily  Cancelled  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  12P2  P2 
Q1
 
Open  138  FOUNDATION INSTALLATION 
346639
 
20100818
1405 
20100902
0602 
20100902
0730 
20100902
1700 
Daily  Cancelled  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  10Q1  Q1 
P2
 
Open  138  FOUNDATION INSTALLATION 
346635
 
20100818
1358 
20100902
0601 
20100902
0730 
20100902
1700 
Daily  Cancelled  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    LN  P2_Q1  P2  Q1    138  FOUNDATION INSTALLATION 
346460
 
20100817
1257 
20100902
1008 
20100902
0700 
20100902
1400 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  2540  PERMIAN BASIN SES    Open  138  Outages to replace bad crossarms and poles. 
346455
 
20100817
1256 
20100902
1008 
20100902
0700 
20100902
1400 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  2460  PERMIAN BASIN SES    Open  138  Outages to replace bad crossarms and poles. 
347039
 
20100823
0815 
20100831
1540 
20100902
0800 
20100902
1800 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_3993  MARSHALL FORD    Close  138  SWITCH IS BEING CLOSED TO BYPASS CB 9070 WHILE OUT FOR OPERATOR INSPECTION Canceled by PEC. 8/31/2010 
347038
 
20100823
0815 
20100831
1540 
20100902
0800 
20100902
1800 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_9073  MARSHALL FORD    Close  138  SWITCH IS BEING CLOSED TO BYPASS CB 9070 WHILE OUT FOR OPERATOR INSPECTION Canceled by PEC. 8/31/2010 
346435
 
20100817
1253 
20100902
1015 
20100902
0700 
20100902
1400 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2105  ECTOR HARPER    Open  138  Outages to replace bad crossarms and poles. 
346564
 
20100818
1028 
20100902
1315 
20100902
1200 
20100902
1530 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  F430  BAYWAY    Open  138  Lube maintenance. 
346481
 
20100817
1302 
20100824
1340 
20100902
2300 
20100903
0900 
Continuous  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  015  LOMO ALTO    Close  138  close for contingency outage, Chapman to install foundations, structures, & move wire for reroute 
345920
 
20100812
1012 
20100813
1423 
20100902
2400 
20100903
1230 
Continuous  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  2740  SPRABERRY SWITCH    Open  69  Outage to calibrate relays on the Autotransformer. 
345919
 
20100812
1012 
20100813
1423 
20100902
2400 
20100903
1230 
Continuous  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2743  SPRABERRY SWITCH    Open  69  Outage to calibrate relays on the Autotransformer. 
347918
 
20100827
1443 
20100902
0904 
20100902
0700 
20100902
1700 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6856_B  SEYMOUR TU  BOMARTON TU    69  OUtage to replace bad crossarms. 
347916
 
20100827
1356 
20100902
1638 
20100902
2400 
20100903
1200 
Continuous  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6009_A  WILLOW CREEK SWITCH  PARKER SWITCH    345  Line outage to remove spacers and static wire bonds in preparation for erecting towers for future work. 
345618
 
20100811
0824 
20100813
1423 
20100902
2400 
20100903
1230 
Continuous  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    XF  AXFMR1  SPRABERRY SWITCH      69  Outage to calibrate relays on the Autotransformer. 
345800
 
20100811
1528 
20100820
1549 
20100902
0800 
20100902
1800 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  EDROY_MATHIS1  MATHIS  EDROY    69  replacing insulators 
345617
 
20100811
0818 
20100827
0839 
20100902
0700 
20100902
1800 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  1010  SWEETWATER NO 2 
ESKOTA SWITCH
 
Open  69  Outage to replace the relay panel. 
346861
 
20100820
0532 
20100831
1540 
20100902
0800 
20100902
1800 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_9071  MARSHALL FORD    Open  138  CLEAR CB 9070 FOR OPERATOR INSPECTION Canceled by PEC. 8/31/2010 
346859
 
20100820
0531 
20100831
1540 
20100902
0800 
20100902
1800 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_9070  MARSHALL FORD    Open  138  CLEAR CB 9070 FOR OPERATOR INSPECTION Canceled by PEC. 8/31/2010 
346716
 
20100819
0555 
20100902
0742 
20100902
0730 
20100902
1130 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  2303  UNIVERSITY REIT    Close  69  LUBE MAINTENANCE LN30>GV ON BYPASS 
346988
 
20100823
1349 
20100827
1019 
20100902
0600 
20100902
1300 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1250_J  LAKEVIEW  PALESTINE SOUTH    138  LINE MAINT 
333893
 
20100507
1027 
20100901
1152 
20100902
2200 
20100903
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_10  MORRIS SHEPPARD    Open  69  Line rebuild. 
334002
 
20100507
1035 
20100901
1154 
20100903
2200 
20100904
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_202_CB  ORAN TMPP 
MORRIS SHEPPARD
 
Open  69  Line rebuild. 
333894
 
20100507
1027 
20100901
1154 
20100903
2200 
20100904
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_10  MORRIS SHEPPARD    Open  69  Line rebuild. 
347156
 
20100824
0816 
20100902
1253 
20100903
0300 
20100903
1200 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  105_A  CARROLLTON NORTHWEST  LEWISVILLE SWITCH    345  Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345 
344139
 
20100728
1502 
20100813
1344 
20100903
0015 
20100903
1200 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6009_A  WILLOW CREEK SWITCH  PARKER SWITCH    345  Outage to install foundations under the line in preparation for line rebuild. Crez Project upgrade. 
347241
 
20100824
1305 
20100901
0853 
20100903
0400 
20100903
1300 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  5812  BOBTOWN    Close  138  verizon wireless site setting new equipment 
347238
 
20100824
1303 
20100901
0853 
20100903
0400 
20100903
1300 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_A  GARLAND BOBTOWN TAP  OATES TMPP    138  verizon wireless site setting new equipment 
347157
 
20100824
0816 
20100902
1253 
20100903
0300 
20100903
1200 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  575_A  CARROLLTON NORTHWEST  LEWISVILLE SWITCH    138  Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345 
348174
 
20100830
1304 
20100830
1351 
20100903
0730 
20100903
1030 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1212  HENRIETTA TU    Close  69  Outage to check the Bus Differential relaying and functional test. The station will be on mobile sub bypass and switch 1212 will be closed to serve the mobile sub from Wichita Falls radially during test. Note sent to 1outagecoordinator.com. 
348173
 
20100830
1303 
20100831
0656 
20100903
0730 
20100903
1030 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  1340  HENRIETTA TU    Open  69  Outage to check the Bus Differential relaying and functional test. The station will be on mobile sub bypass and switch 1212 will be closed to serve the mobile sub from Wichita Falls radially during test. Note sent to 1outagecoordinator.com. 
348172
 
20100830
1303 
20100831
0656 
20100903
0730 
20100903
1030 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  1210  HENRIETTA TU    Open  69  Outage to check the Bus Differential relaying and functional test. The station will be on mobile sub bypass and switch 1212 will be closed to serve the mobile sub from Wichita Falls radially during test. Note sent to 1outagecoordinator.com. 
342525
 
20100715
0858 
20100726
1538 
20100903
0700 
20100903
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  install foundations for new structures 
342509
 
20100715
0852 
20100726
1537 
20100903
0700 
20100903
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_RODD_F1  BARNEY DAVIS  RODD FIELD    138  install foundations for new structures 
347089
 
20100823
1349 
20100827
1019 
20100903
0600 
20100903
1300 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1250_J  LAKEVIEW  PALESTINE SOUTH    138  LINE MAINT 
345801
 
20100811
1528 
20100820
1549 
20100903
0800 
20100903
1800 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  EDROY_MATHIS1  MATHIS  EDROY    69  replacing insulators 
347247
 
20100824
1318 
20100901
0853 
20100903
0400 
20100903
1300 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1372  ROSEHILL    Close  138  verizon wireless site setting new equipment 
347240
 
20100824
1304 
20100901
0853 
20100903
0400 
20100903
1300 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_G  GARLAND BOBTOWN TAP  BOBTOWN    138  verizon wireless site setting new equipment 
347239
 
20100824
1303 
20100901
0853 
20100903
0400 
20100903
1300 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_F  GARLAND BOBTOWN TAP  ROWLETT    138  verizon wireless site setting new equipment 
334459
 
20100510
1118 
20100510
1126 
20100903
0700 
20100903
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  SAN MARCOS  CAMP GARY    69  LINE OVERHAUL 
334218
 
20100507
1049 
20100901
1154 
20100903
2200 
20100904
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M30  WHITT    Open  69  Line rebuild. 
334110
 
20100507
1039 
20100901
1154 
20100903
2200 
20100904
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_204_CB  ORAN TMPP 
WHITT
 
Open  69  Line rebuild. 
334003
 
20100507
1035 
20100901
1154 
20100904
2200 
20100905
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_202_CB  ORAN TMPP 
MORRIS SHEPPARD
 
Open  69  Line rebuild. 
334111
 
20100507
1039 
20100901
1154 
20100904
2200 
20100905
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_204_CB  ORAN TMPP 
WHITT
 
Open  69  Line rebuild. 
334219
 
20100507
1049 
20100901
1154 
20100904
2200 
20100905
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M30  WHITT    Open  69  Line rebuild. 
348106
 
20100830
0930 
20100902
1325 
20100904
0600 
20100904
1200 
Daily  Cancelled  Planned  CITY OF GARLAND (TDSP)    CB  OCB_9110_CB  WYNN JOYCE 
ROSEHILL
 
Open  138  Request is for ONCOR to work a trouble at Site # CLR 0262. 
348105
 
20100830
0929 
20100902
1325 
20100904
0600 
20100904
1200 
Daily  Cancelled  Planned  CITY OF GARLAND (TDSP)    DSC  9112  WYNN JOYCE    Open  138  Request is for ONCOR to work a trouble at Site # CLR 0262. 
348104
 
20100830
0929 
20100902
1325 
20100904
0600 
20100904
1200 
Daily  Cancelled  Planned  CITY OF GARLAND (TDSP)    DSC  1371  ROSEHILL    Open  138  Request is for ONCOR to work a trouble at Site # CLR 0262. 
348103
 
20100830
0928 
20100902
1325 
20100904
0600 
20100904
1200 
Daily  Cancelled  Planned  CITY OF GARLAND (TDSP)    LN  ROS-WYN  ROSEHILL  WYNN JOYCE    138  Request is for ONCOR to work a trouble at Site # CLR 0262. 
342526
 
20100715
0858 
20100726
1538 
20100904
0700 
20100904
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  install foundations for new structures 
342538
 
20100715
0900 
20100726
1538 
20100904
0700 
20100904
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_RODD_F1  BARNEY DAVIS  RODD FIELD    138  install foundations for new structures 
337350
 
20100603
1333 
20100603
1337 
20100904
0700 
20100904
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL 
334460
 
20100510
1118 
20100510
1126 
20100904
0700 
20100904
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  SAN MARCOS  CAMP GARY    69  LINE OVERHAUL 
333895
 
20100507
1027 
20100901
1154 
20100904
2200 
20100905
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_10  MORRIS SHEPPARD    Open  69  Line rebuild. 
334004
 
20100507
1035 
20100901
1154 
20100905
2200 
20100906
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_202_CB  ORAN TMPP 
MORRIS SHEPPARD
 
Open  69  Line rebuild. 
342527
 
20100715
0858 
20100726
1538 
20100905
0700 
20100905
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  install foundations for new structures 
342539
 
20100715
0900 
20100726
1538 
20100905
0700 
20100905
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_RODD_F1  BARNEY DAVIS  RODD FIELD    138  install foundations for new structures 
337351
 
20100603
1333 
20100603
1337 
20100905
0700 
20100905
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL 
334461
 
20100510
1118 
20100510
1126 
20100905
0700 
20100905
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  SAN MARCOS  CAMP GARY    69  LINE OVERHAUL 
333896
 
20100507
1027 
20100901
1154 
20100905
2200 
20100906
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_10  MORRIS SHEPPARD    Open  69  Line rebuild. 
334112
 
20100507
1039 
20100901
1154 
20100905
2200 
20100906
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_204_CB  ORAN TMPP 
WHITT
 
Open  69  Line rebuild. 
334220
 
20100507
1049 
20100901
1154 
20100905
2200 
20100906
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M30  WHITT    Open  69  Line rebuild. 
326760
 
20100310
0821 
20100323
0829 
20100906
0700 
20100906
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  FW_WEB04  WEBSTER  FRIENDSWOOD REIT    138  FOUNDATION WORK FOR CKT93 RECONDUCTOR 
345621
 
20100811
0827 
20100902
1014 
20100906
0700 
20100906
1700 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6560_A  GRAHAM SES  RICE SWITCH    138  Outage to remove guys for Brazos Construction. 
343715
 
20100726
1434 
20100826
1338 
20100906
0900 
20101001
1800 
Continuous  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  RVR_ROBS  ROBSTOWN SUB  CALALLEN SUB    69  line clearance to replace conductor and static wire 
345628
 
20100811
0829 
20100902
1014 
20100906
0700 
20100906
1700 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  LS_4907  RICE SWITCH    Open  138  Outage to remove guys for Brazos Construction. 
345627
 
20100811
0828 
20100902
1014 
20100906
0700 
20100906
1700 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2599  GRAHAM SES    Open  138  Outage to remove guys for Brazos Construction. 
345625
 
20100811
0828 
20100902
1014 
20100906
0700 
20100906
1700 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2601  GRAHAM SES    Open  138  Outage to remove guys for Brazos Construction. 
345623
 
20100811
0827 
20100902
1014 
20100906
0700 
20100906
1700 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  2600  GRAHAM SES 
RICE SWITCH
 
Open  138  Outage to remove guys for Brazos Construction. 
347358
 
20100825
0852 
20100901
0657 
20100906
0900 
20100906
1400 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6625_E  HENRIETTA TU  RINGGOLD MAGNOLIA TAP    69  Disconnect 15MVA Mobile Sub from 69kv bypass switch 1342. Connections from Sw 1342 to 69kv line will be reinstalled. 
342528
 
20100715
0858 
20100726
1538 
20100906
0700 
20100906
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  install foundations for new structures 
342510
 
20100715
0852 
20100726
1538 
20100906
0700 
20100906
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_RODD_F1  BARNEY DAVIS  RODD FIELD    138  install foundations for new structures 
342574
 
20100715
0915 
20100901
0942 
20100906
0600 
20100906
1400 
Daily  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  RBS_HRN  HEARNE  ROBERTSON    138  Line maintenance. 
337352
 
20100603
1333 
20100603
1343 
20100906
0700 
20100906
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL 
333897
 
20100507
1027 
20100901
1154 
20100906
2200 
20100907
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_10  MORRIS SHEPPARD    Open  69  Line rebuild. 
334221
 
20100507
1049 
20100901
1155 
20100906
2200 
20100907
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSW_M30  WHITT    Open  69  Line rebuild. 
331565
 
20100420
1539 
20100812
1211 
20100906
0800 
20100917
1800 
Continuous  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  DER_DILL  DERBY SUB  DILLEY SUB    69  double circuit line 
334462
 
20100510
1118 
20100510
1128 
20100906
0700 
20100906
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  SAN MARCOS  CAMP GARY    69  LINE OVERHAUL 
334113
 
20100507
1039 
20100901
1155 
20100906
2200 
20100907
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_204_CB  ORAN TMPP 
WHITT
 
Open  69  Line rebuild. 
334005
 
20100507
1035 
20100901
1155 
20100906
2200 
20100907
1000 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_202_CB  ORAN TMPP 
MORRIS SHEPPARD
 
Open  69  Line rebuild. 
326758
 
20100310
0816 
20100615
1604 
20100907
0700 
20100907
1200 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  AL_PHR93  PH ROBINSON  ALTA LOMA    138  CUT JUMPERS LOOKING TOWARDS AL 
326761
 
20100310
0826 
20100615
1551 
20100907
0700 
20100907
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  FW_WEB04  WEBSTER  FRIENDSWOOD REIT    138  FOUNDATION WORK FOR CKT93 RECONDUCTOR 
348775
 
20100902
0847 
20100902
0847 
20100907
0930 
20100907
1500 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  3263  SNYDER    Open  138  Outage to to perform Nerc mandated relay testing and fuctional testing. 
348774
 
20100902
0846 
20100902
0846 
20100907
0930 
20100907
1500 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  2360  SNYDER 
 
Open  69  Outage to to perform Nerc mandated relay testing and fuctional testing. 
348773
 
20100902
0846 
20100902
0846 
20100907
0930 
20100907
1500 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    XF  AXFMR1  SNYDER      69  Outage to to perform Nerc mandated relay testing and fuctional testing. 
348770
 
20100902
0721 
20100902
0721 
20100907
0800 
20100910
1500 
Continuous  Received at ERCOT  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  MCF_RFUG  MCFADDIN SUB  REFUGIO SUB    69  line rehab 
348603
 
20100901
1332 
20100901
1332 
20100907
0700 
20100910
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  3950_A  FISH CREEK SWITCH  MOUNTAIN CREEK SES    69  working under line 
348486
 
20100901
0518 
20100901
0519 
20100907
0800 
20100907
1800 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_8889  BUTTERCUP    Open  138  CLEAR CB 8900 TO TEST LINE PANEL 
348756
 
20100901
1703 
20100901
1703 
20100907
1300 
20100907
1500 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  3035_CB  SAN ANGELO COLLEGE HILLS 
SAN ANGELO GRAPE CREEK TAP
 
Open  69  Maintenance testing of relays 
348957
 
20100902
1533 
20100902
1533 
20100907
0700 
20100907
1600 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_208_CB  MCCREE 
SOUTHSIDE POI
 
Open  69  Garland to make repairs on PD and EPS metering at McCree. 
345157
 
20100806
0950 
20100812
0913 
20100907
0700 
20100907
1100 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P880  VELASCO    Open  138  section outage to install temp controll cables 
347968
 
20100830
0845 
20100830
1206 
20100907
0800 
20100907
2400 
Daily  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  OCB_D110  MVEC (VAL VERDE RD)  MVEC ALBERTA ROAD TAP    138  line clearaqnce to c/o 2 dead end structures 
347967
 
20100830
0835 
20100830
0849 
20100907
0800 
20100910
1800 
Continuous  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  MVALR_PHA  PHARR MVEC  MVEC ALBERTA ROAD TAP    138  line clearaqnce to c/o 2 dead end structures 
348945
 
20100902
1534 
20100902
1534 
20100907
0700 
20100907
1600 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  30  SOUTHSIDE POI    Open  69  Garland to make repairs on PD and EPS metering at McCree. 
346424
 
20100817
1222 
20100826
0834 
20100907
0600 
20100907
0645 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL 
343537
 
20100723
0938 
20100831
0959 
20100907
0700 
20100909
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  T1HS  ANBUSH    Open  138  MAINT AT ANBUSH 
343536
 
20100723
0938 
20100831
0959 
20100907
0700 
20100909
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  B830  ANBUSH    Open  138  MAINT AT ANBUSH 
343535
 
20100723
0937 
20100831
0959 
20100907
0700 
20100909
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  B820  ANBUSH    Open  138  MAINT AT ANBUSH 
347140
 
20100824
0817 
20100831
0724 
20100907
0300 
20100907
1200 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  575_A  CARROLLTON NORTHWEST  LEWISVILLE SWITCH    138  Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345 
344857
 
20100804
0952 
20100826
0947 
20100907
0700 
20100907
1500 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    XF  AT3_H  OBRIEN      345  RELAY TEST 
345185
 
20100806
0951 
20100826
1335 
20100907
0700 
20100907
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  H810  VELASCO    Open  138  section outage to install temp controll cables 
347158
 
20100824
0817 
20100831
0724 
20100907
0300 
20100907
1200 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  105_A  CARROLLTON NORTHWEST  LEWISVILLE SWITCH    345  Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345 
348452
 
20100901
0656 
20100901
0656 
20100907
0900 
20100907
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6625_E  HENRIETTA TU  RINGGOLD MAGNOLIA TAP    69  Disconnect 15MVA Mobile Sub from 69kv bypass switch 1342. Connections from Sw 1342 to 69kv line will be reinstalled. 
342529
 
20100715
0858 
20100726
1538 
20100907
0700 
20100907
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  install foundations for new structures 
342511
 
20100715
0852 
20100726
1538 
20100907
0700 
20100907
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_RODD_F1  BARNEY DAVIS  RODD FIELD    138  install foundations for new structures 
342419
 
20100714
1548 
20100827
1402 
20100907
0600 
20100909
1800 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  T1HS  UVALDE REIT    Open  138  REPLACE T1HS - SEE LN03 GBY-EXS 
342418
 
20100714
1545 
20100723
0809 
20100907
0600 
20100909
1800 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  GBYUV_03  GREENS BAYOU  UVALDE REIT    138  NEEDED FOR CLEARANCE TO REPLACE T1HS @ UV 
344743
 
20100803
1412 
20100902
1552 
20100907
0800 
20100907
1700 
Daily  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  2625  HAWKINS SWITCH 
SALEM TMPP
 
Open  138  Test relays. 
347519
 
20100826
0909 
20100830
1352 
20100907
0600 
20100907
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
337353
 
20100603
1333 
20100826
0846 
20100907
0700 
20100907
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  overhaul Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010 
337059
 
20100602
1407 
20100830
0919 
20100907
0700 
20100913
0645 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  ADKBM_09  BRITMOORE  ADDICKS    138  RECONDUCTORING 
338044
 
20100608
1226 
20100713
1630 
20100907
0800 
20100916
1700 
Continuous  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  MVALR_PHA  PHARR MVEC  MVEC ALBERTA ROAD TAP    138  Pour foundations for new steel poles 
332629
 
20100428
0809 
20100826
1053 
20100907
0700 
20100911
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  BG_GV_46  GARDEN VILLAS  BLODGETT    69  VARIOUS EQUIPMENT MAINTENANCE 
331328
 
20100419
1426 
20100727
1020 
20100907
0700 
20101016
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  1936  HITCHCOCK    Open  138  REHAB. CUT JUMPERS LOOKING TOWARDS AL 
326762
 
20100310
0826 
20100615
1552 
20100908
0700 
20100908
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  FW_WEB04  WEBSTER  FRIENDSWOOD REIT    138  FOUNDATION WORK FOR CKT93 RECONDUCTOR 
335245
 
20100517
1302 
20100826
0949 
20100908
0800 
20100908
1200 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P480  HARDY REIT    Open  138  TEST RECLOSERS 
335244
 
20100517
1301 
20100826
0949 
20100908
0800 
20100908
1200 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P120  HARDY REIT    Open  138  TEST RECLOSERS 
335243
 
20100517
1300 
20100826
0949 
20100908
0800 
20100908
1200 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  6865  HARDY REIT    Open  138  TEST RECLOSERS 
348205
 
20100830
1613 
20100902
0737 
20100908
0730 
20100909
1700 
Continuous  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    DSC  DSW_9072  SAM RAYBURN SWITCHYD    Close  138  clearance on bkr 9074 to replace Reclosing Relay - will utilize transfer bkr 9094 
348204
 
20100830
1611 
20100902
0737 
20100908
0730 
20100909
1700 
Continuous  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    CB  OCB_9094_CB  SAM RAYBURN SWITCHYD    Close  138  clearance on bkr 9074 to replace Reclosing Relay - will unilize transfer bkr 9094 
348203
 
20100830
1610 
20100902
0737 
20100908
0730 
20100909
1700 
Continuous  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    CB  OCB_9074_CB  SAM RAYBURN SWITCHYD    Open  138  bkr clearance to replace Reclosing Relay - will unilize transfer bkr 9094 
347823
 
20100827
0931 
20100830
0816 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_10010  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348595
 
20100901
1256 
20100901
1256 
20100908
0600 
20100908
1200 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M10VW  IBM B    Open  138  Oncor wireless work. 
348937
 
20100902
1442 
20100902
1442 
20100908
0700 
20100908
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Open  69  CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL 
348936
 
20100902
1442 
20100902
1442 
20100908
0700 
20100908
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Open  69  CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL 
348935
 
20100902
1442 
20100902
1442 
20100908
0700 
20100908
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Open  69  CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL 
348903
 
20100902
1321 
20100902
1321 
20100908
0600 
20100909
1200 
Continuous  Received at ERCOT  Planned  CITY OF GARLAND (TDSP)    DSC  DISC1389  OATES TMPP    Open  138  ONCOR work - UMTS antenna upgrade. 
348772
 
20100902
0826 
20100902
1102 
20100908
1000 
20100908
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  6026_A  BITTER CREEK  ABILENE MULBERRY CREEK    345  CLEAR BITTER CREEK TO MULBERRY CREEK 345 KV LINE T-491 FOR REPAIRS TO GROUIND SWITCH 11486 AT THE BITTERC REEK END OF LINE. ONCOR HAS OKAYED WORK. 
348771
 
20100902
0825 
20100902
1101 
20100908
1000 
20100908
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  11482  BITTER CREEK    Open  345  CLEAR BITTER CREEK TO MULBERRY CREEK 345 KV LINE T-491 FOR REPAIRS TO GROUIND SWITCH 11486 AT THE BITTERC REEK END OF LINE. ONCOR HAS OKAYED WORK. 
348760
 
20100901
1823 
20100901
1823 
20100908
0900 
20100908
1500 
Daily  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  5090_CB  PLEASANTON 
 
Open  69  CB maintenance 
348609
 
20100901
1411 
20100901
1411 
20100908
0800 
20100909
1500 
Continuous  Received at ERCOT  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  FRI_PEAR  PEARSALL SWITCH  FRIO TOWN SUB    69  line clearance for line maintenance 
348608
 
20100901
1411 
20100901
1411 
20100908
0800 
20100909
1500 
Continuous  Received at ERCOT  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    DSC  DSW_4872  SOUTH BATESVILLE SUB    Close  69  switch closed durring clearance on Pearsall to Frio Town for line maintenance 
347827
 
20100827
0932 
20100830
0817 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_17949  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
347854
 
20100827
0934 
20100830
0817 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10071  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
347853
 
20100827
0934 
20100830
0817 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10069  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
347852
 
20100827
0934 
20100830
0817 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10011  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
347851
 
20100827
0933 
20100830
0817 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10009  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
347850
 
20100827
0933 
20100830
0817 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10051  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
347849
 
20100827
0933 
20100830
0817 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10049  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
347828
 
20100827
0932 
20100830
0816 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_17951  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
347826
 
20100827
0931 
20100830
0816 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_17950  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
347825
 
20100827
0931 
20100830
0816 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10050  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
347824
 
20100827
0931 
20100830
0816 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_10030  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
347822
 
20100827
0930 
20100830
0816 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10070  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348901
 
20100902
1317 
20100902
1317 
20100908
0500 
20100908
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_F  GARLAND BOBTOWN TAP  ROWLETT    138  verizon wireless site setting new equipment 
348949
 
20100902
1440 
20100902
1440 
20100908
0700 
20100908
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Open  69  CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL 
346389
 
20100817
0841 
20100826
0946 
20100908
0700 
20100908
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  FL_OB_73  FLEWELLEN  OBRIEN    138  install bird guards 
343327
 
20100721
1038 
20100723
1440 
20100908
0800 
20100909
1700 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_1303_CB  RW MILLER    Open  138  Dig pier holes and pour foundations for new DE tower. 
346425
 
20100817
1222 
20100826
0836 
20100908
0600 
20100908
0645 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL 
347199
 
20100824
0950 
20100830
1356 
20100908
0015 
20100908
1100 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  DNWD_5047  WEST DENTON    Open  345  Contractor to relocate two lattice towers. 
347197
 
20100824
0950 
20100830
1355 
20100908
0015 
20100908
1100 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  7717  JACKSBORO SWITCHING    Open  345  Contractor to relocate two lattice towers. 
347141
 
20100824
0818 
20100831
0726 
20100908
0300 
20100908
1200 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  575_A  CARROLLTON NORTHWEST  LEWISVILLE SWITCH    138  Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345 
348875
 
20100902
1321 
20100902
1321 
20100908
0500 
20100908
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1372  ROSEHILL    Close  138  verizon wireless site setting new equipment 
348874
 
20100902
1321 
20100902
1321 
20100908
0500 
20100908
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  5812  BOBTOWN    Close  138  verizon wireless site setting new equipment 
348873
 
20100902
1319 
20100902
1319 
20100908
0500 
20100908
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_G  GARLAND BOBTOWN TAP  BOBTOWN    138  verizon wireless site setting new equipment 
348872
 
20100902
1317 
20100902
1317 
20100908
0500 
20100908
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_A  GARLAND BOBTOWN TAP  OATES TMPP    138  verizon wireless site setting new equipment 
348663
 
20100901
1809 
20100901
1809 
20100908
1030 
20100908
1230 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5065_CB  SAN ANGELO COLLEGE HILLS 
BLUFFS
 
Open  138  Maintenance test of relays 
348661
 
20100901
1752 
20100901
1752 
20100908
0800 
20100908
1000 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5060_CB  SAN ANGELO COLLEGE HILLS 
SAN ANGELO SOUTHLAND HILLS
 
Open  138  Maintenance testing of relays 
347159
 
20100824
0818 
20100831
0726 
20100908
0300 
20100908
1200 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  105_A  CARROLLTON NORTHWEST  LEWISVILLE SWITCH    345  Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345 
348563
 
20100901
1258 
20100901
1258 
20100908
0600 
20100908
1200 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M30SWVW  CROSS TIMBERS    Open  138  Oncor wireless work. 
347845
 
20100827
0933 
20100830
0817 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10031  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
347844
 
20100827
0933 
20100830
0817 
20100908
0700 
20100910
1800 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10029  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
342530
 
20100715
0858 
20100726
1538 
20100908
0700 
20100908
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  install foundations for new structures 
342512
 
20100715
0852 
20100726
1538 
20100908
0700 
20100908
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_RODD_F1  BARNEY DAVIS  RODD FIELD    138  install foundations for new structures 
343346
 
20100721
1043 
20100723
1440 
20100908
0800 
20100909
1700 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  3730  STEPHENVILLE TU    Open  138  Dig pier holes and pour foundations for new DE tower. 
343344
 
20100721
1037 
20100723
1440 
20100908
0800 
20100909
1700 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  1303  STEPHENVILLE TMPP 
STEPHENVILLE TAP
 
Open  138  Dig pier holes and pour foundations for new DE tower. 
347520
 
20100826
0910 
20100830
1352 
20100908
0600 
20100908
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
337354
 
20100603
1333 
20100826
0846 
20100908
0700 
20100908
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010 
283008
 
20090205
1032 
20100706
1301 
20100909
0800 
20100909
1700 
Daily  Cancelled  Planned  BRYAN TEXAS UTILITIES (TDSP)    CB  8030  EAST    Open  138  BREAKER MAINTENANCE 
347521
 
20100826
0910 
20100830
1352 
20100909
0600 
20100909
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
337355
 
20100603
1333 
20100826
0846 
20100909
0700 
20100909
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010 
342513
 
20100715
0852 
20100726
1538 
20100909
0700 
20100909
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_RODD_F1  BARNEY DAVIS  RODD FIELD    138  install foundations for new structures 
347160
 
20100824
0818 
20100831
0726 
20100909
0300 
20100909
1200 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  575_A  CARROLLTON NORTHWEST  LEWISVILLE SWITCH    138  Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345 
348662
 
20100901
1758 
20100901
1758 
20100909
0730 
20100909
0830 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  4705_CB  SAN ANGELO COLLEGE HILLS 
 
Open  69  Maintenance test of relays 
348877
 
20100902
1323 
20100902
1323 
20100909
0500 
20100909
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  5812  BOBTOWN    Close  138  verizon wireless site setting new equipment 
348879
 
20100902
1324 
20100902
1324 
20100909
0500 
20100909
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_G  GARLAND BOBTOWN TAP  BOBTOWN    138  verizon wireless site setting new equipment 
348506
 
20100901
0531 
20100901
0532 
20100909
0830 
20100909
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_13450  GERONIMO    Open  138  CLEAR CB 13450 FOR DIAGNOSTIC TESTING 
348505
 
20100901
0531 
20100901
0531 
20100909
0830 
20100909
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_13451  GERONIMO    Open  138  CLEAR CB 13450 FOR DIAGNOSTIC TESTING 
348504
 
20100901
0531 
20100901
0531 
20100909
0830 
20100909
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_13449  GERONIMO    Open  138  CLEAR CB 13450 FOR DIAGNOSTIC TESTING 
348904
 
20100902
1324 
20100902
1324 
20100909
0500 
20100909
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_F  GARLAND BOBTOWN TAP  ROWLETT    138  verizon wireless site setting new equipment 
348759
 
20100901
1803 
20100901
1803 
20100909
0900 
20100909
1030 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  4065_CB  SAN ANGELO COLLEGE HILLS 
SAN ANGELO CONCHO
 
Open  69  Maintenance test of relays 
348169
 
20100830
1218 
20100831
1008 
20100909
0100 
20100909
0900 
Daily  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  MVALR_PHA  PHARR MVEC  MVEC ALBERTA ROAD TAP    138  remove Goliath Mobile from Doedyns line 
348950
 
20100902
1440 
20100902
1441 
20100909
0700 
20100909
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Open  69  CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL 
348828
 
20100902
1240 
20100902
1240 
20100909
0400 
20100909
1100 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  219_A  TOPEKA TRANSITION STATION  WEST LEVEE SWITCH    345  taking oil sample 
345439
 
20100810
1045 
20100810
1045 
20100909
0700 
20100909
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    XF  AXFMR1L  SULPHUR SPRINGS SWITCH      138  Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff 
345438
 
20100810
1044 
20100810
1044 
20100909
0700 
20100909
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    XF  AXFMR1H  SULPHUR SPRINGS SWITCH      345  Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff 
345436
 
20100810
1044 
20100810
1044 
20100909
0700 
20100909
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  2538  SULPHUR SPRINGS SWITCH 
 
Open  138  Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff 
345468
 
20100810
1128 
20100810
1129 
20100909
0700 
20100909
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2537  SULPHUR SPRINGS SWITCH    Open  138  Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff 
345453
 
20100810
1053 
20100810
1053 
20100909
0700 
20100909
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2503  MONTICELLO TAP    Open  138  opened per guide, Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff 
345444
 
20100810
1049 
20100810
1049 
20100909
0700 
20100909
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  3385  SULPHUR SPRINGS SWITCH    Open  345  Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff 
345437
 
20100810
1044 
20100810
1044 
20100909
0700 
20100909
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  3386  SULPHUR SPRINGS SWITCH 
ROYSE SWITCH
 
Open  345  Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff 
346388
 
20100817
0839 
20100826
1428 
20100909
0700 
20100909
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  FL_MAR25  FLEWELLEN  MASON ROAD    138  install bird guards 
343330
 
20100721
1045 
20100721
1327 
20100909
0800 
20100909
1700 
Daily  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  1303  STEPHENVILLE TMPP 
STEPHENVILLE TAP
 
Open  138  Dig pier holes and pour foundations for new DE tower. 
343329
 
20100721
1045 
20100721
1327 
20100909
0800 
20100909
1700 
Daily  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_1303_CB  RW MILLER    Open  138  Dig pier holes and pour foundations for new DE tower. 
343328
 
20100721
1044 
20100721
1327 
20100909
0800 
20100909
1700 
Daily  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  3730  STEPHENVILLE TU    Open  138  Dig pier holes and pour foundations for new DE tower. 
347207
 
20100824
1309 
20100902
1446 
20100909
0700 
20100909
1700 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  5700  BRECKENRIDGE 
 
Open  69  Outage to replace crossarms. Open CB 5700 as part of TOAP. 
347206
 
20100824
1308 
20100902
1446 
20100909
0700 
20100909
1700 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6180_C  GRAHAM SES  SUN ECU TAP    138  Outage to replace crossarms. Open CB 5700 as part of TOAP. 
346426
 
20100817
1222 
20100826
0836 
20100909
0600 
20100909
0645 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL 
345664
 
20100811
0916 
20100811
0916 
20100909
0700 
20100909
1800 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  1020  SWEETWATER NO 2 
US GYPSUM TAP
 
Open  69  Outage to replace the relay panel. 
348354
 
20100831
1010 
20100902
1500 
20100909
0100 
20100909
0900 
Daily  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    CB  20620_CB  MVEC (DOEDYNS) 
MVEC ALBERTA ROAD TAP
 
Open  138  remove Goliath Mobile from Doedyns line Doedyns load to be backfed 
348353
 
20100831
1005 
20100902
1500 
20100909
0100 
20100909
0900 
Daily  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    CB  D110_CB  PHARR MVEC 
MVEC ALBERTA ROAD TAP
 
Open  138  remove Goliath Mobile from Doedyns line 
348152
 
20100830
1219 
20100831
1012 
20100909
0100 
20100909
0900 
Daily  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  MVDO_MVALRD  MVEC (DOEDYNS)  MVEC ALBERTA ROAD TAP    138  remove Goliath Mobile from Doedyns line Doedyns load to be backfed 
348127
 
20100830
1205 
20100831
1003 
20100909
0100 
20100917
1400 
Continuous  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  OCB_D110  MVEC (VAL VERDE RD)  MVEC ALBERTA ROAD TAP    138  line clearaqnce to c/o 2 dead end structures 
348598
 
20100901
1258 
20100901
1258 
20100909
0600 
20100909
1200 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M30SWVW  CROSS TIMBERS    Open  138  Oncor wireless work. 
348596
 
20100901
1257 
20100901
1257 
20100909
0600 
20100909
1200 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M10VW  IBM B    Open  138  Oncor wireless work. 
348940
 
20100902
1443 
20100902
1443 
20100909
0700 
20100909
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Open  69  CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL 
348939
 
20100902
1443 
20100902
1443 
20100909
0700 
20100909
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Open  69  CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL 
348938
 
20100902
1442 
20100902
1442 
20100909
0700 
20100909
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Open  69  CLEAR SAN MARCOS TO CAMP GARY 69 KV LINE T-220 FOR LINE OVERHAUL 
348921
 
20100902
1409 
20100902
1409 
20100909
0830 
20100909
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_575LW  SANDSTONE MOUNTAIN    Close  69  SWITCH IS BEING CLOSED FOR VOLTAGE SUPPORT IF THE AUTO IS LOSS AT FREDERICKSBURG WHILE CB 1800IS OUT FOR OPERATOR INSPECTION AT GILLESPIE 
348852
 
20100902
1240 
20100902
1240 
20100909
0400 
20100909
1100 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  219_B  TOPEKA TRANSITION STATION  NORWOOD SWITCH    345  taking oil sample 
348512
 
20100901
0537 
20100902
1427 
20100909
0830 
20100909
1730 
Daily  Study  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  1801  GILLESPIE LCRA    Open  69  CLEAR CB 1800 FOR OPERATOR INSPECTION 
348511
 
20100901
0537 
20100902
1427 
20100909
0830 
20100909
1730 
Daily  Study  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  1799  GILLESPIE LCRA    Open  69  CLEAR CB 1800 FOR OPERATOR INSPECTION 
348510
 
20100901
0536 
20100902
1427 
20100909
0830 
20100909
1730 
Daily  Study  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  1800_CB  GILLESPIE LCRA    Open  69  CLEAR CB 1800 FOR OPERATOR INSPECTION 
345451
 
20100810
1052 
20100810
1052 
20100909
0700 
20100909
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  4311  MONTICELLO SES    Open  345  Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff 
345450
 
20100810
1051 
20100810
1051 
20100909
0700 
20100909
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  4309  MONTICELLO SES    Open  345  Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff 
345448
 
20100810
1051 
20100810
1051 
20100909
0700 
20100909
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  4310  MONTICELLO SES 
SULPHUR SPRINGS SWITCH
 
Open  345  Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff 
345446
 
20100810
1050 
20100810
1050 
20100909
0700 
20100909
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  205_A  SULPHUR SPRINGS SWITCH  MONTICELLO SES    345  Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff 
345445
 
20100810
1049 
20100810
1049 
20100909
0700 
20100909
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  3388  SULPHUR SPRINGS SWITCH    Open  345  Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff 
345442
 
20100810
1048 
20100810
1048 
20100909
0700 
20100909
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  3387  SULPHUR SPRINGS SWITCH    Open  345  Will need auto transformer at Sulphur Springs Switch out to add new reactor breaker relaying to auto diff 
348532
 
20100901
0552 
20100901
0552 
20100909
1200 
20100909
1600 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_1169  SAN SABA SWITCH    Open  69  CLEAR CB 1170 FOR CITY OF SAN SABA PERSONNEL SWITCH TRAINING. BREAKER WILL BE BYPASSED 
348531
 
20100901
0552 
20100901
0552 
20100909
1200 
20100909
1600 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_1171  SAN SABA SWITCH    Open  69  CLEAR CB 1170 FOR CITY OF SAN SABA PERSONNEL SWITCH TRAINING. BREAKER WILL BE BYPASSED 
348530
 
20100901
0550 
20100901
0551 
20100909
0800 
20100909
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  PCB_6580_CB  ZORN    Open  345  CLEAR MOS 6589 TO ALLOW FOR TEST OPERATING AFTER REPAIRS MADE TO MOTOR OPERATOR 
348529
 
20100901
0550 
20100901
0550 
20100909
0800 
20100909
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_6591  ZORN    Open  345  CLEAR MOS 6589 TO ALLOW FOR TEST OPERATING AFTER REPAIRS MADE TO MOTOR OPERATOR 
348528
 
20100901
0549 
20100901
0550 
20100909
0800 
20100909
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_6589  ZORN    Open  345  CLEAR MOS 6589 TO ALLOW FOR TEST OPERATING AFTER REPAIRS MADE TO MOTOR OPERATOR 
348527
 
20100901
0547 
20100901
0547 
20100909
0730 
20100909
1130 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  PCB_3130  MCNEIL LCRA    Open  138  CLEAR CB 3130 TO REPLACE OPERATION COUNTER 
348526
 
20100901
0546 
20100901
0546 
20100909
0730 
20100909
1130 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_3129  MCNEIL LCRA    Open  138  CLEAR CB 3130 TO REPLACE OPERATION COUNTER 
348525
 
20100901
0546 
20100901
0546 
20100909
0730 
20100909
1130 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_3131  MCNEIL LCRA    Open  138  CLEAR CB 3130 TO REPLACE OPERATION COUNTER 
348524
 
20100901
0545 
20100901
0545 
20100909
0830 
20100909
1200 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  5789  GLIDDEN LCRA    Open  138  CLEAR CB 5790 FOR OPERATOR INSPECTION 
348523
 
20100901
0544 
20100901
0544 
20100909
0830 
20100909
1200 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  5791  GLIDDEN LCRA    Open  138  CLEAR CB 5790 FOR OPERATOR INSPECTION 
348522
 
20100901
0544 
20100901
0544 
20100909
0830 
20100909
1200 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_5790_CB  GLIDDEN LCRA    Open  138  CLEAR CB 5790 FOR OPERATOR INSPECTION 
348521
 
20100901
0543 
20100901
0543 
20100909
0730 
20100909
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  11489  BITTER CREEK    Open  345  CLEAR CB 11490 FOR OPERATOR INSPECTION 
348520
 
20100901
0542 
20100901
0542 
20100909
0730 
20100909
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  11491  BITTER CREEK    Open  345  CLEAR CB 11490 FOR OPERATOR INSPECTION 
348519
 
20100901
0542 
20100901
0542 
20100909
0730 
20100909
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  11490  BITTER CREEK    Open  345  CLEAR CB 11490 FOR OPERATOR INSPECTION 
348878
 
20100902
1324 
20100902
1324 
20100909
0500 
20100909
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1391_A  GARLAND BOBTOWN TAP  OATES TMPP    138  verizon wireless site setting new equipment 
348876
 
20100902
1322 
20100902
1322 
20100909
0500 
20100909
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1372  ROSEHILL    Close  138  verizon wireless site setting new equipment 
347161
 
20100824
0819 
20100831
0726 
20100909
0300 
20100909
1200 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  105_A  CARROLLTON NORTHWEST  LEWISVILLE SWITCH    345  Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345 
348556
 
20100901
0946 
20100901
0946 
20100909
0600 
20100909
1400 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  1607  ROBERTSON    Open  138  Line maintenance. 
342531
 
20100715
0858 
20100726
1538 
20100909
0700 
20100909
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  install foundations for new structures 
326763
 
20100310
0826 
20100615
1552 
20100909
0700 
20100909
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  FW_WEB04  WEBSTER  FRIENDSWOOD REIT    138  FOUNDATION WORK FOR CKT93 RECONDUCTOR 
326764
 
20100310
0826 
20100615
1553 
20100910
0700 
20100910
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  FW_WEB04  WEBSTER  FRIENDSWOOD REIT    138  FOUNDATION WORK FOR CKT93 RECONDUCTOR 
347522
 
20100826
0910 
20100830
1352 
20100910
0600 
20100910
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
348881
 
20100902
1330 
20100902
1330 
20100910
0600 
20100910
1200 
Daily  Received at ERCOT  Planned  CITY OF GARLAND (TDSP)    DSC  1371  ROSEHILL    Open  138  This is a rescheduled outage. ONCOR to work Trouble ticket at cell site. 
347366
 
20100825
0952 
20100825
0952 
20100910
0600 
20100910
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1255_C  NECHES RIVER PUMP  PALESTINE SOUTH    138  line maint 
345754
 
20100811
1308 
20100811
1308 
20100910
0500 
20100910
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1020_A  TRADINGHOUSE SES TAP  ELM MOTT    138  replacing poles and crossarms 
345752
 
20100811
1307 
20100811
1307 
20100910
0500 
20100910
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2829  ELM MOTT    Open  138  replacing poles and crossarms 
346427
 
20100817
1222 
20100826
0836 
20100910
0600 
20100910
0645 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL 
347190
 
20100824
0906 
20100824
0906 
20100910
1200 
20100910
1600 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  D650  CROSBY    Open  138  lube job 
348883
 
20100902
1341 
20100902
1341 
20100910
0500 
20100910
2000 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  3330_D  LOMBARDY LANE  MORRISON LANE SWITCH    138  Work to be performed, Release hold and switch in temporary jumper T-001 to line side of switch 121 @ Lombardy Lane 
348882
 
20100902
1339 
20100902
1339 
20100910
0600 
20100910
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1535_A  TENASKA TU  PARIS SWITCH    138  line maint 
347639
 
20100826
1104 
20100826
1104 
20100910
0500 
20100910
1300 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    LN  BG_GV_46  GARDEN VILLAS  BLODGETT    69  SET POLE BASE FOR CKT46 RELOCATION 
346910
 
20100820
1217 
20100820
1218 
20100910
1815 
20100917
1800 
Continuous  Received at ERCOT  Planned Extension  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  DSC6988  DESERT SKY    Open  138  MCCAMEY SW 1548 THRU TO SW 6988 AT INDN ENRON 2 AS SAFETY FOR LCRA TO PULL NEW CONDUCTOR 
347182
 
20100824
0905 
20100824
0905 
20100910
0800 
20100910
1130 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  D660  CROSBY    Open  138  lube job 
347163
 
20100824
0820 
20100831
0725 
20100910
0300 
20100910
1200 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  575_A  CARROLLTON NORTHWEST  LEWISVILLE SWITCH    138  Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345 
347162
 
20100824
0819 
20100831
0725 
20100910
0300 
20100910
1200 
Daily  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  105_A  CARROLLTON NORTHWEST  LEWISVILLE SWITCH    345  Contractor will be installing tower upgrade kits, erecting towers, for new Carrollton NW - Krum West 345 
348181
 
20100830
1354 
20100830
1354 
20100910
0700 
20100910
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
348145
 
20100830
1122 
20100830
1122 
20100910
0700 
20100910
1800 
Daily  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    DSC  9027  THOMASTON    Open  138  LINE OUTAGE BETWEEN THOMASTON - CUERO TO DIG FOUNDATIONS UNDER LINE 
348151
 
20100830
1209 
20100830
1209 
20100910
0700 
20100910
1800 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_20359  CUERO LCRA    Open  138  CLEAR CUERO TO THOMASTON 138 KV LINE FOR AEP TO DIG FOOTINGS UNDER LINE. 
348150
 
20100830
1209 
20100830
1209 
20100910
0700 
20100910
1800 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_20361  CUERO LCRA    Open  138  CLEAR CUERO TO THOMASTON 138 KV LINE FOR AEP TO DIG FOOTINGS UNDER LINE. 
348149
 
20100830
1209 
20100830
1209 
20100910
0700 
20100910
1800 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_20360  CUERO LCRA 
THOMASTON
 
Open  138  CLEAR CUERO TO THOMASTON 138 KV LINE FOR AEP TO DIG FOOTINGS UNDER LINE. 
348128
 
20100830
1208 
20100830
1208 
20100910
0700 
20100910
1800 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  CUELCA_THOMAS1  CUERO LCRA  THOMASTON    138  CLEAR CUERO TO THOMASTON 138 KV LINE FOR AEP TO DIG FOOTINGS UNDER LINE. 
348597
 
20100901
1258 
20100901
1258 
20100910
0600 
20100910
1200 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M30SWVW  CROSS TIMBERS    Open  138  Oncor wireless work. 
348943
 
20100902
1447 
20100902
1447 
20100910
0100 
20100910
0900 
Daily  Received at ERCOT  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    CB  20620_CB  MVEC (DOEDYNS) 
MVEC ALBERTA ROAD TAP
 
Open  138  remove Goliath Mobile from Doedyns line Doedyns load to be backfed 
348941
 
20100902
1444 
20100902
1444 
20100910
0100 
20100910
0900 
Daily  Received at ERCOT  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    CB  D110_CB  PHARR MVEC 
MVEC ALBERTA ROAD TAP
 
Open  138  remove Goliath Mobile from Doedyns line 
348911
 
20100902
1329 
20100902
1329 
20100910
0600 
20100910
1200 
Daily  Received at ERCOT  Planned  CITY OF GARLAND (TDSP)    DSC  9112  WYNN JOYCE    Open  138  This is a rescheduled outage. ONCOR to work Trouble ticket at cell site. 
348908
 
20100902
1329 
20100902
1329 
20100910
0600 
20100910
1200 
Daily  Received at ERCOT  Planned  CITY OF GARLAND (TDSP)    CB  OCB_9110_CB  WYNN JOYCE 
ROSEHILL
 
Open  138  This is a rescheduled outage. ONCOR to work Trouble ticket at cell site. 
348907
 
20100902
1328 
20100902
1328 
20100910
0600 
20100910
1200 
Daily  Received at ERCOT  Planned  CITY OF GARLAND (TDSP)    LN  ROS-WYN  WYNN JOYCE  ROSEHILL    138  This is a rescheduled outage. ONCOR to work Trouble ticket at cell site. 
348761
 
20100901
1830 
20100901
1830 
20100910
0900 
20100910
1500 
Daily  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  6520_CB  PLEASANTON 
KENEDY SWITCH
 
Open  138  CB maintenance 
345755
 
20100811
1319 
20100811
1319 
20100910
0500 
20100910
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2707  TRADINGHOUSE SES TAP    Open  138  replacing poles and crossarms 
345753
 
20100811
1307 
20100811
1307 
20100910
0500 
20100910
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2831  ELM MOTT    Open  138  replacing poles and crossarms 
345751
 
20100811
1306 
20100811
1306 
20100910
0500 
20100910
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  2830  ELM MOTT    Open  138  replacing poles and crossarms 
348294
 
20100831
0757 
20100831
0757 
20100910
0300 
20100910
1200 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  105_B  ROANOKE SWITCH  LEWISVILLE SWITCH    345  Outage to install tower upgrade kits. 
348146
 
20100830
1123 
20100830
1123 
20100910
0700 
20100910
1800 
Daily  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  8968_CS  THOMASTON    Open  138  LINE OUTAGE BETWEEN THOMASTON - CUERO TO DIG FOUNDATIONS UNDER LINE 
347729
 
20100826
1241 
20100826
1241 
20100910
0600 
20100910
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1797  FRANKSTON    Close  69  line maint 
347648
 
20100826
1240 
20100826
1240 
20100910
0600 
20100910
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1910_B  JACKSONVILLE  FRANKSTON    69  line maint 
348952
 
20100902
1445 
20100902
1445 
20100910
0700 
20100910
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  5700  BRECKENRIDGE 
 
Open  69  Outage to replace crossarms. Open CB 5700 as part of TOAP. 
348951
 
20100902
1444 
20100902
1444 
20100910
0700 
20100910
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6180_C  GRAHAM SES  SUN ECU TAP    138  Outage to replace crossarms. Open CB 5700 as part of TOAP. 
348562
 
20100901
1257 
20100901
1257 
20100910
0600 
20100910
1200 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M10VW  IBM B    Open  138  Oncor wireless work. 
346909
 
20100820
1217 
20100820
1217 
20100910
1815 
20100917
1800 
Continuous  Received at ERCOT  Planned Extension  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  1548  MCCAMEY    Open  138  MCCAMEY SW 1548 THRU TO SW 6988 AT INDN ENRON 2 AS SAFETY FOR LCRA TO PULL NEW CONDUCTOR 
342532
 
20100715
0858 
20100726
1538 
20100910
0700 
20100910
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  install foundations for new structures 
342514
 
20100715
0852 
20100726
1538 
20100910
0700 
20100910
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_RODD_F1  BARNEY DAVIS  RODD FIELD    138  install foundations for new structures 
337356
 
20100603
1333 
20100826
0846 
20100910
0700 
20100910
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL 
334466
 
20100510
1118 
20100510
1126 
20100910
0700 
20100910
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  SAN MARCOS  CAMP GARY    69  LINE OVERHAUL 
326765
 
20100310
0826 
20100615
1554 
20100911
0700 
20100911
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  FW_WEB04  WEBSTER  FRIENDSWOOD REIT    138  FOUNDATION WORK FOR CKT93 RECONDUCTOR 
337357
 
20100603
1333 
20100603
1337 
20100911
0700 
20100911
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL 
347640
 
20100826
1104 
20100826
1104 
20100911
0500 
20100911
1300 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    LN  BG_GV_46  GARDEN VILLAS  BLODGETT    69  SET POLE BASE FOR CKT46 RELOCATION 
348182
 
20100830
1354 
20100830
1354 
20100911
0700 
20100911
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
342533
 
20100715
0858 
20100726
1538 
20100911
0700 
20100911
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  install foundations for new structures 
347523
 
20100826
0910 
20100826
0912 
20100911
0600 
20100911
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
334467
 
20100510
1118 
20100510
1126 
20100911
0700 
20100911
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  SAN MARCOS  CAMP GARY    69  LINE OVERHAUL 
334468
 
20100510
1118 
20100510
1126 
20100912
0700 
20100912
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  SAN MARCOS  CAMP GARY    69  LINE OVERHAUL 
342534
 
20100715
0858 
20100726
1538 
20100912
0700 
20100912
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  install foundations for new structures 
347524
 
20100826
0910 
20100826
0912 
20100912
0600 
20100912
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
348300
 
20100831
0835 
20100831
0835 
20100912
2015 
20100927
0545 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6009_A  WILLOW CREEK SWITCH  PARKER SWITCH    345  Outage to erect towers for re-conductor upgrade. 
348183
 
20100830
1354 
20100830
1354 
20100912
0700 
20100912
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
337358
 
20100603
1333 
20100603
1337 
20100912
0700 
20100912
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL 
308837
 
20090927
1541 
20100603
1328 
20100913
0900 
20100915
1600 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_455_CB  LILLIAN 
 
Open  69  Upgrade CB. 
347489
 
20100825
1652 
20100825
1652 
20100913
1000 
20100916
1800 
Continuous  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  20  FLAT ROCK TMPP    Open  138  Upgrade relay panel and add MO to the 20 switch. 
347488
 
20100825
1652 
20100825
1653 
20100913
1000 
20100916
1800 
Continuous  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  M20CS  FLAT ROCK TMPP 
FLAT ROCK SWITCH
 
Open  138  Upgrade relay panel and add MO to the 20 switch.Mobile Sub will carry Tri-County load during this time. 
346650
 
20100818
1459 
20100818
1459 
20100913
0730 
20100913
1700 
Daily  Received at ERCOT  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    LN  R5_T5  CAGNON  HILL COUNTRY    345  345KV TOWER FOUNDATION INSTALLATION 
344736
 
20100803
1025 
20100803
1025 
20100913
0700 
20100916
1700 
Continuous  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    LN  QNTSRF47  QUINTANA   SURFSI    69  line and section outage at qnt to repair switch 
344735
 
20100803
1020 
20100803
1020 
20100913
0700 
20100916
1700 
Continuous  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  6477  QUINTANA     Open  69  line and section outage at qnt to repair switch 
344734
 
20100803
1020 
20100803
1020 
20100913
0700 
20100916
1700 
Continuous  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  T830  QUINTANA     Open  69  line and section outage at qnt to repair switch 
347256
 
20100824
1333 
20100824
1333 
20100913
0700 
20100913
1200 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_950  DECKER POWER PLANT    Open  138  Sync test on DP-920-2 & DP-1013 breakers 
348958
 
20100902
1543 
20100902
1543 
20100913
0800 
20100917
1600 
Continuous  Received at ERCOT  Planned  CITY OF GARLAND (TDSP)    DSC  1383  APOLLO    Open  138  Tranformer #2 maintenance. Internal visual inspection and testing. 
347253
 
20100824
1332 
20100824
1332 
20100913
0700 
20100913
1200 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_1013  DECKER POWER PLANT 
MCNEIL AEN
 
Open  138  Sync test on DP-920-2 & DP-1013 breakers 
347252
 
20100824
1332 
20100824
1332 
20100913
0700 
20100913
1200 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_902_3  DECKER POWER PLANT    Open  138  Sync test on DP-920-2 & DP-1013 breakers 
347250
 
20100824
1329 
20100824
1329 
20100913
0700 
20100913
1200 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_920_3  DECKER POWER PLANT    Open  138  Sync test on DP-920-2 & DP-1013 breakers 
347249
 
20100824
1329 
20100824
1329 
20100913
0700 
20100913
1200 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_920_2_CB  DECKER POWER PLANT    Open  138  Sync test on DP-920-2 & DP-1013 breakers 
347262
 
20100824
1338 
20100824
1338 
20100913
0800 
20100917
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2234  BARNSLEY    Close  69  Outage to replace bad crossarms. Close switch 2234 at Barnsley for alternate source. 
347261
 
20100824
1337 
20100824
1337 
20100913
0800 
20100917
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6720_D  CRANE TU  CRANE ATLANTIC TAP    69  Outage to replace bad crossarms. Close switch 2234 at Barnsley for alternate source. 
348462
 
20100901
0803 
20100901
0803 
20100913
1000 
20101001
1730 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CP  YOAKU_C1  YOAKUM    Open  138  CLEAR 138 KV CAPACITOR BANK FOR REPLACEMENT 
348254
 
20100831
0808 
20100831
0808 
20100913
1400 
20100917
1730 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_5684  DEVILS HILL    Open  138  CLEAR 138/12.5 KV T-1 POWERBANK FOR MAINTENANCE AND TESTING. T-1 LOAD WILL BE PUT ON A MOBILE XFMR INSTALLED ON THE DEVILs HILL TO BLANCO 69 KV LINE T-318 
348569
 
20100901
0942 
20100901
0942 
20100913
0700 
20100914
1730 
Continuous  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  D242  HADEN    Close  138  CLOSE BACK OF RING FOR MAINT ON D220 
348548
 
20100901
0941 
20100901
0941 
20100913
0700 
20100914
1730 
Continuous  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  D220  HADEN    Open  138  MAINT 
348541
 
20100901
0803 
20100901
0803 
20100913
1000 
20101001
1730 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  4216  YOAKUM    Open  138  CLEAR 138 KV CAPACITOR BANK FOR REPLACEMENT 
348540
 
20100901
0803 
20100901
0803 
20100913
1000 
20101001
1730 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CS_4245  YOAKUM    Open  138  CLEAR 138 KV CAPACITOR BANK FOR REPLACEMENT 
347031
 
20100823
0624 
20100823
0624 
20100913
0700 
20100920
1700 
Continuous  Received at ERCOT  Planned  TEXAS-NEW MEXICO POWER COMPANY    DSC  DSW239-60  GAF SUB    Open  138  Centerpoint energy requesting an outage on line 138-1A 
346497
 
20100817
1413 
20100817
1413 
20100913
0800 
20100917
1500 
Continuous  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  9950_CB  COLETO CREEK 
KENEDY SWITCH
 
Open  138  REPLACE BREAKER 
344727
 
20100803
1254 
20100803
1305 
20100913
1400 
20100917
1730 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CS5685_CS  DEVILS HILL    Open  138  CLEAR 138/12.5 KV T-1 POWERBANK FOR MAINTENANCE AND TESTING. T-1 LOAD WILL BE PUT ON A MOBILE XFMR INSTALLED ON THE DEVILs HILL TO BLANCO 69 KV LINE T-318 
344723
 
20100803
1020 
20100803
1020 
20100913
0700 
20100916
1700 
Continuous  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  T820  QUINTANA     Open  69  line and section outage at qnt to repair switch 
347347
 
20100825
0908 
20100825
0908 
20100913
0700 
20100913
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6540_A  WEATHERFORD SWITCH  ORAN TU    138  Outage to replace bad crossarms. 
347264
 
20100824
1344 
20100824
1344 
20100913
0700 
20100913
1200 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_993_2  DECKER POWER PLANT    Open  138  Sync test on DP-920-2 & DP-1013 breakers 
347258
 
20100824
1334 
20100824
1334 
20100913
0700 
20100913
1200 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  AU_920_1_CB  AUSTROP    Open  138  Sync test on DP-920-2 & DP-1013 breakers 
342535
 
20100715
0858 
20100726
1538 
20100913
0700 
20100913
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  install foundations for new structures 
342515
 
20100715
0852 
20100726
1538 
20100913
0700 
20100913
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_RODD_F1  BARNEY DAVIS  RODD FIELD    138  install foundations for new structures 
346805
 
20100819
1514 
20100831
0807 
20100913
1400 
20100917
1730 
Continuous  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_5684  DEVILS HILL    Open  138  CLEAR 138/12.5 KV T-1 POWERBANK FOR MAINTENANCE AND TESTING. T-1 LOAD WILL BE PUT ON A MOBILE XFMR INSTALLED ON THE DEVILs HILL TO BLANCO 69 KV LINE T-318 
347369
 
20100825
0958 
20100825
0958 
20100913
1100 
20100922
1000 
Continuous  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  3665  BLUFF CREEK    Open  138  SANDBLAST AND PAINT REACTOR 
347259
 
20100824
1335 
20100824
1335 
20100913
0700 
20100913
1200 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  AU_920_2_CB  AUSTROP    Open  138  Sync test on DP-920-2 & DP-1013 breakers 
347255
 
20100824
1333 
20100824
1344 
20100913
0700 
20100913
1200 
Daily  Cancelled  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_993_3  DECKER POWER PLANT    Open  138  Sync test on DP-920-2 & DP-1013 breakers 
347251
 
20100824
1331 
20100824
1331 
20100913
0700 
20100913
1200 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  DP_975_3_CB  DECKER POWER PLANT    Open  138  Sync test on DP-920-2 & DP-1013 breakers 
347525
 
20100826
0910 
20100830
1352 
20100913
0600 
20100913
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
348184
 
20100830
1354 
20100830
1354 
20100913
0700 
20100913
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
343201
 
20100720
1541 
20100720
1544 
20100913
0700 
20100915
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  BW_CN_94  CELANESE CHEMICAL  BAYWAY    138  replace ccvt, line tuner and coax at celnec 
348650
 
20100901
1511 
20100901
1511 
20100913
0800 
20100913
1100 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  1123  UNIVERSITY REIT    Close  69  LUBE MAINTENANCE LN12>GF ON BYPASS 
348566
 
20100901
1436 
20100901
1436 
20100913
0800 
20100913
1100 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  T240  UNIVERSITY REIT    Close  69  LUBE MAINTENANCE LN12>GF ON BYPASS 
348565
 
20100901
1433 
20100901
1433 
20100913
0800 
20100913
1100 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  1120  UNIVERSITY REIT    Open  69  LUBE MAINTENANCE LN12>GF ON BYPASS 
337359
 
20100603
1333 
20100826
0846 
20100913
0700 
20100913
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010 
337058
 
20100602
1326 
20100824
0919 
20100913
0600 
20100918
1800 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  T240  UNIVERSITY REIT    Open  69  VARIOUS EQUIPMENT MAINTENANCE 
332639
 
20100428
0840 
20100824
0917 
20100913
0600 
20100918
1800 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  GV_UN_30  UNIVERSITY REIT  GARDEN VILLAS    69  VARIOUS EQUIPMENT MAINTENANCE 
326768
 
20100310
0832 
20100429
1107 
20100914
0700 
20100914
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  ADKBM_09  BRITMOORE  ADDICKS    138  FOUNDATION WORK - OUTAGE FOR THERMAL UPRATE 
326786
 
20100310
0900 
20100429
1114 
20100914
0700 
20100914
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  ADKBM_24  BRITMOORE  ADDICKS    138  FOUNDATION WORK - OUTAGE FOR THERMAL UPPRATE 
334552
 
20100511
0537 
20100603
1306 
20100914
0700 
20100914
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL 
334470
 
20100510
1118 
20100510
1531 
20100914
0700 
20100914
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  SAN MARCOS  CAMP GARY    69  LINE OVERHAUL 
337360
 
20100603
1333 
20100826
0846 
20100914
0700 
20100914
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010 
348712
 
20100901
1513 
20100901
1513 
20100914
0700 
20100914
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348698
 
20100901
1512 
20100901
1512 
20100914
0700 
20100914
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348683
 
20100901
1511 
20100901
1511 
20100914
0700 
20100914
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348669
 
20100901
1508 
20100901
1508 
20100914
0700 
20100914
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348619
 
20100901
1458 
20100901
1505 
20100914
0700 
20100914
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348337
 
20100831
1232 
20100831
1232 
20100914
0700 
20100914
1500 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  JV_1012  JOLLYVILLE 
NORTHWEST
 
Open  138  Sub station GCB maintenance / testing 
347758
 
20100826
1451 
20100826
1451 
20100914
0600 
20100914
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1255_C  PALESTINE SOUTH  NECHES RIVER PUMP    138  line maint 
348581
 
20100901
1046 
20100902
1411 
20100914
0800 
20100914
1130 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  T1HS  WEST BAY    Open  138  MAINTENANCE 
345894
 
20100812
0848 
20100812
0848 
20100914
0500 
20100914
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2839  LAKE CREEK SES    Open  138  replace poles and crossarms 
348189
 
20100830
1330 
20100830
1330 
20100914
1000 
20100914
1600 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_3070_CB  WALLER LCRA    Open  138  CLEAR CB 3070 FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING. BREAKER WILL BE BYPASSED 
348613
 
20100901
1429 
20100901
1429 
20100914
0700 
20100914
1230 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  F280  OBRIEN    Open  345  DOBLE TEST 
348605
 
20100901
1359 
20100901
1359 
20100914
0700 
20100914
1230 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  N130  TOMBALL    Open  138  DOBLE TEST 
348602
 
20100901
1329 
20100901
1329 
20100914
0800 
20100914
1100 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  T240  UNIVERSITY REIT    Close  69  BYPASS LOWSIDE AT1 FOR K310 LUBE MAINT 
348601
 
20100901
1327 
20100901
1327 
20100914
0800 
20100914
1100 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  K313  UNIVERSITY REIT    Close  69  BYPASS LOWSIDE AT1 FOR K310 LUBE MAINT 
348599
 
20100901
1321 
20100901
1321 
20100914
0800 
20100914
1100 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  K310  UNIVERSITY REIT    Open  69  LUBE JOB 
348889
 
20100902
1252 
20100902
1252 
20100914
0800 
20100914
1700 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  DSC_1576  ROANOKE SWITCH    Open  138  Replace M10 switch at Cross Timbers. 
348868
 
20100902
1252 
20100902
1252 
20100914
0800 
20100914
1700 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  CB_1575  ROANOKE SWITCH 
CROSS TIMBERS
 
Open  138  Replace M10 switch at Cross Timbers. 
348867
 
20100902
1250 
20100902
1250 
20100914
0800 
20100914
1700 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M50SW  CROSS TIMBERS    Open  138  Replace M10 switch at Cross Timbers. 
348191
 
20100830
1330 
20100830
1330 
20100914
1000 
20100914
1600 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_3069  WALLER LCRA    Open  138  CLEAR CB 3070 FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING. BREAKER WILL BE BYPASSED 
348190
 
20100830
1330 
20100830
1330 
20100914
1000 
20100914
1600 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_3071  WALLER LCRA    Open  138  CLEAR CB 3070 FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING. BREAKER WILL BE BYPASSED 
345876
 
20100812
0840 
20100812
0840 
20100914
0500 
20100914
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1280_A  WACO LASALLE  LAKE CREEK SES    138  replace poles and crossarms 
346047
 
20100813
1117 
20100813
1117 
20100914
0700 
20100914
1600 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  HV965  HIDDEN VALLEY 
RIVERPLACE
 
Open  138  Circuit maintenance 
346046
 
20100813
1116 
20100813
1116 
20100914
0700 
20100914
1600 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  RP_965_CB  RIVERPLACE 
HIDDEN VALLEY
 
Open  138  Circuit maintenance 
345901
 
20100812
0852 
20100812
0852 
20100914
0500 
20100914
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2841  LAKE CREEK SES    Open  138  replace poles and crossarms 
345883
 
20100812
0844 
20100812
0844 
20100914
0500 
20100914
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  8167  WACO LASALLE    Open  138  replace poles and crossarms 
347080
 
20100823
1524 
20100823
1525 
20100914
0700 
20100914
1700 
Daily  Received at ERCOT  Planned  GEUS (TDSP)    LN  STE_MAMI  STEAM  MAMIE    69  Line needs to be out so GEUS can do ERCOT Blcak Start Test with line energizing. 
347079
 
20100823
1522 
20100823
1522 
20100914
0700 
20100914
1700 
Daily  Received at ERCOT  Planned  GEUS (TDSP)    LN  LTV_MAMI  LTV TMPP  MAMIE    69  Clearnces for ERCOT Black Start test 
346651
 
20100818
1500 
20100818
1500 
20100914
0730 
20100914
1700 
Daily  Received at ERCOT  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    LN  R5_T5  CAGNON  HILL COUNTRY    345  345KV TOWER FOUNDATION INSTALLATION 
348869
 
20100902
1250 
20100902
1250 
20100914
0800 
20100914
1700 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M10SWVW  CROSS TIMBERS    Open  138  Replace M10 switch at Cross Timbers. 
347741
 
20100826
1347 
20100826
1347 
20100914
0700 
20100915
1800 
Continuous  Received at ERCOT  Planned  BRYAN TEXAS UTILITIES (TDSP)    LN  TAM_SWI  SOUTH BRYAN SWITCHING  TEXAS AM    138  line work on transmission structure 
347447
 
20100825
1628 
20100831
0836 
20100914
0700 
20100914
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  14408  CHILDRESS 20TH ST    Close  69  CLOSE DURING OUTAGE @ W. CHILDRESS 
345864
 
20100813
1111 
20100813
1111 
20100914
0700 
20100914
1600 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    LN  CKT_965  RIVERPLACE  HIDDEN VALLEY    138  Circuit maintenance 
347183
 
20100824
0907 
20100824
0907 
20100914
0800 
20100914
1130 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  D960  CROSBY    Open  138  lube job 
348185
 
20100830
1354 
20100830
1354 
20100914
0700 
20100914
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
348561
 
20100901
1248 
20100901
1248 
20100914
0800 
20100914
1600 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  V360  BELLAIRE    Open  345  BREAKER LUBE MAINTENANCE 
342536
 
20100715
0858 
20100726
1538 
20100914
0700 
20100914
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  install foundations for new structures 
342516
 
20100715
0852 
20100726
1538 
20100914
0700 
20100914
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_RODD_F1  BARNEY DAVIS  RODD FIELD    138  install foundations for new structures 
347486
 
20100825
1627 
20100831
0842 
20100914
0700 
20100914
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5815  CHILDRESS WEST 
HENRY
 
Open  69  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
347485
 
20100825
1626 
20100831
0842 
20100914
0700 
20100914
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  3020_CB  CHILDRESS WEST    Open  69  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
347484
 
20100825
1626 
20100831
0842 
20100914
0700 
20100914
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5225_CB  CHILDRESS WEST 
PADUCAH CLARE STREET
 
Open  138  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
347483
 
20100825
1625 
20100831
0842 
20100914
0700 
20100914
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    XF  138_69T1  CHILDRESS WEST      138  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
344745
 
20100803
1425 
20100803
1425 
20100914
0800 
20100914
1700 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  2655  WHITESBORO JORDAN 
GAINESVILLE EAST TAP
 
Open  138  Test relays. 
347526
 
20100826
0910 
20100830
1352 
20100914
0600 
20100914
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
337593
 
20100603
1622 
20100901
1445 
20100914
0700 
20100914
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  109T220  CAMP GARY  REEDVILLE TAP    69  LINE OVERHAUL CANCELED DUE TO RIGHT OF WAY ISSUES DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
326769
 
20100310
0832 
20100429
1108 
20100915
0700 
20100915
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  ADKBM_09  BRITMOORE  ADDICKS    138  FOUNDATION WORK - OUTAGE FOR THERMAL UPRATE 
326787
 
20100310
0900 
20100429
1115 
20100915
0700 
20100915
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  ADKBM_24  BRITMOORE  ADDICKS    138  FOUNDATION WORK - OUTAGE FOR THERMAL UPPRATE 
347527
 
20100826
0910 
20100830
1352 
20100915
0600 
20100915
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
348369
 
20100831
1145 
20100831
1145 
20100915
0700 
20100917
1600 
Continuous  Received at ERCOT  Planned  CITY OF GARLAND (TDSP)    CB  9310  ROSEHILL    Open  138  INSTALLATION AND TESTING OF NEW LINE DIFFERENTIAL BACKUP RELAY. LINE BREAKERS WILL BE TRIP TESTED DURING THE TESTING PHASE. 
348371
 
20100831
1146 
20100831
1146 
20100915
0700 
20100917
1600 
Continuous  Received at ERCOT  Planned  CITY OF GARLAND (TDSP)    DSC  9311  ROSEHILL    Open  138  INSTALLATION AND TESTING OF NEW LINE DIFFERENTIAL BACKUP RELAY. LINE BREAKERS WILL BE TRIP TESTED DURING THE TESTING PHASE. 
348864
 
20100902
1243 
20100902
1243 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10051  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348863
 
20100902
1242 
20100902
1242 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10049  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348862
 
20100902
1242 
20100902
1242 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10031  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348861
 
20100902
1242 
20100902
1242 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10029  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348860
 
20100902
1242 
20100902
1242 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10011  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348859
 
20100902
1242 
20100902
1242 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10009  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348858
 
20100902
1241 
20100902
1241 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10071  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348857
 
20100902
1241 
20100902
1241 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10069  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348856
 
20100902
1241 
20100902
1241 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_17950  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348193
 
20100830
1333 
20100830
1333 
20100915
1000 
20100915
1600 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_3083  WALLER LCRA    Close  138  SWITCH IS BEING CLOSED TO BYPASS CB 3070 WHILE OUT FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING. 
348192
 
20100830
1331 
20100830
1331 
20100915
1000 
20100915
1600 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_3073  WALLER LCRA    Close  138  SWITCH IS BEING CLOSED TO BYPASS CB 3070 WHILE OUT FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING. 
348168
 
20100830
1329 
20100830
1329 
20100915
1000 
20100915
1600 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  5093  GLIDDEN LCRA    Close  138  SWITCH IS BEING CLOSED TO BYPASS CB 5790 WHILE OUT FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING. 
348167
 
20100830
1324 
20100830
1325 
20100915
1000 
20100915
1600 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  5793  GLIDDEN LCRA    Open  138  SWITCH IS BEING CLOSED TO BYPASS CB 5790 WHILE OUT FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING. 
348166
 
20100830
1322 
20100830
1322 
20100915
1000 
20100915
1600 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  5791  GLIDDEN LCRA    Open  138  CLEAR CB 5790 FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINGING. BREAKER WILL BE BYPASSED 
348165
 
20100830
1322 
20100830
1322 
20100915
1000 
20100915
1600 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_5790_CB  GLIDDEN LCRA    Open  138  CLEAR CB 5790 FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINGING. BREAKER WILL BE BYPASSED 
348260
 
20100831
0852 
20100831
0852 
20100915
0700 
20100915
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  3020_CB  CHILDRESS WEST    Open  69  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
348258
 
20100831
0847 
20100831
0847 
20100915
0700 
20100915
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    XF  138_69T1  CHILDRESS WEST      138  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
348255
 
20100831
0844 
20100831
0844 
20100915
0700 
20100915
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  14408  CHILDRESS 20TH ST    Close  69  CLOSE DURING OUTAGE @ W. CHILDRESS 
348604
 
20100901
1340 
20100901
1340 
20100915
0700 
20100915
1230 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  G480  GREENS BAYOU    Open  138  DOBLE TEST 
348594
 
20100901
1252 
20100901
1252 
20100915
0800 
20100915
1600 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  V350  BELLAIRE    Open  345  BREAKER LUBE MAINTENANCE 
348572
 
20100901
0944 
20100901
0944 
20100915
0700 
20100916
1730 
Continuous  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  D230  HADEN    Open  138  MAINT 
348571
 
20100901
0944 
20100901
0944 
20100915
0700 
20100916
1730 
Continuous  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  D242  HADEN    Close  138  CLOSE BACK OF RING FOR MAINT ON D230 
348896
 
20100902
1301 
20100902
1301 
20100915
1100 
20100916
1600 
Continuous  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M10VW  IBM B    Open  138  Replace M30 switch. 
348895
 
20100902
1301 
20100902
1301 
20100915
1100 
20100916
1600 
Continuous  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M30SWVW  CROSS TIMBERS    Open  138  Replace M30 switch. 
348894
 
20100902
1300 
20100902
1300 
20100915
1100 
20100916
1600 
Continuous  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M60SW  CROSS TIMBERS    Open  138  Replace M30 switch. 
348893
 
20100902
1300 
20100902
1300 
20100915
1100 
20100916
1600 
Continuous  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    DSC  M20-1SW  CROSS TIMBERS    Open  138  LTC maintenance. 
348892
 
20100902
1259 
20100902
1259 
20100915
1100 
20100916
1600 
Continuous  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  M20-1CS  CROSS TIMBERS    Open  138  LTC maintenance. Mobile Sub will carry CoServ Coop load during this time. 
348866
 
20100902
1243 
20100902
1243 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_17951  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348865
 
20100902
1243 
20100902
1243 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_17949  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348855
 
20100902
1241 
20100902
1241 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10050  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348854
 
20100902
1241 
20100902
1241 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_10030  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348853
 
20100902
1240 
20100902
1240 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  OCB_10010  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348851
 
20100902
1240 
20100902
1240 
20100915
0700 
20100917
1800 
Continuous  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10070  CLEAR SPRINGS    Open  345  CLEAR #1 345 KV BUS TO INSTALL TO INSTALL NEW BUS SWITCH FOR NEW 345 KV CIRCUIT OUT OF CLEAR SPRINGS TO GILLELAND CREEK 
348336
 
20100831
1144 
20100831
1144 
20100915
0700 
20100917
1600 
Continuous  Received at ERCOT  Planned  CITY OF GARLAND (TDSP)    CB  OCB_9110_CB  WYNN JOYCE 
ROSEHILL
 
Open  138  INSTALLATION AND TESTING OF NEW LINE DIFFERENTIAL BACKUP RELAY. LINE BREAKERS WILL BE TRIP TESTED DURING THE TESTING PHASE. 
348713
 
20100901
1513 
20100901
1513 
20100915
0700 
20100915
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348699
 
20100901
1512 
20100901
1512 
20100915
0700 
20100915
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348684
 
20100901
1511 
20100901
1511 
20100915
0700 
20100915
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348670
 
20100901
1509 
20100901
1509 
20100915
0700 
20100915
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348635
 
20100901
1506 
20100901
1506 
20100915
0700 
20100915
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348620
 
20100901
1459 
20100901
1505 
20100915
0700 
20100915
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348265
 
20100831
0911 
20100831
0911 
20100915
0700 
20100915
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5815  CHILDRESS WEST 
HENRY
 
Open  69  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
348262
 
20100831
0857 
20100831
0857 
20100915
0700 
20100915
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5225_CB  CHILDRESS WEST 
PADUCAH CLARE STREET
 
Open  138  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
348583
 
20100901
1051 
20100902
1411 
20100915
0800 
20100915
1130 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  T2HS  WEST BAY    Open  138  MAINTENANCE 
348176
 
20100830
1326 
20100830
1326 
20100915
1000 
20100915
1600 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  5793  GLIDDEN LCRA    Close  138  SWITCH IS BEING CLOSED TO BYPASS CB 5790 WHILE OUT FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINING. 
348175
 
20100830
1323 
20100830
1323 
20100915
1000 
20100915
1600 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  5789  GLIDDEN LCRA    Open  138  CLEAR CB 5790 FOR SAN BERNARD ELECTRIC COOP SWITCH TRAINGING. BREAKER WILL BE BYPASSED 
348367
 
20100831
1144 
20100831
1144 
20100915
0700 
20100917
1600 
Continuous  Received at ERCOT  Planned  CITY OF GARLAND (TDSP)    LN  ROS-WYN  WYNN JOYCE  ROSEHILL    138  INSTALLATION AND TESTING OF NEW LINE DIFFERENTIAL BACKUP RELAY. LINE BREAKERS WILL BE TRIP TESTED DURING THE TESTING PHASE. 
344107
 
20100728
1442 
20100826
0917 
20100915
0700 
20101001
1700 
Continuous  Cancelled  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  FI_826_CB  FIESTA 
HOLLY POWER PLANT
 
Open  69  Sub station relay to remove old relaying from the plant. 
344105
 
20100728
1440 
20100826
0917 
20100915
0700 
20101001
1700 
Continuous  Cancelled  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    LN  CKT_826  HOLLY POWER PLANT  FIESTA    69  Sub station relay to remove old relaying from the plant. 
345902
 
20100812
0853 
20100812
0853 
20100915
0500 
20100915
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2841  LAKE CREEK SES    Open  138  replace poles and crossarms 
345896
 
20100812
0849 
20100812
0849 
20100915
0500 
20100915
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2839  LAKE CREEK SES    Open  138  replace poles and crossarms 
346661
 
20100818
1520 
20100818
1520 
20100915
0730 
20100915
1700 
Daily  Received at ERCOT  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  10M2  COLISEUM 
Y1
 
Open  138  FOUNDATION INSTALL FOR TWR #68 
344106
 
20100728
1441 
20100826
0917 
20100915
0700 
20101001
1700 
Continuous  Cancelled  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  HP_826_CB  HOLLY POWER PLANT 
FIESTA
 
Open  69  Sub station relay to remove old relaying from the plant. 
344752
 
20100803
1426 
20100803
1426 
20100915
0800 
20100915
1800 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  2665  WHITESBORO JORDAN 
WHITESBORO POI
 
Open  138  Test relays. 
345884
 
20100812
0844 
20100812
0844 
20100915
0500 
20100915
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  8167  WACO LASALLE    Open  138  replace poles and crossarms 
345879
 
20100812
0841 
20100812
0841 
20100915
0500 
20100915
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1280_A  WACO LASALLE  LAKE CREEK SES    138  replace poles and crossarms 
347271
 
20100824
1340 
20100824
1340 
20100915
0700 
20100915
1700 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  9408  LONGSHORE SWITCHING STATION    Open  345  EON Wind Farm has requested this switch open to perform maintenance inside their yard. 
344113
 
20100728
1444 
20100826
0917 
20100915
0700 
20101001
1700 
Continuous  Cancelled  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  HP_851_CB  HOLLY POWER PLANT    Open  69  Sub station relay to remove old relaying from the plant. 
347576
 
20100826
0920 
20100826
0920 
20100915
0700 
20101001
1700 
Continuous  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  HP_851_CB  HOLLY POWER PLANT    Open  69  Sub station relay to remove old relaying from the plant. 
347575
 
20100826
0920 
20100826
0920 
20100915
0700 
20101001
1700 
Continuous  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  FI_826_CB  FIESTA 
HOLLY POWER PLANT
 
Open  69  Sub station relay to remove old relaying from the plant. 
347770
 
20100826
1452 
20100826
1452 
20100915
0600 
20100915
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1255_C  PALESTINE SOUTH  NECHES RIVER PUMP    138  line maint 
348955
 
20100902
1520 
20100902
1520 
20100915
0730 
20100915
1130 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  T2H0  UNIVERSITY REIT    Open  69  MAINT 
348186
 
20100830
1354 
20100830
1354 
20100915
0700 
20100915
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
347254
 
20100824
1333 
20100824
1333 
20100915
0700 
20100915
1700 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  L740  STRANG    Open  138  BREAKER REPAIR 
347175
 
20100824
0853 
20100824
0853 
20100915
1200 
20100915
1600 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  J510  SHELDON    Open  345  lube job 
348435
 
20100831
1610 
20100831
1610 
20100915
0800 
20100915
1600 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  9567  LONGSHORE SWITCHING STATION    Open  345  Elbow Creek Wind Farm has requested line out for required maintenance. Breakers open for end to end testing. 
348434
 
20100831
1610 
20100831
1610 
20100915
0800 
20100915
1600 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  9405  LONGSHORE SWITCHING STATION    Open  345  Elbow Creek Wind Farm has requested line out for required maintenance. Breakers open for end to end testing. 
348433
 
20100831
1609 
20100831
1609 
20100915
0800 
20100915
1600 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  9390  LONGSHORE SWITCHING STATION    Open  345  Elbow Creek Wind Farm has requested line out for required maintenance. Breakers open for end to end testing. 
342537
 
20100715
0858 
20100726
1538 
20100915
0700 
20100915
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  AIRLIN_B_DAVI1  BARNEY DAVIS  AIRLINE CSW    138  install foundations for new structures 
342517
 
20100715
0852 
20100726
1538 
20100915
0700 
20100915
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_RODD_F1  BARNEY DAVIS  RODD FIELD    138  install foundations for new structures 
347574
 
20100826
0919 
20100826
0919 
20100915
0700 
20101001
1700 
Continuous  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  HP_826_CB  HOLLY POWER PLANT 
FIESTA
 
Open  69  Sub station relay to remove old relaying from the plant. 
347573
 
20100826
0919 
20100826
0919 
20100915
0700 
20101001
1700 
Continuous  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    LN  CKT_826  HOLLY POWER PLANT  FIESTA    69  Sub station relay to remove old relaying from the plant. 
347146
 
20100824
0852 
20100824
0852 
20100915
0800 
20100915
1130 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  J500  SHELDON    Open  345  lube job 
346662
 
20100818
1520 
20100818
1520 
20100915
0730 
20100915
1700 
Daily  Received at ERCOT  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  13Y1  Y1 
COLISEUM
 
Open  138  FOUNDATION INSTALL FOR TWR #68 
346660
 
20100818
1518 
20100818
1518 
20100915
0730 
20100915
1700 
Daily  Received at ERCOT  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    LN  M2_Y1  COLISEUM  Y1    138  FOUNDATION INSTALL FOR TWR #68 
346657
 
20100818
1509 
20100818
1509 
20100915
0730 
20100915
1700 
Daily  Received at ERCOT  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  12T2  T2 
D0
 
Open  138  FOUNDATION INSTALL FOR TWR #68 
346656
 
20100818
1505 
20100818
1505 
20100915
0730 
20100915
1700 
Daily  Received at ERCOT  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    CB  20D0  D0 
T2
 
Open  138  FOUNDATION INSTALL FOR TWR #68 
346655
 
20100818
1503 
20100818
1503 
20100915
0730 
20100915
1700 
Daily  Received at ERCOT  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    LN  D0_T2  D0  T2    138  FOUNDATION INSTALL FOR TWR #68 
346652
 
20100818
1500 
20100818
1500 
20100915
0730 
20100915
1700 
Daily  Received at ERCOT  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    LN  R5_T5  CAGNON  HILL COUNTRY    345  345KV TOWER FOUNDATION INSTALLATION 
348372
 
20100831
1146 
20100831
1146 
20100915
0700 
20100917
1600 
Continuous  Received at ERCOT  Planned  CITY OF GARLAND (TDSP)    DSC  9331  ROSEHILL    Open  138  INSTALLATION AND TESTING OF NEW LINE DIFFERENTIAL BACKUP RELAY. LINE BREAKERS WILL BE TRIP TESTED DURING THE TESTING PHASE. 
348370
 
20100831
1145 
20100831
1145 
20100915
0700 
20100917
1600 
Continuous  Received at ERCOT  Planned  CITY OF GARLAND (TDSP)    CB  9330  ROSEHILL    Open  138  INSTALLATION AND TESTING OF NEW LINE DIFFERENTIAL BACKUP RELAY. LINE BREAKERS WILL BE TRIP TESTED DURING THE TESTING PHASE. 
348368
 
20100831
1145 
20100831
1145 
20100915
0700 
20100917
1600 
Continuous  Received at ERCOT  Planned  CITY OF GARLAND (TDSP)    DSC  9111  WYNN JOYCE    Open  138  INSTALLATION AND TESTING OF NEW LINE DIFFERENTIAL BACKUP RELAY. LINE BREAKERS WILL BE TRIP TESTED DURING THE TESTING PHASE. 
337594
 
20100603
1623 
20100901
1445 
20100915
1200 
20100915
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  109T220  CAMP GARY  REEDVILLE TAP    69  LINE OVERHAUL CANCELED DUE TO RIGHT OF WAY ISSUES DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
334471
 
20100510
1118 
20100510
1531 
20100915
1200 
20100915
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  SAN MARCOS  CAMP GARY    69  LINE OVERHAUL 
337300
 
20100603
1338 
20100826
0851 
20100915
0700 
20100915
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010 
334553
 
20100511
0538 
20100603
1306 
20100915
1200 
20100915
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL 
326770
 
20100310
0832 
20100429
1108 
20100916
0700 
20100916
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  ADKBM_09  BRITMOORE  ADDICKS    138  FOUNDATION WORK - OUTAGE FOR THERMAL UPRATE 
348266
 
20100831
0912 
20100831
0912 
20100916
0700 
20100916
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5815  CHILDRESS WEST 
HENRY
 
Open  69  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
348256
 
20100831
0845 
20100831
0845 
20100916
0700 
20100916
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  14408  CHILDRESS 20TH ST    Close  69  CLOSE DURING OUTAGE @ W. CHILDRESS 
348714
 
20100901
1513 
20100901
1513 
20100916
0700 
20100916
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348700
 
20100901
1512 
20100901
1512 
20100916
0700 
20100916
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348685
 
20100901
1511 
20100901
1511 
20100916
0700 
20100916
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348671
 
20100901
1509 
20100901
1509 
20100916
0700 
20100916
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348405
 
20100831
1505 
20100831
1505 
20100916
0600 
20100917
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  6098  BRIDGEPORT TAP TU    Open  138  Outage to repalce switch 6097 at Bridgeport Tap. 
348636
 
20100901
1506 
20100901
1506 
20100916
0700 
20100916
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348621
 
20100901
1459 
20100901
1505 
20100916
0700 
20100916
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348593
 
20100901
1153 
20100902
1416 
20100916
0800 
20100916
1500 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  CB40  WEST GALVESTON    Open  138  MAINT 
348338
 
20100831
1233 
20100831
1233 
20100916
0700 
20100916
1500 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  SH_1006_CB  SAND HILL ENERGY CTR    Open  138  Sub station GCB maintenance / testing 
348263
 
20100831
0857 
20100831
0857 
20100916
0700 
20100916
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5225_CB  CHILDRESS WEST 
PADUCAH CLARE STREET
 
Open  138  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
348261
 
20100831
0855 
20100831
0855 
20100916
0700 
20100916
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  3020_CB  CHILDRESS WEST    Open  69  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
348729
 
20100901
1519 
20100901
1519 
20100916
0500 
20100916
0800 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    DSC  CF_651  COMMONS FORD    Open  138  Transmission will install static / maintenance. 
348728
 
20100901
1518 
20100901
1518 
20100916
0500 
20100916
0800 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    DSC  CF_601M  COMMONS FORD    Open  138  Transmission will install static / maintenance. 
348727
 
20100901
1518 
20100901
1518 
20100916
0500 
20100916
0800 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  CF_900_CB  COMMONS FORD    Open  138  Transmission will install static / maintenance. 
345903
 
20100812
0853 
20100812
0853 
20100916
0500 
20100916
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2841  LAKE CREEK SES    Open  138  replace poles and crossarms 
345897
 
20100812
0849 
20100812
0849 
20100916
0500 
20100916
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2839  LAKE CREEK SES    Open  138  replace poles and crossarms 
345925
 
20100812
1017 
20100812
1017 
20100916
0700 
20100916
1800 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1031  SWEETWATER NO 2    Open  69  Outage to replace relay panel. 
345924
 
20100812
1016 
20100812
1016 
20100916
0700 
20100916
1800 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  1029  SWEETWATER NO 2    Open  69  Outage to replace relay panel. 
345923
 
20100812
1016 
20100812
1016 
20100916
0700 
20100916
1800 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  1030  SWEETWATER NO 2 
ROSCOE
 
Open  69  Outage to replace relay panel. 
345885
 
20100812
0844 
20100812
0844 
20100916
0500 
20100916
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  8167  WACO LASALLE    Open  138  replace poles and crossarms 
345880
 
20100812
0841 
20100812
0841 
20100916
0500 
20100916
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1280_A  WACO LASALLE  LAKE CREEK SES    138  replace poles and crossarms 
347581
 
20100826
0938 
20100826
1411 
20100916
0700 
20100916
1700 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  T2HS  VELASCO    Open  138  section outage to install temp control cables 
347580
 
20100826
0937 
20100826
1359 
20100916
0700 
20100916
1700 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P890  VELASCO    Open  138  section outage to install temp control cables 
347579
 
20100826
0936 
20100826
1357 
20100916
0700 
20100916
1700 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P880  VELASCO    Open  138  section outage to install temp control cables 
347578
 
20100826
0935 
20100826
1341 
20100916
0700 
20100916
1700 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  6027  VELASCO    Open  138  section outage to install temp control cables 
346653
 
20100818
1500 
20100818
1500 
20100916
0730 
20100916
1700 
Daily  Received at ERCOT  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    LN  R5_T5  CAGNON  HILL COUNTRY    345  345KV TOWER FOUNDATION INSTALLATION 
347771
 
20100826
1452 
20100826
1452 
20100916
0600 
20100916
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1255_C  PALESTINE SOUTH  NECHES RIVER PUMP    138  line maint 
348187
 
20100830
1354 
20100830
1354 
20100916
0700 
20100916
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
345173
 
20100806
0941 
20100826
1309 
20100916
0700 
20100916
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P390  VELASCO    Open  138  section outage to install temp controll cables 
345172
 
20100806
0941 
20100826
1308 
20100916
0700 
20100916
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P380  VELASCO    Open  138  section outage to install temp controll cables 
348655
 
20100901
1516 
20100901
1516 
20100916
0500 
20100916
1600 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    DSC  CF_650M  COMMONS FORD    Open  138  Transmission will install static / maintenance. 
348654
 
20100901
1516 
20100901
1516 
20100916
0500 
20100916
1600 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    DSC  CF_600M  COMMONS FORD    Open  138  Transmission will install static / maintenance. 
347177
 
20100824
0855 
20100824
0855 
20100916
1200 
20100916
1600 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  J530  SHELDON    Open  345  lube job 
347176
 
20100824
0854 
20100824
0854 
20100916
0800 
20100916
1130 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  J520  SHELDON    Open  345  lube job 
348653
 
20100901
1514 
20100901
1514 
20100916
0500 
20100916
1600 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  BA_931_CB  BARTON 
COMMONS FORD
 
Open  138  Transmission will install static / maintenance. 
348652
 
20100901
1514 
20100901
1514 
20100916
0500 
20100916
1600 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  CF_931_CB  COMMONS FORD 
BARTON
 
Open  138  Transmission will install static / maintenance. 
348651
 
20100901
1513 
20100901
1513 
20100916
0500 
20100916
1600 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    LN  CKT_931  COMMONS FORD  BARTON    138  Transmission will install static / maintenance. 
348551
 
20100901
0807 
20100901
0807 
20100916
0700 
20100916
1230 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  V340  BELLAIRE    Open  345  doble 
348463
 
20100901
0804 
20100901
0804 
20100916
0700 
20100916
1230 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  H600  TH WHARTON    Open  345  doble 
342555
 
20100715
0907 
20100726
1538 
20100916
0700 
20100916
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_WOOLRI1  BARNEY DAVIS  WOOLDRIDGE    138  install foundations for new structures 
342540
 
20100715
0903 
20100726
1538 
20100916
0700 
20100916
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_PHARAO1  BARNEY DAVIS  PHAROAH    138  install foundations for new structures 
344746
 
20100803
1427 
20100803
1427 
20100916
0800 
20100916
1700 
Daily  Received at ERCOT  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  2675  WHITESBORO JORDAN 
WHITESBORO SW
 
Open  138  Test relays. 
348301
 
20100831
0848 
20100831
0848 
20100916
0700 
20100916
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    XF  138_69T1  CHILDRESS WEST      138  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
348418
 
20100831
1504 
20100831
1504 
20100916
0600 
20100917
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  9092  BENNETT ROAD SWITCH    Open  138  Outage to repalce switch 6097 at Bridgeport Tap. 
347528
 
20100826
0910 
20100830
1352 
20100916
0600 
20100916
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
338045
 
20100608
1230 
20100713
1630 
20100916
1800 
20101108
1800 
Continuous  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  PMVEC_MER  PHARR MVEC  MERETT    138  Pour foundations for new steel poles and construct 
337550
 
20100603
1623 
20100901
1445 
20100916
0700 
20100916
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  109T220  CAMP GARY  REEDVILLE TAP    69  LINE OVERHAUL CANCELED DUE TO RIGHT OF WAY ISSUES DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
337301
 
20100603
1338 
20100826
0846 
20100916
0700 
20100916
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010 
334472
 
20100510
1118 
20100510
1531 
20100916
0700 
20100916
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  SAN MARCOS  CAMP GARY    69  LINE OVERHAUL 
326788
 
20100310
0900 
20100429
1115 
20100916
0700 
20100916
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  ADKBM_24  BRITMOORE  ADDICKS    138  FOUNDATION WORK - OUTAGE FOR THERMAL UPPRATE 
334554
 
20100511
0538 
20100603
1306 
20100916
0700 
20100916
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL 
326771
 
20100310
0832 
20100429
1109 
20100917
0700 
20100917
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  ADKBM_09  BRITMOORE  ADDICKS    138  FOUNDATION WORK - OUTAGE FOR THERMAL UPRATE 
334555
 
20100511
0538 
20100511
0541 
20100917
0700 
20100917
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL 
348163
 
20100830
1242 
20100830
1243 
20100917
1815 
20100924
1800 
Continuous  Received at ERCOT  Planned Extension  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  1548  MCCAMEY    Open  138  MCCAMEY SW 1548 THRU TO SW 6988 AT INDN ENRON 2 AS SAFETY FOR LCRA TO PULL NEW CONDUCTOR. LCRA ADVISES CREWS NOT COMPLETE WITH WORK 
348162
 
20100830
1240 
20100830
1241 
20100917
1815 
20100924
1800 
Continuous  Received at ERCOT  Planned Extension  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  DSC6988  DESERT SKY    Open  138  MCCAMEY SW 1548 THRU TO SW 6988 AT INDN ENRON 2 AS SAFETY FOR LCRA TO PULL NEW CONDUCTOR. LCRA ADVISES CREWS NOT COMPLETE WITH WORK 
348259
 
20100831
0850 
20100831
0850 
20100917
0700 
20100917
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    XF  138_69T1  CHILDRESS WEST      138  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
348783
 
20100902
0944 
20100902
0944 
20100917
0800 
20100917
1200 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_20539  LONEST    Open  69  CLEAR MATTHEWS TO LONESTAR 69 KV LINE TO RAISE LINE ON ONE STRUCTURE FOR AEP UNDERBUILD. 
348782
 
20100902
0943 
20100902
0943 
20100917
0800 
20100917
1200 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_20579  MATTHE    Open  69  CLEAR MATTHEWS TO LONESTAR 69 KV LINE TO RAISE LINE ON ONE STRUCTURE FOR AEP UNDERBUILD. 
348781
 
20100902
0943 
20100902
0943 
20100917
0800 
20100917
1200 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  810T548  MATTHE  LONEST    69  CLEAR MATTHEWS TO LONESTAR 69 KV LINE TO RAISE LINE ON ONE STRUCTURE FOR AEP UNDERBUILD. 
348715
 
20100901
1513 
20100901
1514 
20100917
0700 
20100917
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348701
 
20100901
1512 
20100901
1514 
20100917
0700 
20100917
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348686
 
20100901
1511 
20100901
1514 
20100917
0700 
20100917
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348672
 
20100901
1509 
20100901
1510 
20100917
0700 
20100917
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348637
 
20100901
1506 
20100901
1507 
20100917
0700 
20100917
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348622
 
20100901
1459 
20100901
1505 
20100917
0700 
20100917
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348264
 
20100831
0859 
20100831
0859 
20100917
0700 
20100917
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5225_CB  CHILDRESS WEST 
PADUCAH CLARE STREET
 
Open  138  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
348257
 
20100831
0846 
20100831
0846 
20100917
0700 
20100917
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    DSC  14408  CHILDRESS 20TH ST    Close  69  CLOSE DURING OUTAGE @ W. CHILDRESS 
345904
 
20100812
0853 
20100812
0853 
20100917
0500 
20100917
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2841  LAKE CREEK SES    Open  138  replace poles and crossarms 
345898
 
20100812
0849 
20100812
0849 
20100917
0500 
20100917
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2839  LAKE CREEK SES    Open  138  replace poles and crossarms 
345886
 
20100812
0844 
20100812
0844 
20100917
0500 
20100917
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  8167  WACO LASALLE    Open  138  replace poles and crossarms 
345881
 
20100812
0841 
20100812
0841 
20100917
0500 
20100917
1400 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1280_A  WACO LASALLE  LAKE CREEK SES    138  replace poles and crossarms 
345154
 
20100806
0944 
20100826
1306 
20100917
0700 
20100917
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  4825  VELASCO    Open  138  section outage to install temp controll cables 
347147
 
20100824
0856 
20100824
0856 
20100917
0800 
20100917
1130 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  J540  SHELDON    Open  345  lube job 
346654
 
20100818
1500 
20100818
1500 
20100917
0730 
20100917
1700 
Daily  Received at ERCOT  Planned  CITY OF SAN ANTONIO, CITY PUBLIC SERVICE (TDSP)    LN  R5_T5  CAGNON  HILL COUNTRY    345  345KV TOWER FOUNDATION INSTALLATION 
347772
 
20100826
1452 
20100826
1452 
20100917
0600 
20100917
1300 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1255_C  PALESTINE SOUTH  NECHES RIVER PUMP    138  line maint 
347746
 
20100826
1412 
20100826
1412 
20100917
0700 
20100917
1700 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  T2HS  VELASCO    Open  138  section outage to install temp control cables 
347744
 
20100826
1400 
20100826
1400 
20100917
0700 
20100917
1700 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P890  VELASCO    Open  138  section outage to install temp control cables 
347743
 
20100826
1358 
20100826
1358 
20100917
0700 
20100917
1700 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P880  VELASCO    Open  138  section outage to install temp control cables 
347740
 
20100826
1341 
20100826
1341 
20100917
0700 
20100917
1700 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  6027  VELASCO    Open  138  section outage to install temp control cables 
348188
 
20100830
1354 
20100830
1354 
20100917
0700 
20100917
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
345175
 
20100806
0944 
20100826
1309 
20100917
0700 
20100917
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P380  VELASCO    Open  138  section outage to install temp controll cables 
345174
 
20100806
0943 
20100826
1310 
20100917
0700 
20100917
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  P390  VELASCO    Open  138  section outage to install temp controll cables 
348467
 
20100901
0805 
20100901
0805 
20100917
0700 
20100917
1230 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  H060  TH WHARTON    Open  138  doble 
348461
 
20100901
0802 
20100901
0802 
20100917
0700 
20100917
1230 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  U100  SAUER    Open  138  doble 
348460
 
20100901
0801 
20100901
0801 
20100917
0700 
20100917
1230 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  J830  JEANETTA    Open  345  doble 
342556
 
20100715
0907 
20100726
1538 
20100917
0700 
20100917
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_WOOLRI1  BARNEY DAVIS  WOOLDRIDGE    138  install foundations for new structures 
342541
 
20100715
0906 
20100726
1538 
20100917
0700 
20100917
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_PHARAO1  BARNEY DAVIS  PHAROAH    138  install foundations for new structures 
348303
 
20100831
0912 
20100831
0912 
20100917
0700 
20100917
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  5815  CHILDRESS WEST 
HENRY
 
Open  69  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
348302
 
20100831
0856 
20100831
0856 
20100917
0700 
20100917
1700 
Daily  Received at ERCOT  Planned  WTU ENERGY DELIVERY COMPANY (WTU-EDC) (TDSP)    CB  3020_CB  CHILDRESS WEST    Open  69  INSTALL DISTURBANCE MONITORING EQUIPMENT AND TRIP TEST ALL PROTECTION 
347589
 
20100826
0910 
20100830
1352 
20100917
0600 
20100917
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
337302
 
20100603
1338 
20100826
0846 
20100917
0700 
20100917
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010 
326789
 
20100310
0900 
20100429
1115 
20100917
0700 
20100917
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  ADKBM_24  BRITMOORE  ADDICKS    138  FOUNDATION WORK - OUTAGE FOR THERMAL UPPRATE 
326772
 
20100310
0832 
20100429
1109 
20100918
0700 
20100918
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  ADKBM_09  BRITMOORE  ADDICKS    138  FOUNDATION WORK - OUTAGE FOR THERMAL UPRATE 
342542
 
20100715
0906 
20100726
1538 
20100918
0700 
20100918
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_PHARAO1  BARNEY DAVIS  PHAROAH    138  install foundations for new structures 
348673
 
20100901
1509 
20100901
1510 
20100918
0700 
20100918
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348638
 
20100901
1506 
20100901
1507 
20100918
0700 
20100918
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348623
 
20100901
1459 
20100901
1505 
20100918
0700 
20100918
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
347390
 
20100825
1010 
20100825
1010 
20100918
0600 
20100927
2000 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6030_A  SWEETWATER GENERATING PLANT  LONG CREEK SWITCHING STATION    345  Contractor will be erecting the Station DEs and transferring conductor to new station-Sweetwater East. This outage will limit the wind farm connected at Champion Creek to flow towards Morgan Crk. for the duration of the outage. 
347389
 
20100825
1006 
20100825
1006 
20100918
0600 
20100927
2000 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6026_A  ABILENE MULBERRY CREEK  BITTER CREEK    345  Contractor will be erecting the Station DEs and transferring conductor to new station-Sweetwater East. This outage will limit the wind farm connected at Bitter Creek to flow towards Morgan Crk. for the duration of the outage. 
348209
 
20100830
1354 
20100830
1354 
20100918
0700 
20100918
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
342557
 
20100715
0907 
20100726
1538 
20100918
0700 
20100918
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_WOOLRI1  BARNEY DAVIS  WOOLDRIDGE    138  install foundations for new structures 
347590
 
20100826
0910 
20100826
0912 
20100918
0600 
20100918
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
338832
 
20100615
1509 
20100803
0932 
20100918
1715 
20101105
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  HK_RB_58  HOCKLEY  RACOON BEND    69  REHAB LINE 
334556
 
20100511
0538 
20100511
0541 
20100918
0700 
20100918
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL 
348716
 
20100901
1513 
20100901
1514 
20100918
0700 
20100918
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348702
 
20100901
1512 
20100901
1514 
20100918
0700 
20100918
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348687
 
20100901
1511 
20100901
1514 
20100918
0700 
20100918
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
326790
 
20100310
0900 
20100429
1116 
20100918
0700 
20100918
1700 
Daily  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  ADKBM_24  BRITMOORE  ADDICKS    138  FOUNDATION WORK - OUTAGE FOR THERMAL UPPRATE 
334557
 
20100511
0538 
20100511
0541 
20100919
0700 
20100919
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL 
342543
 
20100715
0906 
20100726
1538 
20100919
0700 
20100919
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_PHARAO1  BARNEY DAVIS  PHAROAH    138  install foundations for new structures 
348624
 
20100901
1459 
20100901
1505 
20100919
0700 
20100919
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348717
 
20100901
1513 
20100901
1514 
20100919
0700 
20100919
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348703
 
20100901
1512 
20100901
1514 
20100919
0700 
20100919
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348688
 
20100901
1511 
20100901
1514 
20100919
0700 
20100919
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348674
 
20100901
1509 
20100901
1510 
20100919
0700 
20100919
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348639
 
20100901
1506 
20100901
1507 
20100919
0700 
20100919
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348210
 
20100830
1354 
20100830
1354 
20100919
0700 
20100919
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
342558
 
20100715
0907 
20100726
1538 
20100919
0700 
20100919
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_WOOLRI1  BARNEY DAVIS  WOOLDRIDGE    138  install foundations for new structures 
347591
 
20100826
0910 
20100826
0912 
20100919
0600 
20100919
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
308838
 
20090927
1542 
20100211
1446 
20100920
1000 
20100923
1600 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  OCB_395_CB  HOLDER 
BROWNWOOD SWITCH
 
Open  69  Upgrade CB. 
348339
 
20100831
1237 
20100831
1243 
20100920
0700 
20101001
1600 
Continuous  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  SP_607CS  SEAHOLM    Open  138  Sub station LTC maintenance / testing SNT1 transformer. 
348718
 
20100901
1513 
20100901
1516 
20100920
0900 
20100920
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348704
 
20100901
1512 
20100901
1516 
20100920
0900 
20100920
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348689
 
20100901
1511 
20100901
1516 
20100920
0900 
20100920
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348675
 
20100901
1509 
20100901
1515 
20100920
0900 
20100920
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  MOS_497  CAMP GARY    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348640
 
20100901
1506 
20100901
1506 
20100920
0900 
20100920
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348625
 
20100901
1459 
20100901
1505 
20100920
0900 
20100920
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348607
 
20100901
1402 
20100901
1402 
20100920
0700 
20100920
1700 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  CC_944_CB  CARSON CREEK 
PILOT KNOB
 
Open  138  Clearance for drilling and installing cages. 
348606
 
20100901
1401 
20100901
1401 
20100920
0700 
20100920
1700 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    LN  CKT_944  CARSON CREEK  PILOT KNOB    138  Clearance for drilling and installing cages. 
343727
 
20100726
1529 
20100817
1449 
20100920
0800 
20100923
1700 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  AGN_WTH  WEATHERFORD SWITCH  AGNES SWITCH    138  Upgrade Weatherford Switch CB 1304. 
346503
 
20100817
1422 
20100817
1422 
20100920
1000 
20100926
2000 
Continuous  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    DSC  17  COLETO CREEK    Open  345  #2-345-138 XFMR OUTAGE TO REPAIR OIL LEAKS. 
346501
 
20100817
1421 
20100817
1421 
20100920
1000 
20100926
2000 
Continuous  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  200_CB  COLETO CREEK    Open  13.8  #2-345-138 XFMR OUTAGE TO REPAIR OIL LEAKS. 
346500
 
20100817
1421 
20100817
1421 
20100920
1000 
20100926
2000 
Continuous  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  30  COLETO CREEK    Open  138  #2-345-138 XFMR OUTAGE TO REPAIR OIL LEAKS. 
346499
 
20100817
1421 
20100817
1421 
20100920
1000 
20100926
2000 
Continuous  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  20  COLETO CREEK    Open  138  #2-345-138 XFMR OUTAGE TO REPAIR OIL LEAKS. 
343880
 
20100727
1311 
20100902
1306 
20100920
0700 
20100925
1800 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  FAL_DOM  FALLCREEK  DOMINO    138  Reroute line into new Domino Sub and remove existing reroute. 
343879
 
20100727
1311 
20100902
1306 
20100920
0700 
20100925
1800 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    LN  DOM_WPL  WAPLES  DOMINO    138  Reroute line into new Domino Sub and remove existing reroute. 
343539
 
20100723
0941 
20100831
1016 
20100920
0700 
20100922
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  T3HS  ANBUSH    Open  138  MAINT AT ANBUSH 
346502
 
20100817
1421 
20100817
1421 
20100920
1000 
20100926
2000 
Continuous  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  210_CB  COLETO CREEK    Open  13.8  #2-345-138 XFMR OUTAGE TO REPAIR OIL LEAKS. 
346877
 
20100820
1023 
20100820
1023 
20100920
0800 
20100928
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1010_B  WACO NORTHEAST TAP  BELLMEAD    138  replACE CB 3020 and add lightning arresters 
343541
 
20100723
0942 
20100831
1016 
20100920
0700 
20100922
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  B840  ANBUSH    Open  138  MAINT AT ANBUSH 
343540
 
20100723
0942 
20100831
1016 
20100920
0700 
20100922
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  B820  ANBUSH    Open  138  MAINT AT ANBUSH 
348211
 
20100830
1354 
20100830
1354 
20100920
0700 
20100920
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
346949
 
20100820
1609 
20100820
1609 
20100920
0800 
20100929
1800 
Continuous  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  5180  SAN DIEGO 
FREER
 
Open  69  Open 69 KV CB 5180 to solve contingency problem while having the clearance on the Lobo - Bruni 138 KV line 
341992
 
20100712
0831 
20100721
1528 
20100920
0700 
20100927
0645 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  5045  WEST COLUMBIA    Open  138  REHAB WORK 
337792
 
20100607
0835 
20100901
1455 
20100920
0900 
20100920
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL CANCELED: DUE TO RIGHT OF WAY ISSUE DUE TO CROPS. PER BEN VOIGHT. 9/1/2010 
334558
 
20100511
0538 
20100603
1347 
20100920
0900 
20100920
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL 
331566
 
20100420
1541 
20100812
1211 
20100920
0800 
20101015
1800 
Continuous  Cancelled  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  DIL_DIL9  DILLEY SUB  DILLEY SWITCH CSW    69  double circuit line 
335260
 
20100517
1400 
20100721
1531 
20100920
0700 
20100927
0645 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  NEWTGF04  TEXAS GULF SULPHUR  NEW GULF    138  REHAB WORK 
345972
 
20100812
1246 
20100812
1246 
20100920
0700 
20100924
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  5121  WICHITA FALLS NORTH TU    Open  69  Outage to replace circuit breaker 5120. 
345971
 
20100812
1246 
20100812
1246 
20100920
0700 
20100924
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  5119  WICHITA FALLS NORTH TU    Open  69  Outage to replace circuit breaker 5120. 
345970
 
20100812
1245 
20100812
1245 
20100920
0700 
20100924
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  5120  WICHITA FALLS NORTH TU    Open  69  Outage to replace circuit breaker 5120. 
345969
 
20100812
1240 
20100812
1240 
20100920
0600 
20101003
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    CB  CB_1196  WALNUT SPRINGS TU    Open  69  Outage to repair transformer leaks, remove oil and re-gasket . 
345968
 
20100812
1240 
20100812
1240 
20100920
0600 
20101003
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  DISC1197  WALNUT SPRINGS TU    Open  69  Outage to repair transformer leaks, remove oil and re-gasket . 
345967
 
20100812
1240 
20100812
1240 
20100920
0600 
20101003
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  DISC1195  WALNUT SPRINGS TU    Open  69  Outage to repair transformer leaks, remove oil and re-gasket . 
345966
 
20100812
1240 
20100812
1240 
20100920
0600 
20101003
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  AS_1077  WALNUT SPRINGS TU    Open  138  Outage to repair transformer leaks, remove oil and re-gasket . 
345965
 
20100812
1239 
20100812
1239 
20100920
0600 
20101003
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  AS_1076  WALNUT SPRINGS TU    Open  69  Outage to repair transformer leaks, remove oil and re-gasket . 
345944
 
20100812
1035 
20100812
1035 
20100920
0800 
20101015
1800 
Continuous  Received at ERCOT  Planned  SOUTH TEXAS ELECTRIC COOPERATIVE INC (TDSP)    LN  DER_DILL  DILLEY SUB  DERBY SUB    69  double circuit line 
326829
 
20100310
1100 
20100617
1048 
20100920
0700 
20100925
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  G220  UNIVERSITY REIT    Open  138  INSTALL WAVE TRAP CCVTs TUNER AND PANEL 6/17/2010 - CANCELLED OUTAGE PER ERCOT'S' REQUEST DUE TO N-1 CRITERIA LOAD STUDY 
326828
 
20100310
1058 
20100617
1047 
20100920
0700 
20100925
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  3915  UNIVERSITY REIT    Open  138  INSTALL WAVE TRAP CCVTs TUNER AND PANEL 6/17/2010 - CANCELLED OUTAGE PER ERCOT'S' REQUEST DUE TO N-1 CRITERIA LOAD STUDY 
326727
 
20100310
1055 
20100617
1046 
20100920
0700 
20100925
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  ES_UN_91  UNIVERSITY REIT  EASTSIDE    138  REPLACE LINE EQUIPMENT 6/17/2010 - CANCELLED OUTAGE PER ERCOT'S' REQUEST DUE TO N-1 CRITERIA LOAD STUDY 
326726
 
20100310
1052 
20100617
1044 
20100920
0700 
20100925
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    DSC  T2HS  EASTSIDE    Open  138  INSTALL WAVE TRAP CCVTs TUNER AND PANEL 6/17/2010 - CANCELLED OUTAGE PER ERCOT'S' REQUEST DUE TO N-1 CRITERIA LOAD STUDY 
326725
 
20100310
1051 
20100617
1043 
20100920
0700 
20100925
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  CB10  EASTSIDE    Open  138  INSTALL WAVE TRAP CCVTs TUNER AND PANEL 6/17/2010 - CANCELLED OUTAGE PER ERCOT'S' REQUEST DUE TO N-1 CRITERIA LOAD STUDY 
326724
 
20100310
1050 
20100617
1043 
20100920
0700 
20100925
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  4910  EASTSIDE    Open  138  INSTALL WAVE TRAP CCVTs TUNER AND PANEL 6/17/2010 - CANCELLED OUTAGE PER ERCOT'S' REQUEST DUE TO N-1 CRITERIA LOAD STUDY 
326723
 
20100310
1045 
20100830
0930 
20100920
0700 
20100925
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    LN  ADKBM_24  BRITMOORE  ADDICKS    138  THERMAL UPRATE 
326819
 
20100310
1059 
20100617
1047 
20100920
0700 
20100925
1700 
Continuous  Cancelled  Planned  RELIANT ENERGY HL&P (TDSP)    CB  G200  UNIVERSITY REIT    Open  138  INSTALL WAVE TRAP CCVTs TUNER AND PANEL 6/17/2010 - CANCELLED OUTAGE PER ERCOT'S' REQUEST DUE TO N-1 CRITERIA LOAD STUDY 
345963
 
20100812
1239 
20100812
1239 
20100920
0600 
20101003
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    XF  AXFMR2  WALNUT SPRINGS TU      69  Outage to repair transformer leaks, remove oil and re-gasket . 
348135
 
20100830
1043 
20100830
1043 
20100920
0800 
20100920
1000 
Daily  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    CB  8530_CB  LON HILL 
KOCH HEARNS FERRY
 
Close  138  testing 
348564
 
20100901
1402 
20100901
1402 
20100920
0700 
20100920
1700 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  PK_944_CB  PILOT KNOB 
CARSON CREEK
 
Open  138  Clearance for drilling and installing cages. 
346948
 
20100820
1604 
20100820
1604 
20100920
0800 
20100929
1800 
Continuous  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  LAQUIN_LOBO1  LAQUINTA  LOBO     138  CUT IN NEW LA QUINTA SWITCHING STATION AND THE CEDRO HILL WF BETWEEN LOBO & BRUNI MEC AND RELAY CHANGEOUT AT LOBO 
346947
 
20100820
1604 
20100820
1604 
20100920
0800 
20100927
1200 
Continuous  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  BRUNI_LAQUIN1  BRUNI SUB  LAQUINTA    138  CUT IN NEW LA QUINTA SWITCHING STATION AND THE CEDRO HILL WF BETWEEN LOBO & BRUNI MEC AND RELAY CHANGEOUT AT LOBO 
346946
 
20100820
1603 
20100820
1603 
20100920
0800 
20100927
1200 
Continuous  Received at ERCOT  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  BRU_MECB  BRUNI  BRUNI SUB    138  CUT IN NEW LA QUINTA SWITCHING STATION AND THE CEDRO HILL WF BETWEEN LOBO & BRUNI MEC AND RELAY CHANGEOUT AT LOBO 
342559
 
20100715
0907 
20100726
1538 
20100920
0700 
20100920
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_WOOLRI1  BARNEY DAVIS  WOOLDRIDGE    138  install foundations for new structures 
342544
 
20100715
0906 
20100726
1538 
20100920
0700 
20100920
1900 
Daily  Cancelled  Planned  CPL ENERGY DELIVERY COMPANY (CPL-EDC) (TDSP)    LN  B_DAVI_PHARAO1  BARNEY DAVIS  PHAROAH    138  install foundations for new structures 
346897
 
20100820
1023 
20100820
1023 
20100920
0800 
20100928
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1010_C  WACO NORTHEAST TAP  WACO EAST    138  replACE CB 3020 and add lightning arresters 
347376
 
20100825
1149 
20100831
0831 
20100920
0600 
20100926
2000 
Continuous  Cancelled  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  6009_A  WILLOW CREEK SWITCH  PARKER SWITCH    345  Outage to erect towers and pull wire for line reconductor. 
347592
 
20100826
0910 
20100830
1352 
20100920
0600 
20100920
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
337366
 
20100603
1349 
20100826
0851 
20100920
0700 
20100920
1730 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  126T153  LOCKHART  RED ROCK    138  OVERHAUL Note: WORK COMPLETED EARLY. PER STEVE BECK. 8/25/2010 
323762
 
20100211
1451 
20100902
1351 
20100920
0800 
20100923
1700 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  CB_1304  WEATHERFORD SWITCH    Open  138  Upgrade CB. 
323644
 
20100210
1545 
20100211
1446 
20100920
0800 
20100923
1700 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  CB_1304  WEATHERFORD SWITCH    Open  138  Upgrade CB. 
334559
 
20100511
0538 
20100603
1347 
20100921
0700 
20100921
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  519T519  LOCKHART  REEDVILLE TAP    69  LINE OVERHAUL 
348905
 
20100902
1325 
20100902
1325 
20100921
0700 
20100921
1230 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  H240  WA PARISH    Open  138  DOBLE 
348719
 
20100901
1513 
20100901
1513 
20100921
0700 
20100921
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10789  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348705
 
20100901
1512 
20100901
1512 
20100921
0700 
20100921
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    DSC  DSW_10791  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348690
 
20100901
1511 
20100901
1511 
20100921
0700 
20100921
1630 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    CB  CB_10790  SAN MARCOS    Close  69  CLEAR CAMP GARY-SAN MARCOS 138 KV LINE T-220 FOR OVERHAUL 
348626
 
20100901
1459 
20100901
1505 
20100921
0700 
20100921
1630 
Daily  Cancelled  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  150T220  CAMP GARY  SAN MARCOS    69  CLEAR CB 6220 FOR OPERATOR MAINTENANCE 
348142
 
20100830
1058 
20100830
1058 
20100921
0700 
20100921
1600 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  2336  CROCKETT TU    Close  138  line maint. close at Crockett 
348141
 
20100830
1057 
20100830
1057 
20100921
0700 
20100921
1600 
Daily  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    LN  1230_D  CENTERVILLE I45  PLEASANT SPRINGS TU    138  line maint. close at Crockett 
343730
 
20100726
1531 
20100728
1000 
20100921
0800 
20100922
1600 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  790  WEATHERFORD SWITCH 
ORAN TU
 
Open  138  Upgrade CB 1304, replace line and bus side disconnects. 
343729
 
20100726
1531 
20100728
1000 
20100921
0800 
20100922
1600 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  780  WEATHERFORD SWITCH 
FLAT ROCK TAP
 
Open  138  Upgrade CB 1304, replace line and bus side disconnects. 
348340
 
20100831
1238 
20100831
1239 
20100921
0700 
20100921
1500 
Daily  Received at ERCOT  Planned  CITY OF AUSTIN DBA AUSTIN ENERGY (TDSP)    CB  OC_950  ONION CREEK    Open  138  Sub station GCB maintenance / testing. 
348914
 
20100902
1340 
20100902
1340 
20100921
0700 
20100921
1230 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  C300  CROCKETT REIT    Open  138  DOBLE 
348913
 
20100902
1337 
20100902
1337 
20100921
0700 
20100921
1230 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  C490  ADDICKS    Open  138  DOBLE 
343728
 
20100726
1531 
20100728
1000 
20100921
0800 
20100922
1600 
Continuous  Cancelled  Planned  BRAZOS ELECTRIC POWER COOPERATIVE INC (TDSP)    CB  1550  WEATHERFORD SWITCH    Open  138  Upgrade CB 1304, replace line and bus side disconnects. 
347030
 
20100823
0613 
20100823
0613 
20100921
0700 
20100927
1700 
Continuous  Received at ERCOT  Planned  TEXAS-NEW MEXICO POWER COMPANY    DSC  239_01  HEIGHTS SUB    Open  138  Centerpoint energy requesting an outage on line 138-3-2 
347145
 
20100824
0844 
20100824
0844 
20100921
0800 
20100921
1130 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  G050  CHANNELVIEW    Open  138  lube job 
348212
 
20100830
1354 
20100830
1354 
20100921
0700 
20100921
1730 
Daily  Received at ERCOT  Planned  LOWER COLORADO RIVER AUTHORITY (TDSP)    LN  271T153  RED ROCK  HILBIG    138  OVERHAUL 
347168
 
20100824
0846 
20100824
0846 
20100921
1200 
20100921
1600 
Daily  Received at ERCOT  Planned  RELIANT ENERGY HL&P (TDSP)    CB  G060  CHANNELVIEW    Open  138  lube job 
347616
 
20100826
1040 
20100826
1040 
20100921
0600 
20100922
1700 
Continuous  Received at ERCOT  Planned  TXU ELECTRIC COMPANY (TDSP)    DSC  6098&n